LOCN SNAM TASK_NAME
8583 CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD
1858301 CHATSWORTH HS Chatsworth HS - Baseball Netting
8583CHATSWORTH SH (B LETTER) SHADE FAB/PADDING/BLEACHERS (B LTR)
8583 CHATSWORTH SH (JOC) BASEBALL NETTING (JOC)
8583CHATSWORTH SH (M&O WORK) RPR/REN ADMIN/PE BLDGS RR-POT (M&O)
• NO DETAILED DESCRIPTION• NO SPACE IDENTIFICATION• NEED FIELD CLARIFICATION• NEED PROJECT COST
![Page 3: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/3.jpg)
LOCN SNAM TASK_NAME
8583 CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD
NO NEW BUILDINGSAT SOFTBALL FIELDSINCE INITIAL SURVEY
![Page 4: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/4.jpg)
LOCN SNAM TASK_NAME
1858301 CHATSWORTH HS Chatsworth HS - Baseball Netting
8583 CHATSWORTH SH (JOC) BASEBALL NETTING (JOC)
NETTING IS NOT CAPTURED, WHAT ABOUT STEEL POSTS?
![Page 5: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/5.jpg)
LOCN SNAM TASK_NAME
8583 CHATSWORTH SH (B LETTER)SHADE FAB/PADDING/BLEACHERS (B LTR)
SHOULD THESE COMPONENTS BE SURVEYED?
![Page 6: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/6.jpg)
WE’RE ASSUMING THIS IS A RESTROOM RENOVATION WITHIN THE ADMINISTRATION AND PE BUILDING.
ASSUMING “POT” MEANS PATH OF TRAVEL, WHAT ADDITIONAL INFORMATION WILL BE NEEDED TO BE VALIDATED?
ADA FIXTURE VALIDATION.
LOCN SNAM TASK_NAME
8583 CHATSWORTH SH (M&O WORK)RPR/REN ADMIN/PE BLDGS RR-POT (M&O)
![Page 7: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/7.jpg)
THERE ARE 12 RESTROOMS IN BOTH THE ADMINISTRATION AND PE BUILDING
24016ADMINISTRATION 1 116203TOILET
24016ADMINISTRATION 1 115221TOILET
24016ADMINISTRATION 1 115137TOILET
24016ADMINISTRATION 1 116653TOILET
24016ADMINISTRATION 1 116650TOILET
23677PHYSICAL EDUCATION 1 116043TOILET
23677PHYSICAL EDUCATION 1 115883TOILET
23677PHYSICAL EDUCATION 1 113930TOILET
23677PHYSICAL EDUCATION 1 114037TOILET
23677PHYSICAL EDUCATION 1 113541TOILET
23677PHYSICAL EDUCATION 1 113540TOILET
23677PHYSICAL EDUCATION 1 112524TOILET
![Page 8: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/8.jpg)
• LIGHT FIXTURE COMPONENT HAS BEEN MODIFED FROM ORIGINAL SURVEY.• FREQUENCY FOR GLUE UP CEILING TILE IS NOW 6. SHOULD THE RSL BE UPDATED GLOBALLY?
![Page 9: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/9.jpg)
SAME AS 1 OF 12
![Page 10: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/10.jpg)
SAME AS 1 OF 12
![Page 11: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/11.jpg)
• NEW SINK - RSL NEEDS TO BE UPDATED FROM 10 TO 30.• NEW TOILET - COMPONENT NEEDS TO BE CHANGED FROM 22369 TO 22895, WITH AN RSL OF 30.
![Page 12: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/12.jpg)
• NEW SINK, TOILET, FLOOR COVERING, AND PAINT.• UPDATE RSL FOR THE GLUE UP CEILING TILE TO 0.
![Page 13: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/13.jpg)
• NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, URINALS, SINKS, PARTITIONS, AND HAND DRYER.• TWO T-12 FIXTURES HAVE BEEN REPLACED WITH THREE T-8 FIXTURES.
![Page 14: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/14.jpg)
• NEW PAINT ON THE WALLS.• NO URINAL COMPONET IN CURRENT DATA.
![Page 15: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/15.jpg)
• UPDATE CERAMIC WALL TILE RSL FROM 5 TO 35.• UPDATE CERAMIC FLOOR TILE RSL FROM 10 TO 30.• 2 MISSING 3.5 WATER CLOSET COMPONENTS IN CURRENT DATA.
![Page 16: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/16.jpg)
• UPDATE CERAMIC WALL TILE RSL FROM 5 TO 25.• UPDATE CERAMIC FLOOR TILE RSL FROM 20 TO 35.• UPDATE URINAL RSL FROM 2 TO 8.• UPDATE INTERIOR DOORS FROM 5 TO 20.
![Page 17: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/17.jpg)
DRY TOILET TRAPS TYPICAL WITHIN CLOSED BATHROOM
NO SIGNIFICANT CHANGES
![Page 18: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/18.jpg)
NO SIGNIFICANT CHANGES
![Page 19: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/19.jpg)
• NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, SINKS, PARTITIONS, LIGHTING FIXTURES, AND HAND DRYER.
![Page 20: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/20.jpg)
NEW LOCKER ROOMCOMPONENTS
![Page 21: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/21.jpg)
NEW SOLAR PANELS
![Page 22: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/22.jpg)
NEW DRINKING FOUNTAINS
![Page 23: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/23.jpg)
NEW ROOF COVERING OVER ADMINISTRATION BUILDING
![Page 24: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/24.jpg)
NEW COACH’S OFFICE
![Page 25: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/25.jpg)
WHY AREN’T OTHER PROJECTS ON THE LIST?
SHOULD THESES OTHER PROJECTS BE VALIDATED?
WHAT ARE OUR TIME CONSTRAINTS?WHAT PROCESS IS REQUIRED TO ADD
NEW BUILDINGS? REDLINE SURVEYS FOR ALL CRAFTS
![Page 26: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/26.jpg)
SERVICE CALLS A SINGLE BARD UNIT CAN BE REPLACED WITH
A SERVICE CALL. UNITS COST BETWEEN $9,500 TO $13,000.
INSTALLED COSTS CAN BE $28,000 OR MORE. SERVICE CALLS ARE UP TO 100 HOURS.
UNIT CHANGE- OUTS REQUIRE HVAC, CARPENTRY, ELECTRIC, WELDING, ETC.
![Page 27: CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth](https://reader036.vdocument.in/reader036/viewer/2022062315/5697bfe31a28abf838cb4d89/html5/thumbnails/27.jpg)
TO DATE 24 HOURS OF TIME HAS BEEN SPENT VALIDATING THESE 5 PROJECTS.
UPDATES HAVE YET TO BE MADE TO THE DATA WITH WHAT HAS BEEN FOUND.
IN ADDITION TO THE GIVEN PROJECTS LIST, WE NEED A COMPONENT REPORT OF THE ORIGINAL SURVEY SORTED BY BUILDING AND SPACE.