Summary Purpose is to outline the Airports five year needs for
development construction and staffing bull Airport BackgroundGovernanceUpdates bull Airline Industry Overview bull Airport Developments
bull Proposed Capital Improvement Projects bull Financial Analysis
bull Airline Rates and Charges bull Proposed Funding Options
bull Staffing and Aircraft Rescue and Firefighting (ARFF) Analysis
Airport Governance Board of
Supervisors
Transportation and Public Works
Charles M Schulz ndash Sonoma County Airport
Aviation Commission
bull Advisory Only bull Guides Policy
Airport Land Use Commission
bull Compatible land use planning around Airport
bull Does not govern on Airport land uses
Federal Aviation Administration
bull Grant Assurances bull Advisory Circulars bull Operating Certificate bull Master Plan bull Airport Layout Plan bull Land Use bull Navigational Aids bull Air Traffic Control bull Grants
US Department of Transportation
bull American with Disabilities Act bull Civil Rights Act bull Passenger Rights
Caltrans
bull Airport Permit bull Airport Loan Program
Transportation Security Administration (TSA)
bull Airport Security bull Badging Requirements bull Airline Security bull Threat Assessments
Airport Background The County of Sonoma purchased the land for the Airport in 1939 and
opened in 1941
The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway
The Airport encompasses approximately 1200 acres
The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle
Since 2007 Horizon AirAlaska has carried over 18 million passengers
The Board approved the Airportrsquos Master Plan in January 2012
Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights
There are 385 aircraft based at STS
The tenants of the Airport generate over $15 million in possessory taxes annually
4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport
29 volunteer ambassadors 6 of which work alongside therapy dogs
Current Organizational Chart The Airport has 15 employees on staff
8 operations 5 administrative and 2 managers
Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution
The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015
29 based businesses (with approximately 250 based employees) including
bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations
The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants
Airport Enterprise Fund FY 15-16 Revenues and Expenditures
Revenues - $4949005 Expenditures - $4737120
Misc Utilities Industrial PFCs $252115 Wages amp
Benefits $1916170
40
Maintenance $1087180
County Svcs
$690745 15
Prof Svcs $551370
12
$239540 5 5
Aero Operations $2714595
Non-Aero Operations $1513560
31
Park $222100
4
$498750 10
55 23
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Summary Purpose is to outline the Airports five year needs for
development construction and staffing bull Airport BackgroundGovernanceUpdates bull Airline Industry Overview bull Airport Developments
bull Proposed Capital Improvement Projects bull Financial Analysis
bull Airline Rates and Charges bull Proposed Funding Options
bull Staffing and Aircraft Rescue and Firefighting (ARFF) Analysis
Airport Governance Board of
Supervisors
Transportation and Public Works
Charles M Schulz ndash Sonoma County Airport
Aviation Commission
bull Advisory Only bull Guides Policy
Airport Land Use Commission
bull Compatible land use planning around Airport
bull Does not govern on Airport land uses
Federal Aviation Administration
bull Grant Assurances bull Advisory Circulars bull Operating Certificate bull Master Plan bull Airport Layout Plan bull Land Use bull Navigational Aids bull Air Traffic Control bull Grants
US Department of Transportation
bull American with Disabilities Act bull Civil Rights Act bull Passenger Rights
Caltrans
bull Airport Permit bull Airport Loan Program
Transportation Security Administration (TSA)
bull Airport Security bull Badging Requirements bull Airline Security bull Threat Assessments
Airport Background The County of Sonoma purchased the land for the Airport in 1939 and
opened in 1941
The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway
The Airport encompasses approximately 1200 acres
The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle
Since 2007 Horizon AirAlaska has carried over 18 million passengers
The Board approved the Airportrsquos Master Plan in January 2012
Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights
There are 385 aircraft based at STS
The tenants of the Airport generate over $15 million in possessory taxes annually
4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport
29 volunteer ambassadors 6 of which work alongside therapy dogs
Current Organizational Chart The Airport has 15 employees on staff
8 operations 5 administrative and 2 managers
Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution
The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015
29 based businesses (with approximately 250 based employees) including
bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations
The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants
Airport Enterprise Fund FY 15-16 Revenues and Expenditures
Revenues - $4949005 Expenditures - $4737120
Misc Utilities Industrial PFCs $252115 Wages amp
Benefits $1916170
40
Maintenance $1087180
County Svcs
$690745 15
Prof Svcs $551370
12
$239540 5 5
Aero Operations $2714595
Non-Aero Operations $1513560
31
Park $222100
4
$498750 10
55 23
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Governance Board of
Supervisors
Transportation and Public Works
Charles M Schulz ndash Sonoma County Airport
Aviation Commission
bull Advisory Only bull Guides Policy
Airport Land Use Commission
bull Compatible land use planning around Airport
bull Does not govern on Airport land uses
Federal Aviation Administration
bull Grant Assurances bull Advisory Circulars bull Operating Certificate bull Master Plan bull Airport Layout Plan bull Land Use bull Navigational Aids bull Air Traffic Control bull Grants
US Department of Transportation
bull American with Disabilities Act bull Civil Rights Act bull Passenger Rights
Caltrans
bull Airport Permit bull Airport Loan Program
Transportation Security Administration (TSA)
bull Airport Security bull Badging Requirements bull Airline Security bull Threat Assessments
Airport Background The County of Sonoma purchased the land for the Airport in 1939 and
opened in 1941
The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway
The Airport encompasses approximately 1200 acres
The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle
Since 2007 Horizon AirAlaska has carried over 18 million passengers
The Board approved the Airportrsquos Master Plan in January 2012
Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights
There are 385 aircraft based at STS
The tenants of the Airport generate over $15 million in possessory taxes annually
4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport
29 volunteer ambassadors 6 of which work alongside therapy dogs
Current Organizational Chart The Airport has 15 employees on staff
8 operations 5 administrative and 2 managers
Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution
The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015
29 based businesses (with approximately 250 based employees) including
bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations
The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants
Airport Enterprise Fund FY 15-16 Revenues and Expenditures
Revenues - $4949005 Expenditures - $4737120
Misc Utilities Industrial PFCs $252115 Wages amp
Benefits $1916170
40
Maintenance $1087180
County Svcs
$690745 15
Prof Svcs $551370
12
$239540 5 5
Aero Operations $2714595
Non-Aero Operations $1513560
31
Park $222100
4
$498750 10
55 23
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Background The County of Sonoma purchased the land for the Airport in 1939 and
opened in 1941
The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway
The Airport encompasses approximately 1200 acres
The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle
Since 2007 Horizon AirAlaska has carried over 18 million passengers
The Board approved the Airportrsquos Master Plan in January 2012
Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights
There are 385 aircraft based at STS
The tenants of the Airport generate over $15 million in possessory taxes annually
4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport
29 volunteer ambassadors 6 of which work alongside therapy dogs
Current Organizational Chart The Airport has 15 employees on staff
8 operations 5 administrative and 2 managers
Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution
The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015
29 based businesses (with approximately 250 based employees) including
bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations
The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants
Airport Enterprise Fund FY 15-16 Revenues and Expenditures
Revenues - $4949005 Expenditures - $4737120
Misc Utilities Industrial PFCs $252115 Wages amp
Benefits $1916170
40
Maintenance $1087180
County Svcs
$690745 15
Prof Svcs $551370
12
$239540 5 5
Aero Operations $2714595
Non-Aero Operations $1513560
31
Park $222100
4
$498750 10
55 23
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Current Organizational Chart The Airport has 15 employees on staff
8 operations 5 administrative and 2 managers
Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution
The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015
29 based businesses (with approximately 250 based employees) including
bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations
The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants
Airport Enterprise Fund FY 15-16 Revenues and Expenditures
Revenues - $4949005 Expenditures - $4737120
Misc Utilities Industrial PFCs $252115 Wages amp
Benefits $1916170
40
Maintenance $1087180
County Svcs
$690745 15
Prof Svcs $551370
12
$239540 5 5
Aero Operations $2714595
Non-Aero Operations $1513560
31
Park $222100
4
$498750 10
55 23
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution
The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015
29 based businesses (with approximately 250 based employees) including
bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations
The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants
Airport Enterprise Fund FY 15-16 Revenues and Expenditures
Revenues - $4949005 Expenditures - $4737120
Misc Utilities Industrial PFCs $252115 Wages amp
Benefits $1916170
40
Maintenance $1087180
County Svcs
$690745 15
Prof Svcs $551370
12
$239540 5 5
Aero Operations $2714595
Non-Aero Operations $1513560
31
Park $222100
4
$498750 10
55 23
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Enterprise Fund FY 15-16 Revenues and Expenditures
Revenues - $4949005 Expenditures - $4737120
Misc Utilities Industrial PFCs $252115 Wages amp
Benefits $1916170
40
Maintenance $1087180
County Svcs
$690745 15
Prof Svcs $551370
12
$239540 5 5
Aero Operations $2714595
Non-Aero Operations $1513560
31
Park $222100
4
$498750 10
55 23
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle
in order to reflect changes in FAA standards the aviation market and local regulations
The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility
FAA-approved element CountyAirport input Public Input
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airfield Layout Plan Land Use and Boundaries
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Update
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Update ndash Fuel (Gallons Sold) 3000000 6000
2010 2011 2012 2013 2014 2015 000
1000
2000
3000
4000
5000
shy
500000
1000000
1500000
2000000
2500000
Gal
lons
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Update ndash Parking Revenues $1000000 5000
000
500
1000
1500
2000
2500
3000
3500
4000
4500
$shy
$100000
$200000
$300000
$400000
$500000
$600000
$700000
$800000
$900000
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Update ndash Rental Cars Revenues $6000000 4500
2010 2011 2012 2013 2014 2015
Actuals Projected Percentage Change
000
500
1000
1500
2000
2500
3000
3500
4000
$shy
$1000000
$2000000
$3000000
$4000000
$5000000
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Updates ndash Passenger Levels
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Update - HorizonAlaska Airlines
bull STS is an integral part of the Horizon AirAlaska Airlines market strategy
bull 65 of Horizon Airrsquos total capacity operates out of STS
bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)
bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)
bull Each new flight added by Horizon has quickly sold at near seat capacity
bull Other airlines have noted STSrsquos ability to absorb new seat capacity
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airline Economic Impacts of STS
bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community
bull Anticipate 14 to 16 commercial flights per day by summer of 2021
bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community
bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community
bull The average visitor to Sonoma County spends $44298 per day
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento
Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff
Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7
with travel costs $18467 34 $22354 46 $18530 35 $23950 49
Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11
with travel costs $21679 24 $23848 31 $21789 24 $25704 36
Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13
with travel costs $19540 34 $22889 43 $20842 38 $22302 42
San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6
with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data
bull HorizonAlaska airfares are competitive with other regional airports
bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Current Passengers and Growth Potential
Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential
STS-LAX 85213 372030 229 63599
STS-SAN 40265 143161 281 31316
STS-SEA 39711 113852 349 17215
STS-PDX 29638 82057 361 11391
Passenger data for YE June 30 2014
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS
Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airports Used by Sonoma County and Surrounding Area Residents
Share of Passenger Bookings ndash All Airlines
Oakland Sacramento 7 5
STS 2
San jose 1
San Francisco 85
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Percentage Share Of Passengers For Bay Area Airports By Airline
Other US AlaskaHorizon 3 American Airlines
6 13
International Delta Air Lines 13 8
Southwest Virgin America 5
4
United Airlines 48
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the
domestic airline capacity
Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United
Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS
Aircraft manufacturers are shifting production away from small (under 60 seat) jets
Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels
STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Departing Seats STS vs Similar AirportsIndexed to CY 2008
20 170
15
10
5
0
-5
-10
-15
-20
STS 81 104
46
01
-63 -52 -37
-116 -164
-136 -170 -154 -151
-169
2008 2009 2010 2011 2012 2013 2014 2015 2016
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airport Developments
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Development at STS
In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations
The Airport has four (4) signed term sheets ndash
bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)
bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations
In negotiations with Kaiser Air for a new lease to add a third hangar
Proposed improvements total over $13 million
Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airfield Layout Plan
Developable Parcels
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Capital Project Needs
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Completed Projects
bull Remodeled existing terminal in 2010 adding 5000 square feet
bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway
bull Rehabilitated the airline parking apron
bull Expanded rental car staging areas
bull Reconfigured the current long-term parking lot to expand parking spaces
bull Reconfigured and expanded the rental car return lot to double the parking spaces
bull Installed a new rental car wash system and vehicle detail area
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads
bull The service road portion of the project was removed from the main contract to match availability of federal funding
bull Construction is early FY16-17
bull Project was bid in August 2015 waiting for federal funding to award
bull Project estimate is $2 million
bull 9066 federally funded
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Runway Safety Area ndash Phase II ndash Service Roads
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets
current standards for either ARFF or ADA regulations
bull Location of current facility is in the way of long-term terminal expansion needs
bull A new location has not been selected conceptually studied in 2012 Airport Master Plan
bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements
bull Preliminary project estimate is $7 to $8 million
bull Federal funding (90) should be available for this project
bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Aircraft Rescue and Firefighting Building
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
New Long-term Parking Lot
bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers
bull The current long-term lot exceeded capacity 5 times in 2015
bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day
bull The proposed parking lot would add approximately 440 parking spaces
bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000
bull Staff is recommending construction as a single phase project
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
New long-term parking lot ndash Site location
Terminal
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Proposed Terminal Enhancement Project
bull Terminal design objectives included
bull Meeting immediate and near-term needs
bull Establish a project budget for near-term improvements that is affordable for the Airport
bull Design character that signifies its role as a gateway to the region
bull Phase expansion that does not impact current operations
bull Anticipating future needs and establish a pattern of design for future expansions
bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential
bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Existing Terminal
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Terminal Renovation ndash Phases I and II
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
New Holdroom (Phase II) ndash East Elevation
New Holdroom (Phase II) ndash South Elevation
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
New Holdroom Interior Looking East
New Holdroom Interior Looking North
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Flex Space ndash Conventional Construction ndash View from Airfield
Flex Space ndash Tent Option ndash View from Airfield
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Existing Terminal ndash View from Airfield Side
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)
Tent option Phase I
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area
Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system
Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Future Expansion ndash Estimated 2025
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Future Expansion ndash Estimated 2050
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Financial Analysis
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and
financial operations to prepare a financial forecasting model
bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years
bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees
bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments
bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Airline Rates amp Charges
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Recommended Airline Fees bull The financial report recommended airline rates and charges approximately
double current levels
bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)
bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines
bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs
bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)
bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)
Daily Service $250 per square footper month Non-daily Service $325 per square footper month
Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger
Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger
ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity
The proposed fees are anticipated to increase revenues by $250000 annually
Staff agrees with the consultantrsquos recommended airline rates and charges
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Funding Options
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021
Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds
Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021
Funding Needs
bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects
bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding
bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)
Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option
The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit
Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Staffing Analysis
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Staffing Report bull The Airport working with the Human Resources Department (HR) conducted
an assessment of staffing for current needs and forecasted Airport growth over the next five years
bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR
bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows
bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties
bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by
requirements spending approximately $220000 annually to provide ARFF coverage and training
bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category
bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)
bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year
bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage
bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances
bull Most airports similar to or larger than STS have contracted ARFF services
bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire
Airport Operations Budget 2014
Enplanement 2014
Airport Staff
Contract Fire Fire Contract Cost
Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Request for Feedback bull Long-term Parking
bull Airport Terminal Improvement Conceptual Plan
bull FundingFinancing Options
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Future Board Items bull February 9 2016
bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement
bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal
design services long-term parking lot design services and long-term parking lot construction)
bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and
integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement
bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-
Charles M Schulz - Sonoma County Airport
2290 Airport Boulevard
Santa Rosa CA 95403
(707) 565-7243
wwwsono macou ntya irportorg
Follow STS on (j Facebook
Im Linkedln
- Slide Number 1
- Summary
- Airport Governance
- Airport Background
- Current Organizational Chart
- Airport Enterprise Fund
- Airport Enterprise Fund FY 15-16 Revenues and Expenditures
- Airport Master Plan
- Airfield Layout PlanLand Useand Boundaries
- Airport Update
- Airport Update ndash Fuel (Gallons Sold)
- Airport Update ndash Parking Revenues
- Airport Update ndash Rental Cars Revenues
- Airport Updates ndash Passenger Levels
- Airport Update - HorizonAlaska Airlines
- Slide Number 16
- Fare Comparison for STS and Other Airports in the Region
- Current Passengers and Growth Potential
- Airline Industry Overview ndash Potential Markets
- Airports Used by Sonoma County and Surrounding Area Residents
- Percentage Share Of Passengers For Bay Area Airports By Airline
- Airline Industry Overview
- Slide Number 23
- Airport Developments
- Slide Number 25
- Airfield Layout PlanDevelopable Parcels
- Capital Project Needs
- Slide Number 28
- Runway Safety Area ndash Phase II ndash Service Roads
- Runway Safety Area ndash Phase II ndash Service Roads
- Aircraft Rescue and Firefighting Building
- Aircraft Rescue and Firefighting Building
- New Long-term Parking Lot
- Slide Number 34
- Proposed Terminal Enhancement Project
- Existing Terminal
- Terminal Renovation ndash Phases I and II
- New Holdroom (Phase II) ndash South Elevation
- New Holdroom InteriorLooking East
- Flex Space ndash Tent Option ndash View from Airfield
- Existing Terminal ndash View from Airfield Side
- Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
- Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
- Future Expansion ndash Estimated 2025
- Future Expansion ndash Estimated 2050
- Financial Analysis
- Slide Number 47
- Airline Rates amp Charges
- Slide Number 49
- Slide Number 50
- Funding Options
- Current Airport Debt
- Funding Options ndash Long-term
- Staffing Analysis
- Staffing Report
- Aircraft Rescue and Firefighting (ARFF) Services
- ARFF Services at Comparable Airports
- Request for Feedback
- Future Board Items
- Slide Number 60
-