Problem 6
Sample Sample Mean Range1 12.1 0.72 11.8 0.43 12.3 0.64 11.5 0.45 11.6 0.9
Sum 59.3 3.0Mean 11.9 0.6
![Page 3: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/3.jpg)
9.115
3.55
5
6.115.113.128.111.12
5,6
k
XX
kn
X-bar Chart
![Page 4: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/4.jpg)
1.12
)6.0(48.09.11
6.11
)6.0(48.09.11
2
2
RAXUCL
RAXLCL
X-bar Chart
![Page 5: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/5.jpg)
X-bar Chart
X-bar Chart
11
11.5
12
12.5
1 2 3 4 5
LCL
UCL
CL
Mean
![Page 6: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/6.jpg)
X-bar Chart
• A special cause occurred on the 3rd and 4th samples.
• Therefore, the X-bar chart is not in control.• The process mean is unstable and,
consequently, not predictable.• Consequently, it is impossible to get a
valid estimate of the mean.• The operators are responsible for finding
and correcting or institutionalizing special causes.
![Page 7: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/7.jpg)
6.0
5
3
5
9.04.06.04.07.0
k
RR
R Chart
![Page 8: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/8.jpg)
2.1
)6.0(2
0
)6.0(0
UCL
LCL
2
0
6
4
3
D
D
n
R Chart
![Page 9: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/9.jpg)
R Chart
0
0.5
1
1.5
1 2 3 4 5
LCL
UCL
R-bar
Range
R Chart
![Page 10: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/10.jpg)
R Chart
• The R chart is in control
• The process variance is therefore stable and predictable.
• The variance can be estimated as
24.03
6)6.0)(48.0(
3ˆ 2
nRA
![Page 11: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/11.jpg)
Fraction Defective
• Assume that USL = 12.5 ounces and LSL = 11.5 ounces.
• If the mean was in control and centered on the target of 12 ounces, the fraction defective would be
![Page 12: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/12.jpg)
0.0376.4812]-2[.5 defectiveFraction
4812.)08.2(
08.224.
125.12ˆ
Area
XUSLz
Fraction Defective
![Page 13: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/13.jpg)
Sample n X p=X/n1 20 1 0.052 20 3 0.153 20 2 0.14 20 1 0.055 20 4 0.26 20 1 0.057 20 2 0.18 20 0 09 20 3 0.1510 20 1 0.05
Sum 0.9p-bar 0.09
Problem 8 (a)
![Page 14: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/14.jpg)
10
20
k
n
09.010
90.0
k
pp
n
pppLCL
n
pppUCL
)1(3
)1(3
0102.0.20
)09.1(09.309.
282.020
)09.1(09.309.
Problem 8 (a)
![Page 15: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/15.jpg)
p Chart
0
0.05
0.1
0.15
0.2
0.25
0.3
1 2 3 4 5 6 7 8 9 10
Sample
p
p=X/n
LCL
UCL
p-bar
Problem 8 (a)
![Page 16: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/16.jpg)
Problem 8 (a)
• All the sample fraction defectives fall within the control limits and form a random pattern.
• The process appears in control.
• We can therefore estimate the process fraction defective.
• Our best estimate is the p-bar of .09.
![Page 17: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/17.jpg)
Problem 8 (a)
• Thus, 9% of the tires produced are defective.
• Since the process is stable, management action is required to improve the process by reducing the fraction defective.
• On Day 8, no defective tires were found.• Since this point is on the LCL, it should be
investigate for a special cause, which may have a favorable impact on the fraction defective.
![Page 18: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/18.jpg)
Day n X p=X/n LCL UCL p-bar11 20 6 0.3 0 0.282 0.0912 20 3 0.15 0 0.282 0.0913 20 3 0.15 0 0.282 0.0914 20 4 0.2 0 0.282 0.09
Problem 8 (b)
The sample fraction defective on Day 11 falls above the UCL. The process fraction defective isTherefore out of control. The underlying special cause has an unfavorable affect on the processbecause it shifted the process fraction defective upward.
![Page 19: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/19.jpg)
Week c c-bar1 4 4.42 5 4.43 6 4.44 6 4.45 3 4.46 2 4.47 6 4.48 7 4.49 3 4.410 4 4.411 3 4.412 4 4.4
Sum c 53c-bar 4.4
Problem 10
4.4
12
53
k
cc
![Page 20: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/20.jpg)
72.10
4.434.4
3
0or 89.1
4.434.4
3
ccUCL
ccLCL
c-Chart – Control Limits
![Page 21: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/21.jpg)
c-Chart
0
2
4
6
8
10
12
1 2 3 4 5 6 7 8 9 10 11 12
Week
c, n
um
be
r o
f d
efe
cts
c
LCL
UCL
c-bar
![Page 22: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/22.jpg)
Interpretation of Chart
• The process is in control.
• Each billing statement contains on average 4.4 errors, which is unacceptably high.
• Since the process is in control, management action is required to improve the process by reducing the average number of errors.
![Page 23: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/23.jpg)
39.1
)12.0(6
5.95.10
ˆ6
LSLUSL
Cp
Problem 21
Since the capability index is greater than 1, the process is capable.
![Page 24: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/24.jpg)
17.4
)39.1(3
3
Cpz
Problem 21
Process fraction defective = .00003, or 3 outof every 100,000 bottles will be out of spec.
![Page 25: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/25.jpg)
Problem 21
The index assumes that the process is on target. However, the process is not on target. Therefore,we should compute CT.
z was computed using the NORMSDIST in Excel.
.
=2*NORMSDIST(G26)
-4.17 0.000030526
G
![Page 26: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/26.jpg)
.00003
0-4.17 z
.00003
4.17
NORMSDIST(G26) = Area under curve to left of z
Problem 21
USLLSL
![Page 27: Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6](https://reader035.vdocument.in/reader035/viewer/2022081421/56649d815503460f94a65e7a/html5/thumbnails/27.jpg)
71.0
)108.9()12.0(6
5.95.10
Target)(ˆ6
2
2
X
LSLUSLCT
Problem 21