CITY OF RICHMOND

THIRD PRECINCT AND POLICE ACADEMY PARKING GARAGES STRUCTURAL AND PLUMBING REPAIRS

Whitman, Requardt and Associates, Inc. 9030 Stony Point Parkway Suite 220 Richmond, Virginia 23235

Third Precinct and Police Academy Parking Garages Table of Contents City of Richmond, VA

TC - i

TABLE OF CONTENTS

TECHNICAL SPECIFICATIONS

CITY OF RICHMOND THIRD PRECINCT AND POLICE ACADEMY PARKING GARAGES

STRUCTURAL AND PLUMBING REPAIRS DIVISION 1 – GENERAL REQUIREMENTS Section 01000 General Standards 01010 Summary of Work 01092 Reference Standards 01106 Construction Scheduling, Coordination and Sequencing 01130 Measurement and Payment 01152 Applications for Payment 01153 Change Order and Field Order Procedures 01200 Project Meeting 01300 Submittals 01310 Progress Schedule 01380 Construction Photographs 01400 Quality Control 01500 Construction Facilities and Temporary Controls 01510 Temporary Utilities 01600 Product Requirements 01700 Contract Closeout 01710 Cleaning Up 01720 Project Record Documents 01732 Selective Demolition DIVISION 2 – NOT USED DIVISION 3 – CONCRETE

Section 03013 Maintenance of Cast-In-Place Concrete DIVISION 4 – MASONRY Section 04900 Masonry Restoration

Third Precinct and Police Academy Parking Garages Table of Contents City of Richmond, VA

TC - ii

DIVISION 5 – METALS Section 05500 Metal Fabrications DIVISION 6 - NOT USED DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07901 Joint Sealants DIVISION 8 - NOT USED DIVISION 9 – FINISHES Section 09900 Painting DIVISION 10 – NOT USED DIVISION 11 – NOT USED DIVISION 12 – NOT USED DIVISION 13 – NOT USED DIVISION 14 – NOT USED DIVISION 15 – NOT USED DIVISION 16 – NOT USED APPENDICES A. City of Richmond - Health, Safety, and Environment Management Plan B. Sample NOI

Third Precinct and Police Academy Parking Garages General Standards Richmond, VA

01000 - 1

SECTION 01000

GENERAL STANDARDS

PART 1 - GENERAL 1.01 SECTION INCLUDES

A. This section contains requirements and conditions governing the project in addition to those shown in Division 1 of the base project specifications.

B. Work under this contract shall be done in accordance to Section 01010 - Summary of

Work. 1.02 MOBILIZATION/DEMOBILIZATION

A. The CONTRACTOR shall provide the facilities and equipment necessary to move personnel and equipment to and from the Work site, to set up temporary offices, to install any temporary utilities, to prepare the site for the Work, to demobilize, and to clean up the site upon completion of the work.

B. The CONTRACTOR’s price shall include the cost to mobilize at the beginning of

project and demobilize at project closeout. 1.03 FIRE PROTECTION

A. The CONTRACTOR shall furnish and maintain on the site adequate firefighting equipment capable of extinguishing incipient fires. The CONTRACTOR shall comply with applicable parts of the National Fire Prevention Standard for Safeguarding Building Construction Operations (NFPA No. 241).

1.04 TEMPORARY UTILITIES

A. The CONTRACTOR shall provide temporary utilities as needed at no cost to the OWNER. The CONTRACTOR shall be responsible for installing the temporary utilities from the point of connection to the point of use and shall be responsible for all utility requirements. The location of all temporary utilities shall be approved by the OWNER prior to installation.

1.05 SITE CONDITIONS

A. Access and work space at the site is limited. The CONTRACTOR shall schedule and coordinate his Work as needed to minimize interference with the OWNER’s operation of the garage.

Third Precinct and Police Academy Parking Garages General Standards Richmond, VA

01000 - 2

B. The work area contains equipment, piping, and electrical components. It is the CONTRACTOR’s responsibility to protect the equipment, piping, electrical components, and associated utilities during the CONTRACTOR’s operation. Any damage to the equipment, piping, or electrical system caused by the CONTRACTOR’s operations shall be repaired at no additional cost to the OWNER.

1.06 PROTECTION OF THE ENVIRONMENT

A. The CONTRACTOR’s operations shall in no way contribute to air, water, or land

pollution. This includes such nuisances as odors, insects, noise, surface or groundwater contamination, or any other condition that would have detrimental effect on the environment and shall meet all local, state, and federal regulations for handling and disposal/beneficial reuse of the sediment.

B. The CONTRACTOR shall not store any hazardous materials, including fuel oil, at the project site or property of the City.

1.07 LIMITED AND RESTRICTED ACCESS

A. All areas which the CONTRACTOR uses for access shall be maintained and any damage due to his operations shall be repaired to leave these areas in a condition equal to that which existed at the start of the work.

B. The CONTRACTOR will not be entitled to any additional costs or time due to the limited and restricted access to the site.

1.08 WORKING LIMITS

A. The CONTRACTOR shall confine his operations within the areas of new work and to any other limited areas designated by the OWNER for storage of material, access and field office. Since working space is limited, the CONTRACTOR is responsible for securing any off-site space or any additional area required for performing the work.

B. If available, any on-site storage area shall be coordinated with the OWNER. The CONTRACTOR is responsible for securing any on-site storage. The City of Richmond shall not be responsible for any items stored on site.

C. Access to the garage must be maintained at all times.

PART 2 - PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Summary of Work Richmond, VA

01010 - 1

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL 1.01 WORK COVERED BY THE CONTRACT DOCUMENTS

A. This Summary of Work is a general description of the extent of the work. This Summary of Work only highlights the general responsibilities of the Contractor to the City and does not supersede the specific requirements of the Contract Documents. Conditions of the Contract addenda, this section and other sections of Division 1 – General Requirements, apply to the entire work of the contract.

B. Work under this contract includes furnishing and installing all appurtenant and

incidental materials and equipment, complete and in-place, fully operational and in accordance with the Contract Documents. The Work generally includes, but is not limited to the following:

1. Concrete surface repairs

2. Concrete masonry unit wall jointing repairs

3. Compression seal repairs

4. Sealant removal and replacement

5. Concrete and masonry cleaning

6. Deck and trench drain removal and replacement

7. PVC pipe insulation, jacketing, and hanger removal and replacement

8. Steel pipe bollard replacement and painting

9. Prestressed double tee concrete beam and connection repairs

10. Epoxy crack injection

C. Work consists of providing labor, materials, equipment, training, services and administration required in conjunction with or properly incidental to construction of the project. All work shall be performed in accordance with Federal, State and Local regulations and OSHA requirements.

D. Consideration will not be given for misunderstanding the amount of work to be performed. Work includes all items and conditions specified, indicated in the specifications or required by nature of the building or site. Any questions arising during Bidding shall be submitted to the City of Richmond Procurement Services

Third Precinct and Police Academy Parking Garages Summary of Work Richmond, VA

01010 - 2

as specified in Section III of the General Condition. Questions that arise during the Construction Phase should be submitted in writing to the Owner for resolution.

PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Reference Standards City of Richmond, VA

01092-1

SECTION 01092

REFERENCE STANDARDS

PART 1 - GENERAL

1.01 REFERENCE TO STANDARDS AND SPECIFICATIONS OF TECHNICAL SOCIETIES

A. The provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, code or instruction, or the provisions of any such Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation).

B. No provision of any standard, specification, manual, code or instruction shall be effective to change the duties and responsibilities of OWNER, CONTRACTOR or ENGINEER, or any of their subcontractors, consultants, agents or employees from those set forth in the Contract Documents.

C. Work specified by reference to the published standard or specification of a government agency, technical association, trade association, professional society or institute, testing agency, or other organization shall meet the requirements or surpass the minimum standards of quality for materials and workmanship established by the designated standard or specification.

D. Where so specified, products or workmanship shall also meet or exceed the additional prescriptive or performance requirements included within the Contract Documents to establish a higher or more stringent standard of quality than that required by the referenced standard.

E. Where two or more standards are specified to establish quality, the product and workmanship shall meet or exceed the requirements of the most stringent.

F. Where both a standard and a brand name are specified for a product in the Contract Documents, the proprietary product named shall meet or exceed the requirements of the specified reference standard.

G. Copies of standards and specifications of technical societies:

1. Copies of applicable referenced standards have not been bound in these Contract Documents.

Third Precinct and Police Academy Parking Garages Reference Standards City of Richmond, VA

01092-2

2. Where copies of standards are needed by the CONTRACTOR, obtain a copy or copies directly from the publication source and maintain in an orderly manner at the site as Work site records, available to the CONTRACTOR's personnel, Subcontractors, OWNER, and ENGINEER.

H. Any reference to standards in the Contract Documents shall always imply the latest issue in effect including all amendments and errata at the time bids are taken, of said standards unless otherwise stated.

1.02 ABBREVIATIONS

A. Abbreviations for trade organizations, units of measure and government agencies: Following is a list of construction industry organizations and government agencies to which references may be made in the Contract Documents, with abbreviations used.

1. AA Aluminum Association 2. AABC Associated Air Balance Council 3. AAMA American Architectural Manufacturers Association 4. AASHTO American Association of State Highway and

Transportation Officials 5. AASHO The American Association of State Highway Officials 6. ACI American Concrete Institute 7. ACS American Chemical Society 8. AFBMA Anti-Friction Bearing Manufacturers' Association 9. AGA American Gas Association 10. AGMA American Gear Manufacturers’ Association 11. AI Asphalt Institute 12. AICHE American Institute of Chemical Engineers 13. AIEE American Institute of Electrical Engineers (now IEEE) 14. AIMA Acoustical and Insulating Materials Association 15. AISC American Institute of Steel Construction 16. AISI American Iron and Steel Institute 17. AITC American Institute of Timber Construction 18. ALS American Lumber Standards 19. AMA Acoustical Materials Association 20. AMCA Air Movement and Control Association 21. ANSI American National Standards Institute 22. APA American Plywood Association 23. API American Petroleum Institute 24. APWA American Public Works Association 25. AREA American Railway Engineering Association 26. ARI Air Conditioning and Refrigeration Institute 27. ASA American Standards Association (now ANSI) 28. ASAE American Society of Agricultural Engineers

Third Precinct and Police Academy Parking Garages Reference Standards City of Richmond, VA

01092-3

29. ASCE American Society of Civil Engineers 30. ASHRAE American Society of Heating, Refrigeration and Air-Conditioning Engineers, Inc. 31. ASNT American Society for Nondestructive Testing 32. ASME American Society of Mechanical Engineers 33. ASSCBC American Standard Safety Code for Building

Construction 34. ASTM American Society for Testing and Materials 35. AWI Architectural Wood Work Institute 36. AWPA American Wood Preservers' Association 37. AWPB American Wood Preservers Bureau 38. AWPI American Wood Preservers' Institute 39. AWS American Welding Society 40. AWWA American Water Works Association 41. BHMA Builders Hardware Manufacturers' Association 42. BIA Brick Institute of America 43. CBRA Copper and Brass Research Association 44. CBMA Certified Ballast Manufacturers' Association 45. CDA Copper Development Association 46. CGA Compressed Gas Association 47. CIPRA Cast Iron Pipe Research Association 48. CIPRI Cast Iron Pipe Research Institute 49. CISPI Cast Iron Soil Pipe Institute 50. CMAA Crane Manufacturers' Association of America 51. CRSI Concrete Reinforcing Steel Institute 52. CS Commercial Standard (US Dept of Commerce) 53. CSA Canadian Standards Association 54. CSI Construction Specifications Institute 55. CTSS Caltrans Standard Specification 56. E/A Engineer and/or Architect 57. EEI Edison Electric Institute 58. EJCDC Engineers Joint Contract Documents' Committee 59. EPA U.S. Environmental Protection Agency 60. ETL Engineering Test Laboratories 61. FCC Federal Communications Commission 62. FEMA Federal Emergency Management Agency 63. FGMA Flat Glass Marketing Association 64. FM Factory Mutual 65. Fed. Spec. Federal Specifications 66. FS Federal Specification 67. FTI Facing Tile Institute 68. GA Gypsum Association 69. GPM Gallons per Minutes 70. HI Hydraulic Institute 71. HMI Hoist Manufacturers' Institute 72. HP Horsepower

Third Precinct and Police Academy Parking Garages Reference Standards City of Richmond, VA

01092-4

73. ICBO International Conference of Building Officials 74. ICEA Insulated Cable Engineers' Association 75. ID Inside Diameter 76. IEEE Institute of Electrical and Electronics Engineers, Inc. 77. IES Illuminating Engineering Society 78. IFI Industrial Fasteners Institute 79. IPCEA Insulated Power Cable Engineers Association 80. ISA Instrument Society of America 81. ISO Insurance Service Office 82. JIC Joint Industry Conferences of Hydraulic Manufacturers 83. MBE Minority Business Enterprise 84. MBMA Metal Building Manufacturers Association 85. MIA Marble Institute of America 86. Mil. Sp. Military Specification (or MIL) 87. MS Military Specifications 88. MSS Manufactures Standardization Society of the Valve and Fittings Industry 89. MMA Monorail Manufacturers' Association 90. NAAMM National Association of Architectural Metal

Manufacturers 91. NACE National Association of Corrosion Engineers 92. NBHA National Builders' Hardware Association 93. NBFU National Bureau of Fire Underwriters 94. NBS National Bureau of Standards 95. NCPI Nation Clay Pipe Institute 96. NCMA Nation Concrete Masonry Association 97. NEC National Electrical Code 98. NECA National Electrical Contractor's Association 99. NEMA National Electrical Manufacturers' Association 100. NESC National Electric Safety Code 101. NFPA National Fire Protection Association 102. NHLA National Hardwood Lumber Association 103. NHPMA Northern Hardwood and Pine Manufacturer's

Association 104. NLMA National Lumber Manufacturers' Association 105. NPT National Pipe Threads 106. NRCA National Roofing Contractors Association 107. NSF National Sanitation Foundation Testing Lab. 108. NSPE National Society of Professional Engineers 109. NTMA National Terrazzo and Mosaic Association 110. NWWDA National Wood Window and Door Association 111. OD Outside Diameter 112. OECI Overhead Electrical Crane Institute 113. OFCCP Office of Federal Contracts Compliance Programs 114. OSHA Occupational Safety and Health Act (both Federal and

State)

Third Precinct and Police Academy Parking Garages Reference Standards City of Richmond, VA

01092-5

115. PCA Portland Cement Association 116. PCI Prestressed Concrete Institute 117. PEI Porcelain Enamel Institute 118. PPI Plastic Pipe Institute 119. PS Product Standards Section-U.S. Department of

Commerce 120. PSIG Pounds Per Square Inch Gauge 121. RMA Rubber Manufacturers' Association 122. RPM Revolutions per Minutes 123. SAE Society of Automotive Engineers 124. SCPI Structural Clay Products Institute 125. SCPRF Structural Clay Products Research Foundation 126. SDI Steel Deck Institute 127. SDI Steel Door Institute 128. SIGMA Sealed Insulating Glass Manufacturing Association 129. SJI Steel Joists Institute 130. SMACNA Sheet Metal and Air-Conditioning Contractors National Association 131. SMSA Standard Metropolitan Statistical Area 132. SPI Society of the Plastics Industry 133. SPIB Southern Pine Inspection Board 134. SSPC Steel Structures Painting Council 135. STA Station (100 feet) 136. SWI Steel Window Institute 137. TDH Total Dynamic Head 138. TEMA Tubular Exchanger Manufacturers' Association 139. TCA Tile Council of America 140. UBC Uniform Building Code 141. UFC Uniform Fire Code 142. UL Underwriters Laboratories Inc. 143. UMC Uniform Mechanical Code 144. US U.S. Bureau of Standards 145. USASI United States of America Standards Institute 146. USBR U.S. Bureau of Reclamation 147. USC&GS United States Coast and Geodetic Survey 148. USGS United States Geological Survey 149. WCLIB West Coast Lumber Inspection Bureau 150. WWPA Western Wood Products Association

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED) END OF SECTION

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 1

SECTION 01106

CONSTRUCTION SCHEDULING, COORDINATION AND SEQUENCING

PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS

A. Construction work under this contract shall have the least amount of interferences with the operations of existing facilities. Existing facilities must be maintained in continuous operation at all times during the course of the work under this contract.

B. To achieve reliable, continuous operation, new equipment and facilities shall be

tested and in operating condition before final tie-ins are made which connect new equipment and facilities to the existing system.

C. The CONTRACTOR shall submit to the OWNER, drawings showing details of all

temporary connections or facilities as required. D. No extra payment shall be made for any labor, materials, tools, equipment or

temporary facilities required during the construction of facilities. All costs therefore shall be considered to have been included in the price bid of the Proposal.

1.02 SEQUENCE OF CONSTRUCTION

A. A plan for the sequence of construction and delivery dates is necessary to keep shutdowns and the construction to a minimum. The CONTRACTOR shall develop a sequence of construction and submit it to the OWNER for review and approval. The plan shall include all work to be performed and shall be broken down to allow coordination with “Requests for Payment”. The sequence of construction shall be such that all work under this contract shall be completed within the construction time stated in these specifications.

1.03 OPERATIONS OF EXISTING FACILITIES

A. The CONTRACTOR shall coordinate all sequence of the work, operation of existing facilities, shutdowns, etc. with the OWNER. All N.O.I.’s and shutdown requests shall be made, in writing, for approval by the OWNER. No work shall proceed until approval has been received from the OWNER.

B. The CONTRACTOR shall schedule his work in such a manner as to perform the

work under this contract with the least possible interference to normal operation. If it is necessary to interrupt the normal operation of portions of the existing facilities brought about by the need to disconnect and reconnect or to add to or modify certain

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 2

items of equipment, piping, and other existing facilities, such interruptions shall require that the CONTRACTOR submit a Notice of Operation Impact (N.O.I.) request form and arrangements shall be made with the OWNER. The NOI shall be submitted a minimum of three (3) days in advance of such activities requiring the interruption of services by the CONTRACTOR to the OWNER.

C. The N.O.I. forms shall be initiated by the CONTRACTOR and submitted to the

OWNER for review and release prior to any work being done that might, in any way, have an effect on the operations of the facility. An example of an N.O.I. is located in Appendices.

D. It is the CONTRACTOR’s responsibility to coordinate work with the OWNER to be

sure that N.O.I.s are submitted in a timely fashion.

1.04 FACILITY SHUTDOWNS

A. The CONTRACTOR shall carefully coordinate all work and schedules and shall provide the OWNER with written notice prior to each shutdown period unless otherwise approved by the OWNER.

B. Prior to a shutdown, the CONTRACTOR shall submit to the OWNER in writing,

detailed descriptions and schedules of the proposed construction procedures during the shutdown period. Information submitted to the OWNER shall include a complete inventory of materials and equipment needed to perform the work. No shutdown of a facility or operation will be permitted until the OWNER has reviewed and approved, in writing, the proposed construction plans and procedures.

C. If, during any temporary shutdown periods, the work performed is not satisfactory, as

planned, or not completed with the maximum time allocated, the OWNER may order the CONTRACTOR to place the facility back in service and reschedule the work, or he may order the work required to place the facility or operation back in service to be performed with other forces.

D. During scheduled shut downs the CONTRACTOR shall be responsible for all

damages and costs thereof due to negligence. E. Under no circumstances cease Work at the end of a normal working day if such

actions may inadvertently cause a cessation of any facility operating process, in which case, remain onsite until necessary repairs are complete.

F. Electrical Work

1. Power outages will require a N.O.I. submitted to the OWNER. Describe the reason, anticipated length of time, and areas affected by the outage in its

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 3

written request. Provide temporary provisions for continuous power supply to critical existing facility components if requested by OWNER.

2. Other miscellaneous partial electrical shutdowns and tie-ins will be field

identified during progress of the various parts of the work.

G. Sequence of Construction

1. The Contractor shall develop a sequence of construction and submit it to the OWNER for review and approval.

2. In general, the CONTRACTOR shall perform the various items of work under the contract in a sequence but in keeping with the above requirements. The work shall be performed in the general sequence to meet the proposed progress schedule, but in keeping with the requirements of the paragraph 1.03, Operation of Existing Facilities.

3. The plan shall include all work to be performed and shall be broken down to allow coordination with “Requests for Payment”. The Sequence of Construction shall be such that all work under this contract shall be completed within the construction time stated in these specifications.

4. The sequence of construction shall show items of work on the critical path and other major items that have the potential to lie on the critical path. All items shall be tested and be complete for operation before beginning on the next item of work unless otherwise noted.

5. The constraints specified above regarding outages of the existing facilities include certain scheduling requirements. Those requirements shall be considered together with the provisions of this paragraph when planning the work.

6. The Contractor shall schedule all required tests, approvals and inspections of the Work or portions thereof at appropriate times so as not to delay the progress of the Work or other work related to the Project.

1.05 COORDINATION

A. Contractor, Subcontractors and Owner Personnel

1. The CONTRACTOR’s staging areas shall be limited to a 20 feet by 40 feet area designated by the OWNER. Any additional areas may be coordinated with the OWNER but additional space is not guaranteed.

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 4

2. The CONTRACTOR is responsible for the proper coordination of his work and his subcontractor's work, to prevent interference with the operation of the facility and to assure that the OWNER is made aware in advance of proposed construction activities.

3. There will be no basis for claim for extra compensation or contract time extension due to delay caused by the CONTRACTOR's failure to give proper notice for requested shutdowns or to advise the OWNER of proposed construction activities that in the judgement of the OWNER will interfere with operation of the facility.

4. Should an emergency condition arise, the OWNER has the authority to require the CONTRACTOR and his subcontractors to suspend their operations temporarily until conditions return to normal, without claim for extra cost or contract time extension by the CONTRACTOR and his SUBCONTRACTORS.

5. CONTRACTOR agrees to indemnify the OWNER and to hold the OWNER harmless for any injury or malady suffered by any agent, employee, or servant of CONTRACTOR including any subcontractor or independent CONTRACTOR of CONTRACTOR (collectively hereinafter "agent"). Furthermore, CONTRACTOR agrees to adhere to all applicable and pertinent OSHA and Commonwealth of Virginia rules, regulations, and guidelines; to adhere to all OWNER ordinances, laws, rules, and regulations; and to follow and apply safe construction practices in order to promote and provide a safe working environment for agents. CONTRACTOR agrees to indemnify and pay the OWNER for any attorneys fees incurred by the OWNER in the defense of any claim against the OWNER for an injury resulting from CONTRACTOR negligent failure: (1) to provide a safe working environment; (2) to follow safe construction practices; (3) to inspect, supervise or review the job site or any plan or specification prepared by CONTRACTOR or his agents; and (4) to comply with any OSHA or Commonwealth of Virginia rules, regulation or guideline or any City ordinance, law, rule and regulation. CONTRACTOR agrees to pay all court costs and any settlement or judgement incurred by the OWNER as a result of any such action or claim.

1.06 RELATIONS WITH OTHER CONTRACTORS

A. The CONTRACTOR shall conduct his operations so as not to interfere with or injure the work of other contractors or workmen doing work for the City. The CONTRACTOR shall promptly make good, at his own expense, any injury or damage which may be done to such work by him or his employees, agents or subcontractors.

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 5

B. The CONTRACTOR shall suspend such part of his work, or shall carry on the same in such manner as may be ordered by the OWNER when necessary to facilitate the work of such other contractors or workmen.

1.07 UTILITIES

A. Coordinate Work with various utilities within Project limits. Notify applicable utilities prior to commencing Work, if damage occurs, or if conflicts or emergencies arise during Work. Should any utility be damaged or if conflicts or emergencies arise, the OWNER shall be notified immediately.

1.08 INFORMATION NOT GUARANTEED

A. All information in the Contract Documents relating to existing construction and other conditions, natural phenomena and existing pipes is from the best sources at present available to the City. All such information is furnished only for the information and convenience of bidders and is not guaranteed.

B. It is agreed further and understood that no bidder or CONTRACTOR shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the City, arising from or by reason of any variance which may exist between the information made available and the actual conditions, natural phenomena or existing pipes actually encountered during the construction work, except as may be otherwise expressly provided for in the Contract Documents.

1.09 OBSTRUCTIONS UNEXPECTEDLY ENCOUNTERED

A. In case any pipe, structure, or other obstruction, so located or placed as to interfere with the work, is unexpectedly encountered, the CONTRACTOR shall at once notify the ENGINEER by telephone and confirm in writing, of the locality and circumstances, and the work at this location shall be suspended until satisfactory arrangements are made, without any claim for damages or extra compensation arising from the delay, but the CONTRACTOR may be allowed an extension of time as hereinbefore provided.

1.10 COMPLETION OF WORK

A. In addition to the definition in the General Conditions, Substantial Completion is further defined as (i) that degree of completion sufficient to provide the OWNER the full time, uninterrupted, continuous beneficial operation of the Work; and (ii) all inspections required have been completed and identified conditions corrected. Specific items of Work which shall be completed prior to declaration of Substantial Completion date include, but are not limited to, the following:

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 6

1. Correction of all state, local, and other regulatory agencies defective Work lists.

2. Submittals have been received and approved by the ENGINEER.

3. All additional warranty or insurance coverage requirements have been provided.

4. The OWNER may request utilization of substantially completed parts of the project prior to substantial completion of all work. These guidelines are described in paragraph 1.13 in this section.

1.11 HOLIDAYS, WORKING HOURS, AND NOISE

A. The City observes a five-day work week and the following holidays: New Year's Day; Martin Luther King's Birthday; Washington's Birthday, Easter Monday; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; the Friday after Thanksgiving; Christmas Eve and Christmas Day. The CONTRACTOR will not be permitted to work on these holidays unless otherwise authorized from the OWNER.

B. The CONTRACTOR shall not work during City holidays, unless approved by the OWNER, with two (2) weeks prior request needed. CONTRACTOR shall reimburse OWNER for additional expenses incurred for working beyond operation times identified above or on a City holiday.

C. Contractor operations shall be limited to Monday through Friday, 7.00 a.m. to 5:30 p.m., local time, unless approved by the OWNER. The CONTRACTOR may be allowed to work outside of the specified hours or days. The CONTRACTOR shall request written authorization from the OWNER. Request must be submitted 48 hours prior to the work activity. For work outside the standard hours, the CONTRACTOR will be required to pay the whole cost for the City inspection.

D. No Work shall be scheduled without prior notification and authorization.

E. In case of an extreme emergency which may require that work be done on Saturdays, Sundays, holidays or longer than ten hours per day, the CONTRACTOR shall request permission of the OWNER to do so. If, in the opinion of the OWNER, the emergency is bona fide, he will grant permission to the CONTRACTOR to work such hours as may be necessary. Also if in the opinion of the OWNER, a bona fide emergency exists, he may direct the CONTRACTOR to work such hours as may be necessary whether the CONTRACTOR requests permission to do so or not.

F. No playing of portable or car radios at or adjacent to the project site will be permitted.

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 7

G. Noise Control Ordinance: City of Richmond. The maximum allowable noise level at the property line of neighborhood residences is 55 dBA for CONTRACTOR operations at all times.

1.12 ADJACENT FACILITIES AND PROPERTIES

A. Examination:

1. After Effective Date of the Agreement and before Work at site is started OWNER, CONTRACTOR and utility owners shall make thorough examination of pre-existing conditions including existing buildings, structures, and other improvements in vicinity of Work, as applicable, which might be damaged by construction operations. Periodic re-examination shall be jointly performed to include, but not limited to, cracks in structures, settlement, leakage, and similar conditions.

2. Record observations for signature of OWNER and CONTRACTOR.

B. Documentation:

1. Submit two copies of photographs or other records documenting examination for OWNER’s signature. OWNER will review, sign, and return one record copy of every observation document and photograph to CONTRACTOR to be kept on file in CONTRACTOR’s field office as site records.

2. These observations and photographs are intended for use as indisputable

evidence in ascertaining whether and to what extent damage occurred as a result of CONTRACTOR’s operations, and are for protection of adjacent property owners, CONTRACTOR, and OWNER.

1.13 PARTIAL UTILIZATION BY THE OWNER

A. Definition: Use by OWNER of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work.

B. Unless agreed in writing prior to OWNER’s use, the following conditions shall apply:

1. CONTRACTOR’s Responsibilities:

a. Allow access for OWNER’s personnel. b. Allow operation of heating, ventilating, and electrical systems. c. Perform all required lubrication and maintenance of equipment

installed by him until final acceptance of the complete project.

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 8

2. OWNER’s Responsibilities:

a. Operate heating and ventilating systems and pay costs of same. b. Assume responsibility for security and fire protection in utilized

areas, but not extending to protection of CONTRACTOR’s materials and equipment in utilized areas.

3. Other Conditions of OWNER’s Use: The correction period for the occupied

or separately operated portion of Work shall commence at the date of Substantial Completion for that separate part.

C. Property Insurance: OWNER may occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work, provided that no such use or occupancy shall commence before the insurers providing the property insurance have acknowledged notice thereof and in writing effected any changes in coverage necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be canceled or permitted to lapse on account of any such partial use or occupancy.

1.14 OWNER FACILITIES

A. Operation of Existing Facilities:

1. Continuous operation of OWNER’s facilities is of critical importance. Schedule and conduct activities to enable existing facilities to operate continuously, unless otherwise specified.

2. Conduct Work outside regular working hours on prior written consent of OWNER to meet Project schedule and avoid undesirable conditions.

3. Do not proceed with Work affecting a facility’s operation without obtaining

OWNER’s advance approval of the need for and duration of such Work.

4. Provide N.O.I. as required for approval to OWNER of need to shut down a process or facility.

1.15 SALVAGED MATERIALS

A. In the course of performing the work, it will be necessary for the CONTRACTOR to remove existing materials and equipment which will not be incorporated in the new work. Such materials and equipment which the OWNER determines to be salvageable shall remain his property and be turned over to him. All other removed items shall become the property of the CONTRACTOR.

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 9

B. Materials and equipment to be salvaged by the OWNER shall be removed with care by the CONTRACTOR so that they are not damaged. They shall be disassembled and stored in a neat and orderly manner at a location approved by the OWNER.

1.16 TESTS AND INSPECTIONS

A. Provide initial and subsequent inspections of Work to ensure that the Work conforms to the Contract Documents. Give OWNER timely notice of readiness of the Work for all non-CONTRACTOR required inspections, tests or approvals, and cooperate with inspection and testing personnel to facilitate required inspections or tests.

B. OWNER shall employ and pay for the services of an independent testing laboratory to perform all non-CONTRACTOR inspections, tests, or approvals required by the Contract Documents.

C. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested or approved by an employee or other representative of such public body, assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith. Furnish OWNER the required certificates of inspection, or approval. CONTRACTOR shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required for OWNER’s acceptance of materials or equipment to be incorporated in the Work, or of materials, mix designs, or equipment submitted for approval prior to CONTRACTOR’s purchase thereof for incorporation in the Work.

D. Paragraph 6.3 of the GENERAL CONDITIONS is supplemented by this paragraph.

E. An inspector or inspectors of the City will visit the work site to report to the OWNER as to the progress of the work and the manner in which it is being performed; also, to report whenever it appears that the materials furnished and work performed by the CONTRACTOR fail to fulfill the requirements of the specifications and contract, and to call to the attention of the CONTRACTOR any such failure or other default; but no inspection nor any failure to inspect, at any time or place, however, shall relieve the CONTRACTOR from an obligation to perform all of the work strictly in accordance with the requirement of the Contract Documents. The inspectors shall perform such other duties as are assigned to them. They shall not be authorized to revoke, alter, enlarge, relax or release any requirements of these specifications, nor to approve or accept any portion of work, nor to issue instructions contrary to the plans and specifications. Inspectors shall in no case act as foreman or perform other duties for the CONTRACTOR, nor interfere with the management of the work by the latter. Any instructions which the inspectors may give the CONTRACTOR shall in no way be construed as binding the ENGINEER or the OWNER in any way, nor releasing the CONTRACTOR from fulfillment of the terms of the Contract.

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 10

F. The OWNER may appoint such other person or persons as he may deem necessary to inspect, at any time or times, the material and equipment furnished and the work done under this Contract, said inspections to be made at the shops or plants, at the site of the work or at any or all said places, at the discretion of the OWNER.

G. Work and materials will be inspected promptly, but if for any reason delays should occur, the contractor shall thereby have no claims for damages or extra compensation. Materials and workmanship shall always be subject to the approval of the OWNER; but no inspection, approval or acceptance of any part of the work or of the materials used therein, nor any payment on account thereof, shall prevent the rejection of said materials or work at any time thereafter during the existence of the Contract, should said work or materials be found to be defective or not in accordance with the requirements of the specifications and Contract.

H. At all times during the progress of the work, the CONTRACTOR shall, permit, or secure permission for, any duly authorized inspector or representative of the City to enter any factory, shop or other place where any materials and equipment to be supplied for the work under this contract are prepared, manufactured or constructed at any time or times while such preparations, manufacture or construction is in progress. The CONTRACTOR shall furnish and prepare or cause to be furnished and prepared without charge, all such assistance, appliances, samples of materials and test specimens as may be ordered by the OWNER or such inspector or representative for the purpose of making official tests and investigations. The CONTRACTOR shall also provide all tools, testing machines, materials, and labor necessary for the required testing, inspection and weighing at the shops, plants, and/or site of the work, of the materials and equipment and of any and all parts thereof to be supplied for the work under this contract.

I. The OWNER shall be notified of the time and place of preparation, manufacture or construction of all material, equipment and devices for all or part of the work before delivery at the site of the work. Such notification shall be given a sufficient time in advance of the beginning of the work on such material, equipment and devices to allow arrangements to be made for inspecting and testing.

PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION 3.01 CUTTING, FITTING, AND PATCHING

A. Cut, fit, adjust, grout or patch Work and work of others to make Work complete.

B. Obtain prior written authorization of OWNER before commencing Work to cut or otherwise alter:

Third Precinct and Police Academy Parking Garages Construction Scheduling, Coordination Richmond, VA and Sequencing

01106 - 11

1. Structural or reinforcing steel, structural columns or beams, elevated slabs, trusses, or any other structural member.

2. Weather- or moisture-resistant elements.

3. Efficiency, maintenance, or safety of element.

4. Work of others.

C. Refinish surfaces to provide an even finish.

1. Refinish continuous surfaces to nearest intersection.

2. Refinish entire assemblies.

3. Finish restored surfaces to such planes, shapes, and textures that no transition between existing work and Work is evident in finished surfaces.

D. Restore existing work and surfaces that are to remain in completed Work including concrete-embedded piping, conduit, and other utilities as specified and as shown.

E. Make restorations with new materials and appropriate methods as specified for new Work of similar nature; if not specified, use best recommended practice of manufacturer or appropriate trade association.

F. Fit Work airtight to pipes, sleeves, ducts, conduit and other penetrations through surfaces and fill existing voids.

G. Remove specimens of installed Work for testing when requested by OWNER.

END OF SECTION

Third Precinct and Police Academy Parking Garages Measurement and Payment Richmond, VA

01130 - 1

SECTION 01130

MEASUREMENT AND PAYMENT

PART 1 - GENERAL 1.01 GENERAL

A. The CONTRACTOR shall receive and accept the compensation provided in the Bid Proposal(s) and the Contract(s) as full payment for furnishing all materials, labor, tools and equipment, for performing all operations necessary to complete the work under the Contract(s), and also in full payment for all loss or damages arising from the nature of the work, or from any discrepancy between the actual quantities of work and quantities herein estimated by the ENGINEER, or from the action of the elements or from any unforeseen difficulties which may be encountered during the prosecution of the work until the final acceptance by the OWNER.

B. The prices stated in the proposal(s) include all costs and expenses for taxes, labor, equipment, materials, commissions, transportation charges and expenses, patent fees and royalties, labor for handling materials during inspection, insurance permits and other fees, together with any and all other costs and expenses for performing and completing the work as indicated in the Contract Documents. The basis of payment for an item at the lump sum price shown in the proposal(s) shall be in accordance with the description of that item in this Section.

C. The CONTRACTOR’s attention is called to the fact that the quotations for the various items of work are intended to establish a total price for completing the work in its entirety. Should the CONTRACTOR feel that the cost for any item of work has not been defined by a Bid Form payment item, he shall include the cost for that work in some other applicable bid item, so that his proposal for the project reflects his total price for completing the work in its entirety.

D. The OWNER reserves the right to change the alignment, grade, form, length, dimensions or materials of the work under the contract, whenever any conditions or obstructions are met that render such changes desirable or necessary. All such alterations shall be paid for under the total lump sum bid or at a unit price bid for these items of work, except as follows:

1. In case such alterations made the work less expensive to the

CONTRACTOR, a proper deduction shall be made from the contract prices and the CONTRACTOR shall have no claim on this account for damages or for anticipated profits on the work that may be dispensed with.

Third Precinct and Police Academy Parking Garages Measurement and Payment Richmond, VA

01130 - 2

2. In case such alterations make the work more expensive, a proper addition shall be made to contract prices. The OWNER shall determine any such deduction or addition.

E. The OWNER reserves the right to increase or decrease the quantity of material to

be furnished or work to be done under the contract whenever he deems if advisable or necessary, and such increase or decrease shall in no way violate the contract. For the Unit Price Items included in the Bid, the CONTRACTOR will be paid for the actual quantity of the authorized work done or material furnished under each item of the proposal, at the unit price bid for such item. In case the quantity of any item is increased, the CONTRACTOR shall not be entitled to compensation over and above the unit price bid for such item. In case the quantity of any item is decreased, the CONTRACTOR shall have no claim for damages on account of loss of anticipated profits because of such decrease.

1.02 MEASUREMENT

A. The quantities for payment under this Contract shall be determined by actual measurement of the completed items, in place and accepted by the OWNER, in accordance with the General Conditions. A representative of the CONTRACTOR shall witness all field measurements.

1.03 MEASUREMENT - GENERAL

A. Weighing, measuring, and metering devices used to measure quantity of materials for Work shall be suitable for purpose intended and conform to tolerances and specifications as specified in National Institute of Standards and Technology, Handbook 44.

B. Units of measure shall be as follows:

Item Method of Measurement

CF Cubic Foot—Field Measure by ENGINEER within the limits specified or shown

CY

Cubic Yard—Field Measure by ENGINEER within the limits specified or shown

SY Square Yard —Field Measure by ENGINEER within the limits specified or shown

SF Square Foot—Field Measure by ENGINEER within the limits specified or shown

LF Linear Foot—Field Measure by ENGINEER

Third Precinct and Police Academy Parking Garages Measurement and Payment Richmond, VA

01130 - 3

Item Method of Measurement LS Lump Sum—Unit is one; no measurement will

be made.

Hours Hours – Field Measure by ENGINEER 1.04 LUMP SUM and UNIT PRICE ITEMS

A. Bid Items Part A1 and A2: Third Precinct and Police Academy Garage 1. Payment during the course of work for unit price items, shall be made on

the basis of work completed as shown on the drawings and specified herein.

2. Payment for repairs at the locations shown on the plans and as directed, shall be made at the unit price bid per unit of measure for the amount of work actually placed based on the details shown on the plans.

3. Measurement shall be based on quantities as shown on the plans and

details or as directed. The CONTRACTOR shall not exceed the quantities shown on the price schedule without the written approval by the Owner.

4. The unit price per unit of measure shall include all supervision, labor,

materials, equipment and incidental items necessary for the work at the locations shown on the plans and as directed.

B. Bid Items Part B: Mobilization/Demobilization, Bonds, and Insurance

1. Mobilization/Demobilization shall not exceed $25,000. CONTRACTOR

shall provide all labor, services, specialists, material and equipment for preparatory and removal work and operations, including but not limited to those necessary for the mobilizing and demobilization of site equipment, materials, supplies and incidentals; for the establishment and removal of all offices, buildings and other temporary facilities necessary for work on the project; cost for prepaid bonds and insurance; and for all other work and operations to be performed or costs incurred to begin work on the various Contract Items.

2. Cost of pre-paid bonds, insurance, and permit fees required for the

Contract may be reimbursed under this Contract Item. The amount reimbursed for prepaid bonds and insurance costs will be included as part of any mobilization/demobilization payment stipulated under the below listed terms and there will be no extra or separate payment for these items.

3. When the monthly progress payment estimate of the total amount earned,

not including the amount earned for mobilization, is 2% or more of the

Third Precinct and Police Academy Parking Garages Measurement and Payment Richmond, VA

01130 - 4

Total Bid Items Part A1 plus A2 amount, the total amount earned for mobilization and demobilization shall be 35% of the Total Bid Items Part B price.

4. When the monthly progress payment estimate of the total amount earned,

not including the amount earned for mobilization, is 5% or more of the Total Bid Items Part A1 plus A2 amount, the total amount earned for mobilization and demobilization shall be an additional 35% of the Total Bid Items Part B price.

5. When the monthly progress payment estimate of the total amount earned,

not including the amount earned for mobilization and demobilization, is 95% or more of the Total Bid Items Part A1 plus A2 amount, the total amount earned for mobilization and demobilization shall be an additional 30% of the Total Bid Items Part B price.

6. The City reserves the right in case the CONTRACTOR defaults on the

Contract, to retain the use, or have used, the CONTRACTOR's plant, equipment, tools, materials and other property for, and until, completion of the work, in accordance with Section 7 of the General Conditions of the Contract.

C. Bid Items Part C: Contingency Allowance

1. Payment for contingency allowance work shall be in accordance with Bid

Items Part A1 and A2 to perform additional work as authorized by the OWNER in all areas as shown on the drawings and specified herein.

2. Measurement shall be made in accordance with the bid item or as agreed by OWNER.

1.05 PAYMENT FOR MATERIALS NOT INCORPORATED INTO THE WORK

A. No payment will be made for stored materials or materials not incorporated into the work.

PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Applications for Payment Richmond, VA

01152 - 1

SECTION 01152

APPLICATIONS FOR PAYMENT

PART 1 - GENERAL 1.01 REQUIREMENT

A. Submit Applications for Payment in accordance with the requirements established by the Contract Documents.

1.02 FORMAT and DATA REQUIRED

A. Applications for Payment shall include the following:

1. Application and Certification for Progress Payment form. 2. CPM Schedule Earned Value Report. The CPM schedule submitted in

accordance with Section 01310 shall be the basis for payment. 3. Invoices for stored materials. 4. CONTRACTOR'S Monthly Status report in accordance with section

01310. 5. A copy of the current “Red Line” record drawing set. 6. Revised Construction Schedule showing the work completed to date, work

to be completed in the next 30 days and current Substantial Completion date.

1.03 PREPARATION OF APPLICATION FOR EACH PROGRESS PAYMENT

A. Application form is included in General Conditions – Forms and Attachments.

B. Application Form

1. Fill in required information on the "Application and Certification for Progress Payment" form.

2. Execute certification with signature of a responsible officer of CONTRACTOR. An original signature should appear on each copy submitted.

3. Attach to the Application the CPM Schedule Updated Earned Value Report. The agreed upon Earned Value Report will be the basis for all progress payments.

4. Attach to the Application, for payment of materials stored on or off site, original paid invoices.

5. Other Withholding from Progress Payment

Third Precinct and Police Academy Parking Garages Applications for Payment Richmond, VA

01152 - 2

a. If it is determined that additional monies should be withheld from the amount otherwise due CONTRACTOR, a "Other Withholding from Progress Payment" form will be completed with an explanation of the amount and reasons for such Other Withholding, and will be attached to each copy of the Application. Some items which, might be included in the Other Withholding amount are, but not limited to: engineering fees for review of substitutions; excessive shop drawing review; overtime required by CONTRACTOR's work in excess of eight hours per day; costs incurred due to CONTRACTOR caused damage to private or public property; etc.

1.04 SUBSTANTIATING DATA FOR PROGRESS PAYMENTS

A. Provide any substantiating data, as requested by the ENGINEER. B. Since the operations and maintenance information to be supplied will be reviewed

initially and then resubmitted, payment for individual items of equipment shall be based on a cost loaded CPM schedule for the operations and maintenance manuals and equipment until the preliminary draft operation and maintenance data is submitted and receives a "Furnish as Corrected" annotation by ENGINEER.

C. As a prerequisite for monthly progress payments, submit a copy of redline

drawings for review. 1.05 SUBMITTAL PROCEDURES

A. Submit, to the ENGINEER, Applications for Payment at the times stipulated in the Agreement.

B. Submit three copies of each Application. C. When Application is determined to be properly completed and correct, the

Application for Payment will be transmitted to OWNER for payment. PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Change Order and Field Order Procedures Richmond, VA

01153 - 1

SECTION 01153

CHANGE ORDER AND FIELD ORDER PROCEDURES

PART 1 - GENERAL 1.01 REQUIREMENTS

A. Promptly implement change order procedures as follows: 1. Provide full written data required to evaluate changes.

2. Maintain detailed records of Work done on a time-and-material/force

account basis.

3. Provide full documentation on request.

B. Designate in writing the member of CONTRACTOR's organization:

1. Who is authorized to accept changes in the Work.

2. Who is responsible for informing others in the CONTRACTOR's employ of the authorization of changes in the Work.

C. Final approval of all Change Orders will be by the City of Richmond Procurement

Services. 1.02 RELATED WORK SPECIFIED ELSEWHERE

A. General Conditions, Forms and Attachments - Contract B. Division 01010 – Summary of Work C. Section 01152 - Applications for Payment D. Section 01310 – Progress Schedule

1.03 PRELIMINARY PROCEDURES

A. OWNER may initiate changes by submitting a Request for Proposal (RFP) to the CONTRACTOR in accordance with the General Conditions as amended by the Supplementary Conditions. Request will include:

1. A detailed description of the change, products, and location of the change

in the Project;

Third Precinct and Police Academy Parking Garages Change Order and Field Order Procedures Richmond, VA

01153 - 2

2. Supplementary or revised Drawings and Specifications; 3. The projected time span for making the change, and a specific statement

as to whether overtime work is, or is not, authorized;

4. Such request is for information only, and is not an instruction to execute the changes, or to stop work in progress.

B. CONTRACTOR may initiate a request to make a change by submitting a written

notice (in a form acceptable to the OWNER) containing:

1. Description of the proposed changes;

2. Statement of the reason for making the changes;

3. Statement of the effect on the Contract Price and the Contract Time;

4. Statement of the effect on the work of separate Contractors;

5. Documentation supporting any change in Contract Price or Contract Time. 6. Such request is for information only, and is not an instruction to execute

the changes, or to stop work in progress. 1.04 DOCUMENTATION OF PROPOSALS AND CLAIMS

A. CONTRACTOR shall support each quotation for a lump-sum proposal or time-and-material work, and for each unit price that has not previously been established, with sufficient substantiating data to allow evaluation of the quotation, in accordance with the General Conditions.

B. On request, CONTRACTOR shall provide additional data to support time and

cost computations including, but not limited to, the following:

1. Labor required with certified payroll data to submit for review and approval.

2. Equipment required 3. Products required

a. Recommended source of purchase and unit cost. CONTRACTOR shall make every effort to obtain competitive pricing as time allows.

b. Quantities required

Third Precinct and Police Academy Parking Garages Change Order and Field Order Procedures Richmond, VA

01153 - 3

4. Taxes, insurance, and bonds 5. Credit for Work deleted from Contract, similarly documented 6. Overhead and profit 7. Justification for any change in Contract Time

C. Support each claim for additional costs, and for Work done on a time-and-

material/force account basis, with documentation in accordance with the General Conditions, plus additional information as follows:

1. Name of OWNER's authorized agent who ordered the Work, and date of

the order. 2. Name of Procurement Services agent who authorized the Work, and date

of the order. 3. Dates and times Work was performed, and by whom. 4. Time record, summary of hours worked, and hourly rates paid. 5. Receipts and invoices for:

a. Equipment used, listing dates, and times of use b. Products used, listing of quantities c. Subcontracts

1.05 PREPARATION OF CHANGE ORDERS AND FIELD ORDERS

A. ENGINEER will prepare each Change Order and Field Order with technical requirements.

B. Change Orders will describe changes in the Work, both additions and deletions, with attachments of revised Contract Documents to define details of the change.

C. Change Order will provide an accounting of the adjustment in the Contract Price

and/or the Contract Time. D. Field Orders will describe interpretations or clarifications of Contract Documents

and/or document trade-off agreements. E. Field Order work will be accomplished without change in the Contract Price,

Contract Time, and/or claims for other costs. F. If in agreement, the CONTRACTOR shall sign and return Field Orders for

Third Precinct and Police Academy Parking Garages Change Order and Field Order Procedures Richmond, VA

01153 - 4

execution by the next working day at which time they will become binding on the CONTRACTOR.

1.06 CORRELATION WITH CONTRACTOR'S SUBMITTALS

A. Revise Schedule of Values and Application for Payment forms to record each change as a separate item of Work and to record the adjusted Contract Price.

B. Revise the Construction Schedule monthly to reflect each change in Contract

Time. Revise sub-schedules to show changes for other items of Work affected by the changes.

C. Upon completion of Work under a Change Order, enter pertinent changes in

Record Documents.

PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Project Meetings Richmond, VA

01200 - 1

SECTION 01200 PROJECT MEETINGS

PART 1 - GENERAL 1.01 SCOPE OF WORK

A. The CONTRACTOR will schedule and administer a Pre-Construction Meeting, periodic progress meetings, and pre-installation meetings, and other meetings throughout the progress of the work.

1. Prepare agenda for meetings 2. Make physical arrangements for meetings 3. Preside at meetings 4. Prepare and distribute meeting minutes

B. Representatives of the CONTRACTOR, subcontractors and suppliers attending

meetings shall be qualified and authorized to act on behalf of the entity each represents.

1.02 PRECONSTRUCTION MEETING

A. A Pre-Construction Meeting will be scheduled before the CONTRACTOR starts Work at the site.

B. Location: A site designated by the OWNER. C. Attendance:

1. OWNER's representative 2. ENGINEER and his professional consultants 3. CONTRACTOR's project manager and superintendent 4. Major subcontractors 5. Others as appropriate

D. Suggested Agenda:

1. Distribution and discussion of:

a. List of major subcontractors and suppliers b. Projected construction schedules

2. Critical work sequencing. 3. Project coordination:

Third Precinct and Police Academy Parking Garages Project Meetings Richmond, VA

01200 - 2

a. Designation of responsible personnel

4. Procedures and processing of:

a. Field decisions b. Proposal requests c. Submittals d. Change Orders e. Applications for payment

5. Adequacy of distribution of Contract Documents. 6. Procedures for maintaining Record Documents. 7. Use of premises:

a. Office, work and storage areas. b. OWNER's requirements.

8. Construction facilities, controls and construction aids. 9. Temporary utilities. 10. Housekeeping procedures. 11. Check of required Bond and Insurance certifications. 12. Liquidated damages. 13. Check of required Permits. 14. Laboratory testing of material requirements. 15. Inventory of material stored on site. 16. Wage determination compliance and records, work hours. 17. MBE/WBE fair share objective, affirmative action, nondiscrimination

policies. 18. Communication lines and contact persons, including address and telephone

number. 19. Manufacturers' operation and maintenance manuals, and operation and

maintenance training. 20. Regulatory agency inspections. 21. Progress agency inspections. 22. Job site safety. 23. Periodic progress meeting schedule

1.03 PROGRESS MEETINGS

A. Regular periodic Progress Meetings will be held as determined during the pre-construction meeting.

B. Additional meetings will be scheduled as required by progress of the work. C. Location of the meetings: A site designated by the OWNER.

Third Precinct and Police Academy Parking Garages Project Meetings Richmond, VA

01200 - 3

D. Attendance:

1. ENGINEER and his professional consultants as needed. 2. CONTRACTOR and his Subcontractors (as appropriate to the agenda). 3. OWNER's representative. 4. Others as appropriate.

E. Suggested Agenda:

1. Review and approval of minutes of previous meeting. 2. Review of work progress since previous meeting. 3. Field observations, problems and conflicts. 4. Problems which impede Construction Schedule. 5. Review of off-site fabrication, delivery schedules. 6. Corrective measures and procedures to regain projected schedule. 7. Revisions to Construction Schedule. 8. Progress schedule during succeeding work period. 9. Coordination of schedules. 10. Review submittal schedules; expedite as required. 11. Maintenance of quality standards. 12. Pending changes and substitutions. 13. Review proposed changes for:

a. Effect on Construction Schedule and on completion date. b. Effect on other contracts of the Project.

G. The CONTRACTOR is to provide a current shop drawing submittal log and current progress schedule at each progress meeting in accordance with Section 01300.

1.04 QUALITY CONTROL AND COORDINATION MEETING(S)

A. Scheduled as necessary to review test and inspection reports, and other matters relating to quality control of Work and work of other contractors.

B. Location of the meetings: A site designated by the meeting organizer. C. Attendance: As required

D. Agenda: As required

1.05 PRE-INSTALLATION MEETINGS

A. When required in individual Specification sections, convene at site prior to commencing Work of that section.

B. Location of the meetings: A site designated by the CONTRACTOR.

Third Precinct and Police Academy Parking Garages Project Meetings Richmond, VA

01200 - 4

C. Attendance: Require attendance of entities directly affecting, or affected by, Work

of that section. D. Provide 7 day advance notice of meeting date. E. Agenda: As required.

1.06 OTHER MEETINGS

A. OWNER or ENGINEER may request that CONTRACTOR schedule, conduct, or attend other meetings as required to review and resolve project issues. Such meetings may include equipment pre-installation, outage coordination, instrumentation and testing, safety, and other topics as required.

PART 2 - PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 1

SECTION 01300 SUBMITTALS

PART 1 - GENERAL 1.01 GENERAL

A. The CONTRACTOR shall submit for review and approval such shop drawings, test reports and product data on materials and equipment (hereinafter in this section called data), and material samples (hereinafter in this section called samples) as are required for the proper control of work, including but not limited to those shop drawings product data and samples for materials and equipment specified elsewhere in the Contract Documents.

B. The CONTRACTOR is to maintain an accurate updated submittal log and will bring

this log to each scheduled Progress Meeting. This log should include the following items:

1. Submittal-Description and Number assigned. 2. Date submitted. 3. Date returned. 4. Status of Submittal (Approved, Approved as Noted, Revise and Return,

Rejected). 5. Date of Resubmittal and Return (as applicable). 6. Date material release (for fabrication). 7. Projected date of fabrication. 8. Projected date of delivery to site. 9. Status of O&M manuals submittal. 10. Specification Section. 11. Drawings Sheet Number (if applicable).

1.02 TYPES OF SUBMITTALS

A. Shop drawings for manufactured or fabricated items, schedules, diagrams and like material prepared specially for this project.

B. Product Data which include pre-printed material, manufacturer's descriptive

literature, illustrations, catalog data, performance charts and the like intended to identify a part of the work but not necessarily prepared exclusively for this Contract.

C. Samples which include physical examples of products, materials, assemblies or

workmanship which are identical to a portion of the work and which establish standards for materials, workmanship, or appearance of the finished work.

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 2

D. Administrative data to include information required to support the administrative requirements of the contract.

1.03 PROCEDURE FOR SUBMITTALS

A. All submittals shall be distributed electronically in PDF format. Distribution shall be as determined during the pre-construction meeting. Submittals shall be complete for each component of work or system and shall include all inter-related portions of a system.

1.04 CONTRACTOR'S RESPONSIBILITY

A. It is the duty of the CONTRACTOR to check all drawings, data and samples prepared by or for him before submitting them for review. Each and every copy of the Shop Drawings and data shall bear a CONTRACTOR's stamp showing that they have been checked. Shop drawings submitted without the CONTRACTOR's stamp will be returned to the CONTRACTOR for conformance with this requirement. Shop drawings shall indicate any deviations in the submittal from requirements of the Contract Documents.

B. Contract Documents shall not be reproduced for the purpose of making shop

drawings. C. Determine and verify:

1. Field measurements. 2. Field construction criteria. 3. Catalog numbers and similar data. 4. Conformance with Contract Documents.

D. The CONTRACTOR shall ensure that no work is begun on any item of work

requiring an approved submittal until such approval is obtained. E. The CONTRACTOR shall not begin any work covered by a drawing, data, or a

sample returned marked "REVISE AND RETURN” OR “REJECTED" until a revision or correction thereof has been reviewed and returned to him with approval.

F. One approved copy of all submittals shall be held by the CONTRACTOR at the

construction site. G. Each submittal shall be assigned a sequential number by the CONTRACTOR, for

purposes of easy identification, and shall retain its assigned number with appropriate subscript, on required resubmissions. The assigned number shall consist of the specification section number where the item is specified, followed by a sequential number indicating the number of submittals in that Section (e.g., 03300-11 is the 11th separate submittal for items specified in Section 03300). Resubmittals shall be

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 3

identified with the same number as the original submittal, followed by the subscript R1, R2, etc. All products and materials submitted shall be clearly identified with the appropriate equipment name and number as it appears in the Contract Document.

H. The CONTRACTOR shall submit all shop drawings, submittals and schedules within

30 days following the Notice to Proceed and allow no less than 15 calendar days for review from time of receipt.

I. All submittals shall be accompanied with a transmittal letter containing the following

information:

1. Date. 2. Project Title and Number. 3. CONTRACTOR's name and address. 4. The Number of each Shop Drawing, Project Data, and Sample submitted. 5. Notification of Deviations from Contract Documents. 6. Submittal Log Number conforming to Specification Section Numbers.

J. The CONTRACTOR shall be responsible for and bear all costs of damages which

may result from the ordering of any material or from proceeding with any part of work prior to the completion of the review of the necessary Shop Drawings.

K. The CONTRACTOR shall be responsible for observing the need for and making any

changes which may be required by the materials/equipment he proposed to supply both as pertains to his work and any work affected under other parts, heading, or divisions of drawings and specifications at no cost to the OWNER.

1.05 ENGINEER'S REVIEW OF SHOP DRAWINGS

A. The ENGINEER's review of drawings, data and samples submitted by the CONTRACTOR will be only for conformance with the design concept of the Project and for general compliance with the information given in the Contract Documents. The ENGINEER's review and approval will not constitute an approval of dimensions, quantities, and details of the material, equipment, device, or item shown.

B. The review of drawings and schedules will be general, and shall not be construed:

1. as permitting any departure from the Contract requirements; 2. as relieving the CONTRACTOR of responsibility for any errors, including

details, dimensions, and materials; 3. as approving departures from details furnished by the ENGINEER, except as

otherwise provided herein. 4. as approving CONTRACTOR's means, methods, techniques, sequences or

procedures of construction or to safety precautions or programs incident thereto.

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 4

C. If the drawings or schedules as submitted describe variations and show departure from the Contract requirements which are in the interest of the OWNER and to be so minor as not to involve a change in Contract Price or time for performance, the ENGINEER may return the reviewed drawings without noting an exception.

D. The ENGINEER will review, with reasonable promptness, submittals with respect to

the Contract Documents and will indicate a qualified “Approval”, an “Approval As Noted”, a “Revise and Return” or “Rejected” notation. Incomplete submittals will be returned without being reviewed.

E. Resubmittals by CONTRACTOR shall be submitted within 15 calendar days from

the time they are received and handled in the same manner as first submittals. On resubmittals the CONTRACTOR shall direct specific attention, in writing or on resubmitted Shop Drawings, to revisions other than the corrections requested on previous submissions. The CONTRACTOR shall make any corrections required by the ENGINEER.

F. If the CONTRACTOR considers any correction indicated on the drawings to

constitute a change to the Contract Drawings or Specifications, the CONTRACTOR shall give written notice thereof.

G. Review of each original submittal and first resubmittal is included in the contract.

Review time for subsequent resubmittals will be charged to the CONTRACTOR at the rate of $185 per hour.

H. When the Shop Drawings have been completed to the satisfaction of the

ENGINEER, the CONTRACTOR shall carry out the construction in accordance therewith and shall make no further changes therein except upon written instructions from the OWNER.

I. No partial submittals will be reviewed. Incomplete submittals will be returned to the

CONTRACTOR for resubmittal. 1.06 SHOP DRAWINGS

A. When used in the Contract Documents, the term "Shop Drawings" shall be all drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for CONTRACTOR to illustrate some portion of the Work and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams, and other information prepared by a Supplier and submitted by CONTRACTOR to illustrate material or equipment for some portion of the Work.

B. Manufacturer's catalog sheets, brochures, diagrams, illustrations and other standard

descriptive data shall be CLEARLY MARKED TO IDENTIFY THOSE MATERIALS, PRODUCTS OR MODELS THAT ARE PERTINENT TO THE

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 5

WORK. Delete information which is not applicable to the Work by striking through or cross-hatching.

C. Drawings and schedules shall be checked and coordinated with the work of all trades

involved, before they are submitted for review and shall bear the CONTRACTOR's stamp of approval as evidence of such checking and coordination. Drawings or schedules submitted without this stamp of approval shall be returned to the CONTRACTOR for resubmission.

D. Each Shop Drawing shall have a blank area 3-1/2 inches by 3-1/2 inches, located

adjacent to the title block. The title block shall display the following:

1. Project Title and Number 2. Name of project building or structure 3. Number and title of the shop drawing 4. Date of shop drawing or revision 5. Name of contractor and subcontractor submitting drawing 6. Supplier/manufacturer. 7. Separate detailer when pertinent 8. Specification title and number 9. Specification section 10. Application Contract Drawing Number

E. If drawings show variations from Contract requirements because of standard shop

practice or for other reasons, the CONTRACTOR SHALL DESCRIBE SUCH VARIATIONS IN HIS LETTER OF TRANSMITTAL. The transmittal letter shall delineate compliance and exceptions taken to Contract Documents. If acceptable, proper adjustment in the Contract shall be implemented where appropriate. If the CONTRACTOR fails to describe such variations, he shall not be relieved of the responsibility for executing the work in accordance with the Contract, even though such drawings have been reviewed.

F. Data on materials and equipment include, without limitation, materials and

equipment lists, catalog data sheets, cuts, performance curves, diagrams, materials of construction and similar descriptive material. Materials and equipment lists shall give, for each item thereon, the name and location of the supplier or manufacturer, trade name, catalog reference, size, finish and all other pertinent data.

G. For all mechanical and electrical equipment furnished, the CONTRACTOR shall

provide a list including the equipment name, and address and telephone number of the manufacturer's representative and Service Company so that service and/or spare parts can be readily obtained.

H. All manufacturers or equipment suppliers who propose to furnish equipment or

products shall submit an installation list along with the required shop drawings. The

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 6

installation list shall include at least five installations where identical equipment has been installed and has been in operation for a period of at least one (1) year.

1.07 SAMPLES

A. The CONTRACTOR shall furnish for approval, samples required by the Contract Documents or requested by the OWNER. Samples shall be delivered as specified or directed. The CONTRACTOR shall prepay all shipping charges on samples. Materials or equipment for which samples are required shall not be used in work until approved.

B. Samples shall be sufficient size and quantity to clearly illustrate:

1. Functional characteristics of the product, with integrally related parts and

attachment devices. 2. Full range of color, texture and pattern. 3. A minimum of three samples of each item shall be submitted.

C. Each sample shall have a label indicating:

1. Name of project 2. Name of CONTRACTOR and Subcontractor 3. Material or Equipment Represented 4. Place of Origin 5. Name of Producer and Brand (if any) 6. Location of Project (Samples of finished materials shall have additional marking that will identify them under the finished schedules).

D. The CONTRACTOR shall prepare a transmittal letter in triplicate for each shipment

of samples containing the information required in subparagraph 1.04I above. He shall enclose a copy of this letter with the shipment. Approval of a sample shall be only for the characteristics or use named in such approval and shall not be constructed to change or modify any Contract requirements.

1.08 MANUFACTURER'S LIST

A. Within 30 days after receipt of a Notice to Proceed, and before ordering any equipment or materials, the CONTRACTOR shall submit for approval a complete list of proposed manufacturers and fabricators for all materials and equipment to be used in this Contract. The purpose of this submittal is to predetermine the acceptability of proposed suppliers before issuance of purchase orders by the CONTRACTOR. Submission and acceptance of the manufacturers' list shall neither relieve the CONTRACTOR from submitting detailed shop drawings and product data for all materials and equipment nor shall it constitute prior acceptance of any

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 7

specific item of equipment prior to submittal of shop drawings. After submission and acceptance of the manufacturers' list, the CONTRACTOR shall not deviate from the named suppliers and manufacturers without written approval.

1.09 OPERATION and MAINTENANCE MANUALS FOR EQUIPMENT and

PRODUCTS

A. Manual Preparation:

1. Manuals shall include operation and maintenance information on all systems and items of equipment. The data shall consist of: catalogs, brochures, bulletins, charts, schedules, approved Shop Drawings corrected to as-built conditions and assembly drawings and wiring diagrams describing location, operation, maintenance, lubrication, operating weight, lubrication charts and schedules showing manufacturers recommended lubricants for each rotating or reciprocating unit, and other information necessary for the OWNER to establish an effective operating maintenance program. The following data shall also be included:

a. Title page giving name and location of facility, Contract Drawings

No(s). where shown and Specification Section where described. b. Approved Shop Drawings of each piece of equipment. c. Manufacturer's cuts and dimension drawings of each piece of

equipment, and details of all replacement parts. d. Manufacturer's erection, operation and lubrication instructions for all

equipment and apparatus, and complete listing of nameplate data. e. Complete wiring diagrams of all individual pieces of equipment and

systems including one line diagrams, schematic or elementary diagrams, and interconnection and terminal board identification diagrams.

f. The operating version of an operating program if the piece of equipment requires a program to perform its function. A copy of the operating program on CD and a written version of the program.

g. Complete parts list with parts assembly drawing (preferably by exploded view), names and addresses of spare parts suppliers, recommended list of spare parts to be kept "in stock" and sample order forms for ordering spare parts. Lead time required for ordering parts shall be estimated.

h. Instructions with easily understood schematics or diagrams for disassembling and assembling the equipment for overhaul or repair.

2. All items listed above that are of a sheet size of 8-1/2 inches by 11 inches or

can be folded (no more than twice) to this size shall be bound in 4-inch maximum loose-leaf three-ring d-post type binders with black plastic-coated

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 8

covers. The contents shall be fully indexed. PAGES SHALL BE LINEN REINFORCED ON BINDING EDGE.

3. Shop Drawings 24 inches by 36 inches in size shall be folded to

approximately 12 inches by 9 inches with drawing title box exposed along either edge. Shop Drawings descriptive of a single item of equipment shall be grouped together. All Shop Drawings shall be placed in accordion-type folders similar to File Pocket No. 74CG (9-1/2 inches x 14-3/4 inches) as manufactured by the Cooke and Cobb Company, or equal, and fully indexed on the outside of the folders in a neat and uniform manner.

4. All Shop Drawings included in the binders and/or folders shall be those

copies previously submitted for review and approval and shall bear the ENGINEER's stamp of approval and comments as originally noted thereon.

B. Approval:

1. Subsequent to the approval and return of the final manual, the

CONTRACTOR shall submit four complete sets of manuals. 2. Substantial Completion certification will positively not be undertaken until

approved Operation and Maintenance Manuals have been submitted. Partial approvals of the final manual will not be made.

3. Delivery of manufacturer's service (O&M) manuals and installation

instructions satisfactory to the OWNER are an essential part of the equipment delivery. Incomplete or inadequate manuals will be returned to the CONTRACTOR for correction and/or resubmission.

1.10 MANUFACTURER’S REPRESENTATIVE

A. The definition of "manufacturer's representative" shall be as follows: a representative from the manufacturer's plant, familiar with the actual problems of manufacturing, installing and operating the particular equipment or product and with enough years of experience in this field to determine the successful operation of the equipment or product. Sales representatives or agents of the manufacturers will not be acceptable.

B. As related to his obtaining the manufacturer's certificates, the CONTRACTOR shall

include in this contract price the cost of furnishing competent and experienced manufacturer's representatives who shall represent the manufacturer on equipment and products furnished and installed under this Contract, to assist the CONTRACTOR to install, adjust, start up, and test the equipment and products in conformity with the Contract Documents. After the equipment and products have been operated through the trial period for each phase of construction and before being put into permanent service, such manufacturer's representatives shall make all

Third Precinct and Police Academy Parking Garages Submittals Richmond, VA

01300 - 9

adjustments and tests required to provide that such equipment and products are in proper and satisfactory.

1.11 DESIGN CALCULATIONS

A. Design calculations shall be presented in a neat, legible manner and shall bear the stamp and signature of a Registered Professional ENGINEER, registered in the State of Virginia.

1.12 RECORD DRAWINGS

A. The CONTRACTOR will keep Record Drawings in accordance with Section 01720 – Project Record Documents.

PART 2 - PRODUCTS – (NOT USED) PART 3 - EXECUTION – (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-1

SECTION 01310

PROGRESS SCHEDULE PART 1 - GENERAL

1.01 FORM OF SCHEDULES

A. Prepare schedules in the form of critical path method (CPM) as described herein:

1. Provide separate CPM networks (subnetworks) of activities for each process or facility.

2. Each subnetwork shall be assigned a code and separate activity numbering series.

3. Interrelationships between subnetworks and any individual activities shall be identified.

1.02 SCHEDULING RESPONSIBILITIES

A. The Critical Path Method type construction schedule will be used to monitor job progress and as a means to make monthly payments to the CONTRACTOR except for Stored Materials which will be made in accordance with Section 6.10 of the General Conditions of the Contract. The CONTRACTOR will be responsible for providing all information concerning the sequencing, logic, and durations of all activities as well as providing the initial CPM logic network diagram and tabular report data. Once the initial logic network diagram is accepted, the CONTRACTOR will be responsible for providing monthly update information on logic changes, percent complete, actual start and finish dates, and duration changes.

B. From the CONTRACTOR’s initial schedule submittal and from information received at the monthly schedule update meetings, computerized and dated tabular schedule reports, updated network diagrams, and bar charts will be produced which will be reviewed by the CONTRACTOR for accuracy and integrity. It shall at all times remain the CONTRACTOR’s responsibility to schedule and direct his forces in a manner that will allow for the completion of the Work within the Contract Times.

C. It should be clearly understood that the initial schedule and all update information must be provided by the CONTRACTOR, and that this information is a representation of the best efforts of the CONTRACTOR and his Subcontractors as to how they envision the Work to be accomplished. Similarly, all progress information to be provided by and through the CONTRACTOR must be an accurate representation of his, or his Subcontractor’s, or Supplier’s actual performance. The schedule shall at all times remain an accurate reflection of the CONTRACTOR’s actual or projected sequencing of work. Once accepted, adherence to the established CPM Schedule shall be obligatory upon the CONTRACTOR, and his

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-2

Subcontractors for the Work under this Contract. The OWNER may require the CONTRACTOR to revise the schedule if, in his judgment, the schedule does not accurately reflect the actual execution of the Work, or is in violation of any provision of the CPM scheduling requirements; and the CONTRACTOR shall revise the schedule as often as is necessary to bring the course of performance of the Work without additional cost to the OWNER.

1.03 SUBMITTALS

A. CPM Schedule:

1. Within five (5) business days after Notice to Proceed, submit the proposed CPM network diagrams, tabular reports for the entire Contract duration and include both procurement and construction activities. Sort the tabular reports by total float and activity number. They shall also contain a predecessor/successor resource loading report, and project calendar. This logic diagram shall be drawn as described herein and will be the subject of a schedule review meeting with the CONTRACTOR, the OWNER, and OWNER’s representatives within 2 weeks of its submission. No payment will be made until an approved CPM Schedule is received from the CONTRACTOR.

2. If a review of the submitted CPM Schedule indicates a work plan which will

not complete the Work within the Contract Time stated in the Contract, revise the CPM Schedule as required and resubmit it until it is acceptable. Failure to submit an acceptable schedule may, at the OWNER’s sole discretion, be cause for the withholding of any partial payment(s) otherwise due under the Contract.

3. Acceptance of the schedule shall not constitute a representation by the

OWNER that the Work can be completed as shown on the schedule.

B. Submittals Schedule:

1. In addition to the above scheduling requirements, submit a complete and detailed listing of anticipated submittals during the course of the Contract. Coordinate submittals with those of Subcontractors and Suppliers, and identify each submittal as specified. Indicate the anticipated submission date for each submittal along with the date on which its return is anticipated. Review time for submittal shall be as provided for in Section 01300, SUBMITTALS. Durations shown for review shall be to share available float for that path. Submittals and the review time, of which are on the critical path, shall be clearly marked in red with the words “Critical Path” by the CONTRACTOR at the time of submission.

2. Submit the Submittal Schedule within 7 calendar days from the Notice to

Proceed. The Submittal Schedule will then be accepted or revised as

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-3

required, and the CONTRACTOR will incorporate the dates and review durations into his CPM Schedule.

1.04 NETWORK REQUIREMENTS

A. The network diagram shall show the interdependence of activities, and the sequence in which the Work is to be accomplished as planned by the CONTRACTOR. The basic concept of the network analysis diagram is to show how the start of a given activity is dependent on the completion of preceding activities, and its completion restricts the start of succeeding activities. A time scaled precedence format will be followed. The detailed network diagram will be time scaled showing a continuous flow from left to right.

B. The Schedule Activities shall be developed into three major groups:

1. Procurement Activities: Procurement Activities shall include at a minimum:

a. Permits. b. Easements. c. Submittal Items. d. Approval of Submittal Items. e. Fabrication and Delivery of Submittal Items.

Permits, easements, and fabrication and delivery items shall be tied logically to the correct construction activity in the overall CPM construction schedule.

2. Construction Activities: Construction activities will be physical work activities that describe how the job will be constructed.

3. Testing, Startup, Training, and Closeout: CPM activities for this group shall

include all Work to meet the requirements of individual Specification sections and meet the requirements of Substantial and Final Completion.

C. Break the Work into activities, with durations of 1 to 20 working days each, except for non-construction activities (such as procurement of materials and delivery of equipment), and other activities which may require longer durations. To the extent feasible, activities related to a specific physical area of the project shall be grouped on the network for ease of understanding and simplification.

D. Each activity on the network shall have indicated for it the following:

1. A single duration, no longer than 20 days (i.e., the single best estimate of the expected elapsed time considering the scope of work involved in the activity) expressed in working days. City holidays and weather delays shall be included. One critical path shall be shown for the schedule.

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-4

2. An activity I.D. number will be assigned to each activity. The I.D. number will be numeric with a maximum of 10 digits.

3. A brief description of the activity will be included. If this description is not

definitive, a separate listing of each activity and a descriptive narrative may be required.

4. Each activity (except for procurement activities) shall be cost loaded to

indicate the total estimated costs of the activity. No activity shall exceed $60,000 except if an equipment item.

5. Each construction activity shall be man-hour loaded with the estimated

man-hours to be expended on each activity.

E. When preparing the CPM construction schedule, consider all construction sequence and critical construction activities requirements.

F. Failure to include on a network any element of Work required for the performance of this Contract shall not excuse the CONTRACTOR from completing all Work required within the applicable Contract Time.

G. A CPM Schedule which shows a completion of any portion of the construction work (not including testing and start-up) prior to the Contract Time dates may be accepted but in no event shall be acceptable as a basis for a claim for delay against the OWNER by the CONTRACTOR

H. The schedule calendar shall be a 5-day work week with holidays corresponding to those observed by the City of Richmond’s Department of Public Utilities.

1.05 COST LOADING

A. Schedule of Values:

1. Each activity for Work-in-Place on the construction schedule shall be allocated a dollar value in accordance with Article NETWORK REQUIREMENTS, Subparagraph D.4 above. Each activity’s assigned cost shall consist of labor, equipment, and materials costs, and a prorated contribution to overhead and profit. The sum of the activities costs shall be equal to the total contract price. Activities not directly related to Work-in-Place including Stored Materials, preparation and submittal of Shop or Working Drawings, or other required submittal or equipment and material procurement shall not be cost loaded. In submitting cost data the CONTRACTOR certifies that they are not unbalanced, and that the value assigned to each activity represents the CONTRACTOR’s estimate of the actual costs of performing that activity. The listing of cost loaded CPM activities will become the Schedule of Values, and will serve as the basis for payments to the CONTRACTOR.

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-5

2. The accepted Schedule of Values shall represent a fair, reasonable, and

equitable dollar cost allocation for each activity on the CONTRACTOR’s construction schedule.

B. Documentation: If it is determined that the cost data do not meet the requirements for a balanced bid breakdown, provide documentation substantiating any cost allocation on the cost data. Cost allocations shall be considered unbalanced if an activity on the construction schedule has been assigned a disproportionate allocation of direct costs, overhead, and profit.

1.06 PROGRESS OF THE WORK

A. The Work shall be started on the date indicated in the Notice to Proceed, and shall be executed with such progress as may be required to prevent delay to other contractors or to the general completion of the project. The Work shall be executed at such times and in or on such parts of the project, with such forces, material, and equipment, as to assure completion of the Work in the time established by the Contract. Additionally, schedule and direct the Work so that it provides an orderly progression of the Work to completion within the specified Contract Time.

B. Whenever it becomes apparent from the current monthly CPM Schedule update that delays to the critical path have resulted; and these delays are through no fault of the OWNER, or OWNER’s representatives, and hence, that the Contract completion date will not be met, take some or all of the following actions at no additional cost to the OWNER.

1. Increase construction manpower in such quantities and crafts as will substantially eliminate the backlog of Work.

2. Increase the number of working hours per shift; shifts per working day, or

days, per week; the amount of construction equipment; the forms for concrete work; etc., or any combination of the foregoing to substantially eliminate the backlog of Work.

3. Schedule activities to achieve maximum practical concurrence of

accomplishment of activities, and comply with the revised schedule.

C. Submit for review a written statement of the steps to be taken to remove, or arrest the delay to the schedule. If the CONTRACTOR fails to submit a written statement of the steps he intends to take or fails to take such steps as required by the Contract; the OWNER may direct the level of effort in manpower and trades, equipment, work schedule, and overtime to remove or arrest the delay to the critical path in the accepted schedule, and the CONTRACTOR shall promptly provide such level of effort at no additional cost to the OWNER. In addition, should schedule delays persist, the CONTRACTOR’s bond agent will be asked to attend meetings to update the schedule.

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-6

D. Failure of the CONTRACTOR to comply with the requirements of this provision shall subject him to, at the OWNER’s sole discretion, withholding, in partial or in total, payments otherwise due the CONTRACTOR for Work performed under this Contract. The CONTRACTOR agrees that any withholding of moneys is not a penalty for noncompliance, but is an assurance for the OWNER that funds will be available to implement these requirements should the CONTRACTOR fail to do so, since failure of the CONTRACTOR to comply with these requirements shall mean that the CONTRACTOR failed to execute the Work with such diligence as to ensure its completion within the time for completion.

1.07 SCHEDULE UPDATES

A. Meetings: The CPM Schedule shall be updated and copies distributed for review at the Progress Meeting or as required. Actual progress of the previous period and future activities will be reviewed. The duration of activities and their logical connections may be revised as needed. Decisions made at these meetings and agreed to by all parties are binding with the exception that no contract completion dates will be modified without formal written request and acceptance as specified herein. In either case, provide the following minimum information for each Update:

1. Actual start and finish dates for all completed activities.

2. Actual dates for all started but incomplete activities including remaining durations and/or percent completes.

B. Withholding of Payments: Failure to provide specified updated information or failure to attend progress meetings may result in the withholding of progress payments.

1.08 CAUSES FOR EXTENSIONS OF TIME

A. The Contract completion time will be adjusted only for causes specified in this Contract. In the event the CONTRACTOR requests an extension of any contract completion date, he shall furnish justification and supporting evidence per the General Conditions, and provide a detailed CPM Schedule delay analysis based on the most current updated CPM Schedule. The OWNER will, after receipt of such justification and supporting evidence, make findings of fact and will advise the CONTRACTOR in writing thereof. If the OWNER finds that the CONTRACTOR is entitled to an extension of the Contract completion date under the provisions of the Contract, the determination as to the total number of days extensions shall be based upon the current accepted and updated CPM Schedule and on all data relevant to the extension. Such data shall be included in the next monthly updating of the schedule. The CONTRACTOR acknowledges and agrees that actual delays in activities which, according to the CPM schedule, do not affect any Contract completion date shown by the critical path in the network, do not have any effect on the Contract completion date or dates, and therefore will not be the basis for a change in Contract completion time.

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-7

1.09 ABNORMAL WEATHER

A. The Contract Period will be adjusted to account for unusually severe weather conditions which prevent or inhibit the CONTRACTOR's performance of the Work and lengthen the critical path indicated on the Schedule (such unusually severe weather conditions referred to herein as "Inclement Weather"). It is the intent of this provision to offset the impact of Inclement Weather with unusually favorable weather conditions which immediately precede and/or follow the occurrence of Inclement Weather.

B. The CONTRACTOR shall notify the OWNER in writing of the occurrence of

Inclement Weather within two days after the onset of such Inclement Weather and shall describe in reasonable detail the type of Inclement Weather encountered by the CONTRACTOR and the Work thereby interfered with or interrupted.

C. This provision specifies the procedure for the determination of time extensions for

unusually severe weather. The following conditions must be satisfied:

1. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

2. The unusually severe weather must actually cause a delay to the completion

of the project. The delay must be beyond the control and without the fault or negligence of the CONTRACTOR.

D. Schedule: The following Schedule of Monthly Anticipated Adverse Weather Delays is

based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The CONTRACTOR's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

SCHEDULE OF MONTHLY ANTICIPATED ADVERSE WEATHER DELAYS WORK DAYS BASED ON (5) DAY WORK WEEK

City of Richmond

JAN10

FEB 9

MAR9

APR6

MAY8

JUN7

JUL8

AUG7

SEP6

OCT5

NOV7

DEC9

E. Records: Upon acknowledgement of the Notice to Proceed and continuing throughout

the contract, the CONTRACTOR will record daily, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the CONTRACTOR's scheduled work day.

F. Impacted Days: The number of actual adverse weather days shall include days

impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day in each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in the Schedule of Monthly Anticipated Adverse

Third Precinct and Police Academy Parking Garages Progress Schedule Richmond, VA

01310-8

Weather Delays, above, convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather workdays, and issue a modification in accordance with Section 01153 – Change Order and Field Order Procedures.

1.10 APPROVAL REQUESTS

A. As the Work progresses and in the sequence indicated by the accepted progress schedule, the CONTRACTOR must submit a specific request, in writing, for each item of information or approval required of him by the Contract. These requests must be submitted sufficiently in advance of the date upon which the information or approval is actually required by the CONTRACTOR to allow for the time needed to act upon such submissions or resubmissions.

B. The CONTRACTOR shall not have any right to an extension of time on account of delays due to his failure to submit his requests for the required information or the required approval in accordance with these requirements.

1.11 ADJUSTMENT BY OWNER

A. It may be necessary for the Contract schedule and/or Contract Times to be adjusted by the OWNER due to the effects of job conditions, acts or omissions of other contractors not directly associated with this Contract, weather, technical difficulties, strikes, unavoidable delays on the part of the OWNER or his representatives, and other enforceable conditions which may indicate schedule adjustments and/or completion time extension. Under such conditions, the OWNER shall direct the CONTRACTOR to reschedule the Work to reflect the changed conditions, and the CONTRACTOR shall revise his schedule accordingly. Schedule extensions affecting the Contract Times shall be granted only by the OWNER in writing. It is specifically pointed out that the use of available total float in the CPM Schedule may be used by the OWNER and his representatives, as well as, by the CONTRACTOR.

B. Without obligation to extend the Contract Times or any intermediate completion dates set out in the CPM network, the OWNER may initiate changes to the Contract Work that absorb float time only. OWNER initiated changes that affect the critical path on the CPM network shall be the sole grounds for extending or shortening the Contract times. CONTRACTOR initiated changes that encroach on the float time, identified in the CPM network, may be accomplished with the OWNER’s concurrence. Such changes, however, shall give way to OWNER initiated changes competing for the same float time.

PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Construction Photographs Richmond, VA

01380 - 1

SECTION 01380 CONSTRUCTION PHOTOGRAPHS PART 1 - GENERAL 1.01 DESCRIPTION

A. The CONTRACTOR shall have construction record photographs taken prior to start of the Work and periodically during the course of the Work.

1.02 DIGITAL PHOTOGRAPHY

A. All photographs shall be taken digitally. The minimum digital resolution shall be 8 mega-pixels. The CONTRACTOR shall provide to the OWNER a labeled CD or DVD on which the photographs are stored.

1.04 COSTS OF PHOTOGRAPHY

A. The Contractor shall pay costs for specified photography.

1. Parties requiring additional photography or prints will pay photographer directly.

PART 2 - PRODUCTS 2.01 PHOTOS

A. Adequately identify each photo using a numbered list. At a minimum, identify each photo in the list to include:

1. Photo file name 2. Date photo was taken 3. Description of vantage point, indicating location and direction (by compass

point) PART 3 - EXECUTION 3.01 CONSTRUCTION PHOTOGRAPHS

A. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.

B. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-

Third Precinct and Police Academy Parking Garages Construction Photographs Richmond, VA

01380 - 2

editing software. 1. Date and Time: Include date and time in file name for each image.

C. Preconstruction Photographs: Before starting construction, take photographs of

Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by OWNER.

D. Periodic Construction Photographs: Take photographs of each repair, provide a minimum of 2 views per repair, and 20 general construction progress photographs. Photographs shall be submitted with each application for payment. Select vantage points to show status of construction and progress since last photographs were taken.

E. Final Completion Construction Photographs: Take 20 photographs after date of Substantial Completion for submission as project record documents.

3.02 VIEWS REQUIRED

A. Photograph from locations to adequately illustrate condition of construction and state of progress.

3.03 DELIVERY OF PHOTOS, DATA

A. Deliver CDs to the OWNER to accompany each Application for Payment.

END OF SECTION

Third Precinct and Police Academy Parking Garages Quality Control Richmond, VA

01400 - 1

SECTION 01400

QUALITY CONTROL

PART 1 - GENERAL 1.01 CODES AND RULES

A. General:

1. The CONTRACTOR shall comply with the City of Richmond Building Codes as well as the requirements of all permits obtained by the OWNER or the CONTRACTOR.

2. The CONTRACTOR shall give all necessary notices, obtain all permits

(except as otherwise noted herein) and pay all governmental taxes, fees, and other costs in connection with the work, file all necessary plans, prepare all documents and obtain all necessary approvals of all government departments having jurisdiction, obtain all required Certificates of Inspection and Approval for the work and deliver same to the OWNER, except as otherwise noted herein.

B. Included Items:

1. The CONTRACTOR shall include in his work, all labor, materials, services,

apparatus, and drawings required to comply with all applicable laws, ordinances, rules and regulations, whether or not shown in the Contract Documents.

C. Compliance:

1. All materials furnished and all work installed shall comply with the rules and

regulations of the National Fire Protection Association, with all requirements of local utility companies, with the recommendations of the fire insurance rating organization having jurisdiction, and with the requirements of all governmental departments having jurisdiction.

2. The CONTRACTOR shall arrange for inspection and approval by the

appropriate City Inspectors and shall pay all costs of these services. 1.02 MATERIALS and WORKMANSHIP

A. All materials and equipment required for the work shall be new, unless otherwise specified, and of the best quality and especially adapted to the services required.

B. The CONTRACTOR shall furnish a Superintendent who shall be constantly in

Third Precinct and Police Academy Parking Garages Quality Control Richmond, VA

01400 - 2

charge of the installation of the work, together with all skilled workmen and labor required to unload, transfer, erect, connect up, adjust, start, operate, and test each system.

C. The CONTRACTOR shall locate and install all equipment which must be serviced,

operated, or maintained in fully accessible positions. Minor deviations from Contract Documents may be made to allow for better accessibility, but changes of significant magnitude or changes involving extra cost shall not be made without approval of the OWNER.

D. In as much as Drawings are generally diagrammatic, the Drawings do not indicate all supports, hangers, fittings or offsets for piping, conduits, and duct work, or all valves, traps, access panels, or other specialties which the CONTRACTOR shall provide. All piping, conduit and duct work exposed to view shall be run parallel with the lines of the structure and as close to walls, columns, and ceilings as may be practical and consistent with proper grade and the maintenance of proper clearances for access to all parts requiring servicing. No piping, conduit, or duct work shall cross below the head of any window or door.

1.03 STANDARDS

A. Any reference to standards in the Contract Documents shall always imply the latest issue in effect including all amendments and errata at the time bids are taken, of said standards unless otherwise stated.

B. Abbreviations for various organizations which may be used in these

Specifications are listed in Section 01092 – Reference Standards. 1.04 VERIFICATION OF DIMENSIONS

A. The CONTRACTOR shall be responsible for field verification of all dimensions of existing facilities and other items which are shown on the Contract Documents.

1.05 TESTS OF MATERIALS and EQUIPMENT

A. All material shall be subject to inspection, testing and approval before being incorporated in the work. Any work in which such materials are used without prior testing and approval shall be considered defective and unauthorized and will not be paid for. The CONTRACTOR shall perform such tests as required by the specifications in a timely fashion taking into account when the items will be incorporated in the work.

PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)

Third Precinct and Police Academy Parking Garages Quality Control Richmond, VA

01400 - 3

END OF SECTION

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-1

SECTION 01500

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

PART 1 - GENERAL

1.01 SUBMITTALS

A. Administrative Submittals:

1. Copies of permits and approvals for construction as required by Laws and Regulations and governing agencies.

2. The CONTRACTOR shall develop, maintain and submit a copy of the

Site Safety Plan. Such Plan shall be in accordance with the City of Richmond Health, Safety and Environmental Management Plan.

B. Shop Drawings:

1. Temporary Construction Submittals:

a. Staging area location to be determined by OWNER.

C. Traffic Control

1. Limited Parking is available on-site.

1.02 MOBILIZATION

A. Mobilization shall include, but not be limited to, these principal items:

1. Obtaining required permits. 2. Providing on-site sanitary facilities and potable water facilities as

specified and as required by Laws and Regulations, and governing agencies.

3. Arranging for and erection of the CONTRACTOR’s work and storage

yard. 4. Posting OSHA required notices and establishing safety programs and

procedures. 5. Having the CONTRACTOR’s superintendent at the site full time.

1.03 PERMITS & FINES

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-2

A. The CONTRACTOR shall obtain and pay for all construction permits and licenses. OWNER shall assist the CONTRACTOR, when necessary, in obtaining such permits and licenses. The CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the Work

B. The CONTRACTOR shall be responsible for all fines and be responsible for addressing all work stop orders received by the General and his Sub-Contractors.

1.04 SAFETY AND PROTECTION

A. The OWNER and ENGINEER, under this Contract, are not responsible for the safety of the CONTRACTOR's employees.

B. The CONTRACTOR shall initiate, maintain, and supervise all safety precautions and programs in connection with the Work. Provide safe working conditions during the building of all parts of the work under the Contract and abide by all applicable OSHA regulations. Work under this Contract will be subject to inspection by OSHA and Virginia Department of Labor inspectors. Take all necessary precautions for the safety of, and provide the necessary protection to prevent damage, injury, or loss to:

1. All persons on the Work site or who may be affected by the Work. 2. All the Work and materials and equipment to be incorporated therein,

whether in storage on or off the site. 3. Other property at the site or adjacent thereto, including trees, shrubs, lawns,

walks, pavements, roadways, structures, utilities and Underground Facilities not designated for removal, relocation or replacement in the course of construction.

4. CONTRACTOR shall meet all safety requirements for working over and

around water. 5. CONTRACTOR shall restrict access and clearly mark all newly excavated

or otherwise hazardous areas when not working for more than 1 hour or overnight.

6. CONTRACTOR shall meet all safety requirements for working around

High Voltage power facilities.

C. Safety Plan:

1. The CONTRACTOR shall make available the following items for review: OSHA-200 Log for the past five years, current safety program, training program, and experience with other related processes. Documented

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-3

evidence showing compliance with lockout/tagout, emergency response, and safe work practices are required.

2. Before any Work at the site is started, prepare written plan for Project

specific safety precautions and programs, complete with respect to procedures and actions that the CONTRACTOR, and all others, intend to follow in order for CONTRACTOR and all others to comply with all applicable Laws and Regulations, as well as specific site requirements.

3. Revise plan for safety precautions and programs at appropriate times to

reflect changes in construction conditions, the Work, means, methods, techniques, sequences and procedures of construction.

D. Safety Representative: Designate a qualified and experienced safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs.

E. Hazard Communication Programs: Be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with Laws or Regulations.

F. Emergencies: In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the OWNER, is obligated to act to prevent threatened damage, injury or loss. The CONTRACTOR shall give the OWNER prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the OWNER determines that a change in the Contract Documents is required because of the action taken by the CONTRACTOR in response to such an emergency, a Work Change Directive or Change Order will be issued to document the consequences of such action.

1.05 SITE SECURITY

A. Provide the OWNER with an up-to-date list of employees, sub-contractors, and sub-contractor employees who will be coming to the site.

B. The CONTRACTOR shall notify the OWNER of work or deliveries a minimum of 24 hours prior to the start of work or material deliveries. For deliveries, provide description of material to be delivered, date and time, and Delivery Company with the notification.

C. The CONTRACTOR shall notify the OWNER if any suspicious activity is noted around or near the work area.

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-4

D. No private vehicles are allowed on site. All CONTRACTOR vehicles shall be identified with the CONTRACTOR’s name.

E. CONTRACTOR personnel are ONLY allowed in the associated work areas. No CONTRACTOR personnel should be present anywhere else on the site, except for transit from off-site parking to job site.

F. The CONTRACTOR will establish site security procedures for his equipment on the project site.

G. The OWNER will define areas out of bounds for contractor personnel.

1.06 SITE CONDITIONS

A. The CONTRACTOR shall be required to abate any contribution to air, water, or land pollution including such nuisances as odors, noise, surface or groundwater contamination, or other conditions resulting from the CONTRACTOR’s activities.

B. The CONTRACTOR shall comply with all traffic regulations. It shall be the CONTRACTOR responsibility to inspect the condition of the road and plan the Work to accommodate the road condition. The CONTRACTOR shall be responsible for repairing any damage to roadways and other surfaces harmed by the CONTRACTOR’s operations at no additional cost to the OWNER.

C. Examination: After Effective Date of the Agreement and before Work at site is started, CONTRACTOR and OWNER shall make thorough examination of pre-existing conditions including existing roads, structures, and other improvements in vicinity of the work to be performed. The pre-existing condition of surfaces and structures on or near the area of work shall be documented with photographic media.

1.07 PROTECTION OF WORK AND PROPERTY

A. Comply with the OWNER’s safety rules while on the OWNER’s property. B. Keep OWNER informed of serious accidents on the site and related claims.

C. Use of Explosives: No blasting or use of explosives will be allowed on the site.

D. During the performance of the Work, CONTRACTOR is responsible for adapting its means, methods, techniques, sequences and procedures of construction to allow OWNER to maintain operation at the facility and consistent with applicable permit requirements, and Laws and Regulations. In performing such Work and in cooperating with the OWNER to maintain operations, it may be necessary for the CONTRACTOR to plan, design, and provide various temporary services, utilities,

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-5

connections, temporary piping and heating, access, and similar items which will be included within the Contract Price.

E. The CONTRACTOR shall, at his own cost and expense, protect from direct or indirect injury any and all water and gas mains, sewers or drains, conduits, service pipes, roadways, bridges, buildings and all other structures or property in the vicinity of this work, and along his route of travel, whether over or under the ground, and he shall assume all costs for repairing them and all other costs resulting from his damages to them.

1.08 WORKING LIMITS A. The CONTRACTOR shall confine his operations within the areas of new work as

indicated on the drawings. Since working space is limited, the CONTRACTOR is responsible for securing any off-site space or any additional area required for performing the work if required.

B. Access to the buildings and roads must be maintained at all times.

C. All areas which the CONTRACTOR uses shall be restored to a condition at least equal to that which existed at the start of the work.

PART 2 – PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.01 TEMPORARY UTILITIES

A. See Section 01510 – Temporary Utilities.

3.02 PROTECTION OF WORK AND PROPERTY

A. General:

1. Perform Work in a systematic manner that minimizes inconvenience to property owners and the public.

2. No residence or business shall be cut off from vehicular traffic unless

special arrangements have been made. 3. Maintain in continuous service all existing oil and gas pipelines,

underground power, telephone or communication cable, water mains, irrigation lines, sewers, poles and overhead power, and all other utilities encountered along the line of work, unless other arrangements satisfactory to owners of said utilities have been made.

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-6

4. Where completion of Work requires temporary or permanent removal and/or relocation of an existing utility, coordinate all activities with owner of said utility and perform all work to their satisfaction.

5. Protect, shore, brace, support, and maintain structural elements being

repaired, conduits, drains, and any other element affected by construction operations.

6. Keep fire hydrants and water control valves free from obstruction and

available for use at all times. 7. In areas where the CONTRACTOR’s operations are adjacent to or near a

utility such as gas, telephone, television, electric power, water, sewer, or irrigation system and such operations may cause damage or inconvenience, suspend operations until arrangements necessary for protection thereof have been made by the CONTRACTOR.

8. Notify property owners and utility offices which may be affected by the

construction operation at least 2 days in advance. 9. Do not impair operation of existing sewer systems. Prevent construction

material, pavement, concrete, earth, volatile and corrosive wastes, and other debris from entering sewers, pump stations, or other sewer structures. Maintain original site drainage wherever possible.

B. Site Security: Temporary fencing or full time watchmen will not be specifically

required as a part of the Contract, but the CONTRACTOR shall provide inspection of work area daily and shall take whatever measures are necessary to protect the safety of the public, workmen, and materials, and provide for the security of the construction site, both day and night.

C. Barricades and Lights:

1. Provide as necessary to prevent unauthorized entry to construction areas, and as required to ensure public safety and the safety of CONTRACTOR’s employees, other employer’s employees, and others who may be affected by the Work.

2. Provide to protect existing facilities and adjacent properties from potential

damage. 3. Locate to enable access by facility operators and property owners.

D. Signs and Equipment: Conform to requirements of the manual published by the City of Richmond and in accordance with the General Conditions.

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-7

E. Existing Structures: Where the CONTRACTOR contemplates removal of small structures such as mailboxes, signposts, and culverts that interfere with CONTRACTOR’s operations, obtain approval of property owner. Replace those removed in a condition equal to or better than original.

F. Waterways: Keep ditches, culverts, and natural drainages continuously free of construction materials and debris.

3.03 TEMPORARY CONTROLS

A. Air Pollution Control:

1. Minimize air pollution from construction operations. 2. Burning of waste materials, rubbish, or other debris will not be permitted

on or adjacent to the site. 3. Conduct operations of carrying debris away in trucks to cause a minimum

of dust. Give unpaved streets, roads, detours, or haul roads used in the construction area a dust-preventive treatment or periodically water to prevent dust. Strictly adhere to applicable environmental regulations for dust prevention.

B. Noise Control:

1. Provide acoustical barriers so noise emanating from tools or equipment will not exceed legal noise levels.

2. Comply with local noise control ordinance. 3. Noise Control Plans: Proposed plan to mitigate construction noise impacts

and to comply with noise control ordinances including method of construction, equipment to be used, and acoustical treatments.

4. Comply with appropriate sections of Section 01106.

C. Water Pollution Control:

1. Divert sanitary sewage and non-storm waste flow interfering with construction and requiring diversion to sanitary sewers. Do not cause or permit action to occur which would cause an overflow to an existing waterway.

2. Comply with procedures outlined in U.S. Environmental Protection

Agency manuals entitled, “Guidelines for Erosion and Sedimentation Control Planning” and “Implementation, Processes, Procedures, and Methods to Control Pollution Resulting from All Construction Activity,”

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-8

and “Erosion and Sediment Control-Surface Mining in Eastern United States.”

3. Do not dispose of volatile wastes such as mineral spirits, oil, chemicals, or

paint thinner in storm or sanitary drains. Disposal of wastes into streams or waterways is prohibited. Provide acceptable containers for collection and disposal of waste materials, debris, and rubbish.

D. Spill Prevention and Response Plan Requirements

1. Before mobilizing onsite, the CONTRACTOR shall prepare and submit a Spill Prevention and Response Plan (SP&RP). The Plan shall be project specific and designed to protect human health and the environment from spills and releases of “hazardous materials,” including but not limited to chemicals, dangerous waste, problem waste, petroleum products, and hazardous substances.

2. The CONTRACTOR and all SUBCONTRACTORS will use this SP&RP

for the duration of the Project and will update the Plan throughout Project construction so that the Plan reflects actual site conditions and practices. The CONTRACTOR will maintain an updated copy of this Plan on the Project site and all Project employees will have immediate access to this Plan.

3. The CONTRACTOR will implement the spill prevention measures

identified in this Plan before performing any of the following on the Project site:

a. Placing materials or equipment in staging or storage areas; b. Refueling, washing, or maintaining equipment; c. Stockpiling contaminated materials.

4. Spill Response Procedures: Provide a detailed description of all

hazardous material present on the site and actions to take, and the order in which the actions should take place. At a minimum include:

a. Notification procedures – list names and phone numbers of those who must be notified. This will typically be the primary staff persons at the facility (include a back-up person) fire department and agencies such as DCR.

b. Initial response procedures - actions to take immediately by whomever discovers the spill. May include different actions based on what has spilled.

c. Spill cleanup procedures - what happens to material used to cleanup the spill and who assures that the cleanup is complete.

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-9

d. Incident documentation - what reports are prepared and who will complete them.

5. Spill Prevention: Describe the steps that help prevent spills from

happening and structures that contain or treat spills. Employee training and material handling procedures (e.g., fueling procedures) are examples of steps that help prevent spills. Concrete containment structures for fuel tanks and oil/water separators for road runoff are typical structures for containing or treating spills.

3.04 STORAGE YARDS AND BUILDINGS

A. Temporary Storage Yards: Construct temporary storage yards for storage of products that are not subject to damage by weather conditions.

B. Temporary Storage Buildings:

1. Provide environmental control systems that meet recommendations of manufacturers of equipment and materials stored.

2. Arrange or partition to provide security of contents and ready access for

inspection and inventory. 3. Store combustible materials (paints, solvents, fuels, etc.) in a well-

ventilated and remote building meeting safety standards.

3.05 SITE RESTORATION

A. Comply with the requirements in the Contract Documents. Submit a site restoration plan for approval.

B. Remove temporary storage buildings. Clean up the area and restore to existing site conditions to the satisfaction of the OWNER.

C. Completely remove temporary facilities when their use is no longer required.

D. Clean and repair damage caused by temporary installations or use of temporary facilities.

E. Restore permanent facilities used for temporary services to specified condition.

3.06 CLEANING DURING CONSTRUCTION

A. In accordance with the General Conditions, as may be specified in Specification sections, and as required herein.

Third Precinct and Police Academy Parking Garages Construction Facilities and Temporary Controls Richmond, VA

01500-10

B. Provide approved containers for collection and disposal of waste materials, debris, and rubbish. At least at weekly intervals, dispose of such waste materials, debris, and rubbish offsite.

C. At least weekly, brush sweep the entry drive and roadways, and all other streets and walkways affected by Work and where adjacent to Work.

END OF SECTION

Third Precinct and Police Academy Parking Garages Temporary Facilities Richmond, VA

01510 - 1

SECTION 01510 TEMPORARY FACILITIES

PART 1 - GENERAL 1.01 SCOPE OF WORK

A. Furnish, install and maintain temporary utilities required for construction and remove those temporary utilities upon completion of Work.

1.02 REQUIREMENTS OF REGULATORY AGENCIES

A. Comply with National Electric Code. B. Comply with Federal, State, and local codes and regulations and with utility

company requirements. C. Comply with City and State Health Department Regulations.

PART 2 - PRODUCTS 2.01 MATERIALS

A. Materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

2.02 TEMPORARY ELECTRICITY AND LIGHTING

A. CONTRACTOR to provide temporary electricity and lighting as required. CONTRACTOR may coordinate use of 120V power at site with OWNER.

2.03 TEMPORARY HEAT and VENTILATION

A. To be provided and paid for by CONTRACTOR, if required. 2.04 TEMPORARY TELEPHONE SERVICE

A. To be provided and paid for by CONTRACTOR, if required. B. Pay all costs for installation, maintenance and removal, and service charges.

2.05 TEMPORARY WATER

Third Precinct and Police Academy Parking Garages Temporary Facilities Richmond, VA

01510 - 2

A. The OWNER shall not provide potable water to the Contractor for use during construction. The Contractor is responsible for all meters, backflow prevention devices, piping, valves and fittings required to convey water to construction site.

B Each and every connection by the CONTRACTOR to a fire hydrant for temporary

potable water must comply with City of Richmond metering and backflow prevention requirements and CONTRACTOR to pay all fees.

2.06 TEMPORARY SANITARY FACILITIES

A. Approved sanitary convenience for the use of laborers and others employed on the work, properly secluded from public observation shall be constructed and maintained by the CONTRACTOR, in such manner and at such points shall be approved or directed and their use shall be strictly enforced. The collections in the same shall be disinfected and/or removed when and as required.

B. The CONTRACTOR shall provide and maintain, in a neat and sanitary condition,

such accommodations for the use of his employees, as may be necessary to comply with the requirements and regulations of the Department of Health or of other bodies or tribunals having jurisdiction thereof. The CONTRACTOR shall commit no public nuisance.

2.07 TEMPORARY PUMPING and SITE DRAINAGE

A. Keep the site free from water at all times to permit continuous access and to prevent damage to the work.

2.08 DUST and MUD CONTROL

A. Take all necessary precautions to control dust and mud associated with the Work of this Contract, as required by the Virginia Erosion and Sediment Control Manual. In dry weather, spray dusty areas daily with water or provide other approved means in order to control dust. Take necessary steps to prevent the tracking of mud onto adjacent streets and highways.

2.09 CONTRACTOR'S STORAGE SHEDS

A. Provide storage shed(s) for the performance of the work and protection of materials and equipment.

1. Provide commercial grade chain link fence to prevent trespass by the public

onto the construction trailer and storage site. 2. Coordinate location of temporary fencing with property owner and OWNER.

PART 3 - EXECUTION

Third Precinct and Police Academy Parking Garages Temporary Facilities Richmond, VA

01510 - 3

3.01 REMOVAL

A. Completely remove temporary materials and equipment when their use is no longer required.

B. Clean and repair damage caused by temporary installations or use of temporary

facilities. C. Restore permanent facilities used for temporary services to specified condition.

END OF SECTION

Third Precinct and Police Academy Parking Garages Product Requirements Richmond, VA

01600-1

SECTION 01600

PRODUCT REQUIREMENTS

PART 1 – GENERAL

1.01 SUMMARY

A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; and comparable products.

1.02 DEFINITIONS

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature, which is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis-of-Design Product Specification: A specification in which a specific

manufacturer's product is named including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of additional manufacturers named in the specification.

1.03 SUBMITTALS

A. Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and/or Drawing numbers and titles.

Third Precinct and Police Academy Parking Garages Product Requirements Richmond, VA

01600-2

1. Include data to indicate compliance with the requirements specified in "Comparable Products" Article.

B. Basis-of-Design Product List: Prepare a schedule showing specified products. Schedule shall show the following minimum information:

1. Related specification section number 2. Product name, model number and similar designations 3. Manufacturer’s and supplier’s name 4. Installer’s name and certification that installer has previous experience

installing the product and/or has received training for installation of the product

5. Indicate whether on-site installation training is available and will be supplied by the manufacture

1.04 QUALITY ASSURANCE

A. Source Limitations: Provide products of the same kind from a single source.

B. Compatibility of Options: If CONTRACTOR is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options.

1.05 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to determine compliance with the Contract Documents and to determine that products are undamaged and properly protected.

C. Storage:

Third Precinct and Police Academy Parking Garages Product Requirements Richmond, VA

01600-3

1. Store products to allow for inspection and measurement of quantity or counting of units.

2. Store materials in a manner that will not endanger Project structure. 3. Store products that are subject to damage by the elements, under cover in

a weathertight enclosure above ground, with ventilation adequate to prevent condensation.

4. Protect foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment.

5. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage.

6. Protect stored products from damage and liquids from freezing.

PART 2 – PRODUCTS

2.01 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation.

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. OWNER reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

4. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

5. Or Equal: For products specified by name and accompanied by the term "or equal," or "or approved equal," or "or approved," comply with requirements in "Comparable Products" Article to obtain approval for use of an unnamed product.

B. Product Selection Procedures:

1. Proprietary Specification Requirements: Where only a single product or manufacturer is named, provide the product indicated. Comparable products or substitutions for CONTRACTOR's convenience will not be considered.

2. Semi-proprietary Specification Requirements: Where two or more products or manufacturers are named, provide one of the products indicated. Comparable products or substitutions for CONTRACTOR's convenience will not be considered.

Third Precinct and Police Academy Parking Garages Product Requirements Richmond, VA

01600-4

3. Non-proprietary Specification Requirements: When the Contract Documents list products or manufacturers that are available and may be incorporated in the work, but do not restrict the CONTRACTOR to use of these products only, the CONTRACTOR may propose any available product that complies with Contract requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product.

4. Descriptive Specification Requirements: When the Contract Documents describe a product or assembly, listing exact characteristics required, with or without use of a brand or trade name, provide a product or assembly that provides the characteristics and otherwise complies with Contract requirements.

5. Performance Specification Requirements: When the Contract Documents require compliance with performance requirements, provide products that comply with these requirements, and are recommended by the manufacturer for the application indicated. General performance of a product is implied where the product is specified for a specific application.

6. Compliance with Standards, Codes and Regulations: When the Contract Documents only require compliance with an imposed code, standard or regulation, select a product that complies with the code, standard, or regulation specified.

C. Visual Matching Specification: Where Contract Documents require “match existing” or similar phrase, provide a product that complies with requirements and matches existing. OWNER’s decision will be final on whether a proposed product matches.

D. Visual Selection Specification: Where Contract Documents include the phrase "as selected from manufacturer's standard colors, patterns, textures…" or similar phrase, select a product that complies with performance requirements. OWNER will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.02 COMPARABLE PRODUCTS

A. Conditions for Consideration: OWNER will consider CONTRACTOR's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, OWNER may return requests without action, except to record noncompliance with these requirements:

1. Evidence that the proposed product does not require revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. The request is directly related to an “or equal” clause or similar phrase.

Third Precinct and Police Academy Parking Garages Product Requirements Richmond, VA

01600-5

3. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated.

4. Evidence that proposed product provides specified warranty.

B. Alternate Conditions for Consideration: In addition to the above noted conditions, the OWNER will consider CONTRACTOR's request for comparable product in the following situations.

1. The specified product or method of construction cannot be provided within the Contract time. The request will not be considered if the product or method cannot be provided as a result of failure to pursue the work promptly or coordinate activities properly.

2. The specified product or method of construction cannot receive necessary approval by the Authority having Jurisdiction, and the requested substitution can be approved.

3. A substantial advantage is offered the OWNER, in terms of cost, time, energy conservation or other considerations of merit, after deducting offsetting responsibilities the OWNER may be required to bear. Additional responsibilities for the OWNER may include additional compensation to the ENGINEER for redesign and evaluation services, increased cost of other construction by the OWNER, and similar considerations.

4. The specified product or method of construction cannot be provided in a manner that is compatible with other materials, and where the CONTRACTOR certifies that the substitution will overcome the incompatibility.

5. The specified product or method of construction cannot be coordinated with other materials, and where the CONTRACTOR certifies that the substitution can be coordinated.

6. The specified product or method of construction cannot provide a warranty required by the Contract documents and where the CONTRACTOR certifies that the substitution will provide the required warranty.

PART 3 – EXECUTION

3.01 INSPECTION

A. Inspect materials and equipment for signs of pitting, rust decay, or other deleterious effects of storage. Do not install material or equipment showing such effects. Remove damaged material or equipment from the site and expedite delivery of identical new material or equipment. Delays to the Work resulting from material or equipment damage that necessitates procurement of new products will be considered delays within CONTRACTOR’s control.

3.02 INSTALLATION

Third Precinct and Police Academy Parking Garages Product Requirements Richmond, VA

01600-6

A. Comply with manufacturer’s instructions and recommendations for installation of products in the applications intended. Anchor each product securely in place, accurately located and aligned with other work.

1. Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of substantial completion.

END OF SECTION

Third Precinct and Police Academy Parking Garages Contract Closeout Richmond, VA

01700-1

SECTION 01700

CONTRACT CLOSEOUT

PART 1 - GENERAL

1.01 SUBMITTALS

A. Contract Closeout Submittals: Submit prior to application for final payment.

1. Project Record Documents.

2. Approved Shop Drawings and Samples.

3. Bonds, Warranties, and Service Agreements.

4. Consent of Surety to Final Payment.

5. Releases or Waivers of Liens and Claims.

6. Releases from Agreements.

7. Final Application for Payment.

8. Final Completion Construction Photographs

9. Spare Parts and Special Tools. 1.02 WARRANTIES AND BONDS

A. Description:

1. Compile specified warranties and bonds. 2. Co-execute submittals when so specified. 3. Review submittals to verify compliance with Contract Documents.

B. Submittal Requirements

1. Assemble warranties, bonds and service and maintenance contracts, executed by each of the respective manufacturers, suppliers, and subcontractors.

2. Number of original signed copies required: Two each.

Third Precinct and Police Academy Parking Garages Contract Closeout Richmond, VA

01700-2

3. Table of Contents: Neatly typed, in orderly sequence. Provide complete information for each item.

a. Product or work item covered. b. Firm, with name of principal, address and telephone number. c. Scope. d. Date of beginning of warranty, bond or service and maintenance

contract. e. Duration of warranty, bond or service maintenance contract. f. Provide information for OWNER’S personnel:

1) Proper procedure in case of failure. 2) Instances which might affect the validity of warranty or

bond. g. CONTRACTOR and Subcontractors name, street address and

telephone number of responsible principal.

C. Form of Submittals

1. Prepare in duplicate packets. 2. Format:

a. Size 8-1/2 inches x 11 inches, punch sheets for standard three post

binder. Fold larger sheets to fit into binders. b. Cover: Identify each packet with typed or printed title

"WARRANTIES AND BONDS". List:

1) Title of Project 2) Name of CONTRACTOR

c. Binders: Commercial quality, three post binder, with durable and

cleanable plastic covers and maximum post width of two inches.

D. Warranty Submittals Requirements

1. For all major pieces of equipment, the CONTRACTOR shall submit a warranty from the equipment manufacturer. The manufacturer's warranty period shall be concurrent with the CONTRACTOR’S for two (2) years, unless otherwise specified, commencing at the time of Substantial Completion for the entire project.

2. The CONTRACTOR shall be responsible for obtaining certificates for

equipment warranty for all major equipment specified under any Division that lists for more than $1,000. The OWNER reserves the right to request

Third Precinct and Police Academy Parking Garages Contract Closeout Richmond, VA

01700-3

warranties for equipment not classified as major. The CONTRACTOR shall still warrant equipment not considered to be "major" in the CONTRACTOR’S one year warranty period even though certificates of warranty may not be required.

3. In the event that the equipment manufacturer or supplier is unwilling to

provide a two year warranty commencing at the time of Substantial Completion, the CONTRACTOR shall obtain from the manufacturer, a three (3) year warranty commencing at the time of equipment delivery to the job site. This three year warranty from the manufacturer shall not relieve the CONTRACTOR of the two year warranty starting at the time of Substantial Completion for the entire project.

1.03 RELEASES FROM AGREEMENTS

A. Furnish OWNER written releases from property owners or public agencies where side agreements or special easements have been made, or where CONTRACTOR’s operations have not been kept within the OWNER’s construction right-of-way.

B. In the event CONTRACTOR is unable to secure written releases, inform the OWNER of the reasons:

1. OWNER or its representatives will examine the site, and OWNER will direct CONTRACTOR to complete Work that may be necessary to satisfy terms of the easement.

2. Should CONTRACTOR refuse to perform this Work, OWNER reserves

the right to have it done by separate contract and deduct the cost of same from the Contract Price, or require the CONTRACTOR to furnish a satisfactory Bond in a sum to cover legal claims for damages.

3. When OWNER is satisfied that Work has been completed in agreement

with the Contract Documents and terms of easements, the right is reserved to waive the requirement for written release if: (i) CONTRACTOR’s failure to obtain such statement is due to the grantor’s refusal to sign, and this refusal is not based upon any legitimate claims that CONTRACTOR has failed to fulfill the terms of the easement, or (ii) CONTRACTOR is unable to contact or has had undue hardship in contacting the grantor.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.01 COMPLETION

Third Precinct and Police Academy Parking Garages Contract Closeout Richmond, VA

01700-4

A. Substantial Competition

1. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request a certificate of Substantial Completion. Within a reasonable time thereafter, OWNER and CONTRACTOR shall make an inspection of the Work to determine the status of completion.

2. If OWNER does not consider the Work substantially complete, the

CONTRACTOR will be notified in writing giving the reasons therefore. 3. If OWNER considers the Work substantially complete, a Certificate of

Substantial Completion will be issued that shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before final payment.

4. OWNER shall have the right to exclude CONTRACTOR from the Work

after the date of Substantial Completion, but OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the tentative list.

B. Partial Utilization:

1. Use by OWNER at OWNER’s option of any completed part of the Work, which: (i) has specifically been identified in the Contract Documents, or (ii) constitutes a separately functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant interference with CONTRACTOR’s performance of the remainder of the Work, may be accomplished prior to Substantial Completion of all the Work subject to the following:

a. OWNER at any time may request CONTRACTOR in writing to

permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use. The OWNER shall operate the equipment but the CONTRACTOR shall supply and provide all maintenance, maintenance materials and equipment services until substantial completion.

b. No occupancy or separate operation of part of the Work will be accomplished prior to compliance with the requirements of Section 01106 - Construction Scheduling, Coordination and Sequencing, in respect of property insurance.

C. Final Inspection: Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete, the OWNER will conduct a final inspection

Third Precinct and Police Academy Parking Garages Contract Closeout Richmond, VA

01700-5

and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately take such measures as are necessary to complete such work or remedy such deficiencies.

D. Final Application for Payment: After CONTRACTOR has completed all corrections following final inspection and delivered in accordance with the Contract Documents all maintenance and operating instructions, schedules, guarantees, Bonds, certificates or other evidence of insurance, certificates of inspection, marked-up record documents, and other documents, CONTRACTOR may make application for final payment following the procedure for progress payments. The final Application for Payment shall be accompanied (except as previously delivered) by: (i) all documentation called for in the Contract Documents, (ii) consent of the surety, if any, to final payment, and (iii) complete and legally effective releases or waivers (satisfactory to OWNER) of all Liens arising out of or filed in connection with the Work. In lieu of such releases or waivers of Liens and as approved by OWNER, CONTRACTOR may furnish receipts or releases in full and affidavit of CONTRACTOR that: (i) the releases and receipts include all labor, services, material and equipment for which a Lien could be filed, and (ii) all payrolls, material and equipment bills, and other indebtedness connected with the Work for which OWNER or OWNER’s property might in any way be responsible have been paid or otherwise satisfied. If any Subcontractor or Supplier fails to furnish such a release or receipt in full, CONTRACTOR may furnish a Bond or other collateral satisfactory to OWNER to indemnify OWNER against any Lien.

3.02 FINAL CLEANING

A. At completion of Work or of a part thereof and immediately prior to CONTRACTOR’s request for certificate of Substantial Completion; or if no certificate is issued, immediately prior to CONTRACTOR’s notice of completion, clean entire site or parts thereof, as applicable.

1. Leave the Work and adjacent areas affected in a cleaned condition satisfactory to the OWNER.

END OF SECTION

Third Precinct and Police Academy Parking Garages Cleaning Up Richmond, VA

01710 - 1

SECTION 01710

CLEANING UP

PART 1 – GENERAL 1.01 GENERAL

A. During the construction duration, the Work and the adjacent areas affected thereby shall be kept cleaned up and all rubbish, surplus materials, and unneeded construction equipment shall be removed and all damage repaired so that the public and property owners will be inconvenienced as little as possible. Work site shall be kept “broom clean”.

B. Where material or debris has washed or flowed into or been placed in existing

watercourses, ditches, gutters, drains, pipes, structures, work done under this contract, or elsewhere during the course of the CONTRACTOR’s operations, such material or debris shall be entirely removed and satisfactorily disposed of during the progress of the Work. Ditches, channels, drains, pipes, structures and work, etc., shall, upon completion of the Work, be left in a clean and neat condition,

C. On or before the completion of the Work, the CONTRACTOR shall, unless

otherwise directed and permitted in writing, tear down and remove all temporary buildings and structures built by him; shall remove all temporary works, tools and machinery or other construction equipment furnished by him; shall remove, acceptably disinfect, and cover all organic matter and material containing organic matter in, under and around privies, houses and other buildings used by him; shall remove all rubbish from any grounds which he has occupied; and shall leave the roads and all parts of the premises and adjacent property affected by his operations in a neat and satisfactory condition.

D. The CONTRACTOR shall thoroughly clean all materials and equipment installed by

him and his subcontractors, and on completion of the Work shall deliver it undamaged and in fresh and new-appearing condition.

E. The CONTRACTOR shall restore or replace, when and as directed, any public or

private property damaged by his work, equipment or employees to a condition at least equal to that existing immediately prior to the beginning of operations. To this end, the CONTRACTOR shall do all required street, alley, walk, and landscaping work. Suitable materials, equipment and methods shall be used for such restoration. The restoration of exiting property or structures shall be done as promptly as practicable as work progresses and shall not be left until the end of the Contract Period.

PART 2 – PRODUCTS (NOT USED)

Third Precinct and Police Academy Parking Garages Cleaning Up Richmond, VA

01710 - 2

PART 3 – EXECUTION (NOT USED)

END OF SECTION

Third Precinct and Police Academy Parking Garages Project Record Documents Richmond, VA

01720-1

SECTION 01720

PROJECT RECORD DOCUMENTS

PART 1 – GENERAL 1.01 SUMMARY

A. CONTRACTOR shall maintain at the site one record copy of:

1. Drawings.

2. Project Manual.

3. Addenda.

4. Change orders and other modifications to Contract.

5. Field orders, written instructions, or clarifications.

6. Approved submittals.

7. Field test records.

8. Construction photographs.

9. Associated permits.

10. Certificates of inspection and approvals.

11. Building Permits 1.02 SUBMITTALS

A. With Pay Requests

1. With each Pay Request provide a copy of the current “Red Line” record drawing set.

B. At Substantial Completion:

1. Deliver one marked up set of record documents to OWNER. The record

documents shall consist of: “Red Line” record drawings; and “Red Line” specifications.

C. Accompany submittals with transmittal letter containing following.

1. Date.

Third Precinct and Police Academy Parking Garages Project Record Documents Richmond, VA

01720-2

2. Project title and number.

3. CONTRACTOR’S name and address.

4. Title of record document.

5. Signature of CONTRACTOR or authorized representative. 1.03 QUALITY ASSURANCE

A. Furnish qualified and experienced person, whose duty and responsibility shall be

to maintain record documents.

B. Accuracy of Records:

1. Coordinate changes within record documents, making legible and accurate entries on each page of Specifications and each sheet of Drawings and other documents where such entry is required to show change.

2. Purpose of Project record documents is to document factual information regarding aspects of Work, both concealed and visible, to enable future modification of Work to proceed without lengthy and expensive site measurement, investigation, and examination.

PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION 3.01 MAINTENANCE OF DOCUMENTS and SAMPLES

A. Store documents and samples on-site apart from documents used for construction.

1. Provide files and racks for storage of documents.

2. Provide secure storage space for storage of samples.

B. Maintain documents in clean, dry, legible condition and in good order. Do not use record documents for construction purposes.

C. Make documents and samples available for inspection by ENGINEER or

OWNER. D. Failure to properly maintain record documents may be reason to delay a portion

of progress payments until records comply with Contract Documents. E. Make entries within 24 hours after receipt of information that a change in work

has occurred.

Third Precinct and Police Academy Parking Garages Project Record Documents Richmond, VA

01720-3

3.02 RECORD DOCUMENTS

A. Label each document “PROJECT RECORD” in neat, large printed letters. B. Maintain a record set of “Red Line” Record Drawings and Specifications legibly

annotated to show all changes made during construction.

1. Graphically depict changes by modifying or adding to plans, details, sections, elevations, or schedules.

2. Make changes on each sheet affected by changes.

C. Record information concurrently with construction progress.

1. Do not conceal Work until required information is recorded.

2. Record changes made by Written Amendment, Field Order, Change Order or Work Directive Change.

D. Information to be recorded on Record Drawings:

1. Record field changes.

2. Provide details not on original Drawings.

3. Record size of equipment and location including connections.

E. Specifications:

1. Mark Specification sections: to show substantial variations in actual Work performed in comparison with test of Specifications and modifications. Give particular attention to substitutions, selection of options and similar information on elements that are concealed or cannot otherwise be readily discerned later by direct observation.

2. Note related record drawing information and Product Data.

a. Manufacturer, trade name, and catalog model number of each product and item of equipment actually installed.

F. Indication of Changes:

1. All changes shall be annotated in the color red.

2. Annotations to delete or remove items shall be identified in the color blue.

Third Precinct and Police Academy Parking Garages Project Record Documents Richmond, VA

01720-4

3. Comments to the work or instructions to the work and not to be translated to the final shall be annotated in the color green.

4. All changes shall be dated at time of entry

5. Call attention to entry by “cloud” drawn around area or areas affected.

END OF SECTION

Third Precinct and Police Academy Parking Garages Selective Demolition Richmond, VA

01732-1

SECTION 01732

SELECTIVE DEMOLITION

PART 1 - GENERAL 1.01 DESCRIPTION

A. This Section includes requirements for demolition and removal of designated por-tions of the building and structures, equipment and utilities.

1.02 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction and deliver them to OWNER.

C. Remove and Reinstall: Detach items from existing construction, prepare them for

reuse, and reinstall them where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.03 SUBMITTALS

A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, interruption of utility services, and locations of temporary support.

B. Pre-demolition Photographs: Show existing conditions of adjoining construction and of the site, including finish surfaces that might be misconstrued as damage caused by selective demolition operations.

C. Landfill Records: The CONTRACTOR shall submit a receipt and acceptance of hazardous wastes (if any) by a landfill facility licensed to accept hazardous wastes.

1.04 QUALITY ASSURANCE

A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.

Third Precinct and Police Academy Parking Garages Selective Demolition Richmond, VA

01732-2

B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

C. Standards: Comply with ANSI A10.6 and NFPA 241.

D. Pre-demolition Conference: Conduct conference at Project site. E. Before demolition begins, disconnect all mechanical and electrical services

affected by the Work. Interconnecting piping and electrical services that are to remain in service either permanently or temporarily shall be capped, rerouted or reconnected in a manner that will not interfere with the operation of the existing facilities to remain and the demolition work.

1.05 PROJECT CONDITIONS

A. Conditions existing at time of inspection for bidding purpose will be maintained by OWNER as far as practical.

B. Notify OWNER of discrepancies between existing conditions and Contract Documents before proceeding with selective demolition.

C. Hazardous Materials: No hazardous materials are expected to be encountered in the Work.

1. If materials suspected of containing hazardous materials, other than noted

above, are encountered, do not disturb; immediately notify the OWNER.

D. Storage or sale of removed items or materials on-site is not permitted.

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition

operations.

1.06 PROTECTION

A. Provide scaffolding, protective coverings, temporary walks, shoring and bracing during demolition to protect personnel, structures and equipment.

B. Provide adequate lighting at all times during demolition operations. C. Provide and maintain barriers of cloth, plastic or wood to prevent debris and dust

associated with the demolition work from leaving the demolition area.

Third Precinct and Police Academy Parking Garages Selective Demolition Richmond, VA

01732-3

D. Provide warning signs as required, for personnel and the public.

1.07 EXTERIOR DUST CONTROL

A. To prevent unnecessary spread of dust during performance of exterior demolition work thoroughly moisten surfaces and debris as required to prevent dust being a nuisance to the public, neighbors and concurrent performance of other work on the site. Water for use in dust control shall be obtained from CONTRACTOR’s own source.

PART 2 - MATERIALS (NOT USED) PART 3 - EXECUTION 3.01 EXAMINATION

A. Verify that utilities have been disconnected and capped.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to the OWNER.

D. Survey of Existing Conditions: Before demolition begins, the CONTRACTOR shall inspect existing structures, equipment and paving that will remain in-place within and adjacent to the demolition area for existing defects and damage.

E. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

3.02 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage during selective demolition operations.

B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished. 1. Arrange to shut off indicated utilities with utility companies.

2. If services/systems are required to be removed, relocated, or abandoned,

before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

Third Precinct and Police Academy Parking Garages Selective Demolition Richmond, VA

01732-4

3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or

plug and seal remaining portion of pipe or conduit after bypassing.

3.03 PREPARATION

A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

3.04 TEMPORARY SUPPORT/JACKING

A. The CONTRACTOR shall submit plans and design computations for review prior to the installation of any system. Plans and design computations shall bear the seal of a Professional Engineer licensed in the Commonwealth of Virginia.

3.05 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows: 1. Neatly cut openings and holes plumb, square, and true to dimensions

required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.

4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

5. Dispose of demolished items and materials promptly and properly.

Third Precinct and Police Academy Parking Garages Selective Demolition Richmond, VA

01732-5

B. Do not demolish building elements beyond what is indicated on Contract

Documents without OWNER's approval.

C. Removed and Salvaged Items: Clean salvaged items.

D. Removed and Reinstalled Items: As required for construction.

E. Existing Items to Remain: Protect construction indicated to remain against damage, soiling and dust during selective demolition. When permitted by OWNER, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

F. Leave the work area at the end of each day broom clean. Remove waste, litter and debris from the work site and place in dumpster type containers.

G. As required for partially dismantled structures, provide protection from inclement weather for materials, equipment and personnel.

3.06 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Except for items or materials indicated to be recycled, reused, salvaged,

reinstalled, or otherwise indicated to remain OWNER's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.

B. Burning: Do not burn demolished materials.

C. Disposal: Transport demolished materials off OWNER's property and legally dispose of them.

3.07 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.08 FIELD QUALITY CONTROL

A. OWNER will visually inspect demolition and adjacent areas for completeness of demolition, damage that may have resulted from the demolition operation and for completeness of clean-up.

B. New construction shall not begin until the inspection by the OWNER is complet-

ed and accepted.

Third Precinct and Police Academy Parking Garages Selective Demolition Richmond, VA

01732-6

END OF SECTION

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 1

SECTION 03013

MAINTENANCE OF CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Removal of deteriorated concrete and subsequent patching.

2. Epoxy crack injection.

3. Corrosion-inhibiting treatment.

1.02 UNIT PRICES

A. Work of this Section is affected by unit prices specified in Section 01130, "Measurement and Payment"

1. Unit prices apply to authorized work covered by estimated quantities.

2. Unit prices apply to authorized additions to and deletions from the Work as authorized by Change Orders.

B. General: Unit prices include the cost of preparing existing construction to receive the work indicated and costs of field quality control required for units of work completed.

1.03 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Review methods and procedures related to concrete maintenance including, but not limited to, the following:

a. Verify concrete-maintenance specialist's personnel, equipment, and facilities needed to make progress and avoid delays.

b. Materials, material application, color, sequencing, tolerances, and required clearances.

c. Quality-control program.

1.04 SUBMITTALS

A. Product Data: For each type of product. Include construction details, material descriptions, chemical composition, physical properties, test data, and mixing, preparation, and application instructions.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 2

B. Qualification Data: For installers and manufacturers.

C. Material certificates: for each type of product.

D. Product test reports: for each manufactured bonding agent, cementitious patching mortar, and crack injection adhesive, for tests performed by manufacturer and witnessed by a qualified testing agency.

E. Quality-Control Program: Submit before work begins.

F. Calculations and shop drawings for temporary supports, shoring, and bracing, stamped and signed by a Professional Engineer registered in the Commonwealth of Virginia.

1.05 QUALITY ASSURANCE

A. Concrete-Maintenance Specialist Qualifications: Engage an experienced concrete-maintenance firm that employs installers and supervisors who are trained and approved by manufacturer to perform work of this Section. Firm must have completed work similar in material, design, and extent to that indicated for this Project with a record of successful in-service performance. Experience in only installing or patching new concrete is insufficient experience for concrete-maintenance work.

1. Field Supervision: Concrete-maintenance specialist firm must maintain experienced full-time supervisors on Project site during times that concrete-maintenance work is in progress.

B. Quality-Control Program: Prepare a written plan for concrete maintenance to systematically demonstrate the ability of personnel to properly perform maintenance work, including each phase or process, protection of surrounding materials during operations, and control of debris and runoff during the Work. Describe in detail materials, methods, equipment, and sequence of operations to be used for each phase of the Work.

C. Mockups: Build mockups to demonstrate aesthetic effects and to set quality standards for materials and execution.

1. Concrete Removal and Patching: Remove and repair an area of deteriorated concrete, for each type of patching mortar, as designated by OWNER or ENGINEER.

2. Epoxy Crack Injection: Perform epoxy crack injection in two separate areas as designated by OWNER or ENGINEER.

3. Crack Routing and Sealant: Perform crack routing and sealant in two separate areas as designated by OWNER or ENGINEER.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 3

4. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless OWNER or Engineer specifically approves such deviations in writing.

5. Manufacturer Qualifications: Each manufactured bonding agent, cementitious patching mortar, and crack injection adhesive manufacturer must employ factory trained technical representatives who are available for consultation and Project-site inspection and assistance at no additional cost.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Comply with manufacturer's written instructions for minimum and maximum temperature requirements and other conditions for storage.

B. Store cementitious materials off the ground, under cover, and in a dry location.

C. Store aggregates covered and in a dry location; maintain grading and other required characteristics and prevent contamination.

1.07 FIELD CONDITIONS

A. Environmental Limitations for Epoxies: Do not apply when air and substrate temperatures are outside limits permitted by manufacturer. During hot weather, cool epoxy components before mixing, store mixed products in shade, and cool unused mixed products to retard setting. Do not apply to wet substrates unless approved by manufacturer.

1. Use only Class A epoxies when substrate temperatures are below or are expected to go below 40 deg F within 8 hours.

2. Use only Class A or B epoxies when substrate temperatures are below or are expected to go below 60 deg F within 8 hours.

3. Use only Class C epoxies when substrate temperatures are above and are expected to stay above 60 deg F for 8 hours.

B. Cold-Weather Requirements for Cementitious Materials: Do not apply unless concrete-surface and air temperatures are above 40 deg F and will remain so for at least 48 hours after completion of Work.

C. Hot-Weather Requirements for Cementitious Materials: Protect repair work when temperature and humidity conditions produce excessive evaporation of water from patching materials. Provide artificial shade and wind breaks, and use cooled materials as required. Do not apply to substrates with temperatures of 90 deg F and above.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 4

PART 2 - PRODUCTS

2.01 MATERIALS, GENERAL

A. Source Limitations: Obtain each color, grade, finish, type, and variety of product from single source with resources to provide products of consistent quality in appearance and physical properties.

2.02 BONDING AGENTS

A. Epoxy-Modified, Cementitious Bonding and Anticorrosion Agent: MasterEmaco P 124, as manufactured by BASF Corporation, or approved equal.

2.03 PATCHING MORTAR

A. Horizontal Driving and Walking Surfaces: One-component, rapid hardening, early strength gaining, cementitious, patching material for use on concrete: MasterEmaco T 1061, as manufactured by BASF Corporation, or approved equal.

1. Patching mortar must be extended with aggregate where depth of repair exceeds 2 inch, in accordance with manufacturer’s written requirements.

a. Aggregate: ASTM C33, size number 8, Class 4S, well-graded. Uniformity of grading and moisture content must be obtained by methods recommended in ACI 304. Must show expansions less than 0.10 percent at 16 days after casting when testing in accordance with ASTM C1260.

B. Overhead and Vertical Surfaces: Non-sag polymer-modified repair mortar with integral corrosion inhibitor for vertical and overhead applications. MasterEmaco N 425, as manufactured by BASF Corporation, or approved equal.

2.04 CORROSION-INHIBITING STEEL REINFORCING COATING

A. Epoxy-Modified, Cementitious Bonding and Anticorrosion Agent: MasterEmaco P 124, as manufactured by BASF Corporation, or approved equal.

2.05 PENETRATING CORROSION INHIBITER

A. Penetrating corrosion-inhibiting coating for steel reinforced concrete. MasterProtect 8000CI, as manufactured by BASF Corporation, or approved equal.

2.06 CONCRETE AND MASONRY CRACK AND JOINT SEALANT

A. Multi-component, non-sag, polyurethane sealant. MasterSeal NP 2, as manufactured by BASF Corporation, or approved equal. Color to match surrounding material.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 5

2.07 EMBEDDED GALVANIC ANODE

A. MasterProtect 8105 CP, as manufactured by BASF Corporation, or approved equal.

2.08 DECK EXPANSION JOINT

A. WaboCrete Membrane ME-series, as manufactured by Watson Bowman Acme Corp., or approved equal.

1. Provide Wabo bonding agent and WaboCrete II, as manufactured by Watson Bowman Acme Corp., as required for installation.

2.09 MISCELLANEOUS MATERIALS

A. Portland Cement: ASTM C 150, Type I, II, or III unless otherwise indicated.

B. Reinforcing Steel: ASTM A615, Grade 60, deformed, non-epoxy coated.

C. Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107, factory-packaged, nonmetallic aggregate grout, noncorrosive and nonstaining, mixed with water to consistency suitable for application and a 30-minute working time.

D. Water: Potable.

2.10 MIXES

A. General: Mix products, in clean containers, according to manufacturer's written instructions.

1. Do not add water, thinners, or additives unless recommended by manufacturer.

2. When practical, use manufacturer's premeasured packages to ensure that materials are mixed in proper proportions. When premeasured packages are not used, measure ingredients using graduated measuring containers; do not estimate quantities or use shovel or trowel as unit of measure.

3. Do not mix more materials than can be used within time limits recommended by manufacturer. Discard materials that have begun to set.

PART 3 - EXECUTION

3.01 MAINTENANCE

A. Have maintenance work performed only by qualified maintenance specialist.

B. Comply with manufacturers' written instructions for surface preparation, priming, mixing, product application, and ambient and surface temperature requirements.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 6

3.02 EXAMINATION

A. Notify OWNER and ENGINEER seven days in advance of dates when areas of deteriorated or delaminated concrete and deteriorated reinforcing bars will be located.

B. Locate areas of deteriorated or delaminated concrete using hammer or chain-drag sounding and mark boundaries. Mark areas for removal by simplifying and squaring off boundaries. At columns and walls make boundaries level and plumb unless otherwise indicated.

C. Pachometer Testing: Locate at least three reinforcing bars using a pachometer, and drill test holes to determine depth of cover. Calibrate pachometer using depth of cover measurements, and verify depth of cover in removal areas using pachometer.

D. Perform surveys as the Work progresses to detect hazards resulting from maintenance work.

3.03 PREPARATION

A. Ensure that supervisory personnel are on-site and on duty when concrete maintenance work begins and during its progress.

B. Protect persons, motor vehicles, surrounding surfaces of building being repaired, building site, plants, and surrounding buildings from harm resulting from concrete maintenance work.

1. Comply with each product manufacturer's written instructions for protections and precautions. Protect against adverse effects of products and procedures on people and adjacent materials, components, and vegetation.

2. Use only proven protection methods appropriate to each area and surface being protected.

3. Provide temporary barricades, barriers, and directional signage to exclude public from areas where concrete maintenance work is being performed.

4. Erect temporary protective covers over walkways and at points of pedestrian and vehicular entrance and exit that must remain in service during course of concrete maintenance work.

5. Contain dust and debris generated by concrete maintenance work and prevent it from reaching the public or adjacent surfaces.

6. Use water-mist sprinkling and other wet methods to control dust only with adequate, approved procedures and equipment that ensure that such water

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 7

will not create a hazard or adversely affect other building areas or materials.

7. Protect floors and other surfaces along haul routes from damage, wear, and staining.

8. Protect adjacent surfaces and equipment by covering them with heavy polyethylene film and waterproof masking tape or a liquid strippable masking agent. If practical, remove items, store, and reinstall after potentially damaging operations are complete.

9. Neutralize and collect alkaline and acid wastes for disposal off Owner's property.

10. Dispose of debris and runoff from operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.

C. Existing Drains: Prior to the start of work in an area, test drainage system to ensure that it is functioning properly. Notify OWNER immediately of inadequate drainage or blockage. Do not begin work in an area until the drainage system is in working order.

1. Prevent solids such as aggregate or mortar residue from entering the drainage system. Clean out drains and drain lines that become sluggish or blocked by sand or other materials resulting from concrete maintenance work.

2. Protect drains from pollutants. Block drains or filter out sediments, allowing only clean water to pass.

D. Preparation for Concrete Removal: Examine construction to be repaired to determine best methods to safely and effectively perform concrete maintenance work. Examine adjacent work to determine what protective measures will be necessary. Make explorations, probes, and inquiries as necessary to determine condition of construction to be removed in the course of repair.

1. Verify that affected utilities have been disconnected and capped.

2. Inventory and record the condition of items to be removed for reinstallation or salvage.

3. Provide and maintain shoring, bracing, and temporary structural supports as required to preserve stability and prevent unexpected or uncontrolled movement, settlement, or collapse of construction being demolished and construction and finishes to remain. Strengthen or add new supports when required during progress of removal work.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 8

E. Reinforcing-Bar Preparation: Remove loose and flaking rust from exposed reinforcing bars by high-pressure water cleaning, abrasive blast cleaning, needle scaling, or wire brushing until only tightly adhered light rust remains. Do not use methods which may cause damage to adjacent post-tension strands or sheathing.

1. Where section loss of reinforcing bar is more than 25 percent, or 20 percent in two or more adjacent bars, cut bars and remove and replace.

2. Remove additional concrete as necessary to provide at least 3/4-inch clearance at existing and replacement bars.

3. Splice replacement bars to existing bars according to ACI 318 by lapping, welding, or using mechanical couplings.

3.04 CONCRETE REMOVAL

A. Do not overload structural elements with debris.

B. The shape of the prepared saw-cut repair area must be kept as simple as possible, and square or rectangular in shape if possible.

C. Saw-cut perimeter of areas indicated for removal to a depth of at least 1/2 inch. Make cuts perpendicular to concrete surfaces and no deeper than cover on reinforcement.

D. Remove deteriorated and delaminated concrete by breaking up and dislodging from reinforcement.

E. Remove additional concrete if necessary to provide a depth of removal of at least 1/2 inch over entire removal area.

F. If any part of the reinforcing steel is exposed remove concrete from entire perimeter of bar and to provide at least 3/4-inch clearance around bar.

G. Test areas where concrete has been removed by tapping with hammer, and remove additional concrete until unsound and disbonded concrete is completely removed.

H. Provide surfaces with a fractured profile of at least 1/8 inch that are approximately perpendicular or parallel to original concrete surfaces. At columns and walls, make top and bottom surfaces level unless otherwise directed.

I. Thoroughly clean removal areas of loose concrete, dust, and debris. Comply with manufacturer's written instructions and recommendations for application of products, including surface preparation.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 9

3.05 CORROSION-INHIBITING STEEL REINFORCING COATING APPLICATION

A. Apply two coats by stiff-bristle brush or spray at 10 mils per coat. Ensure that underside of completely exposed reinforcing steel is properly coated. Protect coating from direct sunlight and temperatures above 95° F.

B. Allow coating to dry prior to application of patching mortar. Apply patching mortar within 7 days of coating application.

3.06 EMBEDDED GALVANIC ANODE INSTALLATION

A. Anodes must be installed at locations and spacing indicated on the Contract Drawings. Refer to BASF typical layout details for general anode location guidelines.

B. Securely fasten the anode to clean reinforcing steel using a suitable wire twisting tool to eliminate free movement, and to ensure a good electrical connection. If discontinuous steel is present, reestablish continuity with steel tie wires. Following the anode installation, confirm electrical connection between the anode tie wires and the clean reinforcing bar with an appropriate meter.

C. Minimum depth of patching mortar at anode must be 3 inches.

D. Minimum cover over the anodes in all directions must be 1 inch.

3.07 PATCHING MORTAR APPLICATION

A. Place patching mortar as specified in this article unless otherwise recommended in writing by manufacturer.

1. Provide forms where necessary to confine patch to required shape.

2. Wet substrate and forms thoroughly and then remove standing water.

B. Apply bonding agent to all existing concrete surfaces and reinforcement as specified.

C. Pretreatment: Apply mortar scrub coat as required by the manufacturer’s written instructions.

D. General Placement: Place patching mortar by troweling toward edges of patch to force intimate contact with edge surfaces. For large patches, fill edges first and then work toward center, always troweling toward edges of patch. At fully exposed reinforcing bars, force patching mortar to fill space behind bars by compacting with trowel from sides of bars.

E. Vertical Patching: Place material in lifts of not more than 3 inches or less than 1/8 inch. Do not feather edge.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 10

F. Overhead Patching: Place material in lifts of not more than 2 inches or less than 1/8 inch. Do not feather edge.

G. Consolidation: After each lift is placed, consolidate material and screed surface.

H. Multiple Lifts: Where multiple lifts are used, score surface of lifts to provide a rough surface for placing subsequent lifts. Allow each lift to reach final set before placing subsequent lifts.

I. Finishing: Allow surfaces of lifts that are to remain exposed to become firm and then finish to a surface matching adjacent concrete.

J. Curing: Wet-cure cementitious patching materials, including polymer-modified cementitious patching materials, for not less than seven days by water-fog spray or water-saturated absorptive cover.

3.08 EPOXY CRACK INJECTION

A. Clean cracks with a wire brush to remove loose particles.

B. Clean areas to receive capping adhesive of oil, dirt, and other substances that would interfere with bond.

C. Place injection ports as recommended by epoxy manufacturer, spacing no farther apart than thickness of member being injected. Seal injection ports in place with capping adhesive.

D. Seal cracks at exposed surfaces with a ribbon of capping adhesive at least 1/4 inch thick by 1 inch wider than crack.

E. Flush crack or joint with potable water before pumping.

F. Inject cracks at locations indicated on the Contract Drawings.

G. Inject epoxy adhesive, beginning at the lowest port or with the first port that was flushed on a horizontal crack. Inject adhesive into ports to refusal, capping adjacent ports when they extrude epoxy. Cap injected ports and inject through adjacent ports until crack is filled.

H. After epoxy adhesive has set, remove injection ports and repair with patching mortar.

3.09 PENETRATING CORROSION INHIBITER APPLICATION

A. Apply two coats of corrosion-inhibiting treatment to surfaces indicated on Drawings.

Third Precinct and Police Academy Parking Garages Maintenance Of Cast-In-Place Concrete City of Richmond, VA

03013 - 11

B. Apply by brush, roller, or wet fan-type spray nozzle at manufacturer's recommended application rate to patched repair area.

END OF SECTION

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-1

SECTION 04900

MASONRY RESTORATION

PART 1 - GENERAL

1.01 SUMMARY

A. This Section includes restoration of brick as follows:

1. Repairing masonry, including replacing damaged units.

2. Cleaning masonry.

3. Repointing mortar joints.

1.02 SUBMITTALS

A. Product Data: For each type of product indicated. Include recommendations for application and use. Include test data substantiating that products comply with requirements.

B. Samples for Verification: Submit samples of the following:

1. Each type of exposed masonry unit to be used for replacing existing units.

a. For each brick type, provide straps or panels containing at least four bricks.

2. Each type of pointing mortar in the form of sample mortar strips, 6 inches long by 1/2 inch wide, set in aluminum or plastic channels.

a. Include with each sample a list of ingredients with proportions of each. Identify sources, both supplier and quarry, of each type of sand and brand names of cementitious materials and pigments if any.

C. Restoration Program: For each phase of restoration process, provide detailed description of materials, methods, equipment, and sequence of operations to be used for each phase of restoration work including protection of surrounding materials on building and Project site.

1. Include methods for keeping pointing mortar damp during curing period.

2. If materials and methods other than those indicated are proposed for any phase of restoration work, provide a written description, including evidence

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-2

of successful use on comparable projects, and a testing program to demonstrate their effectiveness for this Project.

1.03 DELIVERY, STORAGE, AND HANDLING

A. Deliver masonry units to Project site strapped together in suitable packs or pallets or in heavy-duty cartons.

B. Deliver other materials to Project site in manufacturer's original and unopened containers, labeled with manufacturer's name and type of products.

C. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.

D. Store hydrated lime in manufacturer's original and unopened containers. Discard lime if containers have been damaged or have been opened for more than two days.

1.04 PROJECT CONDITIONS

A. Cold-Weather Requirements: Comply with the following procedures for masonry repair and mortar-joint pointing:

1. When air temperature is below 40 deg F, heat mortar ingredients, masonry repair materials, and existing masonry walls to produce temperatures between 40 and 120 deg F.

2. When mean daily air temperature is below 40 deg F, provide enclosure and heat to maintain temperatures above 32 deg F within the enclosure for 7 days after repair and pointing.

B. Hot-Weather Requirements: Protect masonry repair and mortar-joint pointing when temperature and humidity conditions produce excessive evaporation of water from mortar and repair materials. Provide artificial shade and wind breaks and use cooled materials as required. Do not apply mortar to substrates with temperatures of 90 deg F and above.

C. Patch masonry only when air and surface temperatures are between and 55 and 100 deg F and are predicted to remain above 55 deg F for at least 7 days after completion of work. On days when air temperature is predicted to go above 90 deg F, schedule patching work to coincide with time that surface being patched will be in shade or during cooler morning hours.

D. Clean masonry surfaces only when air temperature is 40 deg F and above and is predicted to remain so for at least 7 days after completion of cleaning.

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-3

PART 2 - PRODUCTS

2.01 MASONRY MATERIALS

A. Face Brick and Accessories: Provide face brick and accessories, including specially molded, ground, cut, or sawed shapes where required to complete masonry restoration work.

1. Provide units with colors, surface texture, size, and shape to match existing brickwork and with physical properties not less than those determined from preconstruction testing of selected existing units.

a. For existing brickwork that exhibits a range of colors, provide brick that matches that range rather than brick that matches an individual color within that range.

2. Provide specially molded shapes for applications where shapes produced by sawing would result in sawed surfaces being exposed to view.

3. Provide specially ground units, shaped to match patterns, for arches and where indicated.

2.02 MORTAR MATERIALS

A. Portland Cement: ASTM C 150, Type I or Type II.

B. Hydrated Lime: ASTM C 207, Type S.

C. Factory-Prepared Lime Putty: Screened, fully-slaked lime putty, prepared from pulverized lime complying with ASTM C 5.

D. Mortar Sand: ASTM C 144, unless otherwise indicated.

1. Color: Provide natural sand; of color necessary to produce required mortar color.

2. Match size, texture, and gradation of existing mortar sand as closely as possible. Blend several sands, if necessary, to achieve suitable match.

E. Mortar Pigments: Natural and synthetic iron oxides, compounded for mortar mixes. Use only pigments with a record of satisfactory performance in masonry mortars.

F. Water: Potable.

2.03 CLEANING MATERIALS

A. Water for Cleaning: Potable.

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-4

B. Job-Mixed Mold, Mildew, and Algae Remover: Solution prepared by mixing 2 cups of tetrasodium polyphosphate (TSPP), 5 quarts of 5 percent sodium hypochlorite (bleach), and 15 quarts of hot water for every 5 gal. of solution required.

C. Nonacidic Liquid Cleaner: Manufacturer's standard mildly alkaline liquid cleaner formulated for removing mold, mildew, and other organic soiling from ordinary building materials, including polished stone, brick, aluminum, plastics, and wood.

2.04 MORTAR MIXES

A. Measurement and Mixing: Measure cementitious materials and sand in a dry condition by volume or equivalent weight. Do not measure by shovel; use known measure. Mix materials in a clean, mechanical batch mixer.

1. Mixing Pointing Mortar: Thoroughly mix cementitious materials and sand together before adding any water. Then mix again adding only enough water to produce a damp, unworkable mix that will retain its form when pressed into a ball. Maintain mortar in this dampened condition for 15 to 30 minutes. Add remaining water in small portions until mortar reaches desired consistency. Use mortar within one hour of final mixing; do not retemper or use partially hardened material.

B. Colored Mortar: Produce mortar of color required by using selected ingredients. Do not alter specified proportions without ENGINEER's approval.

1. Mortar Pigments: Where mortar pigments are indicated, do not exceed a pigment-to-cement ratio of 1:10 by weight.

C. Do not use admixtures of any kind in mortar, unless otherwise indicated.

1. Rebuilding (Setting) Mortar: Comply with ASTM C 270, Proportion Specification, Type N, unless otherwise indicated; with cementitious material content limited to portland cement and lime.

PART 3 - EXECUTION

3.01 PROTECTION

A. Protect persons, motor vehicles, surrounding surfaces of building being restored, building site, plants, and surrounding buildings from harm resulting from masonry restoration work.

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-5

3.02 BRICK REMOVAL AND REPLACEMENT

A. At locations indicated, remove bricks that are damaged, spalled, or deteriorated. Carefully demolish or remove entire units from joint to joint, without damaging surrounding masonry, in a manner that permits replacement with full-size units.

1. When removing single bricks, remove material from center of brick and work toward outside edges.

B. Support and protect remaining masonry that surrounds removal area. Maintain flashing, reinforcement, lintels, and adjoining construction in an undamaged condition.

C. Notify ENGINEER of unforeseen detrimental conditions including voids, cracks, bulges, and loose masonry units in existing masonry backup, rotted wood, rusted metal, and other deteriorated items.

D. Remove in an undamaged condition as many whole bricks as possible.

1. Remove mortar, loose particles, and soil from brick by cleaning with hand chisels, brushes, and water.

2. Store brick for reuse, as indicated.

3. Deliver cleaned brick not required for reuse to Owner, unless otherwise directed.

E. Clean bricks surrounding removal areas by removing mortar, dust, and loose particles in preparation for replacement.

F. Install replacement brick into bonding and coursing pattern of existing brick. If cutting is required, use a motor-driven saw designed to cut masonry with clean, sharp, unchipped edges.

G. Lay replacement brick with completely filled bed, head, and collar joints. Butter ends with sufficient mortar to fill head joints and shove into place. Wet both replacement and surrounding bricks that have ASTM C 67 initial rates of absorption (suction) of more than 30 g/30 sq. in. per min.. Use wetting methods that ensure that units are nearly saturated but surface is dry when laid. Maintain joint width for replacement units to match existing joints.

1. Rake out mortar used for laying brick before mortar sets and point new mortar joints in repaired area to comply with requirements for repointing existing masonry, and at same time as repointing of surrounding area.

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-6

3.03 CLEANING MASONRY, GENERAL

A. Proceed with cleaning in an orderly manner; work from top to bottom of each scaffold width and from one end of each elevation to the other.

B. Use only those cleaning methods indicated for each masonry material and location.

1. Use spray equipment that provides controlled application at volume and pressure indicated, measured at spray tip. Adjust pressure and volume to ensure that cleaning methods do not damage masonry.

a. Equip units with pressure gages.

2. For water spray application, use fan-shaped spray tip that disperses water at an angle of 25 to 50 degrees.

3. For high-pressure water spray application, use fan-shaped spray tip that disperses water at an angle of at least 40 degrees.

C. Perform each cleaning method indicated in a manner that results in uniform coverage of all surfaces, including corners, moldings, and interstices, and that produces an even effect without streaking or damaging masonry surfaces.

D. Removing Plant Growth: Completely remove plant, moss, and shrub growth from masonry surfaces. Carefully remove plants, creepers, and vegetation by cutting at roots and allowing to dry as long as possible before removal. Remove loose soil and debris from open masonry joints to whatever depth they occur.

E. Preliminary Cleaning: Before beginning general cleaning, remove extraneous substances that are resistant to cleaning methods being used. Extraneous substances include paint, calking, asphalt, and tar.

1. Carefully remove heavy accumulations of material from surface of masonry with a sharp chisel. Do not scratch or chip masonry surface.

F. Water Spray Applications: Unless otherwise indicated, hold spray nozzle at least 6 inches from surface of masonry and apply water in horizontal back and forth sweeping motion, overlapping previous strokes to produce uniform coverage.

G. After cleaning is complete, remove protection no longer required. Remove tape and adhesive marks.

3.04 CLEANING BRICKWORK

A. Cold-Water Wash: Use cold water applied by low pressure spray.

3.05 REPOINTING MASONRY

A. Rake out and repoint mortar joints to the following extent:

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-7

1. Joints where mortar is missing or where they contain holes.

2. Cracked joints where cracks are 1/8 inch or more in width and of any depth.

3. Joints where they are worn back 1/4 inch or more from surface.

4. Joints where they are deteriorated to point that mortar can be easily removed by hand.

5. Joints, other than those indicated as sealant-filled joints, where they have been filled with substances other than mortar.

B. Do not rake out and repoint joints where not required.

C. Rake out joints as follows:

1. Remove mortar from joints to depth of 2 times joint width, but not less than 1/2 inch or not less than that required to expose sound, unweathered mortar.

2. Remove mortar from masonry surfaces within raked-out joints to provide reveals with square backs and to expose masonry for contact with pointing mortar. Brush, vacuum, or flush joints to remove dirt and loose debris.

3. Do not spall edges of masonry units or widen joints. Replace or patch damaged masonry units as directed by ENGINEER.

a. Cut out center of mortar bed joints using angle grinders with

diamond-impregnated metal blades. Remove remaining mortar by hand with chisel and mallet. Strictly adhere to written quality-control program. Quality-control program shall include provisions for demonstrating ability of operators to use tools without damaging masonry, supervising performance, and preventing damage due to worker fatigue.

D. Notify ENGINEER of unforeseen detrimental conditions including voids in mortar joints, cracks, loose masonry units, rotted wood, rusted metal, and other deteriorated items.

E. Point joints as follows:

1. Rinse masonry-joint surfaces with water to remove dust and mortar particles. Time rinsing application so, at time of pointing, joint surfaces are damp but free of standing water. If rinse water dries, dampen masonry-joint surfaces before pointing.

2. Apply pointing mortar first to areas where existing mortar was removed to depths greater than surrounding areas. Apply in layers not greater than 3/8

Third Precinct and Police Academy Parking Garages Masonry Restoration City of Richmond, VA

04900-8

inch until a uniform depth is formed. Fully compact each layer thoroughly and allow it to become thumbprint hard before applying next layer.

3. After low areas have been filled to same depth as remaining joints, point all joints by placing mortar in layers not greater than 3/8 inch. Fully compact each layer and allow to become thumbprint hard before applying next layer. Where existing bricks have worn or rounded edges, slightly recess finished mortar surface below face of masonry to avoid widened joint faces. Take care not to spread mortar over edges onto exposed masonry surfaces or to featheredge mortar.

4. When mortar is thumbprint hard, tool joints to match original appearance of joints. Remove excess mortar from edge of joint by brushing.

F. Cure mortar by maintaining in thoroughly damp condition for at least 72 hours including weekends and holidays.

G. Where repointing work precedes cleaning of existing masonry, allow mortar to harden at least 30 days before beginning cleaning work.

END OF SECTION

Third Precinct and Police Academy Parking Garages Metal Fabrications City of Richmond, VA

05500-1

SECTION 05500

METAL FABRICATIONS

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Steel framing and supports for applications where framing and supports are not specified in other Sections.

2. Metal bollards.

3. Post-Installed Anchors.

1.02 COORDINATION

A. Coordinate installation of metal fabrications that are anchored to or that receive other work. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

1.03 SUBMITTALS

A. Product Data: For the following:

1. Paint products.

B. Shop Drawings: Show fabrication and installation details. Include plans, elevations, sections, and details of metal fabrications and their connections. Show anchorage and accessory items. Provide Shop Drawings for the following:

1. Steel framing and supports for applications where framing and supports are not specified in other Sections.

2. Metal bollards.

C. Research/Evaluation Reports: For post-installed anchors, from ICC-ES.

1.04 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."

Third Precinct and Police Academy Parking Garages Metal Fabrications City of Richmond, VA

05500-2

1.05 FIELD CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.

PART 2 - PRODUCTS

2.01 METALS

A. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller marks, rolled trade names, or blemishes.

B. Steel Plates, Shapes, and Bars: ASTM A 36.

C. Steel Pipe: ASTM A 53, Standard Weight (Schedule 40) unless otherwise indicated.

2.02 FASTENERS

A. General: Unless otherwise indicated, provide Type 316 stainless-steel fasteners. Provide hot dip galvanized fasteners for use with galvanized material.

B. Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM A 307, Grade A; with hex nuts, ASTM A 563; and flat washers.

C. Stainless-Steel Bolts and Nuts: Regular hexagon-head annealed stainless-steel bolts, ASTM A 193, Grade B8M, Class 2; with hex nuts, ASTM A 194, Grade 8M; and, flat washers.

D. Post-Installed Anchors: As indicated on drawings.

2.03 MISCELLANEOUS MATERIALS

A. Paint: As indicated.

B. Shop Primer for Galvanized Steel: Primer formulated for exterior use over zinc-coated metal and compatible with finish paint systems indicated.

C. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and compatible with paints specified to be used over it.

D. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for exterior applications.

Third Precinct and Police Academy Parking Garages Metal Fabrications City of Richmond, VA

05500-3

2.04 FABRICATION, GENERAL

A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation.

B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces. Burning of holes for bolts in the shop or field will not be permitted. Shapes may be cut in the shop by standard flame cutting machines and may be cut in the field only with the written consent of the Owner.

C. Match exposed work to produce continuity of line and design. Fabricate and fasten metalwork so that work will not be distorted, the finish impaired, nor the fasteners overstressed from the expansion and contraction of the metal. Conceal fastenings wherever practicable. Use fastenings exposed to public view of the same color and appearance as the surrounding metal.

D. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing work.

E. Form exposed work with accurate angles and surfaces and straight edges.

F. Weld corners and seams continuously to comply with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.

G. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners or welds where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) fasteners unless otherwise indicated. Locate joints where least conspicuous.

H. Fabricate seams and other connections that are exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.

I. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items.

Third Precinct and Police Academy Parking Garages Metal Fabrications City of Richmond, VA

05500-4

J. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads.

2.05 MISCELLANEOUS FRAMING AND SUPPORTS

A. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work.

B. Fabricate units from steel shapes, plates, and bars of welded construction unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction.

C. Galvanize or paint all framing and supports as indicated.

2.06 METAL BOLLARDS

A. Fabricate metal bollards from Schedule 40 steel pipe.

B. Paint bollards as indicated.

2.07 STEEL AND IRON FINISHES

A. Paint: Paint items as indicated.

B. Galvanizing: Hot-dip galvanize items as indicated to comply with ASTM A 153 for steel and iron hardware, ASTM A 123 for other steel and iron products, and ASTM A653 for steel sheet.

C. Items to be shop painted which are fabricated without welding entirely from galvanized shapes, hardware and sheet need not be galvanized after fabrication. All other fabrications to be galvanized shall be hot dipped after fabrication.

PART 3 - EXECUTION

3.01 INSTALLATION, GENERAL

A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing metal fabrications. Set metal fabrications accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels.

B. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations. Do not weld, cut, or abrade surfaces of exterior units that have been hot-dip galvanized after fabrication and are for bolted or screwed field connections.

Third Precinct and Police Academy Parking Garages Metal Fabrications City of Richmond, VA

05500-5

C. Field Welding: Comply with the following requirements:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.

D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts, toggle bolts, through bolts, lag screws, wood screws, and other connectors.

E. Provide temporary bracing or anchors in formwork for items that are to be built into concrete, masonry, or similar construction.

F. Dissimilar Materials: Where dissimilar metals are in contact or where aluminum is in contact with concrete, mortar, masonry, wood or absorptive materials subject to wetting, protect the surfaces with a coat of bituminous paint.

G. Adhesive anchors installed per manufacturer’s recommendations.

3.02 ADJUSTING AND CLEANING

A. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A 780.

END OF SECTION

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 1

SECTION 07901 JOINT SEALANTS

PART 1 - GENERAL 1.01 DESCRIPTION

A. The Contractor shall provide all labor, materials, equipment, and services necessary to install all joint sealants as shown on the drawings and as specified herein.

1.02 SUMMARY

A. This Section includes joint sealants for the following locations:

1. Elastomeric Sealant: Exterior joints in vertical surfaces and nontraffic horizontal surfaces as indicated below:

a. Control and expansion joints in unit masonry. b. Joints between different materials listed above. c. Perimeter joints between materials listed above and frames of doors

and windows. d. Control and expansion joints in ceiling and overhead surfaces. e. Other joints as indicated.

2. Elastomeric Sealant: Exterior joints in horizontal traffic surfaces as indicated

below:

a. Joints in concrete paving, including steps. b. Joints between different materials listed above. c. Other joints as indicated.

1.03 SYSTEM PERFORMANCE REQUIREMENTS

A. Provide elastomeric joint sealants that have been produced and installed to establish and to maintain watertight and airtight continuous seals without causing staining or deterioration of joint substrates.

1. Depth of sealant to be ½ width of joint.

a. Maximum Depth: ½ inch b. Minimum Depth: ¼ inch c. Maximum recommended width: 2 inches d. Minimum width: ¼ inch

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 2

1.04 SUBMITTALS

A. Product data from manufacturers for each joint sealant product required.

B. Samples for initial selection purposes in form of manufacturer's standard bead samples, consisting of strips of actual products showing full range of colors available, for each product exposed to view.

C. Certificates from manufacturers of joint sealants attesting that their products comply

with specification requirements and are suitable for the use indicated.

D. Qualification data complying with requirements specified in "Quality Assurance" article.

E. Compatibility and adhesion test reports from elastomeric sealant manufacturer

indicating that materials forming joint substrates and joint sealant backings have been tested for compatibility and adhesion with joint sealants. Include sealant manufacturer's interpretation of test results relative to sealant performance and recommendations for primers and substrate preparation needed to obtain adhesion.

F. Product test reports for each type of joint sealants indicated, evidencing compliance

with requirements specified.

G. Field adhesion report form as provided by and in accordance with ASTM C1521.

H. Warranty 1.05 QUALITY ASSURANCE

A. Installer Qualifications: Engage an experienced Installer who has completed joint sealant applications similar in material, design, and extent to that indicated for Project that have resulted in construction with a record of successful in-service performance.

B. Single Source Responsibility for Joint Sealant Materials: Obtain joint sealant

materials from a single manufacturer for each different product required.

C. Pre-Installation Conference: Conduct conference at Project site to comply with requirements of the Division 1 Section covering this activity.

D. Mock-ups:

1. At start of Project, perform mock-up of required sealant Work at 1 area of building. Perform minimum of 1 mock-up for each different combination of substrates to be sealed. Coordinate mock-up areas with Engineer.

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 3

2. Install mock-ups and test in presence of sealant manufacturer’s authorized representative and Engineer to ensure application procedures are consistent with warranty requirements.

3. After sealant has achieved sufficient cure as coordinated with manufacturer’s representative, conduct adhesion pull-tests or non-destructive testing, at discretion of Engineer. Conduct tests in accordance with ASTM C1521.

a. Confirm results of adhesion tests as acceptable to Engineer and sealant manufacturer before starting Work.

4. Leave approved mock-ups in place to establish standards and guidelines for acceptable application of sealant Work and acceptable appearance.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to Project site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration period for use, pot life, curing time, and mixing instructions for multicomponent materials.

B. Store and handle materials in compliance with manufacturer's recommendations to

prevent their deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.

1.07 PROJECT CONDITIONS

A. Environmental Conditions: Do not proceed with installation of joint sealants under the following conditions:

1. When ambient and substrate temperature conditions are outside the limits

permitted by joint sealant manufacturer.

2. When joint substrates are wet.

B. Joint Width Conditions: Do not proceed with installation of joint sealants where joint widths are less than allowed by joint sealant manufacturer for application indicated.

C. Joint Substrate Conditions: Do not proceed with installation of joint sealants until

contaminants capable of interfering with their adhesion are removed from joint substrates.

1.08 WARRANTY

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 4

A. Provide warranty from joint sealant manufacturer and installer for material and labor for five years.

B. Include coverage for replacement of sealant materials that fail to achieve watertight seal, exhibit loss of adhesion or cohesion, or do not cure, provided sealant has been installed per manufacturer’s recommendations.

PART 2 - PRODUCTS 2.01 MATERIALS, GENERAL

A. Compatibility: Provide joint sealants, joint fillers, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by sealant manufacturer based on testing and field experience.

B. Colors: Provide color of exposed joint sealants to comply with the following:

1. Provide selections made by Engineer from manufacturer’s full range of

standard colors for products of type indicated. 2.02 ELASTOMERIC JOINT SEALANTS

A. Elastomeric Sealant Standard: Provide manufacturer’s standard chemically curing elastomeric sealants that comply with ASTM C 920 and other requirements indicated for each sealant type, including those requirements referencing ASTM C 920 classifications for Type, Grade, Class, and Uses.

1. Additional Movement Capability: Where additional movement capability is

specified, provide products with the capability, when tested for adhesion and cohesion under maximum cyclic movement per ASTM C 719, to withstand the specified percentage change in the joint width existing at time of installation and remain in compliance with other requirements of ASTM C 920 for Uses indicated.

B. Polyurethane Sealant: two component polyurethane joint sealant, gun grade non-sag

consistency confirming to Federal Specification TT-S-0027E; ASTM C-920, Type M, Grade NS, Class 25 to 50% maximum movement capability per ASTM C-719, Use T, NT, or M – as appropriate for application.

C. Available Products: Subject to compliance with requirements, elastomeric sealants

that may be incorporated in the Work include, but are not limited to the following:

1. Polyurethane Sealant

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 5

a. "Dynatrol II", Pecora Corp. b. "Sikaflex - 2c NS", Sika Corp. c. "MasterSeal NP 2", BASF

2.03 JOINT SEALANT BACKING

A. General: Provide sealant backings of material and type that are nonstaining; are compatible with joint substrates, sealants, primers and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.

B. Plastic Foam Joint Fillers: Preformed, compressible, resilient, nonstaining, nonwaxing, nonextruding strips of flexible plastic foam of material indicated below and of size, shape, and density to control sealant depth and otherwise contribute to producing optimum sealant performance:

1. Closed-cell polyethylene foam, nonabsorbent to liquid water and gas,

nonoutgassing in unruptured state.

C. Elastomeric Tubing Joint Fillers: Neoprene, butyl, EPDM, or silicone tubing complying with ASTM D 1056, nonabsorbent to water and gas, capable of remaining resilient at temperatures down to - 25 F. (-32 deg C). Provide products with low compression set and of size and shape to provide a secondary seal, to control sealant depth, and otherwise contribute to optimum sealant performance.

D. Bond-Breaker Tape: Polyethylene tape or other plastic tape as recommended by

sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive tape where applicable.

2.04 MISCELLANEOUS MATERIALS

A. Primer: Material recommended by joint sealant manufacturer where required for adhesion of sealant to joint substrates indicated.

B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of

sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming in any way joint substrates and adjacent nonporous surfaces, and formulated to promote optimum adhesion of sealants with joint substrates.

C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants

and surfaces adjacent to joints. PART 3 - EXECUTION

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 6

3.01 EXAMINATION

A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint sealant performance. Do not proceed with installation of joint sealants until unsatisfactory conditions have been corrected.

3.02 PREPARATION

A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with recommendations of joint sealant manufacturer and the following requirements:

1. Remove all foreign material from joint substrates that could interfere with

adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.

2. Clean concrete, masonry, unglazed surfaces of ceramic tile, and similar

porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil-free compressed air.

3. Remove laitance and form release agents from concrete.

4. Clean metal, glass, porcelain enamel, glazed surfaces of ceramic tile, and

other nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants.

B. Joint Priming: Prime joint substrates where indicated or where recommended by

joint sealant manufacturer. Apply primer to comply with joint sealant manufacturer's recommendations.

1. Conduct test application to verify adhesion

2. Apply primer full strength with brush or clean lint-free cloth. Apply primer to a light, uniform coating. Porous surfaces require more primer. Do not overapply. Do not apply primer onto face of substrate.

3. Confine primers to areas of joint sealant bond; do not allow spillage or migration onto adjoining surfaces.

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 7

4. Allow primer to dry before installing backer rod and applying joint sealants, in accordance with manufacturer’s printed instruction.

5. Prime and seal on same workday.

C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.

3.03 INSTALLATION OF JOINT SEALANTS

A. General: Comply with joint sealant manufacturer's printed installation instructions applicable to products and applications indicated, except where more stringent requirements apply.

B. Sealant Installation Standard: Comply with recommendations of ASTM C 1193 for

use of joint sealants as applicable to materials, applications, and conditions indicated.

C. Installation of Sealant Backings: Install sealant backings to comply with the following requirements:

1. Install joint fillers of type indicated to provide support of sealants during

application and at position required to produce the cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

a. Do not leave gaps between ends of joint fillers. b. Do not stretch, twist, puncture, or tear joint fillers. c. Remove absorbent joint fillers that have become wet prior to sealant

application and replace with dry material.

2. Install bond breaker tape between sealants where backer rods are not used between sealants and joint fillers or back of joints.

D. Installation of Sealants: Install sealants by proven techniques that result in sealants

directly contacting and fully wetting joint substrates, completely filling recesses provided for each joint configuration, and providing uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability. Install sealants at the same time sealant backings are installed.

E. Tooling of Nonsag Sealants: Immediately after sealant application and prior to time

skinning or curing begins, tool sealants to form smooth, uniform beads of configuration indicated, to eliminate air pockets, and to ensure contact and adhesion of sealant with sides of joint. Remove excess sealants from surfaces adjacent to

Third Precinct and Police Academy Parking Garages Joint Sealants City of Richmond, VA

07901 - 8

joint. Do not use tooling agents that discolor sealants or adjacent surfaces or are not approved by sealant manufacturer.

1. Provide concave joint configuration per Figure 5A in ASTM C 1193, unless

otherwise indicated.

2. Provide flush joint configuration, per Figure 5B in ASTM C 1193, where indicated.

a. Use masking tape to protect adjacent surfaces of recessed tooled

joints. 3.04 CURING TIME

1. Curing of joint sealants varies with temperature and humidity. Consult sealant manufacturer’s technical representative or technical data sheet to determine expected cure times.

3.05 INSPECTION

1. During execution of Work, inspect Work to ensure compliance with manufacturer’s guidelines, these Specifications when they exceed manufacturer’s guidelines, and good construction practice.

a. Evaluate adhesion of sealant in accordance with the latest revision of ASTM C1521. Refer to ASTM C1521 for test methods and frequency.

b. Allow inspections of Work and assist in testing requested by manufacturer’s representative and Engineer.

3.06 CLEANING

A. Clean off excess sealants or sealant smears adjacent to joints as work progresses by methods and with cleaning materials approved by manufacturers of joint sealants and of products in which joints occur.

3.07 PROTECTION

A. Protect joint sealants during and after curing period from contact with contaminating substances or from damage resulting from construction operations or other causes so that they are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so that and installations with repaired areas are indistinguishable from original work.

END OF SECTION

Third Precinct and Police Academy Parking Garages Painting City of Richmond, VA

09900 - 1

SECTION 09900

PAINTING

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Touch-up painting of parking striping and graphics

1.02 COORDINATION

A. Provide finish coats which are compatible with the prime paints used. Review other sections of these specifications in which prime paints are to be provided to ensure compatibility of the total coatings system for the various substrates.

1.03 SUBMITTALS

A. Product Data: For each type of product.

1. Technical information in standard printed published form, including performance criteria, label analysis, application instructions and MSDS sheets for each material proposed for use.

2. List each material and cross-reference to the specific paint and finish system and application. Identify by manufacturer’s catalog number and general classification.

1.04 QUALITY ASSURANCE

A. Codes and Standards

1. SSPC – “Systems and Specifications”, published by the Steel Structure Painting Council.

2. Painting and Decorating Contractors of America (PDCA) Technical Manual as a reference standard.

1.05 DELIVERY, STORAGE, AND HANDLING

A. Deliver all paint to site in manufacturer’s sealed and labeled containers. Labels shall bear manufacturer’s name, brand, type of paint, Federal specification number (if applicable) color of paint, and instructions for reducing.

B. Store materials and equipment in a designated storage space on the site. Keep storage space neat, clean and accessible at all times. Protect floors from paint spillage.

Third Precinct and Police Academy Parking Garages Painting City of Richmond, VA

09900 - 2

1.06 PROTECTION

A. Place paint or solvent-soaked rags, waste, or other materials which might constitute a fire hazard in metal containers and remove from premises at the close of each day’s work. Take every precaution to avoid damage by fire.

B. Provide foam type 2-1/2 gallon capacity fire extinguishers for each paint storage space.

C. Protect the work of all other trades against damage, marking or injury by suitable covering during the progress of the painting and finishing work.

1.07 FIELD CONDITIONS

A. Examine all surfaces to receive coatings and report to the OWNER and ENGINEER any condition which is not acceptable. Commencement of work and in any area constitutes acceptance of conditions and places the responsibility for a workmanlike job on this Section.

B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and the surrounding air temperatures are between 50 degrees F. and 95 degrees F., unless otherwise permitted by the paint manufacturer’s printed instructions.

C. Do not apply paint in snow, rain, fog, or mist; or when the relative humidity exceeds 85%; or to damp or wet surfaces; unless otherwise permitted by the paint manufacturer’s printed instructions.

PART 2 - PRODUCTS

2.01 MATERIALS, GENERAL

A. Provide only pure linseed oil, turpentine, shellac, and other like materials that are of the highest quality, with identifying labels intact and seals unbroken. Use no thinners other than those specified by the manufacturer.

B. Use products of the same manufacturer for succeeding coats.

1. Where existing previously painted surfaces are to be finish painted, confirm compatibility of existing painted surfaces with the manufacturer of the succeeding new paints.

2. Where specific products by selected manufacturers are named, approved equals from ICI Paint Stores, Dunn Edwards Corp., Frazee/Deer-O, Sherwin-Williams Paint Co., and Pioneer Paint may be submitted.

C. All materials shall comply with Environmental Protection Agency Pt. 59, Subpt. D, Table 1 of Section 40CFR parts 53-59, Volume 5.

Third Precinct and Police Academy Parking Garages Painting City of Richmond, VA

09900 - 3

2.02 PARKING LINES AND ARROWS

A. Parking lines, striping, arrows, and graphics on driving surfaces shall be yellow pavement marking paint, conforming to U.S. Bureau of Public Roads colors, unless otherwise noted.

1. Acrylic 2 9001 or Alkyd S 9501; Pratt and Lambert 2. GL-20087; Glidden

2.03 PAINT SYSTEMS

A. Traffic and Parking Lane Markings: Two coats – Traffic paint 14 to 15 mil wet film thickness each coat.

PART 3 - EXECUTION

3.01 SURFACE PREPARATION

A. Perform all preparation and cleaning procedures in strict accordance with the paint manufacturer’s instructions and as herein specified, for each particular substrate condition.

B. Clean surfaces to be completely dry prior to applying primers, paints or surface treatments. Remove oil and grease with clean cloths and cleaning solvents. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions otherwise detrimental to the formation of a durable paint film. For excessive chalked surfaces, pressure washing or scrubbing the surface with a stiff brush and mild detergent is necessary. Rinse thoroughly with a strong stream of water.

C. Prepare cementitious surfaces of concrete to be painted by using approved cleaning solvents and high-pressure power washing with minimum pressures of 2,500 to 5,000 psi at a flow of 4 to 14 gallons per minute in accordance with SSPC SP1 to thoroughly remove all efflorescence, chalk, dust, dirt, grease, oils, and by roughening as required to remove glaze, or provide sufficient bite on existing painted surfaces.

3.02 MATERIALS PREPARATION

A. Mix and prepare painting materials in strict accordance with the manufacturer’s directions.

B. Store materials not in actual use in tightly covered containers. Maintain containers used in storage, mixing, and application of paint in a clean condition, free of foreign materials and residue.

C. Stir all materials before application to produce a mixture of uniform density, and as required during the application of the materials.

Third Precinct and Police Academy Parking Garages Painting City of Richmond, VA

09900 - 4

3.03 APPLICATION

A. Apply paint with brush, roller, spray, or other acceptable practice in accordance with the manufacturer’s directions.

B. Spread all materials evenly and smoothly without runs, sags or other defects. Make edges of paint adjoining other materials or colors sharp and clean, without overlapping.

C. The number of coats and paint film thickness required is the same regardless of the application method. Do not apply succeeding coats until the previous coat has completely dried. Sand between each enamel coat application with fine sandpaper, or rub surfaces with pumice stone where required to produce an even, smooth surface in accordance with the coating manufacturer’s directions.

D. Paint directional arrows, parking stalls, marking lines, handicap symbols, etc., to match existing conditions. Unless otherwise detailed, single line width to be four inches wide. Striped areas shall be four inch wide lines eighteen inches on center. Lay out all painted lines and define with chalk markings for approval before proceeding with painting.

E. Install stall striping using a gravity flow method approved by the ENGINEER. Spray painting will not be approved.

3.04 CLEAN-UP

A. During the progress of the work, remove form the site all discarded paint materials, rubbish, cans and rags at the end of each work day.

B. Upon completion of painting work, clean paint-spattered surfaces. Remove spattered paint by proper methods of washing and scraping, using care not to scratch or otherwise damage finished surfaces.

C. At the completion of work of other trades, touch-up and restore all damaged or defaced painted surfaces.

END OF SECTION

Third Precinct and Police Academy Parking Garages Appendix A City of Richmond, VA Health Safety and Environment Management Plan

APPENDIX A

City of Richmond - Health, Safety, and Environment Management Plan

Health, Safety, and Environment Management Plan

Prepared by: City of Richmond Department of Public Utilities 900 E Broad St Richmond, Virginia 23219 August 2008

Health, Safety, and Environment Management Plan City of Richmond August 2008

i

Table of Contents

1.0 CONTRACTOR HEALTH, SAFETY AND ENVIRONMENT REQUIREMENTS ....................... 1

1.1 Security Requirements.................................................................................................................... 1

2.0 DEFINITIONS ................................................................................................................................... 1

3.0 DOCUMENTATION AND REPORTING REQUIREMENTS ........................................................ 2

4.0 HSE TRAINING/COMMUNICATION REQUIREMENTS ............................................................ 3

5.0 BASIC HSE REQUIREMENTS ........................................................................................................ 3

6.0 CERTIFICATION, INSPECTIONS, AND REGULATORY AGENCY PERMITS ........................ 8

7.0 SITE OPERATIONS ......................................................................................................................... 8

7.1 Clearing and Grubbing ................................................................................................................... 9 7.2 Landfill Operations ....................................................................................................................... 10 7.3 Drilling ......................................................................................................................................... 10 7.4 Excavation and Trenching ............................................................................................................ 13 7.5 Overhead Electrical Lines ............................................................................................................ 15 7.6 Welding, Cutting, and Other Hot Work. ...................................................................................... 17 7.7 Heavy Equipment ......................................................................................................................... 19 7.8 Traffic/Pedestrian Safety .............................................................................................................. 23 7.9 Flammable and Combustible Materials ........................................................................................ 23 7.10 Compressed Gases ....................................................................................................................... 24 7.11 Underground Work ...................................................................................................................... 25 7.12 Poisonous Plants, Insects and Animals Indigenous to Virginia ................................................... 27

8.0 RESPIRATORY PROTECTION ..................................................................................................... 28

9.0 HSE SURVEYS ............................................................................................................................... 28

10.0 PLANNING AND OBSERVATION PROCEDURES ................................................................ 29

11.0 ACCIDENT/INCIDENT INVESTIGATION .............................................................................. 29

12.0 DRUGS, ALCOHOL, AND CONTRABAND ............................................................................ 30

13.0 MEDICAL AND EXPOSURE MONITORING .......................................................................... 31

14.0 IMMINENT DANGER SITUATIONS ....................................................................................... 31

15.0 HSE ADHERENCE POLICY ...................................................................................................... 32

Health, Safety, and Environment Management Plan City of Richmond August 2008

1

1.0 CONTRACTOR HEALTH, SAFETY AND ENVIRONMENT REQUIREMENTS It is the policy of City of Richmond (COR) to select, contract with, and oversee Contractors with the same priority and emphasis on Health, Safety and Environment (HSE) protection as we practice for our own employees. It is a contractual requirement that Contractors comply with all applicable COR, client, State, and Federal health, safety, and environmental regulations. This HSE Management Plan specifies COR’s HSE requirements that may exceed OSHA standards or the Contractors’ normal HSE procedures. Contractors are responsible for reviewing and implementing the HSE requirements set forth in this Management Plan. Contractors are also responsible for ensuring that their lower tier Contractors review and implement these HSE requirements when activities and/or scope of work changes, an addendum to this document will be generated. 1.1 Security Requirements All Contractors will enter the project and sign in (designated foreman/supervisor) on a daily basis. Attachment 1 shows all hospitals located within and around the City of Richmond in the event of an incident or accident. Based on the schedule, activities, and Contractors on site, a mandatory meeting will be held at an agreeable time at with all Contractors and a COR representative to discuss when operations/activities are occurring, hours worked, number of personnel with each respective Contractor, etc. Visitors will be required to check-in at one of the designated entrances and sign in. Visitors will be escorted at all times by a COR official and/or Contractor representative. If visitors tour the site, they are required to wear protective equipment to include safety shoes, hard hat, safety glasses, and high-visibility vest. The site will provide the hard hat, safety glasses (non-prescription), and vest. This policy also applies to regulatory agency (e.g., Virginia Occupational Safety and Health Administration (VOSHA), Department of Environmental Quality (DEQ), etc.) personnel visiting the site. Upon arrival to the site entrance, regulatory personnel will be asked to sign in and remain until COR officials are notified and arrive at the Project Site. Parking for all Contractors (company and personal vehicle) will be in a designated parking area. Only construction vehicles (dump trucks, cranes, etc.) will be allowed to enter the work area. A wash bay will be available for construction vehicles to utilize prior to entering the COR streets. 2.0 DEFINITIONS

Term Definition

Accident/Incident An unplanned, undesirable event that disrupts work activity.

COR City of Richmond (COR) in which these Contractor HSE requirements are incorporated.

Safe Plan of Action (SPA)

A task-specific planning document used to help ensure that every task receives proper HSE assessment and planning. Also referred to as a Job Safety Analysis (JSA) and/or Task Hazard Analysis.

Contractor The party, including “subconsultants”, defined in the subcontract with COR for which

Health, Safety, and Environment Management Plan City of Richmond August 2008

2

Term Definition

these Contractor Health, Safety, and Environmental Requirements are incorporated. Contractor Health, Safety, and Environmental Requirements shall extend to and govern Contractor’s Contractors, vendors, employees, and others under its direction or control.

Site/Project Management

The highest-ranking COR representative or designated agent whose regular work location/office is at the project site.

Task Safety Awareness (TSA)

A review of the SPA among the crew and supervisor to discuss and resolve any HSE issues before work is continued, when there has been a break in the work schedule, change in work conditions, change in crew, etc.

SSO The contractor Site Safety Officer

Work The total of the Contractor’s responsibilities as set forth in the Contract Documents.

COR Site HSE A COR employee designated to provide safety direction.

3.0 DOCUMENTATION AND REPORTING REQUIREMENTS 3.1 A project-specific HSE Action Plan or, in the case of hazardous waste operations, a site-specific

Health and Safety Plan (HASP), must be generated by each Contractor mobilizing on the project. This plan must include a project-specific Emergency Response Action Plan in accordance with COR, Client, State, and Federal requirements.

3.2 If the portion of the project is regulated as a hazardous waste or emergency response operation

(HAZWOPER), as defined in 29CFR 1926.65 or 29CFR 1910.120, then the Contractor will develop a HASP that outlines how hazard agents (chemical/physical/environmental) will be identified and controlled to include air monitoring with Direct Reading Instrumentation (DRI). Contractor site personnel working in this area shall read and acknowledge by signature that they will comply with the applicable HASP. In addition, any Contractor and/or Subcontractor working in adjacent non-HAZWOPER areas will be briefed on work activities and associated hazard(s) in the event of an incident or release if DRI levels exceed established “action levels,” COR officials will be immediately informed.

3.3 Contractor shall furnish to the COR the names and qualifications of the Competent Persons and

Qualified Persons, who may be required for their scope of work by Federal, State, or local regulations. Examples include Competent Persons and/or Qualified Persons for steel erection, excavation, scaffold erection, confined space entry, annual crane inspections, etc.

3.4 Contractors are responsible for maintaining a First Aid Register for all employee injuries and

illness reported on the project. First Aid kits will be provided by all Contractors and at least one person on site from each company will be current and trained in First Aid and CPR.

3.5 Contractors must immediately inform the COR Site/Project Management of any OSHA, EPA, or

other HSE regulatory agencies’ inspections or other actions involving the Contractor’s work. 3.6 Contractor employees must promptly report all potentially work-related incidents, injuries, or

illnesses to their Supervisor or their Site HSE Representative.

Health, Safety, and Environment Management Plan City of Richmond August 2008

3

3.7 Contractor must promptly report all potentially work-related incidents, injuries, or illnesses to the

COR Site/Project Management or COR Site HSE Representative, after the appropriate level of medical assistance has been arranged.

3.8 Injuries, illnesses, or any incident involving a third party or a member of the general public must

be promptly reported to the Site/Project Management. 3.9 Incidents involving potential exposures to hazardous materials and releases or spills of such

materials must be promptly reported to the Site/Project Management. 3.10 Accident investigation reports for all Contractor accidents, injuries, and work-related illnesses

shall be forwarded to the Site/Project Management within twenty-four hours of the occurrence. 3.11 Contractor employees are required to participate in documented, daily task-specific Safe Plans of

Action and regular Safety Observation Reports. 3.12 Contractors will conduct weekly HSE meetings, and signed copies of the meeting reports shall be

made available to the COR upon request. 4.0 HSE TRAINING/COMMUNICATION REQUIREMENTS 4.1 Contract employees must complete HSE training required by applicable COR, Client, State, and

Federal HSE requirements. Such training may include, but is not limited to, OSHA 10-Hour Construction Safety & Health Outreach Program, Safety Leadership Training for Supervisory Personnel, and ergonomics training. Documentation of all HSE training shall be maintained at the project site by the Contractor and provided to the COR upon request.

4.2 Workers involved with hazardous waste operations, as defined by 29 CFR 1910.120 or equivalent

applicable State regulations, shall have met, prior to any field work activity or exposure, the training requirements of the standard to include OSHA 40-Hour HAZWOPER Training. Certification of individual worker training shall be provided to COR prior to commencing work.

4.3 Contractors must certify that all operators of mobile equipment such as forklifts, cranes, boom

lifts, buses, etc., have been trained and/or certified on the proper operation of the equipment. Copies of this training and certification shall be maintained on the project site by the Contractor and forwarded to the COR upon request. Mobile crane operators must be qualified on each specific crane (type & rating) that they are assigned to operate through a testing and qualification procedure recognized by COR. Backup alarms will be functional and tested on a daily basis.

4.4 Contractors must establish a prompt and effective method of providing HSE communications

such as HSE alerts, advisories, bulletins, regulatory updates, etc., to all site employees. 5.0 BASIC HSE REQUIREMENTS

Health, Safety, and Environment Management Plan City of Richmond August 2008

4

The following HSE rules list COR’s fundamental requirements for Contractor HSE. When there are multiple rules that may apply, the most stringent COR, Client, State, or Federal HSE regulations that govern the work shall be followed. 5.1 Each Contractor shall appoint an on-site HSE representative, who will attend regular COR HSE

meetings and be responsible for implementation of the rules listed below, as well as other HSE rules determined, by the COR, to be necessary for the safe execution of the project. COR shall determine appropriate qualifications for Contractor HSE personnel, based on project demands.

5.2 Hard hats (ANSI Z89.1 or equivalent) shall be worn at all times (e.g. construction, environmental

operations, operations or maintenance environment), regardless of the workers activities. This includes welders when using welding hoods.

5.3 Shirts with at least four-inch sleeves shall be worn at all times. No tank tops are allowed. Loose

or frayed clothing, loose or hanging long hair, ties, rings, body jewelry, etc. shall not be worn around moving machinery or other areas where they may become tangled.

5.4 Hearing protection shall be worn when exposures exceed 85 DBA and/or during work with heavy

equipment. 5.5 Hard-toe footwear (ANSI Z41.1, or equivalent) shall be worn by all workers when in the

construction environment or in areas where there is a danger of foot injuries due to falling, rolling, or piercing objects or when employee’s feet are exposed to electrical hazards.

5.6 Safety glasses with rigid side shields (ANSI Z87.1, or equivalent) shall be worn at all times when

in the construction environment and in any area where eye hazards exist. This includes under welding hoods and for workers with prescription eye wear. Safety goggles may be worn over non-safety prescription eyewear.

5.7 Face shields must be worn in addition to safety glasses when grinding, chipping, jack hammering,

and power sawing or when conducting other tasks that involve such face and/or eye hazards. 5.8 Gloves, appropriate for the hazard present, shall be worn when hands are exposed to absorption

of harmful substances, cuts, abrasions, punctures, biological hazards, chemical burns, thermal burns, or harmful temperature extremes.

5.9 Contractor shall comply with the COR’s 100% Fall Protection Policy. This policy states that

“anytime employees are working from an unprotected elevation of six feet or more, fall protection must be used.” Working as stated above means while traveling, stationary, or at anytime exposed to a fall from a surface not protected by approved handrails, guardrails or some other approved fall elimination device. COR prohibits the use of positioning devices as the sole means of fall protection when working above six feet. Positioning device means a body belt or body harness system rigged to allow a worker to be supported on an elevated vertical surface, such as a wall, and work with both hands free.

Health, Safety, and Environment Management Plan City of Richmond August 2008

5

5.10 The use of “passive” systems, such as safety nets, monitoring systems, or controlled access zones, as the sole means of fall protection when working above six feet, is prohibited. COR prohibits the use of safety nets as an independent means of fall protection.

5.11 Workers in mechanical lifts, including scissor lifts, boom trucks, suspended or supported

personnel baskets, articulating lifts, and other similar devices must use fall protection equipment at all times. Handrails on lifts may only be used for fall protection anchor points if approved by a Qualified Person. Such devices shall not be used as elevators to transport workers to different work locations.

5.12 All portable ladders must be clearly marked with the ladder owner’s name. 5.13 The safest means of worker access for overhead work (e.g., rolling scaffolds, mechanical lifts,

platform ladders, etc.) shall be considered as alternatives to the use of portable ladders. If ladders are used, then the top of all straight and extension ladders shall be tied to a substantial anchor point before use; a second worker must hold the ladder until the tie-off is secure. And, if a worker’s feet are on or above the fifth rung of a stepladder, the top of the ladder must be tied to a substantial anchor or a second worker must hold the ladder throughout the task.

5.14 When ascending or descending a portable ladder, three-point contact is considered acceptable fall

protection for fall exposures of less than 20 feet. When potential fall exposure exceeds 20 feet, personnel on ladders must be protected with a personal fall arrest system.

5.15 Decking sections shall be laid tightly and immediately secured upon placement to prevent

accidental movement. During initial placement, decking sections shall be placed in such a manner to ensure full support by structural members and each piece shall be individually secured. Pre-installation or shake-out of multiple sections of decking using temporary methods of attachment, such as tack welding, is not allowed. The use of controlled decking zones is not allowed.

5.16 Work over or adjacent to water requires a specific safe work plan which must be approved by the

COR before work begins. This includes, but is not limited to, rivers, lakes, canals, settlement ponds, and open tanks containing liquids. United States Coast Guard-approved Personal Flotation Devices (PFDs) must be worn when working over or adjacent to water. When working over water or adjacent to water without 100% fall protection, PFDs that will provide an unconscious user floatation in a face-up position must be used. Personnel shall not work over water alone.

5.17 Equipment and tools shall not be altered in any way to adapt it for a job for which the

manufacturer does not intend it. The manufacturer of the equipment must approve any such adaptations or alterations to equipment in writing. Only trained and authorized persons shall operate machinery or equipment.

5.18 All hand-held power tools must be equipped with constant pressure switches that will

automatically shut off power when the pressure (worker’s hand) is removed. Hand-held power tools with on/off or lock-on switches are not allowed.

Health, Safety, and Environment Management Plan City of Richmond August 2008

6

5.19 Ground Fault Circuit Interrupters shall be used to protect all temporary electrical wiring and cord sets. The use of assured grounding (quarterly equipment inspections) in lieu of GFCIs is not an option.

5.20 Lock-out/tag-out procedures shall be followed to minimize the potential exposure of workers to

hazardous energy. Hazardous pipelines or vessels will be isolated by using a double block and bleed system or by blanking. Every effort must be made to de-energize electrical equipment to be worked on and other electrical equipment in the area that may affect the work. If the equipment cannot be isolated or de-energized, written approval must be obtained from the COR’s Site Manager and Operations Manager before work proceeds. Only “Qualified Electricians” may work on energized or potentially energized circuits. See 29 CFR 1910.332 for qualified electrician requirements. COR considers equipment rated at 480 volts and above as “high voltage.”

5.21 Contractor shall comply with the provisions of NFPA 70E, “Standard for Electrical Safety in the Workplace.” Contractors shall ensure that their employees are trained in safe work practices, and that they are qualified, and that they are provided equipment, tools, and personal protective equipment (PPE) that are specified in NFPA 70E.

5.22 Confined space entry work must follow a documented hazard assessment and safe work planning

process, which must be submitted to the COR for review prior to entry per 29 CFR 1910.146.

• As part of project planning activities, all on-site confined spaces that may be entered will be identified, evaluated, and classified (permit-required vs. non-permit-required). Likewise, confined spaces discovered during work activities, and which will require entry, will also be evaluate and classified.

• All permit-required confined spaces will be labeled so that employees are adequately warned of the potential for hazardous atmospheres. Labeling is not required under the following circumstance:

o The spaces are easily recognizable, numerous, and widely spaced (e.g., storm sewer manholes). Employees will be instructed that these constitute confined spaces during required training. However, these locations will be included on the inventory.

o A complete inventory has been developed, all personnel have been trained in the use of the inventory, and the workers consult the inventory prior to performance of any work that may require entry into a confined space.

• When non-permit-required confined spaces require the implementation of confined space entry procedures because of specific work operations (e.g., painting, welding), all entry points will be labeled so as to alert all employees of the existence of the hazardous conditions. These signs will be removed only when the hazard no longer exists (e.g., complete curing of the paint).

• Non-permit-required confined spaces can be designated by only a Certified Industrial Hygienist, Certified Safety Professional, or Professional Engineer, or a competent person with appropriate confined space training and experience after review of the space(s), historical monitoring data, and other factors (e.g., injuries that have occurred). Therefore, all confined spaces will be considered permit-required, unless specifically designated as non-permit space, in writing, be a COR professional.

Health, Safety, and Environment Management Plan City of Richmond August 2008

7

5.23 High-visibility reflective safety vests (ANSI/ISEA 107, Class III, or equivalent) must be worn by all personnel.

5.24 Motor vehicles and mobile equipment shall never be left running without an operator at the

controls. Proper use of seatbelts by all occupants is mandatory. Motor vehicle operators are prohibited from using a mobile phone or two-way radio. This applies to both hands-free and non-hands-free devices. If the use of such a device by the motor vehicle operator is necessary, it is only allowed when the motor vehicle is stationary and in a safe location off the roadway. If required by the client, the use of two-way radios is allowed, provided that written approval by the relevant COR official is obtained and only while on a project location or within a client facility.

5.25 Mobile crane lifts of over 50 tons, which exceed 85% of the crane’s capacity, involve more than

one crane, lifts a non-rigid object, or lifts over active work areas or public property are considered “critical lifts” and require written approval from COR.

5.26 All outriggers on mobile cranes must be fully extended and fully deployed when the crane is used

to lift or support a load. If, due to configuration or physical location, all outriggers cannot be fully deployed, calculations must be made from the “on-rubber” section of the load chart. On-rubber lifts and pick-and-carry operations require COR Site Manager’s written approval.

5.27 Anti two-block devices that automatically disengage crane hoist/boom functions when the hook

or block approaches the jib or boom tip are required on all cranes. 5.28 Multiple lift rigging (Christmas tree lifts) is not allowed without written approval by the COR’s

Senior HSE Manager and development of a written site-specific plan to prevent exposure to overhead loads during such lifts.

5.29 Field supervisors for the Contractor are responsible for protecting their workers from heat and

cold stress conditions by incorporating protective measures, PPE, and adequate fluid and food intake.

5.30 Eating and drinking will be permitted only in designated areas at COR project sites. Smoking will

be permitted only in areas designated by Field Supervisors and situated in locations that are not in the immediate vicinity of activities associated with work site activities. Additionally, Field Supervision will designate each smoking area giving primary consideration to those personnel who do not smoke.

Personnel actively involved in the performance of certain activities will not be permitted to

smoke, eat, drink, or use smokeless tobacco, except during breaks (e.g. HAZWOPER Controlled work areas).

Site personnel will first wash hands and face after completing work activities and prior to eating

or drinking. 5.31 Adequate illumination will be provided by Contractors during work in the evening/night.

Health, Safety, and Environment Management Plan City of Richmond August 2008

8

6.0 CERTIFICATION, INSPECTIONS, AND REGULATORY AGENCY PERMITS 6.1 Certain operations may require a client and/or owner permit. Such activities may include but are

not limited to hot work, confined space/vessel entry, excavations, asbestos abatement, lead abatement, etc. The Contractor representative shall ask COR Site/Project Management whether any parts of the Contractor’s activities require a client and/or owner permit.

6.2 Contractors are responsible for securing and complying with all city, state, and federal permits. 6.3 A third-party certified Competent Person shall make a thorough annual inspection of all cranes

and powered hoisting equipment. Cranes assembled on site shall receive an annual inspection prior to being put into service. Documentation of all crane inspections shall be provided to the COR and must be maintained on site by the Contractor.

6.4 All scaffolding must be inspected and tagged by a Competent Person prior to initial use, before

each work shift, and after any event that could affect its structural integrity. Suspended scaffolds must receive documented daily pre-use inspections. Untagged scaffolds must not be used.

6.5 Mobile equipment must receive daily pre-use inspections, which will be documented. Examples

include forklifts, backhoes, personnel lifts/manlifts, etc. 7.0 SITE OPERATIONS Contractors shall include planning for environmental compliance in the preparation of their HASP or HSE Action Plan. Issues to be considered include but are not limited to release reporting, air permits, water permits, asbestos/lead permits or notifications, hazardous waste generation and related disposal procedures, spill mitigation and clean up methods, etc. Contractor shall have a written Hazard Communication Program and comply with the requirements of 29 CFR 1910.1200. A copy of the program shall be forwarded to Site/Project Management and a copy shall be in the possession of the Contractor on the site. Any potentially hazardous material or chemical brought onto the site shall be accompanied by a Material Safety Data Sheet (MSDS). Copies of MSDSs shall be forwarded to the Site/Project Management before the product is brought onto the site. Small quantities (less than 10 gallons) of hazardous liquids, such as gasoline, diesel fuels, and solvents, brought onto the site shall be stored in a properly labeled safety container with a flame arrestor and self closing lid. Larger quantities will require the construction of a berm to contain a release. Site/Project Management shall be notified before any chemical or material is used that could create foul smelling, noxious, or toxic vapors or gasses. All accidents involving exposure to potentially hazardous materials and hazardous material releases (as defined by EPA-RCRA) must be immediately reported to the COR and the Site/Project Management. It

Health, Safety, and Environment Management Plan City of Richmond August 2008

9

is important to report all releases or exposures even though the incident may be considered minor or no adverse health effects or symptoms are apparent at the time. 7.1 Clearing and Grubbing Chain saws Chain saws should be used with caution in order to prevent personal injury, as the cutting mechanism is unguarded. Kickback is the single biggest cause of the chain saw injuries. A kickback is the sudden and potentially violent rearward and/or upward movement of the chain saw. It is often caused by the chain striking the wood or other object on the top quadrant on the tip of the chain guide bar. It can also be caused by binding or pinching in the cut.

The operator must be completely familiar with the controls and proper use of the equipment.

• Minimum PPE required includes hardhat, steel-toe safety boots, safety glasses, hearing protection, leather gloves, and debris shield.

• Chainsaw operations require the use of chainsaw chaps (leather leggings are not suitable) • Employees working aloft in trees will use a safety belt, safety strap, tree-trimming saddle

belt, or rope saddle belt. Personnel working aloft in aerial platforms will adhere to the fall protection requirements specified.

• A high visibility reflectorized safety vest will be worn when working around vehicular traffic. Fire Prevention

• Fuel should be stored in approved metal safety cans only and labeled as to contents. • The container should have a metal spout and funnel provided, to allow for electrical bonding

during fuel transfer. • Equipment will be turned off while being refueled. • Smoking is prohibited during refueling. • After completing fueling, carefully wipe off any gasoline spilled before starting the engine. • Keep a fire extinguisher available at all times in the work area. • Keep the equipment clean of gasoline, oil, and sawdust.

Wood Chipping Hazards Wood chipping equipment should be used with extreme caution in order to prevent personal injury, as the chipping mechanism is open to receive tree branches and other wooden material. The cutting blades begin to rotate when the engine starts and slows down gradually after the engine is shut off. In addition, the following work safety practices should be observed:

• Care should be taken to avoid foreign objects such as metal, glass or rocks that could damage equipment and become projectiles.

• Personnel will not wear loose clothing, gauntlet gloves, or hand/wrist jewelry when operating a chipper.

• No part of an employee’s body will be placed on the chipper table, nor the discharge chute raised while the rotor is turning.

Health, Safety, and Environment Management Plan City of Richmond August 2008

10

• A chipper will be fed from the side of the centerline, and the employee will immediately turn away when the brush is taken into the rotor chamber.

• Bystanders should be kept at least 25 feet away when in operation. • Never try to clear blockages by hand and always engage the chipping mechanism gradually

using the safety handle. • Brush chippers will be provided with a locking device on the ignition system that prevents

startup when the key is removed. • Access panels must be closed and secured before chippers are used. • The infeed hopper or table will be of a design to prevent an employee from reaching the rotor

blades or knives during normal operation. • Trailer-type chippers will be chocked. • The feed-openings will be protected with flap-type guards to prevent kickback of chips.

7.2 Landfill Operations

• All ground personnel must wear a high-visibility, reflective safety vest at all times. Safety vests must be visible from all angles.

• All ground personnel will yield to heavy equipment and maintain approximately 100 feet of clearance at all times while maintaining constant eye contact with the operator.

• The site supervisor must notify Site/Project management prior to allowing any worker to enter a high-traffic area. The site supervisor shall instruct Site/Project management to alert all operators when personnel will be entering traffic areas to perform assigned work. When feasible, perform work during periods of low traffic. All work performed in high traffic areas shall be performed within physical barriers, such as cones, warning tape, concrete jersey barriers, etc. Physical barriers will be set up in such a manner to be visible to all operators.

• Operators and site supervisors shall ensure all reverse warning devices are in working order prior to the operation of equipment. If any person notices an inoperable reverse warning device, that person shall immediately notify the operator and the site supervisor. Any vehicle with an inoperable reverse warning device shall be tagged and placed out of service until equipped with a working device.

7.3 Drilling

• Use common sense while maintaining a “safety-first” attitude at all times. • Know the location of underground and overhead utilities • Use required PPE, do not wear loose-fitting clothing or jewelry. Keep hair tied back and

tucked into hardhat. • Do not touch or go near moving parts. • Be aware of the location of “Emergency Shut Off” switches. • Be aware of potential contaminants. Always wear required PPE and follow appropriate

decontamination procedures. • In the event of an accident, allow properly equipped and protected personnel to respond.

Immediately leave the area. • Do not smoke or use spark-producing equipment around drilling operations. • No food will be consumed or stored in the work area. • Do not work around a drill rig during a thunderstorm or rain.

Health, Safety, and Environment Management Plan City of Richmond August 2008

11

• Maintain orderly housekeeping on and around the drill rig. Store tools, materials, and supplies to allow safe handling by drill crewmembers. Proper storage on racks or sills will prevent spreading, rolling, or sliding. Avoid storage or transportation of tools, materials, or supplies within or on the drill rig derrick.

• Maintain working surfaces free of obstructions or potentially hazardous substances. • Store gasoline only in containers specifically designed or approved for such use. • Fire-fighting equipment should not be tampered with and should not be removed for other

than the intended fire-fighting purposes or for servicing. • The departing driller should inform the oncoming driller of any special hazards or ongoing

work that may affect the safety of the crew. • Rigging material equipment for material handling should be checked prior to use on each

shift and as often as necessary to ensure it is safe. Defective rigging should be removed from service.

• Work areas and walkways should not be obstructed. The area around the derrick ladder should be kept clear to avoid unimpeded access to the ladder. The rotary table of the rig floor shall be kept free of obstructions and free of undue accumulation of oil, water, ice, or circulating fluids.

• Passengers shall only be allowed in vehicles designed for passenger use. Do not ride on the outside of drill rigs, trailers, or other equipment.

Utility Clearance Contractors will determine the location of all underground/overhead utilities before drilling operations take place. Project management shall contact the One-Call Center for the state in which drilling is to be performed to obtain written clearance. For areas that are not covered by One-Call Centers or local utility companies (i.e., client specific utilities), clearance must be obtained from the COR. In addition to obtaining utility clearances, the appropriate party will make a utility survey of each drilling point. The utility survey shall include both magnetometer and ground-penetrating radar survey. Documentation that nearby utilities have been marked on the ground and that the drill site has been cleared shall be kept in the project trailer/support vehicle and communicated to the drilling Contractor. All utilities shall be identified on a job hazard analysis and communicated to all drilling and drill support personnel. Prior to the start of site work each day, the drilling Contractor will inspect all drilling equipment. The inspections will be documented in the field records, and the records will be maintained at the site. The drilling equipment inspection must be repeated on a daily basis. Defective equipment shall be repaired prior to use. The following are minimum specifications for performing maintenance on drilling equipment:

• Safety glasses shall be work, at a minimum, when performing maintenance on a drill rig or on the drilling tools.

• Follow all manufacturers’ recommendations for maintenance on drilling equipment. • The drill rig engine shall be shut down before making repairs or adjustments to a drill rig or

lubricating fittings (except repairs or adjustments that can only be made with the engine running). The operator shall remove keys and tag out the ignition. All systems (i.e., drill rotor, engine, pressurized lines, etc.) shall be at a “zero energy state” before performing maintenance.

Health, Safety, and Environment Management Plan City of Richmond August 2008

12

• The leveling jacks shall be lowered, the wheels chocked, and the hand/parking brakes set before working under a drill rig.

Moving Drill Equipment

• Lower drilling mast before moving rig. • Secure all loads to rig prior to off-road mobilization. • Inspect the route of travel prior to moving the drill rig off-road. Be aware of holes, rocks,

trees, erosion, and uneven surfaces. • Remove all passengers from the cab before moving drill rig onto rough or sloped terrain. • Engage multiple drive power trains (when available) on rig vehicle when mobilizing off-road. • Travel directly up or down grade on slopes when feasible. Avoid off-camber traverse

approaches to drill sites. • Approach changes in grade squarely to avoid shifting loads or unexpected unweighting. • Use a spotter (person at grade) to provide guidance when vertical and lateral clearance is

questionable. • Use parking brake and chock wheels when grades are steep.

Raising the Derrick (Mast)

• Locate overhead utilities visually prior to raising the mast • Treat overhead electrical lines as if they were energized and maintain at least a 40-foot

clearance. • Contractors will contact appropriate utilities agency to manipulate and deactivate overhead

service in areas that interfere with drilling operations. Do not attempt to handle utilities. • Stabilize and level each work site prior to drill rig setup. Do not drill on slopes near power

lines, including drainage ditches, trenches, excavations, and other holes. • The derrick must not be raised until the rig has been blocked, leveled (leveling jacks down),

and chocked. • Secure and lock mast according to manufacturer’s recommendations prior to drilling. • If required to perform work on the mast at heights above six feet, a full body safety harness

and lanyard shall be work accordingly. • Note wind speed and direction to prevent overhead utility lines from contacting rig derrick.

Allow at least a 40-foot clearance between rig mast and utility lines, unless authorized by the COR Site HSE Representative to operate at a shorter clearance distance.

Drilling

• Follow the manufacturer’s operational or field manual’s safety guidelines/specifications. • Only authorized and trained drill rig operators shall operate a drill rig. Drill rigs shall be setup

and operated according to manufacturer’s specifications. • Set up and delineate appropriate work zones. This may include an exclusion zone,

contamination-reduction zone, and a support zone. When feasible, work zones shall be cleared of obstructions and leveled to provide a safe working area.

• Establish a communication system between driller, helpers, and other field support personnel for responsibilities during drilling operations.

• All personnel shall be instructed to “stand clear” prior to and during startup. Personnel shall stay as far away as possible from operating equipment, especially if a rig is located on unstable terrain (drilling operations shall not proceed on unstable ground).

Health, Safety, and Environment Management Plan City of Richmond August 2008

13

• Begin auger borings slowly with the drive engine operating at low speed. • Keep hands and feet clear of rotating augers and direct push equipment. • Prevent placing hands or feet under auger sections during hoisting over hard surfaces. • Avoid the removal of spoil cuttings with hands or feet. • Assure drill rig is in neutral and the augers are not rotating before cleaning augers. • Wear hearing protection as required.

7.4 Excavation and Trenching The following factors are to be evaluated by a competent person and discussed before commencing excavation operations:

• Soil Structure: Excavations in wet soil, sandy soil, or areas that have been backfilled are relatively unstable and must be supported or sloped if employees are to enter the excavation.

• Weather Conditions: Changing weather conditions greatly affect the safety of working in and around excavations. Excess water from rain or snow loosens the soil, increasing the chance of the soil caving in. Excavation should be diked, pumped, or covered, to prevent an excessive amount of water from accumulating.

• Superimposed Loads: Superimposed loads in the vicinity of excavation walls increase the probability of a cave-in. Heavy equipment and materials should be kept back as far as possible. Heavy equipment should be placed on wooden mats or planking to spread the weight more evenly. Considerations must also be taken when buildings, curbs, trees, utility poles, and other structures are around the excavation. Excavated soil must be stored away from the edge of the excavation.

The following safe operating guidelines will apply to excavations exceeding 4 feet in depth.

• Prior to opening an excavation, all efforts shall be made to locate and mark all underground utilities.

• Trees, boulders, and other surface encumbrances that create a hazard will be removed or made safe before excavation is begun.

• Excavated materials will be stored and retained at least 3 feet from the edge of the excavation. Walkways and sidewalks shall be kept clear of excavated materials.

• Special precautions will be taken in sloping or shoring the sides of excavations adjacent to a previously backfilled excavation.

• Except in hard rock, excavations below the level of the base of the footing of any foundation or retaining wall will not be permitted unless the wall is underpinned and all other precautions have been taken to ensure the stability of the adjacent walls.

• Diversion ditches, dikes, or other suitable means will be used to prevent water from entering an excavation and for drainage of the excavation.

• When mobile equipment is used or allowed adjacent to excavations, stop logs or barricades will be installed. The grade will always be away from the excavation.

• Dust conditions during excavation will be kept to a minimum. Wetting agents shall be used upon the direction of the SSO (COR Site HSE Representative).

• Employees subjected to vehicle traffic in excavating operations shall don reflective clothing. Excavations shall be inspected by a competent person prior to employees entering the space.

Health, Safety, and Environment Management Plan City of Richmond August 2008

14

• When employees are required to work in an excavation 4 feet or deeper, one or more ladders shall be provided for access/egress. Within the trench, the maximum horizontal travel distance to a ladder shall be no more than 25 feet. The ladder shall extend a minimum of 3 feet above the excavation and be secured. This ladder shall not be removed until all employees have exited the excavation. All ladders will meet the requirements of 29 CFR 1910.25.

• Excavations deeper than 5 feet which are entered by employees shall be sloped, shored, or supported by some other protective system prior to entering the space.

• Guardrail or fences shall be placed at all excavations which are close to sidewalks, drives, or other thoroughfares. Adequate protection shall also exist at remote excavations where workers are not present.

Protective Systems OSHA requires that all excavations more than 5 feet deep which will be entered by employees shall be shored, sheeted, braced, or supported.

• The preferred method is to slope the sides of the excavation to the angle of repose, or the angle of control at which the soil will remain at rest. The angle of repose varies with different kinds of soil; this angle must be determined on each individual excavation, using the following guidelines:

Maximum Allowable Slopes

Soil or Rock Type Horizontal to Vertical Ration (Slope) Degrees

Stable Rock Vertical 90

Type A ¾: 1 53

Type B 1:1 45

Type C 1 ½: 1 34

Notes: No soil classification is required if a 1 ½:1 slope (34-degree slope) is used. If a 1 ½:1 slope is not used, a soil classification must be made by a competent person. The excavation must then comply with the above minimum slope requirements.

• The second method of support is shoring, sheeting, tightly placed timber shores, bracing, trench jacks, piles, or other materials installed in a manner strong enough to resist the pressures surrounding the excavations.

• The third method is to use a trench box, which is a prefabricated movable trench shield made of steel plates, welded to a steel frame.

Hazardous Atmospheres When Contractors perform excavation operations in areas where a hazardous atmosphere could reasonably exist (e.g., landfill, hazardous storage areas, underground/aboveground storage tanks, etc) personnel will, at a minimum, apply these guidelines:

Health, Safety, and Environment Management Plan City of Richmond August 2008

15

• Perform atmospheric testing in the anticipated breathing zone of the work area to determine oxygen content, combustible gas, and toxic gases and vapors, at a minimum, if applicable.

• Employees will not perform work in areas with less than 19.5% oxygen without the appropriate respiratory protection or adequate ventilation.

• Employees will not perform work in an area with greater than a 10% lower explosive limit (LEL) level.

• Toxic gases will be evaluated on a per-site basis using direct-reading instrumentation (DRI). Competent Person The SSO (COR Site HSE Representative) or designated alternate will serve as the site’s “competent person” for excavation operations. The designated competent person must meet the following qualifications:

• Has sufficient experience to identify existing and predictable hazards in the excavation surroundings, or working conditions which are unsanitary, hazardous or dangerous to employees, and

• Is a registered Professional Engineer (P.E.) in civil engineering, or • Has completed a minimum of 6 hours of training in excavation safety which includes the

following elements: o Soils classification and identification o Appropriate sloping/shoring methods o Shoring system types and construction o Operational safety practices o Inspection of excavations

The designated competent person will be responsible for:

• Performing a daily inspection of the excavation (to be documented on a Excavation Daily Inspection Checklist form)

• Overseeing excavation operations to ensure that they conform to the requirements of 29 CFR Subpart P.

7.5 Overhead Electrical Lines Operation of heavy equipment and cranes in areas with overhead power lines represents a significant hazard to all personnel on the job site. Accidental contact with an energized lines or arcing between a high power line and grounded equipment can cause electrocution of equipment operators or nearby ground personnel, and damage to power transmission and operating equipment. While maintaining a safe distance from all energized lines is the preferred means for control of this hazard, site conditions may not always accommodate this. If work will (or may) occur within 50 feet of any energized lines, the procedures outlined below will be observed.

• Overhead power lines will be identified on each job site before the work commences. For each identified line, the Project Manager must determine whether it is energized (and the operating voltage for energized lines), and whether work operations will require that activities with heavy equipment (excavators, loaders, cranes, etc) will occur within 50 feet of the line. Unless verified, it will be assumed that all lines will be energized.

Health, Safety, and Environment Management Plan City of Richmond August 2008

16

Hazard Prevention Safe working distance is the minimum distance which must be maintained between any energized electrical line and any part of the operating equipment to maintain adequate safety margins, and is based on the line voltage of the power line. The following safe working distance criteria will be applied for all Operations:

Line Voltage Minimum Safe Working Distance

0-50 10 feet

>50 – 200 15 feet

>200 – 350 20 feet

>350 – 500 25 feet

>500 – 750 35 feet

>750 – 1000 45 feet

Notes: Source – American National Standards Institute, Publication B30.5

Where any work task will not allow the minimum safe working distance to be maintained at all times, an alternate means of protection must be identified and approved by the COR. In order of preference, acceptable procedures are:

• De-energize the power line(s) • Install insulated sleeves on power lines • Assign line spotters to assist the equipment operator

Elimination of electrical power provides the most acceptable means of ensuring safety of personnel. While temporary site power lines are under the control of the site manager (and can be de-energized locally), electrical distribution and transmission lines can be de-energized only by the owner of the line, (generally the local electrical utility). Therefore, de-energizing of a line requires the advance coordination with the line owner – generally at least one week advance notice should be provided. Insulating sleeves can be placed over power lines to provide a contact and arcing barrier if work must occur closer to the power lines than the accepted safe work distance. Although not as desirable as line de-energizing, the use of these sleeves can provide an acceptable alternative where electrical lines are required to remain in service. As with de-energizing of distribution and transmission lines, placement of insulating sleeves can be performed only be the line owner. This requires advance coordination with the line owner – generally at least one week advance notice should be provided. To install the sleeves, representatives of the line owner will require access to the job site. A line spotter is a person located at ground level who is assigned to observe equipment operations with the specific duty of assisting the equipment operator to ensure that no part of the equipment gets too close to an energized, unprotected electrical line. Persons assigned to act as line spotters must meet the following requirements:

Health, Safety, and Environment Management Plan City of Richmond August 2008

17

• While acting as a spotter, no other duties may be performed (e.g., the line spotter cannot also act as the load spotter during a lifting operation)

• The spotter will have a radio or other direct means of communicating with the equipment operator at all times.

• The spotter will be positioned at a right angle to the equipment operator’s line of sight to maximize the sight angles between the personnel.

• Under no circumstances will any portion of a piece of equipment pass closer than 10 feet to an energized, un-insulated electrical line.

The following additional safety measures can be implemented as needed when working around energized power lines:

• Provide equipment with proximity warning devices – these provide an audible alarm if any part of the equipment gets too close to a line.

• Install ground safety stops – these prevent vehicles from accidentally entering hazardous areas.

• Equip cranes with a boom-cage guard – this prevents the boom from becoming energized if an electrical line is contacted.

• Utilize insulated links and polypropylene tag lines – these prevent transmission of electricity to loads or tag line handlers if an electrical line is contacted.

NOTE: These additional safeguards are intended as supplemental protection. Use of these measures is not permissible as a substitute for maintaining the safe working distance or implementation of the safety procedures.

Accident Response If an electrical power line is hit or an electrical arc occurs:

• All ground personnel must evacuate IMMEDIATELY to a distance of at least 50 feet. DO NOT attempt to rescue any injured person until the line can be de-energized.

• The operator should remain in the cab until the line can be de-energized, and carefully try to extricate the equipment from the power line. This may not be possible where melting of insulator material or metal has occurred.

• Contact the line owner to report the line contact and request that the line be de-energized immediately.

• Once the line has been confirmed to be de-energized, the operator can safely evacuate the cab and rescue can commence for any injured personnel.

• Contact the COR to report the incident and implement any instructions provided. If the operator must evacuate while the line is still energized (due to fire or other life-threatening condition) he/she should jump clear of the equipment (making SURE to avoid touching the equipment and the ground simultaneously), and land upright with feet together. Once on the ground, proceed in a direct line away from the equipment, using a short, shuffling gait (feet touching, sliding each foot no more than 1 foot forward at a time) to minimize shock hazard from electrical energy being transmitted through the ground. 7.6 Welding, Cutting, and Other Hot Work.

Health, Safety, and Environment Management Plan City of Richmond August 2008

18

• Equipment will be used only for operations for which it is approved, and as recommended by the manufacturer.

• Workers assigned to operate or maintain oxygen/fuel-gas supply equipment and resistance welding equipment will be thoroughly instructed in the safe use of such equipment by a qualified person.

• Engineering controls will be implemented to control hot work hazards to the extent feasible. • Before cutting or welding is performed, the area will be inspected by the supervisor

responsible for authorizing hot work. When appropriate, a written Hot Work Permit will also be completed to designate specific approvals needed and precautions to be taken.

Storage and Handling of Compressed Gas Cylinders

• Compressed gas cylinders will be legibly marked with either the chemical or trade name of the gas. Such markings will be stenciled, stamped, or labeled and will not be easily removable.

• The marking will be located on the shoulder of the cylinder. • Compressed gas cylinders will be equipped with approved connections. • Acetylene cylinders will be stored and used valve end up. • Cylinders will not be stored near highly combustible/flammable materials, especially oil or

grease. • Cylinders will be stored in an upright and secure position with caps installed and separated

from fuel-gas cylinders or combustible materials (especially oil or grease), by a minimum distance of 20 feet, or by a noncombustible barrier of at least 5 feet high and having a fire resistance rating of at least one half hour.

• Cylinders will not be dropped, struck by objects, or permitted to strike each other violently. • Cylinder valves will be closed and gauges removed before moving cylinders. • Cylinder valves will be closed and gauges removed at the end of the shift or when work is

finished. • Valves of empty cylinders will be closed. • Cylinders will be kept far enough away from the actual welding/cutting operation so that

sparks, hot slag, or flames will not reach them. • Cylinder valves will always be opened slowly. • An acetylene cylinder valve will not be opened more than one and one-half turns of the valve

stem and preferable no more than three-fourths of a turn. • Where a special wrench is required to operate a cylinder valve, it will be left in position on

the stem of the valve when the cylinder is in use. In the case of manifolded or coupled cylinders, at least one such wrench will be available for immediate use.

• Regulators will be removed, valve caps in place, and valves closed when cylinders are transported by vehicles. All vehicles used to transport cylinders will have a proper support rack installed.

• A suitable cylinder truck, chain, or other steadying device will be used to prevent cylinders from being knocked over while in use or storage.

• Cylinders will not be placed where they may become part of an electrical circuit. Tapping of an electrode against a cylinder to strike an arc will be prohibited.

Eye and Face Protection Eye and face protection will comply with the following:

Health, Safety, and Environment Management Plan City of Richmond August 2008

19

• Welding helmets and hand shields will be used during all arc welding/cutting operations, excluding submerged arc welding. Cutting/welding goggles will also be worn during arc welding/cutting operations. The goggles or glasses may be either clear or colored glass, depending on the type of exposure in welding operations. Helpers or attendants will wear proper eye protection.

• Safety goggles or other approved eye/face protection are for use during gas welding operations in light work, torch brazing, or inspection.

• All operators and attendance on resistance welding or brazing equipment will use face shields or goggles, depending on the particular job.

Protective Clothing Hot work will require the following protective clothing:

• Except when engaged in light work, all welders will wear flameproof gauntlet gloves. • Flameproof aprons made of leather, or other suitable material, may also be desirable for

protection against radiated heat and sparks. • Woolen clothing will be worn in preference to cotton because it is not so readily ignited.

Nylon clothing is not permitted for welding/cutting operations. All outer clothing, such as jumpers or overalls, will be reasonable free from oil or grease.

Fire Watch

• When required, a fire watch will be maintained for at least 30 minutes after completion of welding/cutting operations so that possible smoldering fire can be detected and extinguished.

• Firewatchers will have fire-extinguishing equipment readily available and be trained in its use.

• Firewatchers will be familiar with facilities and procedures in the event of a fire. They will watch for fires in all exposed areas and attempt to extinguish them only when obviously within the capacity of the equipment available. The COR’s Fire Department will be immediately notified of all fires.

7.7 Heavy Equipment Field operators that involve heavy equipment represent a significant hazard to ground workers as well as heavy equipment operators. Heavy equipment may cause serious injury or death as a result of a rollover, contact with ground personnel, and pinch points. All personnel working at or visiting a site where heavy equipment operations occur shall read and abide by the requirements of this procedure. Communications Communications between site supervisors/managers, heavy equipment operators, and other site personnel is a key method of preventing serious injury or death during heavy equipment operations. The following outline the communication requirements during heavy equipment operations:

• Site supervisors/managers shall ensure that all operators are notified/informed of when, where, and how many ground personnel will be working on the site.

• Site supervisors/managers shall inform ground personnel before changes are made in the locations of designated areas.

• If required to work near heavy equipment, ground personnel shall use industry standard hand signals to communicate with operators.

Health, Safety, and Environment Management Plan City of Richmond August 2008

20

• Always maintain eye contact with operators to the greatest extent possible (always face equipment). Never approach equipment from a blind spot or angle.

• All heavy equipment shall be equipped with reverse warning devices (i.e., backup alarms) that can be significantly heard over equipment and other background noise. Reverse signaling lights shall be in working order.

• When feasible, two-way radios shall be used to verify the location of nearby ground personnel.

• When an operator cannot adequately survey the working or traveling zone, a guide shall use a standard set of hand signals to provide directions. Flags or other high visibility devices may be used to highlight these signals.

Clearance Ground clearance around heavy equipment may significantly reduce hazards posed during heavy equipment operations. The following outline the clearance requirements during heavy equipment operations:

• Ground personnel shall always yield to heavy equipment. • Ground personnel shall maintain approximately 100 feet of clearance from all active heavy

equipment, unless an approved, job-specific hazard analysis that identifies any special precautions is completed and communicated to the appropriate operators and ground personnel.

• Site supervisors/managers shall designate areas of heavy equipment operation and ensure that all ground personnel are aware of designated areas. Designated areas shall include boundaries and travel routes for heavy equipment. Travel routes shall be set up to reduce crossing of heavy equipment paths and to keep heavy equipment away from ground personnel.

• When feasible, site supervisors/managers shall set up physical barriers (e.g., caution tape, orange cones, and concrete jersey barriers) around designated areas and ensure that unauthorized ground personnel do not enter such areas.

• Operators shall stop work whenever unauthorized personnel or equipment enter the designated area and only resume when the area has been cleared.

• Operators shall only move equipment when aware of the location of all workers and when the travel path is clear.

• Ground personnel shall never stand between two pieces of heavy equipment or other objects (i.e., steel support beams, trees, buildings, etc.)

• Ground personnel shall never stand directly below heavy equipment located on higher ground.

• If working near heavy equipment, ground personnel shall stay out of the travel and swing areas (excavators, all-terrain forklifts, hoists, etc.) of all heavy equipment.

• Ground personnel shall never work near heavy equipment during times of inadequate lighting.

• Personnel shall keep all extremities, hair, tools, and loose clothing away from pinch points and other moving parts on heavy equipment.

Personal Protective Equipment At a minimum, all ground personnel and operators outside of heavy equipment shall wear the following:

Health, Safety, and Environment Management Plan City of Richmond August 2008

21

• High visibility, reflective safety vest that is visible from all angles and made of fluorescent material and orange, white, or yellow reflective material (ensure that vest is not faded or covered with outer garments, dirt, etc.)

• ANSI-approved hard hat • ANSI-approved safety glasses with sideshields • ANSI-approved steel toe safety boots • Hearing protection as needed • Appropriate work uniform (i.e., full length jeans/trousers and a sleeved shirt; no tank, crew

tops or loose clothing permitted). Utilities When contacted by heavy equipment, aboveground and underground utilities may cause severe injuries or death as a result of electrocution, explosion, etc. The following outline the requirements while performing heavy equipment operations that may lead to contact with aboveground or underground utilities:

• Always be aware of surrounding utilities • Ensure all equipment (i.e., dump trailers, loaders, excavators, etc) is lowered prior to moving

underneath of aboveground utilities. • Ensure utilities are cleared and identified prior to beginning any earthwork moving operation.

Contact the local utility service providers for clearance prior to performing work. Training, Inspection, and Maintenance

• Only designated, qualified personnel shall operate heavy equipment. • Operators shall have all appropriate local, state, or federal licenses or training to operate a

designated piece of heavy equipment. • Operators shall be evaluated through documented experience (resume) and a practical

evaluation of skills (field tests). Operators shall be knowledgeable and competent in the operation of a designated piece of heavy equipment.

• All heavy equipment shall be inspected and, if necessary, repaired prior to use. Operators shall not operate heavy equipment that has not been cleared for use. All machinery and mechanized equipment will be certified to be in safe operating condition (certification form attached) by a competent individual seven days prior to on-site operation, and is valid for one year.

Operation

• All heavy equipment shall be operated in a safe manner that will not endanger persons or property.

• All heavy equipment shall be operated at safe speeds. • Always move heavy equipment up and down the face of a slope. Never more equipment

across the face of a slope. • Slow down and stay as far away as possible while operating near steep slopes, shoulders,

ditches, cuts, or excavations. • When feasible, operators shall travel with the “load trailing,” if the load obstructs the forward

view of the operator. • Slow down and sound horn when approaching a blind curve or intersection. Flagmen

equipped with 2-way radio communications may be required to adequately control traffic. • Operators shall remain in cab while heavy equipment is being loaded.

Health, Safety, and Environment Management Plan City of Richmond August 2008

22

• Always keep heavy equipment in gear while in operation. Do not place in neutral. • All heavy equipment shall be shut down prior to and during fueling. Do not smoke or use

electrical devices while fueling. Fuel shall not be carried in or on heavy equipment, except in permanent fuel tanks or approved safety cans.

• Turn off heavy equipment, place gear in neutral, and set parking brake prior to leaving vehicle unattended. Also, place buckets and blades on the ground and place hydraulic gear in neutral. Heavy equipment parked on slopes shall have the wheels chocked.

• Never jump on to or off a piece of heavy equipment. • Never exit heavy equipment while it is in motion. • Passengers shall only ride in heavy equipment designed for occupancy of passengers. • Never ride on the outside of a piece of heavy equipment (e.g., tailgates, buckets, steps, etc.). • Site vehicles must be parked in a safe place away from heavy equipment. • Operators shall never push/pull “stuck” or “broken-down” equipment unless a spotter

determines that the area is cleared of all personnel around and underneath the equipment. • Operators shall wear seatbelts at all times while operating heavy equipment. • If designated for work in contaminated areas/zones, equipment shall be kept in the exclusion

zone until work or the shift has been completed. Equipment will be decontaminated within designated decontamination areas.

• Equipment left unattended at night adjacent to traveled roadways shall have appropriate lights or reflectors, or barricades equipped with appropriate lights or reflectors, to identify the location of that equipment, and shall not be closer than 6 feet (or the regulatory requirement for the work location) to the active roadway.

• Pneumatic-tired earthmoving haulage equipment, with a maximum speed exceeding 15 miles per hour, shall be equipped with fenders on all wheels.

• Lift trucks shall have the rated capacity clearly posted on the vehicle, and the ratings are not exceeded.

• Steering or spinner knobs shall not be attached to steering wheels. • High lift rider industrial trucks shall be equipped with overhead guards. • When ascending or descending grades in excess of 5%, loaded trucks shall be driven with the

load upgrade. • All belts, gears, shafts, pulleys, sprockets, spindles, drums, flywheels, chains, or other

reciprocating, rotating or moving parts of equipment shall be guarded when exposed to contact by persons or when they otherwise create a hazard.

• All hot surfaces of equipment, including exhaust pipes or other lines, shall be guarded or insulated to prevent injury and fire.

• All equipment having a charging skip shall be provided with guards on both sides and open end of the skip area to prevent persons from walking under the skip while it is elevated.

• Platforms, footwalks, steps, handholds, guardrails, and toeboards shall be designed, constructed, and installed on machinery and equipment to provide safe footing and access ways.

• Substantial overhead protection shall be provided for the operators of fork lifts and similar equipment.

Health, Safety, and Environment Management Plan City of Richmond August 2008

23

7.8 Traffic/Pedestrian Safety The following requirements can be implemented for simple work operations occurring on or near roadways. The Contractor will utilize flagmen during activities that require work in local streets and/or schools/pedestrian crossings.

• Use of Signs and Cones to Direct Traffic: Traffic signs and cones are used to direct traffic away from and around personnel. Cones and signs are effective only if they give oncoming drivers enough time to react and make it clear how traffic should react.

• Signs and Traffic Control Devices: Signs are required in addition to cones in almost all traffic control situations.

• “Road Work Ahead” or “Men Working” are the basic warning signs. They are orange, a minimum of 48"x 48" square, and equipped with a self-supporting base. In general, advanced signs should be placed well ahead of the cone taper to warn traffic of the upcoming controls. If required by law, they can be placed on the roadside in advance of the cone taper.

• Directional Arrow signs should be placed ahead of the cone taper to clearly indicate which direction traffic should flow.

• Warning Flags are often put in cones at the leading edge of a taper to make the taper more prominent. They have no legal status and are not recommended. Use a “Road Work Ahead” sign instead.

• Additional protection will be provided by City of Richmond Police in high-traffic areas to include residential areas and pedestrian crossings. In addition, work activities by Contractor will not restrict emergency vehicle access (e.g., Police, fire department, ambulance, etc.)

7.9 Flammable and Combustible Materials

• Storage containers in storage racks are to be stored a minimum of 50 feet from the nearest structure. All containers are to be electrically grounded. Drip trays are to be provided under container spigots.

• When transferring a flammable/combustible liquid an electrical bond (metal-to-metal) is to be established between the two transfer containers prior to transfer. Storage containers are to be equipped with an approved safety faucet and flexible metal hose. A pressure-vacuum relief vent is required for containers of flammable liquids. Metal-to-metal contact may also be established by using a grounding strap.

• Spill containment is required for all solvent dispensing areas. The secondary containment dike will be designed for 110 percent of the maximum stored solvent volume, with the capacity for 24-hour holding time.

• The maximum amount of flammable solvent (used for cleaning purposes) at any workstation is limited to one quart. Variance from this requirement requires the prior approval of the COR.

• Maximum use must be made of fireproof metal cabinets to store flammable liquids inside any structure.

• Rags, kimwipes, etc., that are contaminated with flammable liquids are to be placed in a safety container equipped with a fusible link lid.

• All containers of flammable liquids must be properly identified as to contents. • All manually handled flammable liquids shall be handled in approved safety containers. The

exception is pint-sized squirt bottles.

Health, Safety, and Environment Management Plan City of Richmond August 2008

24

• Where flammable solvents must be used in wash containers, such as for paint sprayer cleaning, the container must be provided with a self-closing or fusible lid.

• Flammable liquid in portable containers in excess of the amount required for one day of use must be stored in approved flammable liquid storage cabinets.

• Flammable storage cabinets will be kept closed, and will be latched each time after use. • “NO SMOKING” signs are to be posted in areas where flammable liquids are stored,

dispensed, or used. • An adequate supply of fire extinguishers will be located to support each area where

flammable or combustible liquids are handled or stored. Additional information and requirements for handling and storage of specific flammable liquids are detailed in Material Safety Data Sheets (MSDS), which must be obtained and maintained on site for each solvent in use. 7.10 Compressed Gases Compressed air or other compressed gases in operating pressures exceeding 10 pounds per square inch gauge (psig) are not to be used to blow dirt, chips, or dust from clothing while it is being worn. Compressed air for other types of cleaning (other than clothing/personnel) is limited to 30 psig. The use of blown compressed air is to be controlled, and proper personal protection equipment or safeguards utilized, to protect against the possibility of eye injury to the operator or other persons. Compressed air or gases are not to be used to empty containers of liquids in cases where the operating pressure can exceed the safe working pressure of the container. Compressed gases are not to be used to elevate or otherwise transfer any hazardous substance from one container to another unless the containers are designed to withstand the operating gas pressure with a safety factor of at least four. Compressed Gases (Cylinders)

• Cylinders are not to be used unless they bear Department of Transportation (DOT) markings showing that they have been tested as required by DOT regulations.

• Cylinders must never be dropped, struck, or permitted to strike each other violently. Cylinders may be moved by tilting and rolling them on their bottom edges.

• Valve protection caps must always be kept on cylinders when they are being moved or stored, and until ready for use.

• Cylinder valves are to be kept closed except when gas is being used or when connected to a permanent manifold. Valves of empty cylinders must be closed.

• Cylinders must never be used as rollers or supports, or for any purpose other than carrying gas.

• Cylinders of compressed gas shall be stored in areas where they are protected from external heat sources such as flame impingement, intense radiant heat, electrical arc, or high-temperature steam lines.

Health, Safety, and Environment Management Plan City of Richmond August 2008

25

• Cylinders are to be stored in an assigned area, with full and empty cylinders stored separately. Stored fuel gases and oxygen cylinders are to be separated by at least 20 feet, or by a fire wall of at least 5 feet high that has a fire-resistance rating of at least ½ hour.

• Oxygen, nitrogen, helium, or freon cylinders may be stored or transported either in an upright or horizontal position. Acetylene cylinders must always be kept in an upright position. All horizontally placed cylinders are to be secured by chocks or ties to prevent rolling.

• Cylinders are to be secured to a fixed object by chain or equivalent fastening device whenever they are placed in an upright position. The protective cap is not to be removed or the cylinder valve opened until the cylinder is secured.

• Repair of leaks must never be attempted on a pressurized system. System pressure should be reduced to atmospheric pressure as rapidly as possible, and the supervisor notified immediately.

• Compressed gas cylinders must be legible marked for the purpose of identifying the gas content with either the chemical or trade name of the gas. Such marking is to be by means of stenciling, stamping, or labeling, and must not be readily removable. Whenever practical, the marking is to be located on the shoulder of the cylinder. Positive identification of the gas in any cylinder is required before connecting cylinders for use.

• Compressed gas cylinders in portable service are to be conveyed by suitable trucks, to which they are securely fastened. All gas cylinders in service must be securely held in substantial racks or secured to other rigid structures so that they will not fall or be knocked over.

• Gas cylinders moved by hoist must be handled in suitable cradles or skip boxes. Any slings used for this purpose must be specifically designed for that cylinder handling.

• Cylinders must not be placed where they might form part of an electrical circuit. • Transfer of acetylene from one cylinder to another or mixing of gases in a cylinder is

prohibited. • Oxygen cylinders are never to be stored near:

o highly combustible materials, especially oil and grease; o reserve stocks of acetylene or other fuel gas cylinders; or o any other substance likely to cause or accelerate fire.

• Compressed oxygen is never to be used: o as breathing air; o to purge pipelines, tanks, or any confined area; o to supply a head-pressure tank; o in pneumatic tools; o in oil preheating burners; o to start internal combustion engines; o for ventilation; o for cleaning clothing; or o in any other way as a substitute for compressed air.

7.11 Underground Work A mandated pre-job meeting will be held prior to the start of the underground work. Participants include all interested parties such as state representatives, COR Management, Contractors, and fire and law enforcement representatives. The pre-job meeting subject items will include all of the following facets of the work:

Health, Safety, and Environment Management Plan City of Richmond August 2008

26

• Personnel requirements • Ventilation • Excavation • Ground support • Diesel engine operation • Emergency plans • Codes of safe practices • Rescue crew and first aid procedures • Protective equipment requirements • Underground communication systems • Fire prevention and control • Explosives safety (if used) • Dust control • Transportation and haulage • Electrical equipment • Lighting requirements • Laser safety • Occupational exposure sampling.

General Safety

• The Contractor Site Supervisor will ensure than every reasonable effort is taken for the safety and health of employees, whether or not specified in this procedure.

• Fence, cover, over or otherwise safeguard to control unauthorized entry underground. • At least one designated employee must be on outside duty when anyone is working

underground. • A check-in/check-out procedure will be provided at the surface that will ensure those

aboveground can accurately determine and identify those underground. • Unnecessary accumulations of water, muck, timber rails, and similar materials will be

avoided underground. • Gunite, shotcrete, and pump crete lines will be secured to prevent uncoupling of sections

under pressure. • Air hose (¾ inch or larger) requires a safety device (whip check) to prevent the hose or line

from whipping if disconnected under pressure. • Inform oncoming shift of any hazardous occurrences or conditions. • Any buried air, fuel, or utility line requires a “buried line” caution sign. Overhead utility lines

should be marked also to prevent accidental contact. All employees involved with underground work will be instructed in hazard recognition and measures to take to eliminate the hazards including:

• Air monitoring and ventilation • Illumination • Communications • Flood control • Personal protective equipment • Emergency procedures, including evacuation plans

Health, Safety, and Environment Management Plan City of Richmond August 2008

27

• Check-in/Check-out procedures • Explosives • Fire prevention and protection • Mechanical equipment

7.12 Poisonous Plants, Insects and Animals Indigenous to Virginia Plants

• Giant Hogweed can be identified by it height, the size of the leaves and its flower clusters. It grows to be approximately 15 feet tall with leaves spanning 2-5 feet. It has a thick green stem with purple areas and hairy flower stakes. A combination of contact with the sap from this plant and exposure to the sun can cause painful burning blisters within 24 to 48 hours. It can also cause purple and black painful scares.

• Blue-Green Algae technically know as cyanobacteria, are naturally occurring and found in lakes and streams. The algae become very abundant in warm in undisturbed waters. Exposure to the algae in small quantities over a long period of time or large quantities of a short period for time can cause liver damage and/or damage to the nervous systems.

• Poison Ivy or Poison oak grows in a vine or a shrub formation. The tissues of these plants contain poisonous oil which is irritating to the skin. The leaf formation is two leaves on the side and one down in the middle. The edge of the leave have varying amounts of notches. In the spring the poison ivy is a red color. Later in the spring they become a shinny green. In autumn the leaves turn yellow, red, and orange. Small greenish flowers grow in bunches close to the leaf joins, later in the season berries form that are whitish and waxy looking. Wash the area several times with soap water if exposure is confirmed. If blisters, redness, and/or itchiness develop, treat with calamine lotion, Epsom salts, or bicarbonate of soda.

Poisonous Insects and Animals

• Fleas, mites, and chiggers are not poisonous but can cause skin irritation. Symptoms of a bite may include small, raised lesions, pain or itching, inflammation of the skin, allergic-type reactions in people that are hypersensitive. Clean the affected area with soap and water. Call a physician if the pain or itching persistent or there are signs of infection, and/or if you have a fever.

• Tick bites can have similar skin irritations as the fleas, mites and chigger bite but can also carry Lyme Disease. The following are symptoms of Lyme Disease: a rash at the site of the bite, have flu like symptoms, fever, headache, nausea, jaw pain, sensitivity to light, red eyes, muscle aches and/or a stiff neck. See your doctor immediately.

• Black and Yellow Argiope female spider spins its web in a circle. The male will spin a smaller web with a zigzag pattern. The female grows to be inch and a half long. The male grows to be ¾ inch long. The spider has a small front body section with silver hairs on it. The abdomen (large back section) is egg shaped with black and yellow coloring. The spider lives in fields and gardens in shrubs, tall plants and flowers.

• Black Widow Spiders are a venomous spider. It injects a small amount of poison when it bites. Reports indicate the human mortality rate is less 1%. The female Black Widow is shiny black, usually with a reddish hourglass shape on the underside of her spherical abdomen. Her body is about .5 inches long, 1.5 inches when the legs are spread. Adult males are harmless to humans, about half the female's size, with smaller bodies, and longer legs and

Health, Safety, and Environment Management Plan City of Richmond August 2008

28

usually have yellow and red bands and spots over the back as do the immature stages. Their webs are erratic in appearance, and the silk is stronger than almost all other spiders.

• Brown Widow Spider is not as dangerous as some other widow spiders because the Brown Widow Spider is less likely to bite someone and injects less poison.

• Fire Ants can inflict painful stings. The ant mounds are found in warm, sunny locations such as landscape beds, lawns, around trees and shrubs, along sidewalk cracks and against buildings. If disturbed, theses ants are generally aggressive and can inflict painful stings.

• Timber Rattlesnakes are venomous snakes. They measure from 3-3.5 feet or more in length. Two color patterns are commonly found: a yellow phase, which has black or dark brown crossbands on a lighter background color of yellow, brown or gray, and a black phase, which has dark crossbands on a dark background. Scales are ridged, giving this rattlesnake a rough-skinned appearance. The timber rattler has a broadly triangular head with many small scales on the crown of the head bordered by a few large scales.

• Northern Copperheads are venomous snakes. Northern Copperheads are medium-sized snakes. Adults typically range in length from 26 to 42 inches. The distinctive feature is the copper or bronze-colored top and sides of the head. This species also uses camouflage, in the form of tan, brown and rust-colored bands that allow the copperhead to disappear easily into dried up, fallen leaves, sticks and limbs.

• Eastern Cottonmouths are venomous snakes. Cottonmouths or water moccasins are common residents of southeastern swamps; however, they can be found in almost any wetland within their range. This species is highly variable in coloration, but is usually plain brown or olive with darker blotches or bands. These snakes average 3 to 31/2 feet long and are very stout-bodied. Cottonmouths have a reputation for being vicious and aggressive. When confronted cottonmouths will often stand their ground and not retreat.

8.0 RESPIRATORY PROTECTION Contractors, who plan to use respirators as a part of their work operations, are required to forward to the COR and Site/Project Management a copy of their written Respiratory Protection Program. Refer to 29 CFR 1910.134 for requirements of this OSHA standard. 9.0 HSE SURVEYS Site/Project Management and the COR HSE Department may conduct periodic HSE surveys of the site. There will be an interval of self-inspections conducted every two weeks with documentation of results sent to the Site/Project management. Any HSE discrepancy observed shall be reported to the appropriate Contractor representative for immediate correction. These HSE surveys do not relieve Contractors of their responsibility to self-inspect their work at a minimum of every two weeks and document audit results with appropriate corrective action(s) with copies and communication sent to COR officials and equipment and to conduct their work in a safe and environmentally compliant manner.

Health, Safety, and Environment Management Plan City of Richmond August 2008

29

10.0 PLANNING AND OBSERVATION PROCEDURES In order to achieve the COR’s goal of Zero Incidents, the following shall be implemented by the Contractor. The SPA, the TSA, and the SOR process require each worker to receive on-the-job training from their direct Supervisor. Contractor employees shall also be trained and educated on their individual responsibilities contained in these tools by the Contractor after mobilization. 10.1 Safe Plan of Action: The Safe Plan of Action (SPA) is developed by the crew assigned to perform

the work with guidance from their Supervisor. The Supervisor identifies the work area and task to be performed and then leads the crew in developing a Safe Plan of Action.

Creating the SPA requires the Supervisor to solicit crew participation in identifying hazards and hazard control measures such as PPE, training requirement, permits, procedures, etc.

Members of the team are required to review and sign the SPA document on a daily basis to indicate their participation, their understanding of the plan, and their agreement to follow the plan.

10.2 Task Safety Awareness: The Task Safety Awareness (TSA) meeting is a daily HSE briefing

associated with the task(s) that are scheduled for the crew during the work shift.

These meetings generally take from two to ten minutes and address the HSE measures specific to the tasks.

TSA meetings shall be conducted at least daily and whenever a task presents a change of hazards from the previous tasks.

10.3 Safety Observation Reports: The Safety Observation Report (SOR), is a proactive process

designed to identify and document HSE-related acts and conditions in the work environment. All Contractor’s supervisors are required to participate in the SOR process by generating written SORs and turning them in to the COR Site/Project Management at least weekly.

The SOR allows any site worker to record observed proper or improper HSE practices and identifies the cause of any deficiencies so that corrective action can be taken.

11.0 ACCIDENT/INCIDENT INVESTIGATION A formal accident investigation must be conducted when an accident occurs, including non-injury incidents, most first-aid type accidents, and environmental releases or spills. 11.1 In the event of a workplace accident, injury, or illness, the most important immediate actions are

to provide medical assistance to those who may need it and to ensure the safety of others that may be affected or acting as emergency responders.

Health, Safety, and Environment Management Plan City of Richmond August 2008

30

11.2 Securing the accident scene is essential to ensure an effective accident investigation. No materials or equipment shall be moved made until a review of the accident is completed, except when securing equipment or materials that could result in further injury.

11.3 Obtain witnesses’ names, permanent addresses, and signed statements of their complete factual

observations. 11.4 All accident investigations must be documented using the Accident Investigation Report. All

required reports should be completed and copies provided within 24 hours to the COR Site/Project Manager.

12.0 DRUGS, ALCOHOL, AND CONTRABAND The COR strictly prohibits the use, sale, attempted sale, manufacture, possession, distribution, cultivation, transfer, or dispensing of any illicit substance. This includes the use or possession of prescription medications without a valid prescription. Contractors shall implement a Drug, Alcohol, and Contraband Policy, including post incident testing, which meets the requirements of the COR’s policy. Key elements of the COR’s policy, except where prohibited by law, are:

• Pre-access/Pre-assignment testing current to within six months prior to initial assignment to work on the COR’s project.

• Post-incident testing of any worker involved in a project-related workplace incident that results, or could have resulted, in injury to any person requiring medical treatment beyond first aid, any type of medical attention given by a third-party medical services provider (hospital, clinic, doctor, etc.), a motor vehicle incident, or property damage.

• Post-incident testing must be conducted as soon as possible after the incident occurs.

• Reasonable suspicion testing upon reasonable suspicion by COR or Contractor management that a worker is under the influence of a prohibited substance. In such cases, worker(s) shall be immediately removed from the project and surrender their project credentials. Personnel so removed may only be allowed to return with a negative test result and written permission of the COR.

• Periodic random or unannounced testing for workers randomly selected or chosen by job classification or worksite. The percentage of the workforce, or the number of workers, selected for testing shall be specified on a project specific basis and stated in the project’s Hazard Assessment Safety Action Plan.

• Possession or use of alcohol in a COR-, client-, or Contractor-provided vehicle is prohibited.

Health, Safety, and Environment Management Plan City of Richmond August 2008

31

• Any worker whose drug or alcohol test is positive will be removed from the project and required to surrender their project credentials.

• Refusal to submit to drug or alcohol testing, or attempts to tamper with, adulterate, dilute, or

otherwise tamper with a test sample will be treated the same as a positive test result.

• Contractor shall adopt collection, chain-of-custody, and other related procedures consistent with sound industry practice.

• The owner’s (client’s) drug and alcohol testing requirements may be more stringent than the COR

minimums. If so, the owner’s requirements shall be enforced.

• If the COR suspects that a worker is in possession of illegal drugs, alcohol, or contraband, the COR may request the individual to submit to a search of his or her person, personal effects, vehicles, lockers, and baggage. The COR may also conduct random searches of individuals entering or leaving the work site.

• Any suspected contraband will be confiscated and may be turned over to law enforcement, as

appropriate. If an individual is asked to submit to a search and refuses, that individual will be considered insubordinate, will surrender their project credentials, will be escorted off the job, and will not be allowed to return.

• COR shall have the right to review the Contractor’s Drug, Alcohol, and Contraband Policy and to

audit the Contractor’s implementation of their program at the jobsite.

• Contractors shall comply with all applicable federal, state, and local alcohol and drug-related laws and regulations.

13.0 MEDICAL AND EXPOSURE MONITORING Contractors involved with operations, such as those involving hazardous waste, asbestos or lead abatement, certain carcinogenic compounds, etc., shall describe their medical and exposure monitoring procedures and their proposed compliance methods in their HSE Action Plan or HASP. Employees involved in these operations shall have met, prior to any fieldwork activity or exposure, the medical requirements of applicable regulations or standards, including, but not limited to, a baseline medical exam and periodic update exams, as required. Employee medical requirements and limitations shall be considered prior to the use of certain types of PPE, such as respirators. 14.0 IMMINENT DANGER SITUATIONS Upon discovery of any situation that may, in the opinion of the COR, reasonably be expected to cause serious physical harm, illness, death, or significant environmental damage, the Contractor Site/Project

Health, Safety, and Environment Management Plan City of Richmond August 2008

32

Management or HSE representative shall suspend the related work immediately. Work may resume only after the HSE concern(s) have been corrected, to the satisfaction of the COR. Examples of “imminent danger” situations may include, but are not limited to the following:

• Visual observations of contamination, waste, etc. in a non-HAZWOPER work area

• Falls from elevations

• Excavations not properly sloped or shored

• Electrocution hazards

• Work activities posing injury hazards to the general public

• Operation of vehicles, machinery or heavy equipment in an unsafe manner

• Improper Lock Out/Tag Out procedures

In addition to the immediate suspension of work, the procedure for correction of imminent danger situations follows the “HSE Adherence Policy” set forth below. If site personnel are required to evacuate the area, personnel will exit through designated emergency routes and gather in a designated area for a head count, etc. 15.0 HSE ADHERENCE POLICY Contractors are required to comply with the applicable HSE requirements and regulations. The procedures below outline a three-step, progressively administered system to correct compliance problems. However, if in the opinion of the COR, non-compliance issues are considered to be severe, Contractors’ contracts may be terminated at any time. 15.1 Action Level One: If a Contractor fails to comply with an applicable HSE standard, Site/Project

Management will issue a written “Notice of HSE Non-Compliance” to the Contractor’s site representative. Site/Project Management will also forward a “Warning Letter for HSE Non-Compliance” and a copy of the Notice of HSE Non-Compliance to the Contractor’s President or Operations Manager.

15.2 Action Level Two: If item(s) of HSE non-compliance are not corrected by Action Level One, or

if the Contractor repeatedly fails to comply with the applicable HSE regulations, the COR Site HSE Representative will issue a “Written Notice of Temporary Job Suspension” to the Contractor. The Contractor’s work may not resume until the COR Site HSE Representative and the Contractor’s Division Manager or equivalent have met and the Contractor has proposed corrective actions that are acceptable to the COR. Actions that may be considered include, but are not limited to:

• Removal of certain Contractor personnel from the project,

• Alteration of the Contractor’s job procedures, or

• Implementation of corrective action by the COR with back charges to the Contractor.

Health, Safety, and Environment Management Plan City of Richmond August 2008

33

The Contractor shall not resume work until the COR's Site HSE Representative accepts the proposed corrective actions. COR Site HSE Representative will document and keep on file the meeting results in the form of meeting minutes.

15.3 Action Level Three: If Action Levels One and Two do not result in the Contractor’s HSE

performance being brought into compliance, contract termination may result. COR may terminate the contract after verifying with the COR Site HSE Representative that the HSE adherence procedure has not been followed and after giving the Contractor applicable notice. Contractors that have a contract terminated in accordance with this procedure are ineligible to participate in future COR projects until they have implemented and demonstrated corrective actions to improve their deficiencies.

Attachments

Richmond Area Hospital Map

A. HCA Virginia-Richmond Hospitals: Retreat Hospital - www.retreathospital.com - (804) 254-5100

B. Bon Secours Richmond Comm Hospital - www.bonsecours.com - (804) 225-1700

C. Healthsouth Rehabilitation Hospital of Virginia - www.healthsouth.com - (804) 288-5700

D. HCA Virginia-Richmond Hospitals: Henrico Doctors' Hospital-Parham - www.henricodoctorshospital.com - (804) 747-5600

E. St. Mary's Hospital of Richmond - www.bonsecours.com - (804) 285-2011

F. VCU Massey Cancer Center - www.massey.vcu.edu - (804) 828-0450

G. MCV Hospitals and Physicians at Virginia Commonwealth University - www.richmond.k12.va.us - (804) 828-3129

H. HCA Virginia-Richmond Hospitals: CJW Medical Center-Chippenham - www.cjwmedical.com - (804) 320-3911

I. Henrico Doctors Hospital - www.henricodoctorshospital.com - (804) 287-4340

J. MCV Hospitals & Physicians at Virginia Commonwealth University H - www.vcu.edu - (804) 828-4204

Third Precinct and Police Academy Parking Garages Appendix B City of Richmond, VA Sample Notice of Operational Impact (NOI)

 

APPENDIX B

Sample Notice of Operational Impact (NOI)

NOTICE OF OPERATIONAL IMPACT NOTICE 01

Date: August 6, 2012 Page 1

N:\46491-000\Engineering\Specs\Submittals\60%\NOI-Solids Sampling.doc

TITLE: LOCATION: [Describe location of impact(s)]

ACTIVITY: [Describe the project scope. Include drawing or sketches showing the locaction of impact.]

IMPACT: [List all possible impact to plant operations and other projects.] SCHEDULE: [Provide a description of the project phases and durations]

PROCEDURE: [Provide a detailed description of all procedures required for the project]

SUPPORT REQ: [List project tasks requiring plant staff support.] CONTACTS: Department Name Phone [Provide distribution list for notification] APPROVAL: _______________ DPU: [Project Engineer]