CITY OF TARPON SPRINGS Staff Report
March 19, 2019
TO: BOARD OF COMMISSIONERS FROM: PLANNING & ZONING DEPARTMENT
HEARING DATES: APRIL 9, 2019
SUBJECT: APPLICATION #19-08, RESOLUTION 2019-06 – SITE PLAN
APPROVAL FOR MEADOWS MOBILE HOME PARK TO
CONSTRUCT IMPROVEMENTS TO AN EXISTING
COMMUNITY CENTER INCLUDING A 770 SQUARE FOOT
EXPANSION OF THE EXISTING ONE-STORY
COMMUNITY CENTER BUILDING, ADDITION OF A 912
SQUARE FOOT HEALTH CLUB AND ADDITION OF AN 830
SQUARE FOOT POOL, LOCATED AT 505 ANCLOTE
BOULEVARD IN THE MOBILE HOME PARK (MHP)
ZONING DISTRICT.
I. APPLICATION
A. Application: Site Plan approval for Meadows Mobile Home Park
Community Center Improvements
B. Owner: Cove Communities
C. Applicant: Cove Communities
D. Agent: George F. Young, Inc.
E. Request: To construct improvements to the existing community
center.
II. PROPERTY INFORMATION
A. Location: 505 Anclote Boulevard
B. Property Size: 54.11 Acres
C. Land Use: Residential Urban (RU)
D. Zoning District: Mobile Home Park (MHP)
2
E. Surrounding Uses: Zoning District Use
North (Pasco County): R-4 (High Density Residential
Single Family Residential
South (Tarpon Springs): Industrial Restricted Vacant
South (Pinellas County):
Employment-1 Storage, Junk Yard
Residential Planned Development
Electric Power Easement
East (Pinellas County): Residential Planned Development
Single Family Residential
West (Pinellas County): Residential Planned Development
Vacant
F. Tax Parcel Number: 01-27-15-00000-220-0100 III. BACKGROUND
The Meadows Mobile Home Park wishes to expand the amenities at its existing community center located in the park’s interior adjacent to the main stormwater pond. The proposed project includes expansion of the existing one-story clubhouse by 770 square feet, addition of a new 912-square foot health club, addition of a new swimming pool, and accompanying parking lot reconfiguration.
IV. REVIEW CRITERIA - COMPREHENSIVE PLAN:
The project is located within an existing mobile home park in the Residential Urban (RU) Future Land Use Category. This category accommodates primarily residential uses. The applicant’s project is consistent with the Comprehensive Plan and Countywide Plan requirements.
V. REVIEW CRITERIA - ZONING:
The property is located within the Mobile Home Park (MHP) zoning district. That district permits mobile home parks and requires the provision of recreation facilities and area. This park’s existing community recreational amenities are being expanded with this application. The proposed site plan is consistent with the permitted uses and requirements of the MHP zoning district.
VI. SITE PLAN REVIEW PROCEDURES AND STANDARDS
The process for site plan review is set forth in Sec. 210.03 of the Land Development Code (LDC) and calls for the Planning and Zoning Board to review the site plan for compliance with the Comprehensive Plan, the Comprehensive
3
Zoning and Land Development Code, including the City's concurrency management system, and, the City's Building Codes and, to provide a written recommendation to the Board of Commissioners as enumerated in Sec. 210.03(C)(4) of the LDC. The Technical Review Committee has reviewed and determined the application for site plan approval to be complete and in compliance with the above-cited standards for review: 1. The application is found to be consistent with the City’s Comprehensive Plan, 2. The application is found to be compliance with the City’s Land Development
Code (LDC), 3. The project does not propose new impacts to facilities and therefore meets the
City’s Concurrency Management standards, and, 4. The project will be required to, and is expected to be able to, meet the standards
of the City’s Building Codes.
VII. LEVEL OF SERVICE ANALYSIS
Article VIII of the Land Development Code requires that public facilities be available concurrent with impacts from development. The mobile home park is already established and is not proposed to be expanded in a manner that would impact public facilities. The community center is intended to serve only the park residents at the existing approved residential density. This project proposes to expand amenities completely within the existing community center area and therefore does not propose any new impacts to public facilities.
VIII. OTHER INFORMATION
Technical Review Committee (TRC) The TRC reviewed this application at a series of meetings, the most recent on February 7, 2019, and had no objections to the request. The TRC minutes and comments from this meeting are included as an attachment.
IX. STAFF RECOMMENDATION Staff finds the application for site plan approval consistent with the applicable review criteria; and therefore the staff recommendation is to approve the site plan subject to the following:
1. The developer is responsible for meeting the minimum criteria of the Land
Development Code and for acquiring all other jurisdictional permits and approvals.
2. Construction plans shall be consistent with the approved site plan. All
requisite fees attendant to the project shall be paid in accordance with the Land Development Code.
3. This site plan shall expire at one year from the effective date unless an
application has been filed for a building permit with construction plans signed and sealed by a registered engineer licensed in the State of Florida.
4
X. PLANNING AND ZONING BOARD RECOMMENDATION
The Planning and Zoning Board heard this application at their March 18, 2019 meeting. The Board voted unanimously to approve the application with the conditions listed herein.
Attachments
1. Vicinity Map 2. Aerial Map 3. Technical Review Committee Minutes 4. Application 5. Resolution 2019-06 6. Site Plan and Survey (Exhibit A) 7. Legal Description (Exhibit B)
5
Vicinity Map: App 19-08 Cove Communities
Subject Property
6
Aerial Map: App 19-08 Cove Communities
Subject Property
7
Date: 2/19/2019
TECHNICAL REVIEW COMMITTEE (TRC) MINUTES
PROJECT NAME: Meadows Mobile Home Park FILE NUMBER: 19-08 APPLICATION TYPE: Site Plan Review PROJECT DESCRIPTION: Site Plan to add Community Center PROPERTY LOCATION: 505 Anclote Blvd PARCEL ID / TAX ID NO.: 01-27-15-00000-220-0100 TRC MEETING DATE: 2/7/2019
TRC REVIEW RESULTS: Your project was reviewed by the City of Tarpon Springs Technical Review Committee on the above referenced date. The following items have been identified for your review and response:
Additional information required from applicant.
Redlined plans enclosed.
See Member Comments below.
Submit revised plans per enclosed redlines or department comments. Four full sets of revised
plans will be required for staff’s off-line review.
City of Tarpon Springs, Florida
DEVELOPMENT SERVICES DEPARTMENT
PLANNING AND ZONING DIVISION
324 EAST PINE STREET
P.O. BOX 5004
TARPON SPRINGS, FLORIDA 34688-5004
(727) 942-5611
FAX (727) 943-4651
8
TRC MEMBER COMMENTS
PLANNING & ZONING REVIEW COMMENTS:
APPROVED DENY DEFER SEE BELOW NO COMMENTS INITIALS: HU/PM
Four of the 34 required parking spaces are proposed to be sized for golf carts. Golf cart parking is not prohibited, but it cannot be counted as a parking space. If the applicant adds bicycle racks sufficient to accommodate 4 bicycles, the parking can be reduced by 10% (by 3 spaces). Another option to fulfill the parking requirement would be to use a compact parking space assigned to an employee. Please see Section 127.03(P) and Section 127.05 of the parking code for guidance on this. March 13, 2019: The site plan has been revised to reflect 3 bicycle parking spaces and 31 standard automobile parking places. This item is in compliance.
The proposed ISR of 0.72 is increased from 0.65 for this site. The ISR limit for the Residential Urban district is 0.65 and may be applied parkwide for this property. Please present a calculation on the plan set that shows that the 0.65 impervious surface ratio is met park-wide. March 13, 2019: The site plan has been revised to reflect a proposed impervious surface ratio (ISR), calculated on a park-wide basis, of 0.236. This item is in compliance.
FIRE DEPARTMENT REVIEW COMMENTS:
APPROVE DENY DEFER SEE BELOW NO COMMENTS INITIALS: RK BUILDING DEVELOPMENT REVIEW COMMENTS:
APPROVE DENY DEFER SEE BELOW NO COMMENTS INITIALS: KP POLICE DEPARTMENT REVIEW COMMENTS:
APPROVE DENY DEFER SEE BELOW NO COMMENTS INITIALS: JU/SG PUBLIC SERVICES REVIEW COMMENTS:
APPROVE DENY DEFER SEE BELOW NO COMMENTS INITIALS: FF/RP/RR PUBLIC WORKS REVIEW COMMENTS
APPROVE DENY DEFER SEE BELOW NO COMMENTS INITIALS: TM
9
PROJECT ADMINISTRATION DEPARTMENT
APPROVE DENY DEFER SEE BELOW NO COMMENTS INITIALS: NM PLANNING AND ZONING BOARD REVIEW
TRC review is complete and your project is scheduled for Planning and Zoning Board on the following date Tentative
Your project remains unscheduled for Planning and Zoning Board because revised plans or additional information is required.
Planning and Zoning Board review is not required for this project.
BOARD OF ADJUSTMENT REVIEW AND FINAL ACTION (VARIANCES ONLY)
Your project is scheduled for BOA review on the following date:
Your project remains unscheduled for BOA because additional information is required (see
previous page).
Board of Adjustment review is not required for this project. BOARD OF COMMISSIONER REVIEW AND FINAL ACTION
Your project is scheduled for review and final action by the Board of Commissioners on the
following date(s):
Your project remains unscheduled for Board of Commissioners because revised plans or additional information is required.
Board of Commissioner review is not required for this project.
HERITAGE PRESERVATION BOARD REVIEW AND FINAL ACTION (CERTIFICATES OF
APPROVAL ONLY)
Your project is scheduled for HPB review on the following date:
Your project remains unscheduled for HPB review because additional information is required (see
above).
Heritage Preservation Board review is not required for this project.
REQUIRED ACTION OF THE APPLICANT
Please review any checked items above and provide any additional required information. Your project
10
will not be scheduled for Planning and Zoning Board, Board of Adjustments or Board of Commission review until all required information or revised plans are provided. If no additional information is required, your project should be scheduled for the next applicable meeting, if sufficient time is available to meet required advertising deadlines (generally at least 21 days).
If TRC comment sheets are attached, please follow up with the department who made the comments. The reviewing individual from each City department is responsible for notifying this department when any and all plan corrections have been made or any conditions that have been established for approval of the project.
Please keep in mind that the Planning & Zoning Division has a 90-day suspense from the date of the TRC review for the submission of revisions/additional information. If revised plans/additional information are not submitted within the above referenced time frame, the application will be considered to be “EXPIRED” and a new application will have to be submitted.
If you have questions concerning any of the above information, please do not hesitate to contact the Planning Division for assistance.
Cc: Subject File – 19-08 Applicant – Cove Communities – Brandon Schilling
1
RESOLUTION NO. 2019-06
A RESOLUTION OF THE CITY OF TARPON SPRINGS,
FLORIDA, APPROVING APPLICATION #19-08 REQUESTING
SITE PLAN APPROVAL FOR MEADOWS MOBILE HOME PARK
TO CONSTRUCT IMPROVEMENTS TO AN EXISTING
COMMUNITY CENTER INCLUDING A 770 SQUARE FOOT
EXPANSION OF THE EXISTING ONE-STORY COMMUNITY
CENTER BUILDING, ADDITION OF A 912 SQUARE FOOT
HEALTH CLUB AND ADDITION OF AN 830 SQUARE FOOT
POOL, LOCATED AT 505 ANCLOTE BOULEVARD IN THE
MOBILE HOME PARK (MHP) ZONING DISTRICT; PROVIDING
FOR FINDINGS; PROVIDING FOR CONDITIONS; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Tarpon Springs has received an application for site plan
approval to improve an existing community center by constructing a 770 square foot
addition to the clubhouse, a new 912 square foot health club and a new 830 square foot
pool, located at 505 Anclote Boulevard in the Mobile Home Park (MHP) zoning district;
and,
WHEREAS, the Planning and Zoning Board held a public hearing on this
application at its meeting of March 18, 2019 and voted to recommend approval of the site
plan with conditions; and,
WHEREAS, pursuant to Section 210.03(C)(4) of the Comprehensive Zoning and
Land Development Code, the Board of Commissioners must approve, approve with
conditions, or, deny the application.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF
COMMISSIONERS OF THE CITY OF TARPON SPRINGS, FLORIDA:
SECTION 1: FINDINGS
1. That the site plan, as conditioned, meets the applicable sections of the
Comprehensive Zoning and Land Development Code.
2. That the site plan, as conditioned, is consistent with the Tarpon Springs
Comprehensive Plan.
3. That the site plan, as conditioned, demonstrates that required facilities and
services will be available at the prescribed level of service standards concurrent
with the impact of the development and may, subject to Section 3 of this
resolution, during the term of this site plan approval, receive a Certificate of
Concurrency pursuant to Section 122.00 et seq.
2
SECTION 2: SITE PLAN APPROVAL
The site plan prepared and sealed by Allison C. Shaw, P.E., on February 19, 2019, and
attached as Exhibit A is hereby approved on property located at 505 Anclote Boulevard
with a Parcel legally described in Exhibit B, attached hereto.
SECTION 3: CONDITIONS
1. The developer is responsible for meeting the minimum criteria of the Land
Development Code and for acquiring all other jurisdictional permits or approvals.
2. Construction plans shall be consistent with the approved site plan. All requisite
fees attendant to the project shall be paid in accordance with the Land
Development Code.
3. This site plan shall expire at one year from the effective date unless an application
has been filed for a building permit with construction plans signed and sealed by a
registered engineer licensed in the State of Florida.
SECTION 4: EFFECTIVE DATE
This Resolution shall become effective upon adoption.
&&
&&
P
H
A
S
E
I
I
P
H
A
S
E
I
I
I
P
H
A
S
E
I
I
P
H
A
S
E
I
I
I
CONC DUMPSTER PAD W/
6 FT TALL PRIVACY FENCE
OPEN/COMMON SPACE
AREAS
STORMWATER
MANAGEMENT POND
MAINTENANCE
AREA
DUKE ENERGY
EASEMENT
DUKE ENERGY
RIGHT OF WAY
OPEN
SPACE
OPEN
SPACE
OPEN
SPACE
OPEN
SPACE
OPEN
SPACE
OPEN
SPACE
Fitness Studio: FF 11.00
X XUtility
Unisex
K-2035-8PINOIRLAVATORY VITREOUS CHINA
GRATETOP = 9.60INV = 4.20
NEWSEAWALL
MEET ANDMATCH
30 LF24" RCP
30 LF24" RCP
GRATETOP = 9.50INV = 3.70
GRATETOP = 10.00INV = 4.00
15 LF24" RCP
INV = 3.50
MEET ANDMATCH
LEGEND
PROPOSED CONCRETE
PROPOSED PAVERS
PROPOSED ASPHALT PAVEMENT
PROPOSED GREEN AREA
NEWSEAWALL
Since 1919
George F. Young, Inc. Meadows MHP Community Center
S
W E
N
LEGAL DESCRIPTION (ENTIRE PROJECT)
Commencing at the Northwest corner of Section 1, Township
27 South, Range 15 East, Pinellas Country, Florida, run
S.00°26'08"E.,115.00 feet to a point of Beginning; thence N.
89°54'32"E., along the South rigth-of-way of Anclote
Boulevard 1331.77 feet; thence S.00°29'06"E., 1268.68 feet;
thence along the arc of a curve to the right, concave to the
northwest 68.90feet, said curve having a 68.39 feet bearing
S.23°38'56"W.; thence S.00°32'02"E., 529.14 feet; thence
N.89°31'34"W., 1083.63 feet; thence N.45°00'20"W., 356.50
feet ; thence S.00°29'06"E, 188.95 feet; feet to the Point of
Beginning.
Containing 53.941 acres, more or less.
SUBJECT to any easements of record.
OVERALL SITE DATA SUMMARY
Total Area = 53.941
Zoning = MHP
Total lots = 300
Density = 311/52.101 = 5.969 Lots/Acres
Minimum Living Area = 450 Square Feet/ Lots
Finish Floor Elevation on Lots = FEMA X Zone: 18” Above Highest Crown of Road
AE Zone: 12” Above BFE and 18” Above Road Elevation
If 12” Above BFE cannot be met:
36” Clearance to the bottom to the I-Beam or utilities
Setbacks : Front = 10 Feet interior lots
Side = 5 Feet interior lots, 10' for Lot 15
Rear = 5 Feet, 10' perimeter lots
Recreation Area = 18.3 Acres
(33.9 Total Area)
ACREAGE LOTS (APPROVED) UNITS LOTS LOST
Phase I 14.447 Ac. 111 109 2
Phase II 20.398 Ac. 115 108 7
Phase III 19.096 Ac. 100 83 17
TOTAL 53.94 Ac. 326 300 26
CLIENT INFORMATION
Client: Cove Communities
Name : Bardon Schilling
Address : 4350 E. Cameback Road, A-100
Phoenix, Arizona 85018
Phone: (602) 399-9984
ENGINEER
George F. Young, Inc.
PM: Allison C. Shaw, PE
Address: 299 Dr. Martin Luther King, Jr. St. North
St. Petersburg, FL 33701
Phone: 727.822.4317 / 1.877.439.1919
COMMUNITY CENTER
STORMWATER LOT
PROJECT AREA:
181,445 SF (4.17 AC.)
COMMUNITY CENTER SITE DATA SUMMARY
Total Area = 4.17 Ac.
Zoning = MHP
Clubhouse = 6160 GFA (EXISTING)
= 6930 GFA (PROPOSED)
Health Club =912 GFA (PROPOSED)
Finish Floor Elevation on Lots = 13 min or 18" above road
(NGVD1929 Datum)
= 12 min or 18" above road
(NAVD1988 Datum)
PARKING : Clubhouse (1 SPACE/250 GFA)= 28 SPACES
Health Club (1 SPACE/150 GFA)=6 SPACES
TOTAL REQUIRED: 34 SPACES
TOTAL PROVIDED: 34 SPACES (INC. 10% (3) BICYCLE)
(31 CAR SPACES, 3 BICYCLE SPACES)
2/19/2019
1
X X X X
X
X
X
X
X
X
X
X
X
X X X X
Fitness Studio: FF 11.00
X X X X X X X X X X X X X X X X X X X X X X X X X
Clubhouse
Community RoomExpansion
New Pool830 sqft
Black fencealong sea-wall
Utility
Paver Deck
X
XX
Pool Area fenceboundary
Covered Entry
New Egress New Egress
38'-0"
24'-0
"6'
-0"
30'-0
"
24'-0"Existing Pool1,362 sqft
ExistingSpa
Unisex
XX
X
X
K-2035-8PINOIRLAVATORY VITREOUS CHINA
M
E
D
I
C
I
N
E
B
A
L
L
S
S
T
O
R
A
G
E
R
A
C
K
S
T
R
E
T
C
H
I
N
G
A
N
D
Y
O
G
A
Z
O
N
E
(14) Additional Vehicle Stalls
(6) Golf Cart Stalls
(17) Proposed Vehicle Stalls
11'
9' T
YP
19' TYP
19' TYP
9' T
YP
12'
7' TYP
12'
9' TYP
5'
12'
ArtificialTurfCornhole
Game
Plant Pots (Typical)
UpgradedLandscaping
DD
D
GRATETOP = 9.60INV = 4.20
D
NEWSEAWALL
MEET ANDMATCH
30 LF24" RCP
30 LF24" RCP
GRATETOP = 9.50INV = 3.70
GRATETOP = 10.00INV = 4.00
15 LF24" RCP
INV = 3.50
MEET ANDMATCH
LEGEND
PROPOSED CONCRETE
PROPOSED PAVERS
PROPOSED ASPHALT PAVEMENT
PROPOSED GREEN AREA
NEWSEAWALL
(3) Bicycle Stalls
11'
TYP
12'
18' T
YP
10' T
YP 5' TYP
ArtificialTurf
BBQBBQ
Since 1919
George F. Young, Inc. Meadows MHP Phase III
S
W E
N
COMMUNITY CENTER SITE DATA SUMMARY
Total Community Center/
Stormwater Lot Area = 181,445 SF (4.17 Ac.)
Zoning = MHP
EXISTING PROPOSED
Clubhouse: 6160 SF 6930 SF
Health Club: 0 SF 912 SF
Total Building Area: 6160 SF 7842 SF
Pavement: 31,955 SF 35,050 SF
Greenspace: 143,330 SF 138,553 SF
Impervious Surface Ratio (ISR) 0.21 (21%) 0.236 (23.6%)
PARKING : Clubhouse (1 SPACE/250 GFA)= 28 SPACES
Health Club (1 SPACE/150 GFA)=6 SPACES
TOTAL REQUIRED: 34 SPACES
TOTAL PROVIDED: 34 SPACES (INC. 10% (3) BICYCLE)
(31 CAR SPACES, 3 BICYCLE SPACES)
2/19/2019
1
REVISIONNO. DATE BY
THE MEADOWS CLUBHOUSE
IN
PINELLAS COUNTY, FLORIDA
SURVEYOR'S CERTIFICATE:
DATE
SURVEY VALID ONLY TO THE DATE OF FIELD SURVEY SHOWN HEREON. NOT VALID WITHOUT THE SIGNATURE AND ORIGINAL RAISED SEAL OF A
FLORIDA LICENSED SURVEYOR AND MAPPER.
WALTER J. SMITH
FLORIDA CERTIFICATE NO. 4807 PROFESSIONAL SURVEYOR AND MAPPER
CERTIFIED TO:
I HEREBY CERTIFY THAT THIS TOPOGRAPHIC SURVEY MEETS THE APPLICABLE "STANDARDS OF
PRACTICE FOR LAND SURVEYING" AS SET FORTH BY THE FLORIDA BOARD OF PROFESSIONAL
SURVEYORS AND MAPPERS IN CHAPTER 5J-17, PURSUANT TO SECTION 472.027, FLORIDA STATUES.
12/31/2018
ESP ASSOCIATES FL, INC.
518 13TH ST. W.
BRADENTON, FLORIDA 34205
PHONE: 941-345-5451
WWW.ESPASSOCIATES.COM
PROFESSIONAL SURVEYORS AND MAPPERS
LB. #7343
Date of Field Survey: 12/13/2018
Page:
Drawn By: RLW
Checked By: RLW
Project No.: GX06.800.000
Date: 12/19/2018
Scale: 1"=20'
Field Book:
COVE COMMUNITIES
IRON ROD (IR) FOUND SIZE NOTED
IRON PIPE (IP) FOUND
CONCRETE MONUMENT (CM) FOUND
NAIL & DISK FOUND
LICENSED BUSINESS
LICENSED SURVEYOR
PROFESSIONAL SURVEYOR & MAPPER
PARCEL IDENTIFICATION NUMBER
TOP OF BANK
TOE OF SLOPE
INVERT ELEVATION
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
LB
LS
PSM
PID
TOB
TOS
INV
PVC
RCP
TELEPHONE PEDESTAL
BACKFLOW PREVENTER
LIGHT POLE
SANITARY MANHOLE
VERIZON VAULT
CABLE PEDESTAL
WOOD UTILITY POLE
GAS PEDESTAL
WATER METER
GAS LINE MARKER
MAIL BOX
ELECTRIC METER
FIRE HYDRANT
WATER VALVE
SANITARY CLEANOUT
CONCRETE (CONC)
STORM MANHOLE
PAVERS
HANDICAP PARKING
NUMBER OF PARKING
SPACES
ASPHALT PAVEMENT
LEGEND:
BENCHMARK
TEMPORARY BENCHMARKTBM
TELEPHONE MANHOLE
SPOT ELEVATION
NAIL & DISK SET
OFFICIAL RECORDS BOOKORB
POINT OF CURVATUREPC
POINT OF TANGENCYPT
RIGHT-OF-WAYR/W
MITERED END SECTION
1. THE PURPOSE OF THIS TOPOGRAPHIC SURVEY IS TO ESTABLISH
ELEVATIONS AROUND AND THE CLUBHOUSE AND THE SEAWALL.
2. HORIZONTAL DATA SHOWN HEREON IS BASED THE FLORIDA STATE
PLANE COORDINATE SYSTEM (NAD 83/2011 ADJUSTMENT) UTILIZING
A GPS NETWORK FROM BOTH FPRN AND TRIMBLE VRS NETWORKS.
3. VERTICAL DATA SHOWN HEREON IS BASED ON NGS BENCHMARK
DESIGNATION S 761, WITH A PUBLISHED ELEVATION OF 11.46 (NAVD
1988) AND REFERENCED WITH A GPS NETWORK FROM BOTH FPRN
AND TRIMBLE VRS NETWORKS. ON-SITE TEMPORARY BENCHMARKS
WERE SET IN THE PAVEMENT ON BERNICE BOULEVARD AS SHOWN
ON SURVEY AND AS FOLLOWS:
TBM #1: NAIL & DISK IN ASPHALT - ELEVATION = 8.79 FEET
TBM #2: NAIL & DISK IN ASPHALT - ELEVATION = 9.59 FEET
TBM #3: NAIL & DISK IN SIDEWALK - ELEVATION = 7.54 FEET
4. ALL UTILITIES SHOWN WERE LOCATED FROM SURFACE EVIDENCE.
5. THE INFORMATION DEPICTED ON THIS TOPOGRAPHIC SURVEY
REPRESENTS THE RESULT OF A SURVEY PERFORMED ON THE
INDICATED DATE AND CAN ONLY BE CONSIDERED AS INDICATING
THE GENERAL CONDITIONS AT THAT TIME.
6. BOUNDARY INFORMATION SHOWN HEREON IS FOR INFORMATIONAL
PURPOSES ONLY. BOUNDARY SURVEY PROVIDED BY CLIENT;
PERFORMED BY DEUEL ASSOCIATES, FIELD DATE OF AUGUST 9,
2017.
SURVEYORS REPORT AND NOTES:
TOPOGRAPHIC SURVEY
FOR
THE MEADOWS CLUBHOUSE
7
Michigan3400 Auburn Rd, Suite 200Auburn Hills, MI 48326+1 248.622.4035
Florida14055 Riveredge Dr, Suite 460Tampa, FL 33637+1 813.466.3310
Minnesota6500 City West Pkwy, Suite 300Eden Prairie, MN 55344+1 612.607.1105
www.fieldstoneae.com
Project Title
Sheet Title
Issued for:Date
Sheet No.
© F i e l d s t o n e A & E , L L CDO NOT SCALE DRAWINGS
COVE COMMUNITIES"THE MEADOWS"FITNESS BUILDING
C:\U
sers
\bpe
ak\a
ppda
ta\lo
cal\t
emp\
AcP
ublis
h_16
08\C
ove
Mea
dow
s_G
en2.
dwg,
Plo
t Dat
e: T
uesd
ay ,
Dec
embe
r 11
, 201
8,9:
37 A
M, P
lotte
d B
y:bp
eak
A0.1
Job No.
1848402.100
1 10-25-18 Gen 1
2 12-11-18 Gen 2
-- -- --
-- -- --
-- -- --
Cove Communities4350 E. Camelback Road, A-100Phoenix, AZ 85018+1 480.423.5700
www.covecommunities.com
COVER SHEET ANDINDEX
NOENCLOSED
INTERNAL PRESSURE COEFFICIENT +/-0.18ROOF LIVE LOADS 20 PSF
ROOF DEAD LOADSTILE ROOF TOP CHORD 15 PSFBOTTOM CHORD 10 PSF
A0.1 COVER SHEET AND INDEX
A2.1A3.1 BUILDING SECTIONS AND DETAILS
STRUCTURAL
CONSTRUCTION TYPE VB CLASS C ROOF ASSEMBLY
TOTAL STRUCTURE AREA:
ENCLOSED BUILDING AREA:COVERED OUTDOOR AREA:
FLORIDA ENERGY CONS CODE
2017 ED.2017 ED.2017 ED.
140
150
140
150
140
150
160
170
180
180
170
160
150
140
120
130 120 115
115 130
STRUCTURE ACTUAL HEIGHT (TO HIGHEST POINT): 15'-4"±, 1 STORY
FLORIDA FIRE PREVENTION CODEFLORIDA BUILDING CODENATIONAL ELECTRIC CODE
2017 ED.2014
A1.1
COVER SHEET ANDINDEX
ARCHITECTURAL MECHANICAL / ELECTRICALRISK CATEGORY l l
PARKING AND ACCESSIBLE ROUTE
ADA, FBC or NONEITEM:FITNESS BLDG
RESIDENTIAL BUILDINGS (NOT IN SCOPE) SEPARATE PERMITS
144 SQ. FT.912 SQ. FT.
1,056 SQ. FT.
(NOT IN SCOPE) ADA AND FBC CHAPTER 11
ADA AND FBC CHAPTER 11DESIGN WIND VELOCITY
EXPOSUREWIND BORNE DEBRIS REGION
150 MPH"C"
YES
IMPACT GLASSHURRICANE SHUTTERS
YESNO
STRUCTURE TYPE ENCLOSED
INTERNAL PRESSURE COEFFICIENT +/-0.18ROOF LIVE LOADS 20 PSF
ROOF DEAD LOADSTILE ROOF TOP CHORD 15 PSFBOTTOM CHORD 10 PSF
A0.1 COVER SHEET AND INDEX
A2.1 EXTERIOR ELEVATIONSA3.1 BUILDING SECTIONS AND DETAILS
STRUCTURAL
COVE COMMUNITIES"THE MEADOWS"
AMENITY - FITNESSTARPON SPRINGS, FLORIDA
DRAWING INDEX
BUILDING DATA
DRAWING HISTORY
1
BUILDING CRITERIA
FLORIDA MECHANICAL CODEFLORIDA PLUMBING CODE
STRUCTURE ACTUAL HEIGHT (TO MEAN ROOF POINT):
BUILDING, OCCUPANCY CLASSIFICATION:
ALLOWABLE BUILDING AREA PER FBC TABLE 506.2:
BUILDING USE:1 STORY, ASSEMBLY
(A-3) FITNESS CENTER
12'-7"±, 1 STORY
ALLOWABLE HEIGHT: 40'-0", 1 STORY
ALLOWABLE HEIGHTS AND BUILDING AREASFROM FLORIDA BUILDING CODE
CONSTRUCTION TYPE: VB - UNPROTECTED - NON-SPRINKLERED
CONSTRUCTION TYPE VB CLASS C ROOF ASSEMBLY
TOTAL STRUCTURE AREA:
ENCLOSED BUILDING AREA:COVERED OUTDOOR AREA:
CLASS C ROOF ASSEMBLIES ARE THOSE THAT ARE EFFECTIVE AGAINST LIGHT FIRE-TESTEXPOSURE. CLASS C ROOF ASSEMBLIES AND ROOF COVERINGS SHALL BE LISTED ANDIDENTIFIED AS CLASS C BY AN APPROVED TESTING AGENCY
IN ACCORDANCE WITH FLORIDA STATUTE, A THRESHOLD BUILDING IS ANY BUILDING WHICHIS ONE OR MORE OF THE FOLLOWING:
1. GREATER THAN THREE (3) STORIES, OR2. GREATER THAN 50' IN HEIGHT, OR3. HAS AN ASSEMBLY OCCUPANCY CLASSIFICATION THAT EXCEEDS 5,000 SQUARE FEET
AND AN OCCUPANT CONTENT OF GREATER THAN 500 PERSONS
FLORIDA ENERGY CONS CODE
INTERIOR WALL & CEILING FINISHES SHALL MEET CLASS B & CLASS C SPECIFICATIONS PERTABLE 803.9. INTERIOR FLOORING FINISHES SHALL COMPLY WITH SECTION 804.DOCUMENTATION SHALL BE PROVIDED TO THE FIRE MARSHAL'S OFFICE PRIOR TOCERTIFICATE OF OCCUPANCY, AS REQUIRED.
LOCATION MAPVICINITY MAP
140
150
140
150
140
150
160
170
180
180
170
160
150
140
120
130 120 115
115 130
STRUCTURE ACTUAL HEIGHT (TO HIGHEST POINT):
6,000 SQ. FT.
FLORIDA FIRE PREVENTION CODEFLORIDA BUILDING CODENATIONAL ELECTRIC CODE
2017 ED.
RISK CATEGORY II
WIND-BORNE DEBRIS REGION
DESIGNATED AREAS
WHERE BASIC WIND SPEED
IS 140 MPH OR GREATER.
130 MPH AND WITHIN 1 MILE
OF THE COAST.
PINELLAS COUNTYFLORIDA
A1.1 FLOOR AND ROOF PLANS
"THE MEADOWS" TARPON SPRINGS,
PINELLAS COUNTY, FL
VB - UNPROTECTED - UNSPRINKLED"A-3" - ASSEMBLY
0 HR.
0 HR.0 HR.
0 HR.NON BEARING WALLS AND PARTITIONS (EXTERIOR > 30'-0") (table 602)
PRIMARY STRUCTURAL FRAME (table 601)FIRE PROTECTION USEFIRE PROTECTION APPLICATION
FLOOR CONSTRUCTION AND ASSOCIATED MEMBERS (table 601)
BEARING WALLS (EXTERIOR) (table 601) (INTERIOR) (table 601)
0 HR.
0 HR.
(INTERIOR) (table 601)
ROOF CONSTRUCTION AND ASSOCIATED MEMBERS (table 601) 0 HR.NO LIMITEXTERIOR WALL PERCENTAGE OF OPENINGS (>30' per table 705.8)
10-25-18 GEN 1 OWNER REVIEW
THRESHOLD BUILDING (SEE DEFINITION BELOW) NO
2
12-11-18 GEN 2 OWNER REVIEW
0'-0"FIN FLOOR ELEV
8'-8"BOTTOM OF BEAM
10'-0"TOP OF WALL
12'-7"±APPROX MEAN ROOF HT
15'-7"±APPRX MAX ROOF HT
A3.1A
ROOF TILE PER SPEC OVER SELF ADHERINGMEMBRANE UNDERLAYMENT INSTALLED AS PERMANUFACTURER'S INSTRUCTIONS. ROOF FINISHAPPLICATIONS TO COMPLY WITH FRSACONCRETE & CLAY ROOF TILE INSTALLATIONMANUAL SYSTEM ONE ROOFING STANDARDS
5/8" STUCCO (TYP)
APPROX FINISHEDGRADE
124
124
RAISED STUCCOBANDING
8'-8
"
0'-0"FIN FLOOR ELEV
8'-8"BOTTOM OF BEAM
10'-0"TOP OF WALL
12'-7"±APPROX MEAN ROOF HT
15'-7"±APPRX MAX ROOF HT
1'-4
"
10'-0
"
15'-7
"±
A3.1
B
ROOF TILE PER SPEC OVER SELF ADHERINGMEMBRANE UNDERLAYMENT INSTALLED AS PERMANUFACTURER'S INSTRUCTIONS. ROOF FINISHAPPLICATIONS TO COMPLY WITH FRSACONCRETE & CLAY ROOF TILE INSTALLATIONMANUAL SYSTEM ONE ROOFING STANDARDS
APPROX FINISHEDGRADE
124
5/8" STUCCO (TYP)
124
8'-8
"
0'-0"FIN FLOOR ELEV
8'-8"BOTTOM OF BEAM
10'-0"TOP OF WALL
12'-7"±APPROX MEAN ROOF HT
15'-7"±APPRX MAX ROOF HT
1'-4
"
10'-0
"
15'-7
"±
A3.1B
ROOF TILE PER SPEC OVER SELF ADHERINGMEMBRANE UNDERLAYMENT INSTALLED AS PERMANUFACTURER'S INSTRUCTIONS. ROOF FINISHAPPLICATIONS TO COMPLY WITH FRSACONCRETE & CLAY ROOF TILE INSTALLATIONMANUAL SYSTEM ONE ROOFING STANDARDS
APPROX FINISHEDGRADE
124
124
5/8" STUCCO (TYP)
RAISED STUCCOBANDING
0'-0"FIN FLOOR ELEV
10'-0"TOP OF WALL
12'-7"±APPROX MEAN ROOF HT
15'-7"±APPRX MAX ROOF HT
10'-0
"
15'-7
"±
A3.1A
ROOF TILE PER SPEC OVER SELF ADHERINGMEMBRANE UNDERLAYMENT INSTALLED AS PERMANUFACTURER'S INSTRUCTIONS. ROOF FINISHAPPLICATIONS TO COMPLY WITH FRSACONCRETE & CLAY ROOF TILE INSTALLATIONMANUAL SYSTEM ONE ROOFING STANDARDS
5/8" STUCCO (TYP)
APPROX FINISHEDGRADE
124 12
4
RAISED STUCCO BANDING
Michigan3400 Auburn Rd, Suite 200Auburn Hills, MI 48326+1 248.622.4035
Florida14055 Riveredge Dr, Suite 460Tampa, FL 33637+1 813.466.3310
Minnesota6500 City West Pkwy, Suite 300Eden Prairie, MN 55344+1 612.607.1105
www.fieldstoneae.com
Project Title
Sheet Title
Issued for:Date
Sheet No.
© F i e l d s t o n e A & E , L L CDO NOT SCALE DRAWINGS
COVE COMMUNITIES"THE MEADOWS"FITNESS BUILDING
C:\U
sers
\bpe
ak\a
ppda
ta\lo
cal\t
emp\
AcP
ublis
h_16
08\C
ove
Mea
dow
s_G
en2.
dwg,
Plo
t Dat
e: T
uesd
ay ,
Dec
embe
r 11
, 201
8,9:
37 A
M, P
lotte
d B
y:bp
eak
A2.1
Job No.
1848402.100
1 10-25-18 Gen 1
2 12-11-18 Gen 2
-- -- --
-- -- --
-- -- --
Cove Communities4350 E. Camelback Road, A-100Phoenix, AZ 85018+1 480.423.5700
www.covecommunities.com
EXTERIORELEVATIONS
24x36 SCALE:
FRONT ELEVATION1/4" = 1'-0"1
24x36 SCALE:
REAR ELEVATION1/4" = 1'-0"2
24x36 SCALE:
RIGHT SIDE ELEVATION1/4" = 1'-0"3
24x36 SCALE:
LEFT SIDE ELEVATION1/4" = 1'-0"4