SUBCONTRACTOR: H.E.E. SECTION OF LOCATION Stage Checked by HEE Checked by QC Date 1 Che ck fa ls ework desi gn and issue perm it to lo ad E 2 Ch ec k qu al it y of sh ut te r li ni ng fo r requ ir ed fi ni sh F 3 Check formwork ereceted and restrained as per approved drawings GF 4 Check dimensions, line and level E 5 Check preparation of forms inc. support, tie rods, release agents, cleanliness F 6 Check plumbness and spacing props. F 7 Check tightness of bolts and wedges F 8 Check special built-in items, inserts, mechanical, electrical & plumbing embedments E/MEP 9 Che ck st op -end s, water ba r, dowels , f lexcell , e tc. F 10 Check bar placement as per approved bar bending schedule E 11 Check tie wires, spacers, cover F 12 Clean out loose material (tie-wires, nails etc.) F P.E./E.R. 13 Check correct mix, slump, temp. L 14 Check correct placing, compaction, grout loss control F 15 Take concrete test cubes and log L 16 Recheck line and level E 17 Protection against weather condition F P.E./E.R. 18 Check surface for blemishes F 19 Check cleanliness of forms after striking F PLACING CONCRETE CHECK SHEET FOR IN-SITU REINFORCED CONCRETE PROJECT : JUMEIRAH BEACH RESIDENCE - JBR 04 E- ENGINEER , F-FOREMAN, GF-GE NE RAL FOREMAN, MEP -MEP COOR DINATOR, ER-ENGINE ER 'S REP R LABORATORY TECHNICIAN  APPROVAL TO STRIKE STRIKING FORMWORK SH AL HABTOOR ENGINEERING ENTERPRISES CO. (L.L.C. APPROVAL TO POUR Item FORMWORK (Before Concreting) REINFORCEMENT c:\mnj\222647875.xlsx.ms_office.xls

Upload: zawadimran

Post on 17-Oct-2015

18 views

Category:

Documents


0 download

DESCRIPTION

checklist

TRANSCRIPT

originalAppendix CONC/04/AFebruary 1995

AL HABTOOR ENGINEERING ENTERPRISES CO. (L.L.C.)PROJECT : JUMEIRAH BEACH RESIDENCE - JBR 04SITE NO.: 583

CHECK SHEET FOR IN-SITU REINFORCED CONCRETESHEET No.

SUBCONTRACTOR: H.E.E.

SECTION OF WORKLOCATION

StageItemChecked by HEEChecked by QCDateChecked by A&BTDateFORMWORK (Before Concreting)1Check falsework design and issue permit to loadE2Check quality of shutter lining for required finishF3Check formwork ereceted and restrained as per approved drawingsGF4Check dimensions, line and levelE5Check preparation of forms inc. support, tie rods, release agents, cleanlinessF6Check plumbness and spacing props.F7Check tightness of bolts and wedgesF8Check special built-in items, inserts, mechanical, electrical & plumbing embedmentsE/MEP9Check stop-ends, waterbar, dowels, flexcell, etc.FREINFORCEMENT10Check bar placement as per approved bar bending scheduleE11Check tie wires, spacers, coverF12Clean out loose material (tie-wires, nails etc.)FAPPROVAL TO POURP.E./E.R.PLACING CONCRETE13Check correct mix, slump, temp.L14Check correct placing, compaction, grout loss controlF15Take concrete test cubes and logL16Recheck line and levelE17Protection against weather conditionFAPPROVAL TO STRIKEP.E./E.R.STRIKING FORMWORK18Check surface for blemishesF19Check cleanliness of forms after strikingF

E-ENGINEER, F-FOREMAN, GF-GENERAL FOREMAN, MEP-MEP COORDINATOR, ER-ENGINEER'S REPRESENTATIVE, L-LABORATORY TECHNICIAN

&7c:\mnj\&F.xls

rev. 0Appendix CONC/04/AJuly 2004

AL HABTOOR ENGINEERING ENTERPRISES CO. (L.L.C.)PROJECT : JUMEIRAH BEACH RESIDENCE - JBR 04SITE NO.: 583

CHECK SHEET FOR IN-SITU REINFORCED CONCRETESHEET No.

SUBCONTRACTOR: H.E.E.

SECTION OF WORKLOCATION

StageItemChecked by HEEChecked by QCDateChecked by A&BTDateFORMWORK (Before Concreting)1Check falsework design and issue permit to loadE2Check quality of shutter lining for required finishF3Check formwork ereceted and restrained as per approved drawingsGF4Check dimensions, line and levelE5Check preparation of forms inc. support, tie rods, release agents, cleanlinessF6Check plumbness and spacing props.F7Check tightness of bolts and wedgesF8Check special built-in items, inserts, mechanical, electrical & plumbing embedmentsE/MEP9Check stop-ends, waterbar, dowels, flexcell, etc.FREINFORCEMENT10Check bar placement as per approved bar bending scheduleE11Check tie wires, spacers, coverF12Clean out loose material (tie-wires, nails etc.)FAPPROVAL TO POURP.E./E.R.PLACING CONCRETE13Check correct mix, slump, temp.L14Check correct placing, compaction, grout loss controlF15Take concrete test cubes and logL16Recheck line and levelE17Protection against weather conditionFAPPROVAL TO STRIKEP.E./E.R.STRIKING FORMWORK18Check surface for blemishesF19Check cleanliness of forms after strikingF

E-ENGINEER, F-FOREMAN, GF-GENERAL FOREMAN, MEP-MEP COORDINATOR, ER-ENGINEER'S REPRESENTATIVE, L-LABORATORY TECHNICIAN

&7c:\mnj\&F.xls

rev. 01QC/STR/1-583Rev.01(Sept.2004)

AL HABTOOR ENGINEERING ENTERPRISES CO. (L.L.C.)PROJECT : JUMEIRAH BEACH RESIDENCE - JBR 04SITE NO.: 583

CHECK SHEET FOR IN-SITU REINFORCED CONCRETESHEET No.

SUBCONTRACTOR: H.E.E.

SECTION OF WORKLOCATION

StageItemChecked by HEEDateChecked by A&BTDateFORMWORK (Before Concreting)1Check falsework design and issue permit to loadE2Check quality of shutter lining for required finishF3Check formwork ereceted and restrained as per approved drawingsGF4Check dimensions, line and levelE5Check preparation of forms inc. support, tie rods, release agents, cleanlinessF6Check plumbness and spacing props.F7Check tightness of bolts and wedgesF8Check special built-in items, inserts, mechanical, electrical & plumbing embedmentsE/MEP9Check stop-ends, waterbar, dowels, flexcell, etc.FREINFORCEMENT10Check bar placement as per approved bar bending scheduleE11Check tie wires, spacers, coverF12Clean out loose material (tie-wires, nails etc.)FAPPROVAL TO POURE/CRPLACING CONCRETE13Check correct mix, slump, temp.L14Check correct placing, compaction, grout loss controlF15Take concrete test cubes and logL16Recheck line and levelE17Protection against weather conditionFAPPROVAL TO STRIKEE/CRSTRIKING FORMWORK18Check surface for blemishesF19Check cleanliness of forms after strikingF

E-ENGINEER, F-FOREMAN, GF-GENERAL FOREMAN, MEP-MEP COORDINATOR, CR-CONSULTANT'S REPRESENTATIVE, L-LABORATORY TECHNICIAN

&7c:\mnj\&F.xls

rev. 4

A-Z ENGINEERING & MANAGEMENT SERVICES PROJECT : SAADIYAT ST. REGIS BEACH RESORTSITE NO.: HMR - 831CHECK SHEET FOR IN-SITU REINFORCED CONCRETE SUSPENDEED SLABSHEET No.

Related I.R. ref.

SECTION OF WORKLOCATION

StageItemCHECKED BY SUBCONTRACTOR / DATECHECKED BY HMR / DATECHECKED BY CONSULTANT / DATEFORMWORK (Before Concreting)1.Check falsework design and issue permit to load.SE/PESE/PE2.Check formwork erected and restrained as per approved drawings.SE/PESE/PE3.Check construction joints to conform approved shop drawing.SE/PESE/PE4.Check dimensions, line and level.SUE/PESE/PE5.Check quality of shutter lining for required finish.SE/PESE/PE6.Check preparation of shutters including support, tie rods, release agents, cleanliness.SE/PESE/PE7.Check verticality and spacing of props.SE/PESE/PE8.Check tightness of bolts and wedges.SE/PESE/PE9.Check end stoppers, waterbars, hyrib, flexcell sheet etc.SE/PESE/PE10.Check embedded items, inserts and mechanical, electrical and plumbing provisions.MEP / BK GulfMEP COORD.11.Check adequacy of working flatforms.SO/PESO/PEREINFORCEMENT1.Check bar placement as per approved bar bending schedule.SE/PESE/PE2.Check tie wires, chairs,spacers, coverSE/PESE/PE3.Check stop-ends, waterbar, dowels, flexcell, etc.SE/PESE/PE4.Clean out loose material (tie-wires, nails etc.)SE/PESE/PEAPPROVAL TO POURQCEQCEPLACING OF CONCRETE1.Check concrete mix, temperature and slump.LAB. TECH. / QCELAB. TECH. / QCE2.Take concrete test cubes,and log / record.LAB. TECH. LAB. TECH. 3.Check proper placing, concrete compaction and grout loose control.SE/PESE/PE4.Recheck line and level.SUE/PESE/PE5.Provide protection against weather.SE/PESE/PESTRIKING OF FORMWORKSAPPROVAL TO STRIKE FORMWORKQCEQCE1.Check concrete surface for blemishes.SE/PESE/PE2.Check cleanliness of forms after striking.QCEQCE

LAB TECH.-LABORATORY TECHNICIAN, SUE-SURVEY ENGINEER, SO-SAFETY OFFICER, SE-SITE ENGINEER, PE-PROJECT ENGINEER, MEP COORD.-MEP COORDINATOR, QCE- QUALITY CONTROL ENGINEER