City CouncilMarch 22, 2011
![Page 2: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/2.jpg)
Roller Compacted Concrete
• What is Roller Compacted Concrete (RCC)
• Where has RCC been used
• RCC Construction Process
• 50th Street & Grape Creek Bid Tab
• Street Life Cycle
![Page 3: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/3.jpg)
Roller Compacted Concrete
RCC Pavement
• No Slump
• Consistency of damp gravel
• No forms
• No reinforcing steel
• No finishing
• Placed with asphalt pavers
• Compacted with vibratory rollers
• Normal cement hydration
• Low W/C ratio = limited shrinkage cracks
Reynoldsburg, OH
![Page 4: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/4.jpg)
RCC Construction Projects
Street Projects
• Collector & Residential
• Several in S. Carolina
• 100+ in Columbus, OH
• S. Carolina DOT – 8 Projects
• Interstate Projects
• I-285 Atlanta, GA
• I-385 Greenville, SC
Aiken, SC
![Page 5: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/5.jpg)
RCC Construction Projects
S. Carolina DOT US Hwy 2009
• 10” RCC reconstruction
• 6000 ADT, 4 lanes
• 45 mph
• Replaced 1 mile in 15 days
• Re-opened in 24 hours
![Page 6: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/6.jpg)
RCC Construction Projects
Ohio State University 2002
• 8” RCC reconstruction
• 150 buses/day
• Reconstructed in 1 weekend
• RCC selected for fast
construction process to
complete by 1st football game
![Page 7: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/7.jpg)
RCC Construction Process
•Mid size applications
•200 to 300 tons/hr
•Available at some locations
•Fixed locations
•Capacity reduced due to low
water content of mixture
Central Mix
![Page 8: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/8.jpg)
RCC Construction Process
•High-volume applications
•Excellent mixing efficiency
for dry materials
•250 to 900+ tons/hr
•Mobile, erected on site
•Mobilization costs
Continuous Flow Pugmill
![Page 9: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/9.jpg)
RCC Construction ProcessAsphalt Paver Placement
• High density
• High initial density (85% to 95%)
• Smooth surface depends on initial density
• High-production (1900 LF/day)
• Max lift thick – 8 to 10 in. Lane Ave – Columbus, OH
![Page 10: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/10.jpg)
RCC Construction ProcessAsphalt Paver Placement
• Proper compaction is critical for strength and durability
• Compact to 98% of modified proctor
• 10 to 12 Ton vibratory roller
• Eliminate long. cold joints through compaction process
Reynoldsburg, OH
![Page 11: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/11.jpg)
RCC Construction ProcessRCC Asphalt
RCC
Diamond
Ground
RCC
Diamond
Ground
Conventional
Concrete
Conventional
Concrete
![Page 12: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/12.jpg)
75 Year Useful Life Maintenance Cost Asphalt RCC
Sealcoat $939,680.28 $0.00
(Every 8yrs)
Mill & Overlay $6,556,466.24 $0.00
(Every 24yrs)
Overlay $0.00 $1,416,103.69
(RCC at 60yrs)
Maintenance Cost $7,496,146.52 $1,416,103.69
(75yrs)
![Page 13: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/13.jpg)
Asphalt Street Life Cycle
0
5
10
15
20
25
0 25 50 75
Time (Yrs)
Use
ful
Lif
e (Y
rs)
![Page 14: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/14.jpg)
50th & Grape Creek Bid TabPrice Construction Reece Albert
50th $2,267,261.73 $2,353,428.01
Grape Ck “A” $1,431,937.80 $1,174,202.99
Grape Ck “B” $1,352,668.32 $1,193,184.85
“A”= Asphalt “B”= Roller Compacted Concrete
50th & “A” $3,699,199.53 $3,527,631.00
50th & “B” $3,619,930.05 $3,546,612.86
Difference $79,269.48 $18,981.86
![Page 15: City Council March 22 - 50th Street & Grape Creek Road Construction](https://reader033.vdocument.in/reader033/viewer/2022052910/559c715d1a28ab5e708b4647/html5/thumbnails/15.jpg)
Roller Compacted Concrete
Questions