CHAPTER#11MATHEMATICAL MODELS FOR ENGINEERING MANAGEMENT DECISION MAKING
Lecture No. 14 Course: Engineering Management
MED DEPARTMENT, U.E.T TAXILA
COURSE INSTRUCTOR : PROF. DR. SHAHAB KHUSHNOOD
![Page 2: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/2.jpg)
INTRODUCTION
Mathematical Model is used to provide useful input factors in engineering
management decision making. The models in this chapter basically fall into the following three areas.
1- Cost-Capacity.
2- Financial Investment Modeling.
3- Equipment Repair.
![Page 3: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/3.jpg)
Large Plant Investment Decision Models
Model 1:• This model is known as cost capacity model.• In this model it is assumed that for equipment
or a plant under consideration, cost data on similar equipment or plant of different capacity is available.
• Thus the cost of a new equipment or plant, Kn, under consideration may be calculated by utilizing the following equation
![Page 4: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/4.jpg)
Large Plant Investment Decision Models (Cont...)
WhereKs is the known cost of the similar plant or
equipment of capacity Cs
Cs is he known capacity of similar plant or equipment
Cn is the capacity of the new plant or equipment under consideration
β is the cost capacity factor
![Page 5: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/5.jpg)
Example # 1
Solution:
![Page 6: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/6.jpg)
Large Plant Investment Decision Models (Cont...)
Model 2:• This model is known as the Cost Index.• This is used for comparison purposes.• A cost index for a specified period or time
shows the cost at that time in relation to a given base year.
• Thus the following formula is used to predict present, future or past cost.
![Page 7: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/7.jpg)
Model 2 (Cont.…)
WhereKr denotes the original reference cost.
Kpfp denotes the present, future or past cost.
Ir denotes the value of the index.
Ipfp denotes the present, future or time value of the index.
![Page 8: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/8.jpg)
Model 2 (Cont.…)• The main advantage of this cost index is that it allows
the estimator to predict the cost of the similar product design from the past time to the present or future period, without going into extensive cost analysis.
• To estimate the value of the index, Ipfp, the commonly used method is known as the “Weighted Arithmetic
Technique”.• Thus for m times, the index, Ipfp, is defined as follows:
![Page 9: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/9.jpg)
Model 2 (Cont.…)
WhereK1i denotes, for the first year, the cost of ith term; for
i=1,2,3,…….,m.K0i denotes, for the base year, the cost of the i th item;
for i=1,2,3,…..,m.• The above equation is known as the Simple Index
because it treats all items in question equally.
![Page 10: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/10.jpg)
Model 2 (Cont.…)• This equation can be modified by assigning a
weight to each item as follows:
Where Wi denotes the i th term weight; for
i= 1,2,3,…,m.
![Page 11: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/11.jpg)
Example # 2
Solution:
![Page 12: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/12.jpg)
Financial Investment Modeling• This is one mathematical model to determine the
optimum area to be saved by a warehouse.• It is generally accepted that as the volume of
goods in a warehouse increases, the warehousing costs per dollar’s worth of goods decreases.
• In this model, it is assumed that a company has a number of warehouses.
• If company increases the size of its warehouses, the number of warehouses required and good warehousing costs would be reduced in return.
![Page 13: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/13.jpg)
Financial Investment Modeling (Cont.…)
• Thus, the cost, K, per dollar’s worth of goods distributed in the warehouse district boundaries is given by
WhereK1 denotes the operating costs of the warehouse
K2 denotes the goods delivery costs
K3 denotes the fixed costs
![Page 14: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/14.jpg)
Financial Investment Modeling (Cont.…)
However, K1, and K2 are given by
K1 = Kf/v
Where Kf denotes the warehouse operation fixed costs
v denotes the volume of goods per unit of timeThe volume must be given in dollars and
K2 = Kv (a)1/2
Where a denotes the area of the district, in square miles, to
which warehouse distributes its goods.
![Page 15: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/15.jpg)
Financial Investment Modeling (Cont.…)
Kv denotes that cost which is assumed to vary with.
The relationship, R, between volume and the area served is defined by
R = v/aPutting the value of v into K1 = Kf/v gives
K1= Kf/aR
Putting these values into the equation of “K” givesK=Kf/aR +Kv +K3 ………………………………..(A)
![Page 16: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/16.jpg)
Financial Investment Modeling (Cont.…)
• In order to minimize the cost, K, differentiate equation “A” with respect to “a” and set the resulting expression equal to zero as follows
• Rearranging this equation leads to the following equation for the optimum value
![Page 17: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/17.jpg)
Engineering Equipment Repair Facility Decision Models
Model 1:• This model is known as the single channel, single
phase queuing model with infinite population.• The repair time t1, to repair a single piece of
equipment is less than the time between arrivals, t2.
• Because of no queue forms, the lost time or the waiting time has the same value as the servicing time, t1.
![Page 18: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/18.jpg)
Engineering Equipment Repair Facility Decision Models (Cont.…)
• Thus, the total variable cost, K, per unit time is given by
Where K1 denotes the repair cost per unit time
K2 denotes the waiting cost per unit time
![Page 19: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/19.jpg)
Model 1 (Cont.…)Ks denotes the repair cost of a single piece of equipment. This cost does not include the cost of materials used for repair but includes the cost for maintaining the repair facility.Kwt denotes the cost of waiting per piece of equipment per unit time
By assuming that the repair time is an independent variable, we differentiate above equation with respect to t1 as follows
dKt/dt1 = -Ks/t12 + Kwt/t1…………………(1)
To obtained the minimum value of Kt by setting the derivative in equation “1” equal to zero yields
![Page 20: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/20.jpg)
Model 1 (Cont.…)Rearranging gives
Where t1* is the optimum repair or service time.
By putting the values into equation of “Kt” leads to the optimum value of
![Page 21: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/21.jpg)
Example # 3
![Page 22: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/22.jpg)
Solution:
![Page 23: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/23.jpg)
Engineering Equipment Repair Facility Decision Models (Cont.…)
Model 2:• This model is the result of further
development on Model 1.• The only difference between this Model and
Model 1 is that this one has “M” service or repair channels instead of only one.
![Page 24: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/24.jpg)
Model 2 (Cont.…)• Thus, one can write directly the equation for the
“M” channel arrangement total variable cost, Kmt, per unit time as follows
where θ= t1/t2
![Page 25: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/25.jpg)
Model 2 (Cont.…)
Setting the derivative of this equation equal to zero results in
Rearranging gives
![Page 26: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/26.jpg)
Model 2 (Cont.…)
Where “t1
*” denotes the optimum value of “t1”
Substituting this equation for “t1” gives
Where “Kmt” denotes the optimum value of “Kmt”.
![Page 27: Chapter#11 Mathematical Models FOR engineering Management Decision Making](https://reader035.vdocument.in/reader035/viewer/2022062410/5681578f550346895dc522b6/html5/thumbnails/27.jpg)
THANKS