check sheet for in-situ reinforced concrete for suspended slab-f08
DESCRIPTION
checklistTRANSCRIPT
originalAppendix CONC/04/AFebruary 1995
AL HABTOOR ENGINEERING ENTERPRISES CO. (L.L.C.)PROJECT : JUMEIRAH BEACH RESIDENCE - JBR 04SITE NO.: 583
CHECK SHEET FOR IN-SITU REINFORCED CONCRETESHEET No.
SUBCONTRACTOR: H.E.E.
SECTION OF WORKLOCATION
StageItemChecked by HEEChecked by QCDateChecked by A&BTDateFORMWORK (Before Concreting)1Check falsework design and issue permit to loadE2Check quality of shutter lining for required finishF3Check formwork ereceted and restrained as per approved drawingsGF4Check dimensions, line and levelE5Check preparation of forms inc. support, tie rods, release agents, cleanlinessF6Check plumbness and spacing props.F7Check tightness of bolts and wedgesF8Check special built-in items, inserts, mechanical, electrical & plumbing embedmentsE/MEP9Check stop-ends, waterbar, dowels, flexcell, etc.FREINFORCEMENT10Check bar placement as per approved bar bending scheduleE11Check tie wires, spacers, coverF12Clean out loose material (tie-wires, nails etc.)FAPPROVAL TO POURP.E./E.R.PLACING CONCRETE13Check correct mix, slump, temp.L14Check correct placing, compaction, grout loss controlF15Take concrete test cubes and logL16Recheck line and levelE17Protection against weather conditionFAPPROVAL TO STRIKEP.E./E.R.STRIKING FORMWORK18Check surface for blemishesF19Check cleanliness of forms after strikingF
E-ENGINEER, F-FOREMAN, GF-GENERAL FOREMAN, MEP-MEP COORDINATOR, ER-ENGINEER'S REPRESENTATIVE, L-LABORATORY TECHNICIAN
&7c:\mnj\&F.xls
rev. 0Appendix CONC/04/AJuly 2004
AL HABTOOR ENGINEERING ENTERPRISES CO. (L.L.C.)PROJECT : JUMEIRAH BEACH RESIDENCE - JBR 04SITE NO.: 583
CHECK SHEET FOR IN-SITU REINFORCED CONCRETESHEET No.
SUBCONTRACTOR: H.E.E.
SECTION OF WORKLOCATION
StageItemChecked by HEEChecked by QCDateChecked by A&BTDateFORMWORK (Before Concreting)1Check falsework design and issue permit to loadE2Check quality of shutter lining for required finishF3Check formwork ereceted and restrained as per approved drawingsGF4Check dimensions, line and levelE5Check preparation of forms inc. support, tie rods, release agents, cleanlinessF6Check plumbness and spacing props.F7Check tightness of bolts and wedgesF8Check special built-in items, inserts, mechanical, electrical & plumbing embedmentsE/MEP9Check stop-ends, waterbar, dowels, flexcell, etc.FREINFORCEMENT10Check bar placement as per approved bar bending scheduleE11Check tie wires, spacers, coverF12Clean out loose material (tie-wires, nails etc.)FAPPROVAL TO POURP.E./E.R.PLACING CONCRETE13Check correct mix, slump, temp.L14Check correct placing, compaction, grout loss controlF15Take concrete test cubes and logL16Recheck line and levelE17Protection against weather conditionFAPPROVAL TO STRIKEP.E./E.R.STRIKING FORMWORK18Check surface for blemishesF19Check cleanliness of forms after strikingF
E-ENGINEER, F-FOREMAN, GF-GENERAL FOREMAN, MEP-MEP COORDINATOR, ER-ENGINEER'S REPRESENTATIVE, L-LABORATORY TECHNICIAN
&7c:\mnj\&F.xls
rev. 01QC/STR/1-583Rev.01(Sept.2004)
AL HABTOOR ENGINEERING ENTERPRISES CO. (L.L.C.)PROJECT : JUMEIRAH BEACH RESIDENCE - JBR 04SITE NO.: 583
CHECK SHEET FOR IN-SITU REINFORCED CONCRETESHEET No.
SUBCONTRACTOR: H.E.E.
SECTION OF WORKLOCATION
StageItemChecked by HEEDateChecked by A&BTDateFORMWORK (Before Concreting)1Check falsework design and issue permit to loadE2Check quality of shutter lining for required finishF3Check formwork ereceted and restrained as per approved drawingsGF4Check dimensions, line and levelE5Check preparation of forms inc. support, tie rods, release agents, cleanlinessF6Check plumbness and spacing props.F7Check tightness of bolts and wedgesF8Check special built-in items, inserts, mechanical, electrical & plumbing embedmentsE/MEP9Check stop-ends, waterbar, dowels, flexcell, etc.FREINFORCEMENT10Check bar placement as per approved bar bending scheduleE11Check tie wires, spacers, coverF12Clean out loose material (tie-wires, nails etc.)FAPPROVAL TO POURE/CRPLACING CONCRETE13Check correct mix, slump, temp.L14Check correct placing, compaction, grout loss controlF15Take concrete test cubes and logL16Recheck line and levelE17Protection against weather conditionFAPPROVAL TO STRIKEE/CRSTRIKING FORMWORK18Check surface for blemishesF19Check cleanliness of forms after strikingF
E-ENGINEER, F-FOREMAN, GF-GENERAL FOREMAN, MEP-MEP COORDINATOR, CR-CONSULTANT'S REPRESENTATIVE, L-LABORATORY TECHNICIAN
&7c:\mnj\&F.xls
rev. 4
A-Z ENGINEERING & MANAGEMENT SERVICES PROJECT : SAADIYAT ST. REGIS BEACH RESORTSITE NO.: HMR - 831CHECK SHEET FOR IN-SITU REINFORCED CONCRETE SUSPENDEED SLABSHEET No.
Related I.R. ref.
SECTION OF WORKLOCATION
StageItemCHECKED BY SUBCONTRACTOR / DATECHECKED BY HMR / DATECHECKED BY CONSULTANT / DATEFORMWORK (Before Concreting)1.Check falsework design and issue permit to load.SE/PESE/PE2.Check formwork erected and restrained as per approved drawings.SE/PESE/PE3.Check construction joints to conform approved shop drawing.SE/PESE/PE4.Check dimensions, line and level.SUE/PESE/PE5.Check quality of shutter lining for required finish.SE/PESE/PE6.Check preparation of shutters including support, tie rods, release agents, cleanliness.SE/PESE/PE7.Check verticality and spacing of props.SE/PESE/PE8.Check tightness of bolts and wedges.SE/PESE/PE9.Check end stoppers, waterbars, hyrib, flexcell sheet etc.SE/PESE/PE10.Check embedded items, inserts and mechanical, electrical and plumbing provisions.MEP / BK GulfMEP COORD.11.Check adequacy of working flatforms.SO/PESO/PEREINFORCEMENT1.Check bar placement as per approved bar bending schedule.SE/PESE/PE2.Check tie wires, chairs,spacers, coverSE/PESE/PE3.Check stop-ends, waterbar, dowels, flexcell, etc.SE/PESE/PE4.Clean out loose material (tie-wires, nails etc.)SE/PESE/PEAPPROVAL TO POURQCEQCEPLACING OF CONCRETE1.Check concrete mix, temperature and slump.LAB. TECH. / QCELAB. TECH. / QCE2.Take concrete test cubes,and log / record.LAB. TECH. LAB. TECH. 3.Check proper placing, concrete compaction and grout loose control.SE/PESE/PE4.Recheck line and level.SUE/PESE/PE5.Provide protection against weather.SE/PESE/PESTRIKING OF FORMWORKSAPPROVAL TO STRIKE FORMWORKQCEQCE1.Check concrete surface for blemishes.SE/PESE/PE2.Check cleanliness of forms after striking.QCEQCE
LAB TECH.-LABORATORY TECHNICIAN, SUE-SURVEY ENGINEER, SO-SAFETY OFFICER, SE-SITE ENGINEER, PE-PROJECT ENGINEER, MEP COORD.-MEP COORDINATOR, QCE- QUALITY CONTROL ENGINEER
Doc. No.: HMR-831-C-QAC-009-F08Rev. 01
Sheet2
Sheet3