checklist for valuation studies

1
Checklist for Valuation (Power Plant) 1. Land - market value from Stamps & Registration Department 2. Previous 2 years balance sheets (audited / unaudited) 3. Details of Plant & Machinery with specs and purchase prices 4. Details of Misc. Fixed Assets with specs and purchase prices 5. Supporting documents for (3) and (4) above 6. Details of poultries (layer & broiler) with distances from the power plant 7. Agreements, if any, for supply of poultry litter and paddy husk 8. Quotations for fuels with price trends 9. PPA copy 10. Copies of all statutory approvals / clearances / permissions 11. Fuel analysis reports from reputed labs 12. Water requirement and sources 13. Water analysis report 14. Past performance data with supporting documents (from TRANSCO) 15. Sample copies of log books 16. Cost of power (actual / estimated)

Upload: mohann-krish

Post on 15-Apr-2016

7 views

Category:

Documents


4 download

DESCRIPTION

Valuation studies are essential to report on the current value of movable / immovable properties by consultants. This checklist provides the information needed to be collected before carrying out valuations of property.

TRANSCRIPT

Page 1: Checklist for Valuation Studies

Checklist for Valuation (Power Plant)

1. Land - market value from Stamps & Registration Department2. Previous 2 years balance sheets (audited / unaudited)3. Details of Plant & Machinery with specs and purchase prices4. Details of Misc. Fixed Assets with specs and purchase prices5. Supporting documents for (3) and (4) above6. Details of poultries (layer & broiler) with distances from the power plant7. Agreements, if any, for supply of poultry litter and paddy husk8. Quotations for fuels with price trends9. PPA copy10. Copies of all statutory approvals / clearances / permissions11. Fuel analysis reports from reputed labs12. Water requirement and sources 13. Water analysis report14. Past performance data with supporting documents (from TRANSCO)15. Sample copies of log books16. Cost of power (actual / estimated)