CIS 517 – IT Project Management ©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University. CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 1 of 28 (Prerequisite: CIS 500) COURSE DESCRIPTION This course provides a practical and theoretical foundation for applying project management techniques to Information Technology projects. Managerial emphasis is placed on the Project Management Institute Project Management Body of Knowledge (PMBOK®) knowledge areas with practical application of project management tools and software to address information technology opportunities. INSTRUCTIONAL MATERIALS Required Resources Schwalbe, K. (2011). Information technology project management. (6th revised ed.). Boston: Course Technology-Cengage. Microsoft Office and Microsoft Project or their equivalents such as OpenOffice and Open Project are required. Tutorials for Microsoft Office 2010 can be found on Microsoft’s support site, located at http://office.microsoft.com/en-us/support/training-FX101782702.aspx. Supplemental Resources The textbook and course learning outcomes are aligned around the Project Management Institute’s Project Management Body of Knowledge (PMBOK® Guide)-Fourth Edition. Additional resources are available at www.pmi.org. COURSE LEARNING OUTCOMES 1. Describe the knowledge and processes areas of project management in accordance to the Project Management Institute Project Management Body of Knowledge (PMBOK®) Guide. 2. Identify how project management improves the success of information technology projects. 3. Describe and demonstrate ethical practices in project management. 4. Compare the PMBOK® process groups and knowledge areas. 5. Summarize how the PMBOK® process groups and knowledge areas are involved throughout the project life cycle. 6. Explain the relationship of the scope of a project to the work breakdown structure. 7. Distinguish among various time management techniques such as CPM, Gantt charts, and the PERT method. 8. Evaluate the different cost management factors in an IT project management context. 9. Explain and defend the various quality factors in project quality. 10. Examine the human resource factors that can impact project management. 11. Compare the factors and constituents in effective project communication. 12. Compare and contrast the sources and mitigating factors of project risk. 13. Summarize the tools and techniques in project procurement. 14. Use project management and graphic software to plan and manage a project throughout the project life cycle. 15. Use technology and information resources to research issues in IT project management. 16. Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Upload: chun-yu-poon

Post on 20-Dec-2015

7 views

Category:

Documents


3 download

DESCRIPTION

student guide

TRANSCRIPT

Page 1: CIS517 Student Guide

CIS 517 – IT Project Management

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 1 of 28

(Prerequisite: CIS 500)

COURSE DESCRIPTION

This course provides a practical and theoretical foundation for applying project management techniques to Information Technology projects. Managerial emphasis is placed on the Project Management Institute Project Management Body of Knowledge (PMBOK®) knowledge areas with practical application of project management tools and software to address information technology opportunities.

INSTRUCTIONAL MATERIALS

Required Resources

Schwalbe, K. (2011). Information technology project management. (6th revised ed.). Boston: Course Technology-Cengage.

Microsoft Office and Microsoft Project or their equivalents such as OpenOffice and Open Project are required. Tutorials for Microsoft Office 2010 can be found on Microsoft’s support site, located at http://office.microsoft.com/en-us/support/training-FX101782702.aspx.

Supplemental Resources

The textbook and course learning outcomes are aligned around the Project Management Institute’s Project Management Body of Knowledge (PMBOK® Guide)-Fourth Edition. Additional resources are available at www.pmi.org.

COURSE LEARNING OUTCOMES

1. Describe the knowledge and processes areas of project management in accordance to the Project Management Institute Project Management Body of Knowledge (PMBOK®) Guide.

2. Identify how project management improves the success of information technology projects.

3. Describe and demonstrate ethical practices in project management.

4. Compare the PMBOK® process groups and knowledge areas.

5. Summarize how the PMBOK® process groups and knowledge areas are involved throughout the project life cycle.

6. Explain the relationship of the scope of a project to the work breakdown structure.

7. Distinguish among various time management techniques such as CPM, Gantt charts, and the PERT method.

8. Evaluate the different cost management factors in an IT project management context.

9. Explain and defend the various quality factors in project quality.

10. Examine the human resource factors that can impact project management.

11. Compare the factors and constituents in effective project communication.

12. Compare and contrast the sources and mitigating factors of project risk.

13. Summarize the tools and techniques in project procurement.

14. Use project management and graphic software to plan and manage a project throughout the project life cycle.

15. Use technology and information resources to research issues in IT project management.

16. Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Page 2: CIS517 Student Guide

CIS 517 – IT Project Management

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 2 of 28

WEEKLY COURSE SCHEDULE

The standard requirement for a 4.5 credit hour course is for students to spend 13.5 hours in weekly work. This includes preparation, activities, and evaluation regardless of delivery mode.

Week Preparation, Activities, and Evaluation Points

1 Preparation

Reading(s)

o Chapter 1: Introduction to Project Management

o Chapter 2: The Project Management and Information Technology Context

Activities

Discussions

Evaluation

None

20

2 Preparation

Reading(s)

o Chapter 3: The Project Management Process Groups: A Case Study

Activities

Discussions

Evaluation

Assignment 1: IT Project Management Assessment

20

75

3 Preparation

Reading(s)

o Appendix 1: Guide to Using Microsoft Project 2010

o Chapter 4: Project Integration Management

Activities

Discussions

Evaluation

Case Study 1: Green Computing Research Project – Part 1

20

70

4 Preparation

Reading(s)

o Chapter 5: Project Scope Management

Activities

Discussions

Evaluation

Assignment 2: Scope and Time Management

20

75

5 Preparation

Reading(s)

o Chapter 6: Project Time Management

Activities

Page 3: CIS517 Student Guide

CIS 517 – IT Project Management

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 3 of 28

Discussions

Evaluation

Midterm Exam: Chapters 1 through 5, and Appendix 1

20

100

6 Preparation

Reading(s)

o Chapter 7: Project Cost Management

Activities

Discussions

Evaluation

Case Study 2: Green Computing Research Project – Part 2

20

70

7 Preparation

Reading(s)

o Chapter 8: Project Quality Management

o Chapter 9: Project Human Resource Management

Activities

Discussions

Evaluation

Assignment 3: Cost and Quality

20

75

8 Preparation

Reading(s)

o Chapter 10: Project Communications Management

Activities

Discussions

Evaluation

Assignment 4: Communication and Risk

20

75

9 Preparation

Reading(s)

o Chapter 11: Project Risk Management

Activities

Discussions

Evaluation

Case Study 3: Green Computing Research Project – Part 5

20

60

10 Preparation

Reading(s)

o Chapter 12: Project Procurement Management

e-Activity

o Search the Web for an IT-specific request for proposal (RFP) or request for quotation (RFQ) and be prepared to measure it against Figure 12-4.

Activities

Discussions

Evaluation

20

Page 4: CIS517 Student Guide

CIS 517 – IT Project Management

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 4 of 28

Term Paper: Final Project 100

11 Preparation

Reading(s): None

Activities

Discussions

Evaluation

Final Exam: Chapters 7 through 12

100

Page 5: CIS517 Student Guide

CIS 517 – IT Project Management

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 5 of 28

GRADING SCALE – GRADUATE

Assignment Total Points % of

Grade

Assignment 1: IT Project Management Assessment 75 7.5%

Assignment 2: Scope and Time Management 75 7.5%

Assignment 3: Costs and Quality 75 7.5%

Assignment 4: Communication and Risk 75 7.5%

Case Study 1: Green Computing Research Project–Part 1 70 7%

Case Study 2: Green Computing Research Project–Part 2 70 7%

Case Study 3: Green Computing Research Project–Part 5 60 6%

Term Paper: Final Project 100 10%

Midterm Exam (Chapters 1-5, and Appendix 1) 100 10%

Final Exam (Chapters 7-12) 100 10%

Tests are open book with a 2-hour time limit and may contain multiple choice, true / false, and essay questions.

Participation (20 discussions worth 10 points apiece)

Note: Week 11 discussions are not graded.

200 20%

Totals 1,000 100%

Points Percentage Grade

900 – 1,000 90% – 100% A

800 – 899 80% – 89% B

700 – 799 70% – 79% C

Below 700 Below 70% F

Writing Assignments

The objective of the School of Information Systems’ writing assignments is to promote attitudes and skills that will improve a student’s ability to communicate in writing, develop research skills and documentation techniques, and encourage critical analysis of data and conclusions specific to the course learning outcomes in the information systems and technology domain.

Page 6: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 6 of 28

Assignment 1: IT Project Management Assessment

Due Week 2 and worth 75 points

Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award.

Write a two to three (2-3) page paper in which you:

1. Summarize how the project manager or team exhibited exceptional and ethical project management practices.

2. Discuss the role of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints.

3. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

Describe the knowledge and processes areas of project management in accordance to the Project Management Institute Project Management Body of Knowledge (PMBOK®) Guide.

Describe and demonstrate ethical practices in project management.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 75 Assignment 1: IT Project Management Assessment

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

1. Summarize how the project manager or team exhibited exceptional and ethical project management practices.

Weight: 40%

Did not submit or incompletely summarized how the project manager or team exhibited exceptional and ethical project management practices.

Partially summarized how the project manager or team exhibited exceptional and ethical project management practices.

Satisfactorily summarized how the project manager or team exhibited exceptional and ethical project management practices.

Thoroughly summarized how the project manager or team exhibited exceptional and ethical project management practices.

2. Discuss the role of the project manager or team, the organizational setting,

Did not submit or incompletely discussed the role

Partially discussed the role of the project manager or

Satisfactorily discussed the role of the project

Thoroughly discussed the role of the project

Page 7: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 7 of 28

the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints.

Weight: 45%

of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints.

team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints.

manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints.

manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints.

3. 2 references

Weight: 5%

No references provided.

Does not meet the required number of references; some or all references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

4. Clarity, writing mechanics, and formatting requirements

Weight: 10%

More than 6 errors present

5-6 errors present 3-4 errors present 0-2 errors present

Page 8: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 8 of 28

Case Study 1: Green Computing Research Project – Part 1

Due Week 3 and worth 70 points

Read the Green Computing Research Project, Part 1 in Appendix C. Assume the project budget is $500,000 and will take six months to complete and that you must select the project team as soon as possible. Use project charter examples from Chapters 3 and 4 as support in your answer.

Prepare a project charter for the Green Computing Research Project.

Write a two to three (2-3) page paper in which you include the following:

1. Project title and date of authorization

2. Project manager name and contact information

3. A summary schedule

4. Project budget summary

5. Brief description of the project’s objectives

6. Project success criteria

7. Summary of planned approach for managing the project

8. Roles and responsibilities matrix

9. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

Describe the knowledge and processes areas of project management in accordance to the Project Management Institute Project Management Body of Knowledge (PMBOK®) Guide.

Describe and demonstrate ethical practices in project management.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 70 Case Study 1: Green Computing Research Project – Part 1

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

1. Create a project title and date of authorization.

Weight: 2%

Did not submit or incompletely created a project title and date of

Partially created a project title and date of authorization.

Satisfactorily created a project title and date of authorization.

Thoroughly created a project title and date of authorization.

Page 9: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 9 of 28

authorization.

2. Include a project manager name and contact information. Weight: 3%

Did not submit or incompletely included a project manager name and contact information.

Partially included a project manager name and contact information.

Satisfactorily included a project manager name and contact information.

Thoroughly included a project manager name and contact information.

3. Create a summary schedule.

Weight: 10%

Did not submit or incompletely created a summary schedule.

Partially created a summary schedule.

Satisfactorily created a summary schedule.

Thoroughly created a summary schedule.

4. Create a project budget summary.

Weight: 15%

Did not submit or incompletely created a project budget summary.

Partially created a project budget summary.

Satisfactorily created a project budget summary.

Thoroughly created a project budget summary.

5. Describe briefly the project’s objectives.

Weight: 10%

Did not submit or incompletely described briefly the project’s objectives.

Partially described briefly the project’s objectives.

Satisfactorily described briefly the project’s objectives.

Thoroughly described briefly the project’s objectives.

6. Develop the project success criteria.

Weight: 15%

Did not submit or incompletely developed the project success criteria.

Partially developed the project success criteria.

Satisfactorily developed the project success criteria.

Thoroughly developed the project success criteria.

7. Create a summary of the planned approach for managing the project.

Weight: 15%

Did not submit or incompletely created a summary of the planned approach for managing the project.

Partially created a summary of the planned approach for managing the project.

Satisfactorily created a summary of the planned approach for managing the project.

Thoroughly created a summary of the planned approach for managing the project.

8. Develop a roles and responsibilities matrix.

Weight: 15%

Did not submit or incompletely developed a roles and responsibilities matrix.

Partially developed a roles and responsibilities matrix.

Satisfactorily developed a roles and responsibilities matrix.

Thoroughly developed a roles and responsibilities matrix.

9. 2 references

Weight: 5%

No references provided.

Does not meet the required number of references; some or all references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

10. Clarity, writing mechanics, and formatting requirements

Weight: 10%

More than 6 errors present

5-6 errors present 3-4 errors present 0-2 errors present

Page 10: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 10 of 28

Assignment 2: Scope and Time Management

Due Week 4 and worth 75 points

This assignment consists of two (2) sections: a Work Breakdown Structure (WBS) and a summary document. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for.

Overview:

As the IT Project Manager, you have been assigned a project to deploy ten (10) wireless access points in your company’s warehouse and break room within the next ninety (90) days. You are free to make assumptions that satisfy the scope of the project such as training, wiring, consulting efforts, etc.

Your submission will also be graded on the accuracy of your work package assumptions and duration estimates.

Section 1: Work Breakdown Structure (WBS)

Required Format (MS Project File)

1. Use Microsoft Project or Open Project (.mpp format) to create a WBS in which you:

a. Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

b. Ensure the main WBS tasks headings are the 5 PMBOK® process areas.

c. Create a Work Breakdown Structure Code for each task.

d. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

e. Create accurate work package assumptions and duration estimates.

Section 1 of your assignment must follow these formatting requirements:

Microsoft Project or its open source alternative in .mpp format.

Section 2: Summary Document

Required Format (MS Word File)

2. Use Microsoft Word to write a one (1) page summary in which you:

a. Summarize how this activity improves the chances of your future IT project being a success.

b. Use at least one (1) quality resource in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Section 2 of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

Page 11: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 11 of 28

Identify how project management improves the success of information technology projects.

Explain the relationship of the scope of a project to the work breakdown structure.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 75 Assignment 2: Scope and Time Management

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

Section 1: Work Breakdown Structure (WBS)

1a. Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

Weight: 35%

Did not submit or incompletely created 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

Partially created 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

Satisfactorily created 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

Thoroughly created 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

1b. Ensure the main WBS tasks headings are the 5 PMBOK

® process

areas. Weight: 10%

Did not submit or incompletely ensured the main WBS tasks headings are the 5 PMBOK

® process

areas.

Partially ensured the main WBS tasks headings are the 5 PMBOK

®

process areas.

Satisfactorily ensured the main WBS tasks headings are the 5 PMBOK

® process

areas.

Thoroughly ensured the main WBS tasks headings are the 5 PMBOK

®

process areas.

1c. Create a Work Breakdown Structure Code for each task.

Weight: 10%

Did not submit or incompletely created a Work Breakdown Structure Code for each task.

Partially created a Work Breakdown Structure Code for each task.

Satisfactorily created a Work Breakdown Structure Code for each task.

Thoroughly created a Work Breakdown Structure Code for each task.

1d. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Weight: 10%

Did not submit or incompletely determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Partially determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Satisfactorily determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Thoroughly determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

1e. Create accurate work package assumptions and duration estimates.

Weight: 10%

Did not submit or incompletely created accurate work package assumptions and duration estimates.

Partially created accurate work package assumptions and duration estimates.

Satisfactorily created accurate work package assumptions and duration estimates.

Thoroughly created accurate work package assumptions and duration estimates.

Section 2: Summary Document

2a. Summarize in one to Did not submit or Partially Satisfactorily Thoroughly

Page 12: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 12 of 28

two (1 or 2) paragraphs how this activity improves the chances of your future IT project being a success.

Weight: 10%

incompletely summarized in one to two (1 or 2) paragraphs how this activity improves the chances of your future IT project being a success.

summarized in one to two (1 or 2) paragraphs how this activity improves the chances of your future IT project being a success.

summarized in one to two (1 or 2) paragraphs how this activity improves the chances of your future IT project being a success.

summarized in one to two (1 or 2) paragraphs how this activity improves the chances of your future IT project being a success.

2b. 1 reference

Weight: 5%

No references provided.

Does not meet the required number of references; some or all references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

3. Clarity, writing mechanics, and formatting requirements

Weight: 10%

More than 6 errors present

5-6 errors present 3-4 errors present 0-2 errors present

Page 13: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 13 of 28

Case Study 2: Green Computing Research Project – Part 2

Due Week 6 and worth 70 points

Read the Green Computing Research Project, Part 2 in Appendix C. Document the requirements and develop a scope statement.

Write a two to three (2-3) page paper in which you:

1. Document the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix.

2. Include a list of questions to ask the sponsor about the project scope. Include at least six (6) questions for full credit.

3. Develop a scope statement for the project.

4. Describe product characteristics and deliverables.

5. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

Summarize how the PMBOK® process groups and knowledge area are involved throughout the project life cycle.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 70 Case Study 2: Green Computing Research Project – Part 2

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

1. Document the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix.

Weight: 20%

Did not submit or incompletely documented the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix.

Partially documented the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix.

Satisfactorily documented the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix.

Thoroughly documented the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix.

2. Include a list of Did not submit or Partially included a Satisfactorily Thoroughly

Page 14: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 14 of 28

questions to ask the sponsor about the project scope. Include at least six (6) questions for full credit.

Weight: 20%

incompletely included a list of 1-2 questions to ask the sponsor about the project scope.

list of 3-4 questions to ask the sponsor about the project scope.

included a list of 5 questions to ask the sponsor about the project scope.

included a list of at least six (6) questions to ask the sponsor about the project scope.

3. Develop a scope statement for the project.

Weight: 20%

Did not submit or incompletely developed a scope statement for the project.

Partially developed a scope statement for the project.

Satisfactorily developed a scope statement for the project.

Thoroughly developed a scope statement for the project.

4. Describe product characteristics and deliverables.

Weight: 20%

Did not submit or incompletely described product characteristics and deliverables.

Partially described product characteristics and deliverables.

Satisfactorily described product characteristics and deliverables.

Thoroughly described product characteristics and deliverables.

5. 2 references

Weight: 5%

No references provided.

Does not meet the required number of references; some or all references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

6. Clarity, writing mechanics, and formatting requirements

Weight: 15%

More than 6 errors present

5-6 errors present 3-4 errors present 0-2 errors present

Page 15: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 15 of 28

Assignment 3: Cost and Quality

Due Week 7 and worth 75 points

This assignment is a continuation and enhancement of Assignment 2.

Create a Work Breakdown Structure (WBS), and assign resources and cost by using a project management tool. As the IT project manager, you have been assigned a project to deploy ten (10) wireless access points in your company’s warehouse and break room within the next ninety (90) days. You are free to make assumptions that satisfy the scope of the project such as training, wiring, consulting efforts, etc.

Your submission will be made in .mpp format and will be graded on the accuracy of your work package assumptions and duration estimates.

In your assignment, address the following:

1. Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

2. Ensure the main WBS tasks headings are the 5 PMBOK® process areas.

3. Create a Work Breakdown Structure Code for each task.

4. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

5. Create accurate work package assumptions and duration estimates.

6. Include 7 resources assigned in the Resource Sheet as “Work” types and 3 resources assigned as “Material” types.

7. Ensure the Resources are paid no more than $30/hour and that the “Material” cost per use will not exceed $50.

8. Include your resources and materials from the Resource Sheet in the task sheet.

9. Create 10 dependencies in the Task Sheet.

Your assignment must follow these formatting requirements:

Microsoft Project or its open source alternative in .mpp format.

The specific course learning outcomes associated with this assignment are:

Describe the knowledge and processes areas of project management in accordance to the Project Management Institute Project Management Body of Knowledge (PMBOK®) Guide.

Evaluate the different cost management factors in an IT project management context.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 75 Assignment 3: Cost and Quality

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

1. Create 15 or more Did not submit or Partially created 15 Satisfactorily Thoroughly created

Page 16: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 16 of 28

decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

Weight: 10%

incompletely created 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

created 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

2. Ensure the main WBS tasks headings are the 5 PMBOK

® process areas.

Weight: 10%

Did not submit or incompletely ensured the main WBS tasks headings are the 5 PMBOK

® process

areas.

Partially ensured the main WBS tasks headings are the 5 PMBOK

®

process areas.

Satisfactorily ensured the main WBS tasks headings are the 5 PMBOK

® process

areas.

Thoroughly ensured the main WBS tasks headings are the 5 PMBOK

®

process areas.

3. Create a Work Breakdown Structure Code for each task.

Weight: 10%

Did not submit or incompletely created a Work Breakdown Structure Code for each task.

Partially created a Work Breakdown Structure Code for each task.

Satisfactorily created a Work Breakdown Structure Code for each task.

Thoroughly created a Work Breakdown Structure Code for each task.

4. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Weight: 10%

Did not submit or incompletely determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Partially determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Satisfactorily determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

Thoroughly determined an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

5. Create accurate work package assumptions and duration estimates.

Weight: 10%

Did not submit or incompletely created accurate work package assumptions and duration estimates.

Partially created accurate work package assumptions and duration estimates.

Satisfactorily created accurate work package assumptions and duration estimates.

Thoroughly created accurate work package assumptions and duration estimates.

6. Include 7 resources assigned in the Resource Sheet as “Work” types and 3 resources assigned as “Material” types.

Weight: 15%

Did not submit or incompletely included 7 resources assigned in the Resource Sheet as “Work” types and 3 resources assigned as “Material” types.

Partially included 7 resources assigned in the Resource Sheet as “Work” types and 3 resources assigned as “Material” types.

Satisfactorily included 7 resources assigned in the Resource Sheet as “Work” types and 3 resources assigned as “Material” types.

Thoroughly included 7 resources assigned in the Resource Sheet as “Work” types and 3 resources assigned as “Material” types.

7. Ensure the Resources are paid no more than $30/hour and that the “Material” cost per use will not exceed $50.

Weight: 15%

Did not submit or incompletely ensured the Resources are paid no more than $30/hour and that the “Material” cost per use will not exceed $50.

Partially ensured the Resources are paid no more than $30/hour and that the “Material” cost per use will not exceed $50.

Satisfactorily ensured the Resources are paid no more than $30/hour and that the “Material” cost per use will not exceed $50.

Thoroughly ensured the Resources are paid no more than $30/hour and that the “Material” cost per use will not exceed $50.

8. Include your resources and materials from the

Did not submit or incompletely

Partially included your resources and

Satisfactorily included your

Thoroughly included your

Page 17: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 17 of 28

Resource Sheet in the task sheet.

Weight: 15%

included your resources and materials from the Resource Sheet in the task sheet.

materials from the Resource Sheet in the task sheet.

resources and materials from the Resource Sheet in the task sheet.

resources and materials from the Resource Sheet in the task sheet.

9. Create 10 dependencies in the Task Sheet.

Weight: 5%

Did not submit or incompletely created 1-5 dependencies in the Task Sheet.

Partially created 6-8 dependencies in the Task Sheet.

Satisfactorily created 8 -9 dependencies in the Task Sheet.

Thoroughly created 10 dependencies in the Task Sheet.

Page 18: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 18 of 28

Assignment 4: Communication and Risk

Due Week 8 and worth 75 points

In this assignment you are to submit the PowerPoint Presentation for the term paper. This is the first part of your term paper submission. Part A is a persuasive PowerPoint presentation of up to 15 slides that you will present to the Executive Committee of Fiction Corporation. Use the Notes Section of PowerPoint to give a brief overview of each slide.

The PowerPoint presentation must include the following:

1. Introduction: project name, a brief description of the project, and deliverables of the project.

2. Project organization: organizational charts and project responsibilities.

3. Management and technical approaches: management objectives, Project controls, Project staffing, Technical processes.

4. Work to perform: major work packages and deliverables.

5. Project schedule: summary schedule.

6. Project budget: summary budget.

7. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Note: You will be graded on the quality of your slides, the logic/organization of the slides, your language skills, and your writing skills.

The specific course learning outcomes associated with this assignment are:

Describe the knowledge and processes areas of project management in accordance to the Project Management Institute Project Management Body of Knowledge (PMBOK®) Guide.

Evaluate the different cost management factors in an IT project management context.

Identify how project management improves the success of information technology projects.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 75 Assignment 4: Communication and Risk

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

1. Introduction: project name, a brief description of the project, and deliverables of the project.

Weight: 10%

Did not submit or incompletely included the Introduction: project name, a brief description of the project, and deliverables of the project.

Partially included the Introduction: project name, a brief description of the project, and deliverables of the project.

Satisfactorily included the Introduction: project name, a brief description of the project, and deliverables of the project.

Thoroughly included the Introduction: project name, a brief description of the project, and deliverables of the project.

2. Project organization: organizational charts and

Did not submit or incompletely developed the

Partially developed the project organization:

Satisfactorily developed the project

Thoroughly developed the project

Page 19: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 19 of 28

project responsibilities.

Weight: 10%

project organization: organizational charts and project responsibilities.

organizational charts and project responsibilities.

organization: organizational charts and project responsibilities.

organization: organizational charts and project responsibilities.

3. Management and technical approaches: management objectives, Project controls, Project staffing, Technical processes.

Weight: 10%

Did not submit or incompletely developed management and technical approaches: management objectives, Project controls, Project staffing, Technical processes.

Partially developed management and technical approaches: management objectives, Project controls, Project staffing, Technical processes.

Satisfactorily developed management and technical approaches: management objectives, Project controls, Project staffing, Technical processes.

Thoroughly developed management and technical approaches: management objectives, Project controls, Project staffing, Technical processes.

4. Work to perform: major work packages and deliverables.

Weight: 20%

Did not submit or incompletely developed work to perform: major work packages and deliverables.

Partially developed work to perform: major work packages and deliverables.

Satisfactorily developed work to perform: major work packages and deliverables.

Thoroughly developed work to perform: major work packages and deliverables.

5. Project schedule: summary schedule.

Weight: 20%

Did not submit or incompletely developed a project schedule: summary schedule.

Partially developed a project schedule: summary schedule.

Satisfactorily developed a project schedule: summary schedule.

Thoroughly developed a project schedule: summary schedule.

6. Project budget: summary budget.

Weight: 15%

Did not submit or incompletely developed a project budget: summary budget.

Partially developed a project budget: summary budget.

Satisfactorily developed a project budget: summary budget.

Thoroughly developed a project budget: summary budget.

7. 2 references

Weight: 5%

No references provided.

Does not meet the required number of references; some or all references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

8. Clarity, writing mechanics, and formatting requirements

Weight: 10%

More than 6 errors present

5-6 errors present 3-4 errors present 0-2 errors present

Page 20: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 20 of 28

Case Study 3: Green Computing Research Project – Part 5

Due Week 9 and worth 60 points

Read the Green Computing Research Project, Part 5 in Appendix C and review the Seven Basic Tools of Quality located in Chapter 8.

Write a two to three (2-3) page paper in which you:

1. Select one (1) of the seven (7) tools of quality from Chapter 8 and create a scenario related to this project where it would be useful.

2. Document and defend your recommendation, scenario, and tool.

3. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

Explain and defend the various quality factors in project quality.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 60 Case Study 3: Green Computing Research Project – Part 5

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

1. Select one (1) of the seven (7) tools of quality from Chapter 8 and create a scenario related to this project where it would be useful.

Weight: 40%

Did not submit or incompletely selected one (1) of the seven (7) tools of quality from Chapter 8 and created a scenario related to this project where it would be useful.

Partially selected one (1) of the seven (7) tools of quality from Chapter 8 and created a scenario related to this project where it would be useful.

Satisfactorily selected one (1) of the seven (7) tools of quality from Chapter 8 and created a scenario related to this project where it would be useful.

Thoroughly selected one (1) of the seven (7) tools of quality from Chapter 8 and created a scenario related to this project where it would be useful.

2. Document and defend your recommendation, scenario, and tool.

Weight: 45%

Did not submit or incompletely documented and defended your recommendation, scenario, and tool.

Partially documented and defended your recommendation, scenario, and tool.

Satisfactorily documented and defended your recommendation, scenario, and tool.

Thoroughly documented and defended your recommendation, scenario, and tool.

Page 21: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 21 of 28

3. 2 references

Weight: 5%

No references provided.

Does not meet the required number of references; some or all references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

4. Clarity, writing mechanics, and formatting requirements

Weight: 10%

More than 6 errors present

5-6 errors present 3-4 errors present 0-2 errors present

Page 22: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 22 of 28

Term Paper: Final Project

Due Week 10 and worth 100 points

This assignment consists of two (2) sections: a written paper and a Work Breakdown Structure (WBS). You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for.

The final term project for this course is based off the background that follows below. Your submission will demonstrate your mastery of project management techniques and tools such as Microsoft Project management in accordance with the PMBOK® knowledge and process areas. You will be graded on the quality, supported assumptions, and the level of detail.

Background

You are a small project management consulting company called Big-Proj that is looking for that big break. You are one of ten (1 of 10) project managers in your organization. Recently, you made a persuasive and high-level presentation of your company’s approach to managing projects on time and on schedule in accordance with the PMBOK®. Leads are pouring in. It looks like business is about to pick up.

Your small but experienced team of ten (10) PMP-certified project managers have managed a wide range of small capital projects, namely wiring closets, wireless, data center moves, network upgrades, and ERP deployments. You have been selected to initiate, plan, execute, monitor, and control and close a data center move in a 30-day period.

Overview

Fiction Corporation is a large national retail chain of 10,000 employees and 500 retail outlets. Fiction is moving its primary data center operation to a new headquarters building several miles away. The company wishes to upgrade its network and correct any security flaws in its infrastructure as part of this move. The Fiction CEO has informed you that the capital budget cannot exceed $500,000 and must not interrupt business operations. What follows is a brief overview that will serve as your foundation in developing the network design.

The data in the center supports remote retail locations, an off-site 100-seat call center and 3 remote warehousing operations 24 hours a day. Any significant downtime to its production systems would impact Fiction Corporation’s operations and profitability. From the data processing viewpoint, the move includes 2 large UPS, 4 RS/6000 AIX application servers, 10 virtualized servers, and 20 PC servers.

The network consists of approximately 500 remote location retail stores connected via frame relay (with ISDN backup) to 10 routers at the data center running a common LAN shared by the entire organization. The retail operations also run WLANs that are on their own subnet. You will have a T1 link and ISDN as its backup. Network managers also need to monitor the status of remote systems. The SNMP management system must be able to detect and report failure of the remote system or its communications link and the status of individual applications.

The company wishes a seamless migration that minimizes impact to its customers and employees. Any gaps in this background will require you to make sound technical and persuasive assumptions that satisfy the customer’s goals that are within the budget guidelines.

You were selected in part due to your detailed analysis and agreement to an implementation cost that will not exceed $500,000. Your network migration plan will be in accordance to the PMBOK® process areas and will use standard project management software to manage the budget and associated tasks. Key to the success of this plan is adherence to the scope, time, and cost baseline.

Page 23: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 23 of 28

Technically, the client must ensure the availability of a T1 link between the remote sites to support remote bridging and development of configurations for all the remote routers.

Students may have to create fictitious assumptions and details in support of this assignment.

Section 1: Written paper

Required Format (MS Project File)

1. Write a ten to fifteen (10-15) page paper in which you:

a. Describe how you would initiate the project.

b. Create a project plan for moving the data center, considering the budget and time constraints.

c. Develop an inclusive plan that incorporates the five (5) process areas and nine (9) knowledge areas of the PMBOK®.

d. Describe how you will monitor and control the plan.

e. Explain the methods you would use to close the project.

f. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Section 1 of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Section 2: Work Breakdown Structure (WBS)

Required Format (MS Project File)

2. Use Microsoft Project or Open Project (.mpp format) to create the project work breakdown structure (WBS) and resource sheet.

Section 2 of your assignment must follow these formatting requirements:

Microsoft Project or its open source alternative in .mpp format.

The specific course learning outcomes associated with this assignment are:

Describe the knowledge and processes areas of project management in accordance to the Project Management Institute Project Management Body of Knowledge (PMBOK®) Guide.

Evaluate the different cost management factors in an IT project management context.

Identify how project management improves the success of information technology projects.

Summarize the tools and techniques in project procurement.

Use technology and information resources to research issues in IT project management.

Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Page 24: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 24 of 28

Points: 100 Term Paper: Final Project

Criteria Unacceptable Below 70% F

Fair 70-79% C

Proficient 80-89% B

Exemplary 90-100% A

Section 1: Written Paper

1a. Describe how you would initiate the project.

Weight: 10%

Did not submit or incompletely described how you would initiate the project.

Partially described how you would initiate the project.

Satisfactorily described how you would initiate the project.

Thoroughly described how you would initiate the project.

1b. Create a project plan for moving the data center, considering the budget and time constraints.

Weight: 15%

Did not submit or incompletely created a project plan for moving the data center, considering the budget and time constraints.

Partially created a project plan for moving the data center, considering the budget and time constraints.

Satisfactorily created a project plan for moving the data center, considering the budget and time constraints.

Thoroughly created a project plan for moving the data center, considering the budget and time constraints.

1c. Develop an inclusive plan that incorporates the five (5) process areas and nine (9) knowledge areas of the PMBOK

®.

Weight: 20%

Did not submit or incompletely developed an inclusive plan that incorporates the 1-2 process areas and 1-3 knowledge areas of the PMBOK

®.

Partially developed an inclusive plan that incorporates the 3 process areas and 4-6 knowledge areas of the PMBOK

®.

Satisfactorily developed an inclusive plan that incorporates the 4 process areas and 7-8 knowledge areas of the PMBOK

®.

Thoroughly developed an inclusive plan that incorporates the 5 process areas and 9 knowledge areas of the PMBOK

®.

1d. Describe how you will monitor and control the plan.

Weight: 10%

Did not submit or incompletely described how you will monitor and control the plan.

Partially described how you will monitor and control the plan.

Satisfactorily described how you will monitor and control the plan.

Thoroughly described how you will monitor and control the plan.

1e. Explain the methods you would use to close the project.

Weight: 10%

Did not submit or incompletely explained the methods you would use to close the project.

Partially explained the methods you would use to close the project.

Satisfactorily explained the methods you would use to close the project.

Thoroughly explained the methods you would use to close the project.

1f. 3 references

Weight: 5%

No references provided.

Does not meet the required number of references; some or all references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

Section 2: Work Breakdown Structure (WBS)

2. Use Microsoft Project or Open Project (.mpp format) to create the project work breakdown structure (WBS) and resource sheet.

Weight: 20%

Did not submit or incompletely used Microsoft Project or Open Project (.mpp format) to create the project work breakdown structure (WBS) and resource sheet.

Partially incompletely used Microsoft Project or Open Project (.mpp format) to create the project work breakdown structure (WBS) and resource sheet.

Satisfactorily incompletely used Microsoft Project or Open Project (.mpp format) to create the project work breakdown structure (WBS) and resource sheet.

Thoroughly incompletely used Microsoft Project or Open Project (.mpp format) to create the project work breakdown structure (WBS) and resource sheet.

3. Clarity, writing mechanics, and

More than 6 errors 5-6 errors present 3-4 errors present 0-2 errors present

Page 25: CIS517 Student Guide

CIS 517 – Assignments and Rubrics

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 25 of 28

formatting requirements

Weight: 10%

present

Page 26: CIS517 Student Guide

CIS 517 – Student Notes

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 26 of 28

Weekly Course Schedule

The purpose of the course schedule is to give you, at a glance, the required preparation, activities, and evaluation components of your course. For more information about your course, whether on-ground or online, access your online course shell.

The expectations for a 4.5 credit hour course are for students to spend 13.5 hours in weekly work. This time estimate includes preparation, activities, and evaluation regardless of the delivery mode.

Instructional Materials

In order to be fully prepared, obtain a copy of the required textbooks and other instructional materials prior to the first day of class. When available, Strayer University provides a link to the first three (3) chapters of your textbook(s) in eBook format. Check your online course shell for availability.

Review the online course shell or check with your professor to determine whether Internet-based assignments and activities are used in this course.

Strayer students are encouraged to purchase their course materials through our designated bookstore MBS Direct. http://bookstore.mbsdirect.net/strayer.htm If a lab is required for the course, MBS Direct is the only vendor that sells the correct registration code so that Strayer students may access labs successfully.

Kaltura Video Sessions

Instructors will record video or screen capture sessions using Kaltura in Weeks 2 and 4. Your instructor may also provide these sessions on a weekly basis to act as student tutorials on the following applicable procedures:

Running and navigating the software or labs that will be used in this course

Demonstrating the use of relevant programming languages and tools through screen capture and live navigation.

Logging into the lab environments and running a sample lab required in this course (if labs are required)

Demonstrating the downloading and installing of software to a student’s computer (if necessary) or using the software already installed in the Strayer University campus labs

Locating or finding files and other student materials that may be required to use in assignments

Submitting assignments in Blackboard

You are strongly advised to use the material provided by faculty in these sessions. Online and Ground instructors will post the Kaltura video recorded sessions to the Instructor Insights folder within the weekly tabs of the online course shell (Blackboard).

Study Buddy Wiki

The School of Information Systems and Technology provides Study Buddy Wikis for nine (9) course categories which include: Homeland Security, Computer Security, Programming, Database Management, Web Design, Software Engineering, Networking, Capstone, and Infrastructure. You will be provided a direct link to the courses aligned within your program to post questions, search for answers, add helpful tips, and to assist other students. You should post to the Study Buddy Wiki board that corresponds to the course(s) you are currently taking. Assigned faculty will be monitoring to assist as needed.

Page 27: CIS517 Student Guide

CIS 517 – Student Notes

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 27 of 28

Discussions

To earn full credit in an online threaded discussion, students must have one original post and a minimum of one other post per discussion thread.

Please note: Material in the online class will be made available on the previous Thursday. As it is always possible that students could lose their work due to unforeseen circumstances, it is a best practice to routinely save a working draft in a separate file before posting in the course discussion area. Professors hold discussions during class time for on-ground students. Check with your professor if any additional discussion participation is required in the online course shell outside of class hours.

Tests

Tests (quizzes, midterm and final exams, essay exams, lab tests, etc.) are available for student access and completion through the online course shell. Check the online course shell to determine how you are expected to take the tests.

Online students are to complete the test by Monday 9:00 a.m. Details regarding due dates are posted in the Blackboard Calendar tool.

On-ground students are to complete the tests after the material is covered and before the next class session.

Assignments

A standardized performance grading rubric is a tool your professor will use to evaluate your written assignments. Review the rubric before submitting assignments that have grading rubrics associated with them to ensure you have met the performance criteria stated on the rubric.

Grades are based on individual effort. There is no group grading; however, working in groups in the online or on-ground classroom is acceptable.

Assignments for online students are always submitted through the online course shell. On-ground professors will inform students on how to submit assignments, whether in paper format or through the online course shell.

Association for Computing Machinery (ACM) Digital Library

The ACM Digital Library is a complete collection of all of ACM’s publications, including ACM journals, conference proceedings, magazines, newsletters, and multimedia titles. The ACM Digital Library contains the largest and most complete full-text archive of articles on computing available today, consisting of: 2.0+ Million Pages of full-text articles , 20,000 New full-text articles added each year, 40+ High Impact Journals , 270+ Conference Proceedings Titles, 9 Magazines (including the flagship Communications of the ACM), 43 Special Interest Groups contributing content.

You are encouraged to search the ACM Digital Library for full-text articles for your writing assignments and Term Papers refereed referenced material. For more information on the ACM Digital Library please watch the video located in the Student Center tab of the online course shell (Blackboard).

To access the ACM Digital Library:

Students:

1. Login to iCampus: http://icampus.strayer.edu

2. Click on Student Services

3. Click on Learning Resource Center

4. Click on Databases

5. Scroll down to Information Systems/Computing

Page 28: CIS517 Student Guide

CIS 517 – Student Notes

©2013 Strayer University. All Rights Reserved. This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed written permission of Strayer University.

CIS 517 Student Version 1132 (1112 12-10-2012) Final Page 28 of 28

6. Click on ACM Digital Library

Resources

The Resource Center navigation button in the online course shell contains helpful links. Strayer University Library Resources are available here as well as other important information. You should review this area to find resources and answers to common questions.

Technical support is available for the following:

For technical questions, please contact Strayer Online Technical Support by logging in to your

iCampus account at https://icampus.strayer.edu/login and submitting a case under “Student

Center,” then “Submit Help Ticket.” If you are unable to log in to your iCampus account, please

contact Technical Support via phone at (877) 642-2999.

For concerns with your class, please access the Solution Center by logging in to your iCampus

account at https://icampus.strayer.edu/login and submitting a case under “Student Center,” then

“Submit Help Ticket.” If you are unable to log in to your iCampus account, please contact the IT

Help Desk at (866) 610-8123 or at mailto:[email protected].

TurnItIn.com is an optional online tool to assess the originality of student written work. Check with your professor for access and use instructions.

The Strayer Policies link on the navigation bar in the online course shell contains academic policies. It is important that students be aware of these policies.