7/25/2019 Check Log
1/12
MODEL CHECKS
NAME LOADS
20160612_POST_PERIPHERAL_WIND0_K LOADS NOT OK.POST MOMENT MAX LO
LOAD COMBO 1 MISSIN
1.2 DEAD + 1.6 WIND
20160612_TORQUECORRELATED_PERIPHERAL_WIND0_K LOADS OK.
LOAD COMBO 1 MISSIN
1.2 DEAD + 1.6 WIND
20160612_POSTS_PERIPHERAL_WIND20_K LOAD COMBO 1 MISSIN1.2 DEAD + 1.6 WIND
LOADS ARE MORE THA
CALCULATION3 PREDIC
FOR 0KMPH
20160612_POSTS_INTERNAL_WIND!"_K THE SQRT#2$ FACTOR S
HA%E BEEN MISSED.
20160612_POSTS_PERIPHERAL_WIND!"_K LOADS OK.
-
7/25/2019 Check Log
2/12
SECTIONS
MIDDLE PIPAD CASE MISSSING
G
ISSING
MIDDLE PIP
OK
G
ISSING
G OKISSING
WHAT
TS
EEMS TO
-
7/25/2019 Check Log
3/12
DESIGN P
E 12&'11". NEXT 12&'11. NEXT 12&'121. NEXT 12&X122 ONL( L(S PPOSTS USE
L)* TO BE
COMPLETE
E 12&'11". NEXT 12&'11. NEXT 12&'121. NEXT 12&X122 POSTS USE
AFTER ADDFAILURE IN
TUBE SEGM
-
7/25/2019 Check Log
4/12
RAMS OUTPUT DAF APPLIED
T. POSTS 0.03 (ES 2.!
,- FOR TT 0.623 1.2"
ESS
2.! POSTS 0.01/0. (ES
TT 0." 1.13
AS MOMENT MAX LOAD CASE WAS MISSING
TT WAS PASSING IN POSTS MODEL WHILE
IT SHOULD FAIL
ING L( POSTS 0."" (ES 1 TORQUE TT 1.06 AWA( FROM CENTRAL 1.!&1&"
ENT. SEGMENT
-
7/25/2019 Check Log
5/12
MODEL CHECKS
NAME LOADS
POSTS INTERIOR WIND0 FOUND OK.DAFS USED WERE OK.
MOMENT MAX LOADS
ADDED
LOADS
POSTS INTERIOR WIND20 USED DAFS SEEM MOR
WHAT IS REQUIRED.
DAF GCN 1.3
DAF MCHR 1.2
USED DAFS 1.!1."
MOMENTMAX LOADS
POSTS INTERIOR WIND!" ,* DAFS * 45
:* 5;,:5
DAF REQ
GCN 1.2
MH(ROW 1.2
LOADS OK
20160616_T45;,C455
-
7/25/2019 Check Log
6/12
THAN REQD
LOADS OK
20160616_T45;,C455
-
7/25/2019 Check Log
7/12
SECTIONS
UNS(MMETFOLLOWIN
ERE POSTS CHA
BETA 0
SECTIONS
E THAN
FOLLOWIN
POSTS CHA
BETA 0
ERE ADDED
-78 97-
POSTS CHA
DAF USD BETA 0
1.2"
1."
POSTS CHA
BETA 0
DAF USD
1.3
1."
POSTS CHA
BETA 0
POSTS CHA
BETA 0
POSTS CHA
RE BETA 0
-
7/25/2019 Check Log
8/12
MEMBERS
CENTRAL PI
SECOND
THIRD
FOURTH
TORQUE ST
POSTS CHA
BETA 0
POSTS CHA
BETA 0
POSTS CHA
BETA 0
POSTS CHA
BETA 0
POSTS CHA
SIN USED BETA 0
-
7/25/2019 Check Log
9/12
DESIGN P
RICALL( ASSIGNED SECTIONS. FOR POSTSCHANGES MADE ?78@ -4
NGED TO W6X." ?78-:
-
7/25/2019 Check Log
10/12
USED ?78-:
-
7/25/2019 Check Log
11/12
RAMS OUTPUT DAF APPLIED
K> ONL( MIDDLE 2 SPANS (ES 1." 45 TT AND CENTRAL POSTS FAIL
?- RATIOS CLOSE TO 1
LIST WUD BE EXPECTED TO PASS IN
MOMENT CORRELATED MODELS
RAMS OUTPUT DAF APPLIED
K> ALL PASSING
1." 45 ONL( CENTRAL TT FAILS.
?- TORQUE STRUTS FAIL
LIST WUD BE EXPECTED TO PASS IN
MOMENT CORRELATED MODELS
RAMS ALL RELE%ANT SECTIONS PASSING
K> E%EN INTERNAL ONES
1." 45
?-
LIST
RAMS TORQUE TUBE PASSES
K> AT CENTRE. TORQUE STRUT
1." 45 IS FAILING AT 1.02
?-
LIST
RAMS ALL MEMBERS PASSK>
1." 45
?-
LIST
7
-
7/25/2019 Check Log
12/12
?- ABO%E 0. UTILI)ATION.
LIST
RAMS 7 TORQUE STRUT
1." 45 CENTRAL AND SECOND ARE
?- ABO%E 0.& UTILI)ATION.
LIST
RAMS 7
1." 45
?-
LIST
RAMS ALL MEMBERS PASS
K>
1." 45
?-
LIST
RAMS ALL MEMBERS PASS
K> TT AT 0.6&
1." 45
?-
LIST
RAMS ALL MEMBERS PASS
K> TORQUE TUBE
1." 45 SPAN 2 IS AT 1.01
?-
LIST