city of duluth, minnesota | home - sample only · 2019. 10. 7. · doc 255-b-0919 pre-construction...

1
Doc 255-B-0919 Pre-Construction Meeting Agenda I:\DEVELOPMENT\ConstSvcs\FORMS and INFO OUT\Current Handouts\Template - Commercial Inspections - Sample Pre-Construction Meeting Agenda 255.docx duluthmn.gov/csi | 218-730-5240 | [email protected] Zvago – 3900 London Road – 8/6/19 A pre-construction meeting provides an opportunity to begin communication, understand expectations and responsibilities for the construction and design team and city staff. To create a framework for problem solving prior to the start of a major construction project. Construction Services staff is committed to helping developers, contractors and owners achieve success. Inspections Introduce inspectors (plumbing, electrical, mechanical) Contact information for all inspectors is to be posted on site List of contractors and contact info for all on jobsite posted for city Inspectors Inspection record cards, inspection notice forms/process, must be on site and posted Project site address must be posted How to schedule inspections, permit numbers, and required time notice: 24 hours Required inspection types (footings, foundation walls, slabs, piers, etc.) (also water, sewer, storm) Schedule meetings directly with Fire Marshal for sprinklers (rough-in and final), fire alarms, hydro test, and general fire code inspections. Special Inspections Special inspections not a substitute for required city inspections Contractor responsible for scheduling special inspections Special inspection form on site and posted Review approved Special Inspection Form Required special inspections and Periodic vs. continual Failure to comply with code requirements for special inspections can result in additional testing and project delays. Daily field reports and discrepancy log accessible in job trailer for city inspector All copies of lab test results are to be copied to city construction inspector immediately Final Special Inspections Summary Report must be submitted to city construction inspector prior to occupancy Construction Plans and Permits Plans on site for access and review by all inspectors Phased Construction - Memorandum of Understanding (MOU) Design Build does not allow work to begin on portions of the project that have yet to be properly, reviewed (if needed), and permitted. Review of list of permits issued, applied, still needed, etc. Review project Plan Review Comment Sheet Review Special Approvals by other departments Plan Changes Plan Change Submittal Form Instructions - Explain process for approval of plan changes, change orders, Addenda’s, RFI/RFPs, ASIs, PRs Shop Drawings, Detailed Submittal Requirements Fire-stopping assemblies Rebar shops Structural steel framing Pre-cast systems Wood truss systems (floor and roof) SIP panel systems EFIS Systems Final Inspection Preliminary Overview Pre-final meeting Pre-testing of systems All inspections complete Fire final sign-off prior Energy - Commissioning, testing and balancing Building Official shall perform intermittent inspections and will perform a final review prior to the certificate of occupancy issuance. SAMPLE ONLY

Upload: others

Post on 04-Sep-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: City of Duluth, Minnesota | Home - SAMPLE ONLY · 2019. 10. 7. · Doc 255-B-0919 Pre-Construction Meeting Agenda I:\DEVELOPMENT\ConstSvcs\FORMS and INFO OUT\Current Handouts\Template

Doc 255-B-0919

Pre-Construction Meeting Agenda

I:\DEVELOPMENT\ConstSvcs\FORMS and INFO OUT\Current Handouts\Template - Commercial Inspections - Sample Pre-Construction Meeting Agenda 255.docx

duluthmn.gov/csi | 218-730-5240 | [email protected]

Zvago – 3900 London Road – 8/6/19 A pre-construction meeting provides an opportunity to begin communication, understand expectations and responsibilities for the construction and design team and city staff. To create a framework for problem solving prior to the start of a major construction project. Construction Services staff is committed to helping developers, contractors and owners achieve success.

Inspections Introduce inspectors (plumbing, electrical,

mechanical) Contact information for all inspectors is to be

posted on site List of contractors and contact info for all on jobsite

posted for city Inspectors Inspection record cards, inspection notice

forms/process, must be on site and posted Project site address must be posted How to schedule inspections, permit numbers, and

required time notice: 24 hours Required inspection types (footings, foundation

walls, slabs, piers, etc.) (also water, sewer, storm) Schedule meetings directly with Fire Marshal for

sprinklers (rough-in and final), fire alarms, hydrotest, and general fire code inspections.

Special Inspections Special inspections not a substitute for required city

inspections Contractor responsible for scheduling special

inspections Special inspection form on site and posted Review approved Special Inspection Form Required special inspections and Periodic vs.

continual Failure to comply with code requirements for

special inspections can result in additional testingand project delays.

Daily field reports and discrepancy log accessible injob trailer for city inspector

All copies of lab test results are to be copied to cityconstruction inspector immediately

Final Special Inspections Summary Report must besubmitted to city construction inspector prior tooccupancy

Construction Plans and Permits Plans on site for access and review by all inspectors Phased Construction - Memorandum of

Understanding (MOU) Design Build does not allow work to begin on

portions of the project that have yet to be properly,reviewed (if needed), and permitted.

Review of list of permits issued, applied, stillneeded, etc.

Review project Plan Review Comment Sheet Review Special Approvals by other departments

Plan Changes Plan Change Submittal Form Instructions - Explain

process for approval of plan changes, changeorders, Addenda’s, RFI/RFPs, ASIs, PRs

Shop Drawings, Detailed Submittal Requirements Fire-stopping assemblies Rebar shops Structural steel framing Pre-cast systems Wood truss systems (floor and roof) SIP panel systems EFIS Systems

Final Inspection Preliminary Overview Pre-final meeting Pre-testing of systems All inspections complete Fire final sign-off prior Energy - Commissioning, testing and balancing

Building Official shall perform intermittent inspections and will perform a final review prior to the certificate of occupancy issuance.

SAMPLE O

NLY