cidade de itajai factsheet
TRANSCRIPT
Teekay PetrojarlBeddingen 16N-7014 Trondheim, Norway+47 73 98 30 00 Rev. June 2015
Design
ContraCt
DelivereD
ContraCt status
Client
Duty holDer
status
FielD loCation
Country
new/Conversion
Mooring type
proDuCeD water
water injeCtion
ship shape
time Charter
2012
Q4 2021 + options (1 x 6 years)
petrobras
petrobras
producing
tiro e sidon Field
Brazil
Conversion
spread Mooring / 16 lines
76,000 bwpd
96,000 bwpd
BreaDth42.67 M
water Depth70-1000 M
length overall265.7 M
FPSO Cidade de itajaíFPSO
Storage CapaCity
650,000 bblS
oil produCtion
80,000 bopd
aCComodation
70 people
gaS handling
76 mmSCFd
total liquidS
80,00O bpd
riSer SlotS
34