chazapis commissioning: are you interested in?
TRANSCRIPT
![Page 1: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/1.jpg)
Dear building Owner, or Operator, Are you interested in …
Benefits of Systems Commissioning
![Page 2: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/2.jpg)
Are you interested in Energy savings?
• You may operate a big or medium building and try to save energy, knowing the most energy inefficient equipment and think to start retrofit.
• You may plan to start with an Energy Audit.• You may never heard about Commissioning at
all.• Ask Commissioning procedures from your
Consultant.
![Page 3: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/3.jpg)
Are you interested in Indoor air quality?
• You, may have problems in your Office or Facility or Laboratory.
• You, may try to measure parameters and discover why the quality of indoor air is not acceptable.
• You, may plan your next project with strict IAQ requirements.
• Ask Commissioning procedures from your Consultant.
![Page 4: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/4.jpg)
Are you interested in LEED certification?
• You know, may be, already about Fundamental and Enhanced Commissioning.
• You have, may be, the experience of a recent project or a scheduled one.
• You, may be, interested in a prestigious certification (Gold or Platinum) for your next project.
• You may plan to upgrade your certificate.
![Page 5: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/5.jpg)
Are you interested in Post Occupancy Evaluation?
• You may operate a brand new building but you face your first problems from occupants.
• You may have not finished yet the HVAC seasonal tests.
• You may search for a protocol on P.O.E• You may face deterioration of systems
performance during the first 3-years.
![Page 6: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/6.jpg)
Are you interested in Facilities Management?
• You may think to lower OPEX with a facilities management contract (parts and labor).
• You may desire to outsource non critical operations.
• You may desire to consolidate different suppliers to a single FM provider in order to fix the budget for years.
![Page 7: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/7.jpg)
Are you interested in Internet of Things?
• You may wish to gain from Innovation and new technology inside your corporation.
• You want to re-engineer the whole communication process of people, equipment and systems.
• You may want instant automation and wide use of open protocols available in the market.
![Page 8: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/8.jpg)
Are you interested in High performing buildings?
• You may have targeted on a high performance score for your facilities.
• You may keep a benchmarking classification for all your processes (staff) and systems (equipment).
• You may score all sustainable issues: Energy – Water – Internal Environment – Occupant satisfation.
![Page 9: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/9.jpg)
Are you interested in Energy savings Performance Contracting?
• Your organization, may keep a portfolio with many existing building stock.
• You may have restrictions in you CAPEX budget and have a limited cash flow.
• You may think to initiate on a ESPC contract.• You may plan to monitor the performance of
the ESPC contract.
![Page 10: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/10.jpg)
Are you interested in Operating Expenses (OPEX) savings?
• You may consider that it is possible to lower the operating expenses as a whole: staff – energy – water – maintenance – repair – spare parts and space.
• You consider the impact of lower OPEX on higher profit margin.
• You may want to evaluate different Operation & Maintenance scenarios.
![Page 11: Chazapis Commissioning: are you interested in?](https://reader036.vdocument.in/reader036/viewer/2022082721/58e9092e1a28abc7598b5b5d/html5/thumbnails/11.jpg)
Are you interested in ISO 50001 for your organization?
• You may follow the new trend of leading Corporations.
• You may want to satisfy your environmentally conscious customers, shareholders and stakeholders.
• You may want to standardize and certify your Energy Management System inside your organization.