checklist for solar rooftop projects site visit

1
www.ezysolare.com Checklist for Solar Rooftop Projects 1. Project Site GPS Co-ordinates Orientation from True South Roof / Land Area Roof / Land Type Flat: Inclined: Angle: Orientation: Dimensions of Roof (Please attached a separate sketch drawing for roofs having different shapes) Ex: (Please mention dimensions of all sides) FLAT : TOP VIEW : _____m(width) _____m (length) FRONT VIEW : ____m(height) _____m (length) SHED : TOP VIEW : ____m(length) _____m (length) FRONT VIEW : ____m(h1) ____m(h2) _____m (1/2 width) Roof / Land Height MSL Roof Height from Ground Roof Material Roof Thickness Nearby Shading Obstruction Trees, Ht: ___________ Building, Ht: __________ (Please consider the scope of expansions) Shadow Casting Objects (With detail dimensions on other paper) Roof / Land surface level difference Availability of water Rain water draining facility Age of the Roof 2. Electricals Required O/P Phase: Single Three Voltage: 220 V 440 V Distribution Panel Load Distribution basis Distance from site Existing Cable Routing Existing Earthing Suitable Place for SPV Plant Earthing Health of Existing Electrical Connections 3. Existing Grid & DG Source Contracted Demand (kVA) Operating Demand (kVA) I/P Voltage 33 kV 11 kV Others Distribution Transformers (Individually) Average Grid outage per day in hours Diesel Generator (DG) Capacity (Individually) DG Interconnection Voltage 440 V 11 kV Plant Distribution Voltage 440 V 11 kV Others 4. Energy Consumption Annual from GRID (kWh) Monthly from GRID (kWh) At least last 12 months data Average PF Annual from DG (kWh / litres) Monthly from DG (kWh) At least last 12 months data Rate of fuel consumption (Litres / hr) Full Load: Half Load: Rate of energy generation (kWh / Litre) Full Load: Half Load: Issues in existing grid connection Issues in existing DG connection 5. Facility & Loads Connected Load (kW) Composition of Loads (% or kW) Bisection of Loads (on separate sheet) Rating, quantity etc. as per composition Facility type Domestic: Industrial: Commercial: Agricultural Operational days in a year Operational hours in a day Off days in a year Operational loads during off days 6. List of documents needed Last 12 months Electricity bills Electrical layouts of the facility Structural and roof layouts of the facility 108, Pinnacle Business Park, Corporate Road, Prahalad Nagar, Ahmedabad – 380015 (M) : +91 9376708346 | [email protected]

Upload: ezysolare-gosolar

Post on 02-Aug-2015

134 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: Checklist for solar rooftop projects site visit

www.ezysolare.com

Checklist for Solar Rooftop Projects

1. Project Site

GPS Co-ordinates

Orientation from True South

Roof / Land Area

Roof / Land Type Flat: Inclined:

Angle: Orientation:

Dimensions of Roof (Please attached a separate sketch drawing for roofs having different shapes)

Ex:

(Please mention dimensions of all sides)

FLAT :

TOP VIEW :

_____m(width)

_____m (length)

FRONT VIEW :

____m(height)

_____m (length)

SHED :

TOP VIEW :

____m(length)

_____m (length)

FRONT VIEW :

____m(h1) ____m(h2)

_____m (1/2 width)

Roof / Land Height MSL

Roof Height from Ground

Roof Material

Roof Thickness

Nearby Shading Obstruction

Trees, Ht: ___________ Building, Ht: __________

(Please consider the scope of expansions)

Shadow Casting Objects (With detail dimensions on other paper)Roof / Land surface level difference

Availability of water

Rain water draining facility

Age of the Roof

2. Electricals

Required O/PPhase: Single Three Voltage: 220 V 440 V

Distribution Panel ¬Load Distribution basis

¬Distance from siteExisting Cable Routing

Existing Earthing

Suitable Place for SPV Plant Earthing

Health of Existing Electrical Connections

3. Existing Grid & DG Source

Contracted Demand (kVA)

Operating Demand (kVA)

I/P Voltage 33 kV 11 kV Others

Distribution Transformers (Individually)

Average Grid outage per day in hours

Diesel Generator (DG) Capacity (Individually)

DG Interconnection Voltage 440 V 11 kV

Plant Distribution Voltage 440 V 11 kV

Others

4. Energy Consumption

Annual from GRID (kWh)

Monthly from GRID (kWh) At least last 12 months data

Average PF

Annual from DG (kWh / litres)Monthly from DG (kWh) At least last 12 months data

Rate of fuel consumption (Litres / hr) Full Load: Half Load:

Rate of energy generation (kWh / Litre) Full Load: Half Load:

Issues in existing grid connection

Issues in existing DG connection

5. Facility & Loads

Connected Load (kW)

Composition of Loads (% or kW)Bisection of Loads (on separate sheet) Rating, quantity etc. as per composition

Facility type

Domestic: Industrial: Commercial: Agricultural

Operational days in a year

Operational hours in a day

Off days in a year

Operational loads during off days

6. List of documents needed

• Last 12 months Electricity bills

• Electrical layouts of the facility

• Structural and roof layouts of the facility