cii watercom case study aban power published by cii

1
WATERCO M Objective Install Air cooled condensers in place of water cooled condensers at ABAN POWER CO. LIMITED, Tanjavur, Tamilnadu Eliminate fresh water consumption using air Cooled Condensers in place of conventional cooling towers Results How Achieved (incl. resources) Installed Air cooled condensers in place of conventional cooling Towers Cost of the project : Rs 150 million Annual Cost saving : Rs 64 million Payback period : 28 months Size of Prize 188 million m3 per year (Based on more than 70 % of the CPP’s in India (14,000 MW) operate with wet Cooling towers) Contact : ( Mr B V Udhayakumar, [email protected], Ph: 0435 - 2451199 ) WaterCom Best Practice Template Water savings 2 million m3/ year Saving of Rs. 63 million per year Reduction in Water Consumption by 2.4 m3/ MWh

Upload: udhayakumar-venkataraman

Post on 22-Jan-2018

126 views

Category:

Environment


6 download

TRANSCRIPT

WATERCOM

Objective

Install Air cooled condensers in place of water cooled condensers at ABAN POWER CO. LIMITED, Tanjavur, Tamilnadu

Eliminate fresh water consumption using air Cooled Condensers in place of conventional

cooling towers

Results

HowAchieved( incl. resources)

• Installed Air cooled condensers in place of conventional cooling Towers• Cost of the project : Rs 150 mill ion• Annual Cost saving : Rs 64 mill ion• Payback period : 28 months

Size of Prize188 mil l ion m3 per year(Based on more than 70 % of the CPP’s in India (14,000 MW) operate with wet Cooling towers)

Contact : ( Mr B V Udhayakumar, [email protected], Ph: 0435 - 2451199 )

WaterCom Best Practice Template

• Water savings 2 mil l ion m3/ year• Saving of Rs. 63 mil l ion per year• Reduction in Water Consumption by 2.4 m3/ MWh