chung-a st company profile · company profile total cleanroom solution clean room system machinery...
TRANSCRIPT
CHUNG-A ST Company ProfileTotal Cleanroom Solution
www.cacr.co.kr
Clean Room System
Machinery & Fire Protection
Facilities
HVAC & Clean Equipment
Utility Total Solution
Head Office and Research Institute173, Bodeum-ro, Seo-gu, Incheon (17 Block – 14 Lot, Geomdan General Industrial Complex, Oryu-dong)Tel. (+82) 32-579-3078 Fax. (+82) 32-579-3079
Management Office (Sales and Management)285, Digital-ro, Guro-gu, Seoul (701-1, Ace Twin Tower #1, Guro-dong)Tel. (+82) 2-862-8283 Fax. (+82) 2-857-7417
CHUNG-A Vina (Vietnam Corporation)No 37, Lane 52 Pham Hung St., My Dinh 2 Ward, Nam Tu Liem Dist., Hanoi, VietnamTel. (+84) 4-6686-3422 VOIP. (+82) 70-8280-8079
CHUNG-A LCD (China Corporation)Industrial Park, Suzhou, Jiangsu, ChinaTel. (+86) 512-6296-1230 Fax. (+86) 512-6296-1626
Clean & Affluent World Through Advanced Technology
ContentsCompany Profile CEO Message Company Profile Organizational Structure Company History Company Philosophy Core Values Patents and Registrations Certificates List of Personnel Specialized in Construction and Fire Protection Technology
Business Areas Clean Room System HVAC & Clean Equipment Utility Total Solution Machinery & Fire Protection Facilities
Technical Design Area System Design Production Design Site Design
Precision T.A.B.
Follow Up Plans Regular Maintenance and Follow Up Plans Follow Up Plans After Warranty Period
Performances Major Performances Other Performances
Access Map
www.cacr.co.kr
Best Partner That Creates Best Values! Reliable Partner with Trust!
Since its establishment in 2000, CHUNG-A ST started its cleanroom businesses and has diversified the business structure into mechanical and fire protection facility works while expanding its overseas business networks to establish infrastructure for global development.
CHUNG-A ST will reward support and interest from our customers with best quality.
CHUNG-A ST strives to be a company with trust by creating designs and installations that can maintain best conditions for various industrial sites and buildings based on its accumulated technical competence and experience.
CHUNG-A ST will be continuously committed to development of original technology and quality improvement by continued R&D investments to realize its vision of “Customer Impression Service” and “Technology That Changes the World.”
Lee Dong-cheol, CEO of CHUNG-A ST Co., Ltd.
ORGANIZATION CHART
COMPANY PROFILECHUNG-A ST Co., Ltd.
January 06, 2000
Lee Dong-cheol
Head Office and Research Institute173, Bodeum-ro, Seo-gu, Incheon (17 Block – 14 Lot, Geomdan General Industrial Complex, Oryu-dong)
Seoul Office285, Digital-ro, Guro-gu, Seoul (701-1, Ace Twin Tower #1, Guro-dong)
China CorporationCHUNG-A LCD SUZHOU Co., Ltd. Industrial Park, Suzhou, Jiangsu, China
Vietnam CorporationCHUNG-A VINA Co., Ltd. No 37, Lane52 Pham Hung St., My Dinh 2 Ward, Nam Tu Liem Dist., Hanoi, Vietnam
Company Name
Date of Establishment
CEO
Business Locations
Overseas Corporation
CEO
Management Support
Plan Technical Sales Manufacturing Vietnam CorporationCleanroom Design Cleanroom
Construction Quality ControlR&D
Finance / Accounting Maintenance China CorporationMachinery Design Machinery
Construction
Human Resources / General Affairs A/SFire Protection
Facility DesignFire Protection Facility Work
Auditor Environment / Safety
Management Strategy Division Business Management Division
Affiliated Research Institute DesignSales Construction /
ManagementProduction Overseas Businesses
Quality & Safety
President
www.cacr.co.kr
2000-2001 2002-2004 2009-2011 2012 2013 2014-2016
2012. 04Obtained Venture Business certification (Korea Technology Finance Corporation)
Obtained INNO-BIZ certification for small and medium business with technical innovation
2012. 08Constructed and relocated to a new head office building (Geomdan General Industrial Complex)
2012. 09Capital increased (200 million KRW) and licensed for a specialized construction company
(Machinery and Installation Work; Seo-gu, Incheon 2012-10-14)
2013. 04Reported for overseas construction businesses
2013. 05Established an affiliated research institute
2013. 07Obtained certification for industry-university cooperation family company by Korea Polytechnic University
Certified to ISO 14001 environmental management system
Certified to ISO 9001 quality management system
2013. 11Selected for a national project related to energy technology development ‘Eco Heat Pump Air Handling Unit System’
2013. 12Contracted with Seoul National University of Science and Technology for industry-university cooperation
2014. 04Vietnam Corporation ‘CHUNG-A VINA’ established
2014. 12Registered as a supplier for 4 Samsung companies (Samsung C&T Corporation, Samsung Engineering, Samsung Everland and Samsung Heavy Industries)
2015. 03Obtained K-Mark for ‘Eco Heat Pump Air Handling Unit System’ by Korea Testing Laboratory
2016. 01Capital increased (300 million KRW)
2016. 02Licensed for specialized fire protection facility work
2000. 01CHUNG-A Air Conditioning Co., Ltd. established 83-4, Guro-dong, Guro-gu, Seoul
2000. 05Factory registered for ‘production of air Handling Unit with No. 29172’
2001. 05Utility model registered for ‘cooler’ (No. 2001-0005361)
2002. 02Relocated the head office to ‘525-5, Gajwa-dong, Seo-gu, Incheon’
2002. 05Obtained the first overseas construction project in ‘Myanmar’
2009. 03Patent applied for air Handling Unit with new concept
2009. 07China Corporation ‘CHUNG-A Air Conditioning (Suzhou) Co., Ltd’ established
2010. 06China Corporation changed its legal description to ‘CHUNG-A LCD (Suzhou) Co., Ltd.’
2011. 03Company name changed to ‘CHUNG-A ST Co., Ltd.’
Patent registered for ‘air conditioning systems (No. 10-1024699)’
2011. 12Achieved sales of 10 billion KRW
CHUNG-A'S HISTORY
www.cacr.co.kr
We cannot rely on outsourcing to provide services.
We cannot rely on outsourcing to provide services.
Our dedicated A/S personnel will resolve your inconvenience in a fast and
accurate manner.
We cannot negotiate quality with anything.
We are challenging for Zero Defect by applying strict quality control criteria
for both production and installation stages.
Our experienced personnel are producing their own equipment.
Offering quality products at reasonable price.
We have established our own database for raw materials and labor
cost to provide quality products and services at reasonable price and
realized the most economic and stable systems meeting your needs.
CHUNG-A'S VISION CORE VALUE
Realizing
Clean and Rich World Through Advanced TechnologyCHUNG-A ST develops new technology and products allowing customers to cope with ever changing industrial conditions and produce
advanced products in more stable environment.
CHUNG-A ST will be committed to providing differentiated products and services for customer satisfaction.
CHUNG-A ST will change the world for everyone to live in clean and rich environment.
Clean & Affluent World Through Advanced
Technology
Technology
Technology That Changes the World
Service
Customer Impression Service
Based on its accumulated know-how since the establishment in 2000, CHUNG-A ST will realize
customer satisfaction by providing differentiated products and services.
SSpeed
PPrice
QQuality
www.cacr.co.kr
CERTIFICATE CERTIFICATE
Business Registration Certificate
Utility Model Certificate
Factory Registration Certificate Patent Registration Certificate
www.cacr.co.kr
CERTIFICATE CERTIFICATE
Construction Business Registration Certificate
Overseas Construction Business Certificate
Fire Protection Facility Work Registration Certificate
Affiliated Research Institute Certificate
www.cacr.co.kr
Venture Business Certificate
CERTIFICATE CERTIFICATE
ISO 9001 Certificate
CERTIFICATE
INNO-BIZ ISO 14001 Certificate
www.cacr.co.kr
CERTIFICATE CERTIFICATE
K-Mark Certificate by Korea Testing Laboratory
OHSAS Certificate
Family Company Certificate by Korea Polytechnic University
Agreement for Industry-University Cooperation with Seoul National University of
Science and Technology
www.cacr.co.kr
CERTIFICATE CERTIFICATE
Supplier Registration Certificate with 4 Samsung Companies
Tax Registration Certificate for Vietnam Corporation
Approval Certificate
Business Registration Certificate for China Corporation
www.cacr.co.kr
List of Construction Specialists
No NameQualification
QualificationItem Grade Qualification No. Qualification Date
1 Lee Dong-cheol Electric welding Craftsman Electrical Welding 84406060321L 1984.08.13
2 Lee Seong-deok Machinery Entry Level Engineer 81308201886F 1981.11.30 Industrial Engineer Computer Aided Manufacturing
3 Kim Yeong-gap Machinery Craftsman Sheet Metal Boiler Making 85410380268S 1985.12.30
4 Kwon Jae-won Machinery Entry Level Engineer G00450878 2006.12.06
5 Yu Yeong-seok Electricals Craftsman Electricity 88405153781T 1988.09.05
6 Park Jun Machinery Entry Level Engineer G00649554 2009.02.20
7 Kim Yong-gil Construction Professional Engineer 82309210315k 1982.12.20Engineer Construction SafetyEngineer Architecture Grade 1Engineer Landscape Architecture Grade 1
8 Yu Ho-jun Machinery Mid-Level Engineer G00621378 2014.05.29 Craftsman Construction Piping
9 Kim Seong-su Air Conditioning and Freezing Machinery
Professional Engineer Air-conditioning
Refrigerating Machinery
05177010014Z 2005.11.28
No NameQualification
QualificationItem Grade Registration No. Registration Date
1 Kim Yong-gil Engineer Fire Protection System - Mechanical
Professional Level 82307200140 1982.11.08
2 Kim Yong-gil Engineer Fire Protection System - Electrical Entry Level 82307200140 1982.11.08
3 Rou Ho-jun Engineer Fire Protection System - Mechanical
Advanced Level 2009-01-00336W 1999.10.27
4 Rou Ho-jun Engineer Fire Protection System - Electrical
Advanced Level 2009-01-00336W 1999.10.27
5 Kwon Jae-won Qualification for Fire Protection Technology Entry Level 2016-01-00032L 2016.01.11
6 Park Jun Qualification for Fire Protection Technology Entry Level 2016-01-00033L 2016.01.11
7 Son Seong-ok Engineer Fire Protection System - Electrical Entry Level 15202102147S 2004.12.09
List of Fire Protection Specialists
LIST OF PERSONNEL SPECIALIZED IN CONSTRUCTION AND FIRE PROTECTION TECHNOLOGY
LIST OF PERSONNEL SPECIALIZED IN CONSTRUCTION AND FIRE PROTECTION TECHNOLOGY
www.cacr.co.kr
BUSINESS AREA
Clean Room System
HVAC & Clean Equipment
Utility Solution
Machinery & Fire Protection Facilities
Realizing clean spaces for advanced industries
Dust free devices to prevent contaminants from getting inside
Utility Solution Performing machinery & fire protection facility work
www.cacr.co.kr
CLEAN ROOM SYSTEMCleanroom systems create clean spaces that control dust and the number of bacteria for advanced industries.We provide the most appropriate cleanrooms for different purposes to realize the most economic and efficient spaces.
Total Consulting Company from Design to Installation and Maintenance
Applications
Applications
Semiconductors, displays (ICR)
2D/ 3D Design
Hospitals, laboratories (BCR)
Analyzing air flow, pressure distribution
Electrical/electronic, precision machinery (ICR)
Precision production / installation
Pharmaceuticals (GMP facilities), food (HACCP facilities)
Fast and direct controlled A/S services
H.V.A.C SOLUTION
Keeping constant temperature and humidity
HVAC solutions are systems that keep indoor spaces at constant temperature and humidity in clean environment by using air Handling Unit and duct systems. Air Handling Unit manufactured based on advanced engineering techniques and efficient system constructions will realize optimized indoor environment.
www.cacr.co.kr
UTILITY SOLUTION
P-VACUUM SYSTEM
CDA SYSTEM
PCW SYSTEM
DI WATER SYSTEM
EXHAUST SYSTEM
01
02
03
04
05
CLEAN EQUIPMENTCHUNG-A ST manufactures dust free devices necessary to maintain cleanliness in cleanrooms.
CLEAN ROOM SYSTEM
Clean Locker
Air Shower
Clean Bench
Pass Box
Clean Booth
HFU(HEPA Filter Unit)
Relief Damper
ACU(Air Control Unit)
FFU(Fan Filter Unit)
BFU(Blower Filter Unit)
PREPARE ROOM
CLEAN ROOMClass 1.000~100.000
CLEAN ROOMClass 1~100
SMOCK ROOM
www.cacr.co.kr
CHUNG-A ST provides installation of hygienic, heating and cooling, air conditioning and fire protection facilities.
CHUNG-A ST offers installation of fire protection, alarm, fire extinguishing, evacuation and fire water facilities.
Piping facilities necessary to use water in an easy and hygienic way.
1. Water Supply Facilities: piping installations to supply water to sinks, washstands and fireplugs2. Water Discharge Facilities: piping installation to discharge water used in sinks or bathtubs outside3. Ventilation Pipes: Piping installation to discharge polluted gases in pipes
Facilities to provide clean environment that residents need by maintaining indoor temperature higher or lower than outside temperature
1. Heating Facilities: various installations such as central heating, individual heating and regional heating2. Cooling Facilities: installations using fusion heat, sublimation heat and evaporation heat types, method to use expansion by
compressor and method to use Peltier effect
Facilities to maintain indoor places at proper temperature and humidity to create clean air and prevent pollution
Rectangular and spiral duct installation for ventilation, temperature and humidity control and air supply adjustment
Hygienic FacilitiesMachinery, equipment or facilities to use water or other fire extinguishing agents for fire fightingFire extinguishers, indoor fireplugs, outdoor fireplugs, sprinklers, temporary sprinklers, sprinkler facilities for early detection, water spraying fire extinguishers, water cannon facilities, carbon dioxide extinguishers, halogen compound extinguishers and clean extinguishing agents
Fire Extinguishing Facilities
Machinery, equipment or facilities to notify fire alarmsEmergency bell and auto siren facilities, independent alarm detectors, emergency broadcasting systems, short circuit alarms, auto fire detection facilities, visual alarms and gas leak alarms
Alarm Facilities
Facilities used to extinguish fire or rescue peopleAnti-smoke facilities, connecting pipes, connecting water spray facilities, emergency plug facilities and wireless communication support facilities
Fire Extinguishing Activity Facilities
Equipment or facilities used for evacuation from fireEscape slides, escape ladders, rescue system, escape ropes, air cushioning mattresses and other evacuation equipment, fire resistant clothes, air respirators and artificial ventilators, guide lights and signposts and emergency lights
Evacuation Facilities
Heating and Cooling Facilities
Air Conditioning Duct Facilities
MACHINERY WORK FIRE PROTECTION FACILITY WORK
www.cacr.co.kr
ENGINEERING FIELD
Realizing optimized custom designs based on strict technical verification and data with know-how accumulated for several years
Designating the project system designers as the onsite designers to minimize errors between designs and installations, allowing accurate onsite installations and realizing optimized deigns customized for sites based on know-how accumulated over time
We are committed to research projects together with our affiliated research institute to provide all the designs necessary for production, allow customer to produce accurate precision equipment and realize optimized designs with know-how accumulated for several years.
System Design Onsite Design
Production Design
Main Businesses
Main Businesses
Main Businesses
Sales Support Design
Equipment Production Design Equipment Improvement and Development
Onsite station and support design
Process monitoring and supervision
Custom designs for sites
New Technology Training
Precision Installation Design
Onsite Support Design
New Technology Training
www.cacr.co.kr
PRECISION T.A.B COMPANY MANAGEMENT
01
01
02
02
03
Regular Maintenance ·Regular maintenance is intended to prevent operational accidents of cleanrooms in advance in order to prevent any problems in production.
·We manage operation of the customer’s cleanrooms so that they can be maintained in their optimized conditions.
Quarterly Inspection Visits (Regular Maintenance) ·Regular maintenance will be done on a quarterly basis to manage cleanrooms in their optimized conditions.
·Particles (class) are measured for management and inspection.
·Systems are evaluated (temperature, humidity and operational conditions) for management and inspection.
·Components with potential problems are replaced before such problems occur.
·Cleanroom operation management and training is offered.
·Cleanroom status report is submitted to customers.
Follow Up Inspections Upon Customer Request (Non-regular Inspection) ·Preliminary actions are taken for customers to cope with emergency measures on the phone upon customer request.
·Visits are made within 6 hours after phone calls to identify causes and resolve them.
·Problems are recognized by customers and reporting is made in writing.
·Actions for cleanrooms are submitted to customers in reports.
Follow Up Plans After Warranty Period ·We enter into contracts with customers for follow up actions so that they can continue their production without problems.
Regular Maintenance After Warranty Period ·Regular maintenance will be done on a quarterly basis (twice a year) to manage cleanrooms in their optimized conditions
·Particles (class) are measured for management and inspection.
·Systems are evaluated (temperature, humidity and operational conditions) for management and inspection.
·Cleanroom operation management and training is offered.
·Cleanroom status report is submitted to customers.
* Above details may vary depending on contract terms for annual maintenance.
Measurement Items
Filter Installation Leak Test
Filter Face Velocity Test
Airborne Particle Count
Temperature & Humidity Test
Room Pressure Test
Air Flow Test
Sound Level Test
Lighting Level Test
Air Handling Unit air volume balancing
Heat source systems
Regular Maintenance
After Warranty Period
Maintaining cleanrooms in their best conditions and realizing best production environment through precision measurement and adjustment
Organizing dedicated T.A.B. outsourcing team
www.cacr.co.kr
PERFORMANCEPERFORMANCE
Site Hanoi, Vietnam
Year 2015
Scale 1,100m2
Project Name Cleanroom Design and Installation
Class 100,000 Zone
Site Hanoi, Vietnam
Year 2014
Scale 5,400m2
Project Name Cleanroom Design and Installation
Class 10 Zone
Daeduck GDS Vietnam Factory Project Cammsys Vina Clean Room Project
www.cacr.co.kr
PERFORMANCEPERFORMANCE
Air compressor installation200HP * 10SET
Site Weihai, China
Year 2013
Scale 7,600m2
Project Name Cleanroom Design and Installation
Class 10 Zone
Site Cheonan, Chungnam
Year 2011
Scale 4,300m2
Project Name Cleanroom Design and Installation
Class 1,000 Zone
Cleanroom facilities for Sun Yang DNT, Manufacturing Factory 1 in China Utility system works for DID Co., Ltd.
www.cacr.co.kr
PERFORMANCEPERFORMANCE
Site China Nanjing
Year 2011
Scale 11,200m2
Project Name Cleanroom Design and Installation
Class 1,000 Zone
Site Paju, Gyeonggi
Year 2010
Scale 1,200m2
Project Name Installation of ME fences
Class 100 Zone
Site Cheonan, Chungnam
Year 2010
Scale 4,300m2
Project Name Cleanroom Design and Installation
Class 1,000 Zone
Site China Suzhou
Year 2008. 09
Scale 12,000m2
Project Name Cleanroom Design and Installation
Class 1,000 Zone
LG Display P8E Project ME Construction of new cleanrooms for Dongwa Photoelectrics in China Suzhou
Construction of new cleanrooms for Donggwang Photoelectrics in China Nanjing Utility system works for DID Co., Ltd.
www.cacr.co.kr
PERFORMANCEPERFORMANCE
Site Cheonan, Chungnam
Year 2007. 08
Scale C/R 330m2
Project Name Installation of interior panels, air conditioning pipes and ducts, and cleanroom equipment
Class 100 Zone
Site Myanmar
Year 2003. 09
Scale C/R 990m2
Project Name HVAC installations
Class 1,000 Zone
Site Asan, Chungnam
Year 2004. 09
Scale C/R 400m2
Project Name Installation of clean booths
Class 100 Zone
Site Gumi, Gyeongbuk
Year 2010. 03
Scale C/R 1,160m2
Project Name Installation of air Handling Unit, interiors and cleanroom equipment
Class 1,000 Zone
Site Cheonan, Chungnam
Year 2004. 10
Scale C/R 2,150m2
Project Name Installation of interiors, air conditioning pipes and ducts, and cleanroom equipment
Class 1,000 Zone
Site Asan, Chungnam
Year 2008. 05
Scale C/R 330m2
Project Name Production and installation of air handling unit and cleanroom equipment
Class 10,000 Zone
Construction of new cleanrooms for Praxair Surface Technologies CJ Factory in Myanmar
Installation of clean booths for UNIMED Construction of new cleanrooms for Korea Powertrain
DI Co., Ltd. KB Chemicals
www.cacr.co.kr
Other Performances Domestic Other Performances Domestic
PERFORMANCEPERFORMANCE
NO Customer Project Name Site Year Class Scale Item
1 CJ Engineering & Construction Corporation Construction of a new office building in Daechi-dong Gangnam, Seoul 2016 - 23,100m2 -
2 CJ Engineering & Construction Corporation Construction of a new office building in Yeoksam-dong Gangnam, Seoul 2016 - 19,577m2 -
3 GS Neotek Construction of a new factory for IONES Co., Ltd. Anseong, Gyeonggi 2016 - - LCD
4 Samsung SDI Regular replacement of HEPA filters for the first line Ochang, Chungbuk 2015 1,000 - LCD POL
5 Samsung SDI Replacement of 1F acrylic booths for the first line Ochang, Chungbuk 2015 1,000 - LCD POL
6 Samsung Engineering Production and installation of air showers for Samsung SDI Ulsan 2014 1,000 - -
7 Samsung Everland Improvement works for air conditioning in PVA unwinding devices Ochang, Chungbuk 2014 1,000 - LCD POL
8 Samsung Everland Improvement works for air flows for the second and third coating lines Ochang, Chungbuk 2014 100 - LCD POL
9 DID Co., Ltd. Design and installation of cleanrooms for extend facilities Cheonan, Chungnam 2014 1,000 1,600m2 BLU,TFT LCD
10 Daeyang Chemical Co., Ltd. Cleanroom Design and Installation Yongin, Gyeonggi 2013 - 350m2 -
11 CAMMSYS Co., Ltd. Cleanroom Design and Installation Incheon 2013 10 7,600m2 Camera Module
12 DID Co., Ltd. Design and installation of cleanrooms for the second floor of the factory #1 Cheonan, Chungnam 2013 10,000 300m2 BLU,TFT LCD
13 DID Co., Ltd. Design and installation of cleanrooms for the third floor of the factory #2 Cheonan, Chungnam 2012 10,000 500m2 BLU,TFT LCD
14 Digitech Systems Co., Ltd. Hook up works for ventilation ducts Paju, Gyeonggi 2012 - - -
15 Sinnara Construction Co., Ltd.
Extension works for Seonyu factory #1 for Digitech Systems Paju, Gyeonggi 2012 10,000 4,000m2 Touch screens
16 BIO & CHEMICAL R&D Production and installation of microorganism rooms, stability sample rooms and culture rooms Yeoju, Gyeonggi 2012 10,000 4,500m2 Production of
pharmaceuticals
17 Korea Thumb Vet Co., Ltd. Supplementary works for KVGMP Iksan, Jeonbuk 2012 - - Production of animal medicine
18 DID Co., Ltd. Cleanroom Design and Installation Cheonan, Chungnam 2011 1,000 6,300m2 BLU,TFT LCD
19 CERAGEM MEDISYS Co., Ltd. Installation of constant temperature and humidity facilities Gwangju, Jeonnam 2010 - 500m2 Medical devices
20 EIG Co., Ltd. Installation of constant temperature and humidity facilities Cheonan, Chungnam 2010 - 500m2 Batteries for electric vehicles
21 C&C Automotive Cleanroom Design and Installation Yeoju, Gyeonggi 2010 - 2,500m2 Automotive navigation systems
22 NENSYS Co., Ltd. Installation of constant temperature and humidity facilities Suwon, Gyeonggi 2010 - 3,800m2 Production of medical compounds
23 Zeus Co., Ltd. Production and installation of LGD P8 EX ME & skirts Paju, Gyeonggi 2010 - 5,500m2 BLU,TFT LCD
24 KCTech Co., Ltd. Production and installation of LGD P8 EX ME & skirts Paju, Gyeonggi 2010 - 5,500m2 BLU,TFT LCD
25 SLS Co., Ltd. Production and installation of LGD P8 EX ME & skirts Paju, Gyeonggi 2010 - 5,500m2 BLU,TFT LCD
26 Korea Powertrain Cleanroom Design and Installation Waegwan, Gyeongbuk 2010 10,000 1,200m2 Automotive components
27 DID Co., Ltd. Utility system works for facility lines Cheonan, Chungnam 2009 1,000 6,000m2 BLU,TFT LCD
28 Samchundang Pharm Co., Ltd. Cleanroom Design and Installation Hyangnam, Gyeonggi 2009 1,000 4,200m2 Production of
pharmaceuticals
NO Customer Project Name Site Year Class Scale Item
29 Kyongbo Pharm Cleanroom Design and Installation Asan, Chungnam 2009 1,000 3,500m2 Production of
pharmaceuticals
30 NK BIO Cleanroom Design and Installation Sunggnam, Gyeonggi 2008 1,000 1,000m2 Stem cells
31 Kyongbo Pharm Cleanroom Design and Installation Asan, Chungnam 2008 1,000 3,500m2 Raw ingredients
32 KOLMAR KOREA Cleanroom Design and Installation Yeongi, Chungnam 2008 1,000 4,700m2 Production of cosmetics
33 DID Co., Ltd. Cleanroom Design and Installation Cheonan, Chungnam 2008 1,000 6,300m2 BLU,TFT LCD
34 Daesung Electric Co., Ltd. Repair and renovation of cleanrooms Ansan, Gyeonggi 2007 1,000 3,700m2 Automotive components
35 BIO & CHEMICAL R&D Cleanroom Design and Installation Yeoju, Gyeonggi 2007 100 4,000m2 Production of pharmaceuticals
36 Praxair Surface Technologies Cleanroom Design and Installation Cheonan, Chungnam 2006 1,000 2,000m2 Production of industrial
gases
37 Soon Chun Hyang University Hospital Installation of air conditioning facilities Yongsan, Seoul 2006 1,000 2,300m2 Surgical rooms
38 SJ Construction Co., Ltd. Cleanroom Design and Installation Eumseong, Chungbuk 2006 1,000 2,500m2 Electronic components
39 ACE, Inc. Installation of constant temperature and humidity facilities Mapo, Seoul 2005 1,000 1,200m2 BLU,TFT LCD
40 TSTI Installation of constant temperature and humidity facilities Asan, Chungnam 2005 1,000 1,000m2 Equipment measuring
rooms
41 Songdo Hospital Cleanroom Design and Installation Incheon 2005 1,000 3,900m2 Surgical rooms
42 Young Poong Pharmaceutical Cleanroom Design and Installation Incheon 2005 1,000 4,300m2 Production of
pharmaceuticals
43 Hanlim Pharmaceutical Cleanroom Design and Installation Yongin, Gyeonggi 2005 1,000 4,900m2 Production of
pharmaceuticals
44 Kangnam University Installation of constant temperature and humidity facilities Suwon, Gyeonggi 2005 - 500m2 Audio rooms
45 Hana Pharm Cleanroom Design and Installation Hwaseong, Gyeonggi 2004 1,000 3,000m2 Production of
pharmaceuticals
46 Kyungdong Pharm Cleanroom Design and Installation Osan, Gyeonggi 2004 100 5,500m2 Production of pharmaceuticals
47 Yonsei University Severance Hospital Cleanroom Design and Installation Sinchon, Seoul 2004 1,000 2,000m2 Surgical rooms
48 CJ Cleanroom Design and Installation Icheon, Gyeonggi 2004 1,000 5,000m2 Production of
pharmaceuticals
49 Soon Chun Hyang University Hospital
Installation of air conditioning facilities in general surgical rooms Yongsan, Seoul 2004 1,000 1,500m2 Surgical rooms
50 Korea Otsuka Pharmaceuticals Cleanroom Design and Installation Hyangnam,
Gyeonggi 2004 1,000 4,000m2 Production of pharmaceuticals
51 CJ Cleanroom Design and Installation Eumseong, Chungbuk 2003 1,000 6,200m2 Production of
pharmaceuticals
52 ISU Chemical Cleanroom Design and Installation Sinchon, Seoul 2003 1,000 3,500m2 Production of pharmaceuticals
53 KOLMAR KOREA Cleanroom Design and Installation Yeongi, Chungnam 2003 1,000 4,800m2 Production of
pharmaceuticals
54 BIO & CHEMICAL R&D Extension works for cleanrooms Incheon 2003 1,000 4,000m2 Production of pharmaceuticals
55 Wooyoung Co., Ltd Extension works for cleanrooms Osan, Gyeonggi 2002 1,000 2,800m2 BLU,TFT LCD
56 D&D Tech Extension works for cleanrooms Osan, Gyeonggi 2002 1,000 2,500m2 BLU,TFT LCD
57 Insect Bio Cleanroom Design and Installation Daejeon 2002 1,000 3,300m2 Production of pharmaceuticals
www.cacr.co.kr
MAPPERFORMANCE
NO Customer Project Name Site Year Class Scale Item
58 CJ Construction of cleanroom equipment Seoul 2002 1,000 5,000m2 Production of pharmaceuticals
59 Soon Chun Hyang University Hospital Construction of new cleanrooms for ICU Yongsan, Seoul 2002 1,000 2,000m2 Surgical rooms
60 Estech Pharma Construction of cooling storages Hwaseong, Gyeonggi 2002 1,000 1,500m2 Production of
pharmaceuticals
61 CJ Production Technology Center Cleanroom Design and Installation Seoul 2001 1,000 4,300m2 Production of
pharmaceuticals
62 Whanin Pharm Cleanroom Design and Installation Anseong, Gyeonggi 2001 1,000 1,500m2 Production of
pharmaceuticals
63 Onnuri Hospital Cleanroom Design and Installation Seoul 2001 1,000 2,000m2 Surgical rooms
64 Ducksung M&P Installation of heating and cooling systems for factory building Seoul 2001 1,000 3,500m2 Precision molding
65 DID Co., Ltd. Construction of cleanrooms for production building Cheonan, Chungnam 2000 1,000 7,200m2 BLU,TFT LCD
66 Hi-Q Co., Ltd. Cleanroom Design and Installation Gunpo, Gyeonggi 2000 1,000 2,000m2 Semiconductors
67 Samsung Pharm Cleanroom Design and Installation Hyangnam, Gyeonggi 2000 1,000 4,500m2 Production of
pharmaceuticals
NO Customer Project Name Site Year Class Scale Item
1 Cheil Industries Mobile1 Over Bridge Mechanical Work(Fire protection piping) Hanoi, Vietnam 2015 - 1,400m2 Production of mobile
phones
2 Daeduck GDS Installation of cleanrooms Hanoi, Vietnam 2015 100,000 1,100m2 PCB
3 CAMMSYS Vina Design and installation of cleanrooms Hanoi, Vietnam 2014 10 5,400m2 Camera modules
4 Sun Yang DNT, Manufacturing Factory1 Design and installation of cleanrooms Weihai, China 2012 10 4,200m2 Camera modules
5 Sun Yang DNT, Manufacturing Factory1 Design and installation of cleanrooms Weihai, China 2012 1,000 3,400m2 Camera modules
6 Donggwang Photoelectrics Design and installation of 3F cleanrooms Nanjing, China 2012 1,000 11,200m2 BLU,TFT LCD
7 Donggwang Photoelectrics Design and installation of cleanrooms Nanjing, China 2011 1,000 11,200m2 BLU,TFT LCD
8 Lumens Design and installation of cleanrooms Suzhou, China 2010 1,000 5,500m2 LED
9 Dongwa Photoelectrics Design and installation of the second cleanrooms Suzhou, China 2009 1,000 12,000m2 BLU,TFT LCD
10 Dongwa Photoelectrics Design and installation of the first cleanrooms Suzhou, China 2008 1,000 12,000m2 BLU,TFT LCD
11 Corhex Design and installation of cleanrooms Vietnam 2008 1,000 66,000m2 Production of mobile phones
12 Humantec Korea Engineering Design and installation of cleanrooms Suzhou, China 2007 1,000 4,500m2 BLU,TFT LCD
13 CJ Design and installation of cleanrooms Myanmar 2006 1,000 8,000m2 Medicine (injection)
Head Office and Incheon Factory
Seoul Office
Vietnam Corporation
China Corporation
173, Bodeum-ro, Seo-gu, Incheon (17 Block – 14 Lot, Geomdan General Industrial Complex, Oryu-dong)
Tel. (+82) 32-579-3078 Fax. (+82) 32-579-3079
285, Digital-ro, Guro-gu, Seoul (701-1, Ace Twin Tower #1, Guro-dong)
Tel. (+82) 2-862-8283 Fax. (+82) 2-857-7417
No 37, Lane 52 Pham Hung St., My Dinh 2 Ward, Nam Tu Liem Dist., Hanoi, VietnamTel. (+84) 4-6686-3422 VOIP. (+82) 70-8280-8079
Industrial Park, Suzhou, Jiangsu, ChinaTel. (+86) 512-6296-1230 Fax. (+86) 512-6296-1626
◀서인천화력(청라도)신공항고속도로
경인고속도로
강화(초지대교)▶
검단,강화▶
검단▶
▲신공항
계양▼
당하동▼
◀북향.INISTEEL경서동주물공단
(주)영기업
대덕강업
(주)제일티앤에이
서구청
백석초교
배수문
◀석남동
Other Performances Domestic
Other Performances Overseas