civil and structural drawings project no avatiu...
TRANSCRIPT
ww
w.b
eca.
com
ww
w.b
eca.
com
6204430-ZA-0000 1
6204430
ISSUED FOR CONSTRUCTION
CIVIL AND STRUCTURAL DRAWINGS
INFRASTRUCTURE COOK ISLANDS
AVATIU PUNANGANUI MARKETBRIDGE REPLACEMENT
31st JULY 2019
ByBeca
Project No
Prepared for
Docu
ment
No.
Rev.Drawing No.
Drawing Plotted:
6204
430-
ZA-0
000.D
WG
30 Jul 2019 7:23 PM
SITE LOCATION PLAN
NEW BRIDGESITE LOCATION
DRAWING NO.
DRAWING LISTDRAWING TITLE
GENERAL
CIVIL
6204430-CA-1000 BRIDGE APPROACHES AND STREAM TIE-INS PLAN VIEW
STRUCTURAL6204430-SA-0001 GENERAL NOTES
6204430-ZA-0000 COVER SHEET AND DRAWING LIST
6204430-SA-0002 GENERAL NOTES - REINFORCED CONCRETE SHEET 1
6204430-SB-0102 GENERAL ARRANGEMENT - ELEVATION AND SECTIONS6204430-SB-0201 PILING SETOUT PLAN
6204430-CA-1001 BRIDGE APPROACHES LONG SECTIONS
6204430-CA-1003 STREAM TIE-INS CROSS SECTIONS6204430-CA-1002 BRIDGE APPROACHES CROSS SECTIONS
6204430-SB-0301 ABUTMENT CONCRETE GEOMETRY SHEET 1 OF 26204430-SB-0302 ABUTMENT CONCRETE GEOMETRY SHEET 2 OF 2
6204430-SB-0311 DECK SLAB AND ABUTMENT CONCRETE DETAILS SHEET 1 OF 36204430-SB-0312 DECK SLAB AND ABUTMENT CONCRETE DETAILS SHEET 2 OF 3
6204430-SB-0350 NOTES FOR PRECAST BRIDGE BEAMS6204430-SB-0351 PRECAST "U" BEAM DETAILS6204430-SB-0401 PEDESTRIAN BARRIER
6204430-SA-0003 GENERAL NOTES - REINFORCED CONCRETE SHEET 26204430-SB-0100 EXISTING SITE PLAN6204430-SB-0101 GENERAL ARRANGEMENT - PLAN
6204430-CA-100 WORKS OVERVIEW
6204430-SB-0801 CIVIL AND BACKFILL DETAILS6204430-SB-0901 PROPOSED CONSTRUCTION SEQUENCE
6204430-SB-0313 DECK SLAB AND ABUTMENT CONCRETE DETAILS SHEET 3 OF 3
a) PROJECT DETAIL REFERENCES
i)
b)
1XX-YYYY
AXX-YYYY
DETAIL1:25
AXX-YYYY
AXX-YYY
PROJECT SECTION REFERENCE
ii) PROJECT DETAIL REFERENCE
iii) PROJECT TITLE REFERENCE
REFERENCE BUBBLE EXPLANATION
TITLE UNIQUE IDENTIFIER- SECTIONS (NUMERIC, EG. 1, 2, 3, ETC)- DETAILS (ALPHABETICAL EG. A, B, C, ETC)
REFERENCE LOCATION, IDENTIFIER
(XX-YYYY)REFERENCE LOCATION, REFER TO DRAWING WHERE XX MAY BE: SA = GENERAL NOTESSB = BRIDGE SPECIFIC DRAWINGS
1. GENERAL NOTES
1.1 THE TERM 'OTHER PROJECT DRAWINGS' WHEN USED ON THE STRUCTURAL DRAWINGS SHALL BE TAKEN TOMEAN A REFERENCE TO THE DRAWINGS / DOCUMENTATION OF OTHER DISCIPLINES (E.G. ARCHITECTURAL,CIVIL SERVICES, URBAN DESIGN, ETC) AS APPROPRIATE TO THE PROJECT AND THE CONTEXT IN WHICH IT ISUSED.
1.2 THE STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE STRUCTURAL SPECIFICATION ANDOTHER PROJECT DRAWINGS. ANY DISCREPANCIES SHALL BE REFERRED TO THE DESIGNER FOR RESOLUTIONPRIOR TO THE CONSTRUCTION OF WORK INCORPORATING ANY DISCREPANCY.
1.3 THE LOCATION, SIZE AND DETAILS OF ALL PENETRATIONS, RECESSES, SLEEVES, HOLES ETC IN STRUCTURALMEMBERS, MUST BE APPROVED BY THE DESIGNER PRIOR TO CONSTRUCTION COMMENCING UNLESS SHOWNON THE STRUCTURAL DRAWINGS. THESE ITEMS SHALL BE CAST-IN, FORMED, OR SHOP FABRICATED ANDSHALL NOT BE CUT OR CORED ON SITE UNLESS NOTED OTHERWISE ON THE PROJECT DRAWINGS ORAPPROVED BY THE DESIGNER.
1.4 SUBSTITUTION FOR OR AMENDMENT OF SPECIFIED DETAILS OR MATERIALS SHALL NOT BE CARRIED OUTWITHOUT APPROVAL OF THE DESIGNER.
1.5 THE STANDARDS LISTED ON THE STRUCTURAL DRAWINGS REFER TO THEIR LATEST ISSUE INCLUDINGAMENDMENTS THAT ARE CURRENT AT THE TIME OF PREPARING THE DRAWINGS.
2. STRUCTURAL DRAWINGS
2.1 THE STRUCTURAL DRAWINGS GENERALLY CONSIST OF THE FOLLOWING TYPES OF DRAWINGS ANDDETAILS:
a) GENERAL NOTES DRAWINGS:THESE DRAWINGS PROVIDE CLARIFICATIONS OF NEW ZEALAND DESIGN STANDARDS AND SET OUTINFORMATION PRESENTED ON THE STRUCTURAL DRAWINGS
b) PROJECT SPECIFIC DRAWINGS:THESE DRAWINGS ARE PROJECT SPECIFIC AND SET OUT INFORMATION SPECIFIC TO THE PROJECT.
3. DETAIL AND SECTION REFERENCE AND TITLE EXPLANATION
3.1 DETAILS AND SECTIONS ARE TYPICALLY REFERENCED ON THE STRUCTURAL DRAWINGS AS FOLLOWS:'PROJECT REFERENCES' REFERS TO PROJECT SPECIFIC DETAILS SPECIFIC TO THIS PROJECT ONLY.'STANDARD REFERENCES' REFER TO THE SERIES OF STANDARD DETAILS CONTAINED ON THE PROJECTSTANDARD DETAIL SHEETS.
4. SETOUT
4.1 UNLESS SETOUT INFORMATION IS SPECIFICALLY NOTED ON THE STRUCTURAL DRAWINGS, REFER TO THE OTHERPROJECT DRAWINGS FOR ALL SETOUT INFORMATION (E.G. SET OUT OF GRIDS, LEVELS, SLOPES, OFFSETS,PENETRATIONS, ETC).
4.2 THE ORIENTATION OF STRUCTURAL MEMBERS SHALL BE AS NOTED / DEPICTED ON THE STRUCTURAL DRAWINGS.
4.3 CIVIL DRAWINGS SHOW FINISHED ROAD LEVEL TO TOP OF LEVELLING COURSE.
4.4 CO-ORDINATES ARE IN TERMS OF NZTM AND THE VERTICAL DATUM IS NZVD 2009.
5. DIMENSIONS
5.1 ANY DIMENSIONAL DISCREPANCIES SHALL BE REFERRED TO THE DESIGNER FOR RESOLUTION.
5.2 DO NOT SCALE THE PROJECT DRAWINGS.
5.3 ALL DIMENSIONS ARE IN MILLIMETRES UNLESS UNITS ARE NOTED OTHERWISE.
5.4 ALL DIMENSIONS SHALL BE VERIFIED WITH THE REQUIREMENTS OF THE OTHER PROJECT DRAWINGS PRIOR TOFABRICATION AND / OR CONSTRUCTION COMMENCING.
5.5 ALL DIMENSIONS TO EXISTING WORK SHALL BE VERIFIED BY SITE MEASUREMENT PRIOR TO FABRICATION AND /OR CONSTRUCTION COMMENCING.
6. FOUNDATIONS
6.1 PRIOR TO PLACING SITE CONCRETE THE CONSTRUCTOR SHALL REQUEST INSPECTION OF THE PREPAREDFOUNDATION TRENCH / BASE BY THE DESIGNER TO CONFIRM THAT THE BASE OF THE FOUNDATIONS ARELOCATED WITHIN THE ASSUMED FOUNDING SOILS.OVER EXCAVATION AND BACKFILLING WITH ENGINEERING FILL OR SITE CONCRETE MAY BE NECESSARY WHERESOFT SOIL / FILL IS ENCOUNTERED.
6.2 NO SERVICES SHALL BE ROUTED BELOW FOUNDATIONS UNLESS NOTED OR DETAILED ON THE STRUCTURALDRAWINGS. THE CONSTRUCTOR SHALL NOTIFY THE DESIGNER WHERE THE SERVICES DRAWINGS ARE INCONFLICT WITH THE STRUCTURAL REQUIREMENTS.
6.3 ALL FOUNDATIONS SHALL BE CONSTRUCTED ON SAND / 10MPa SITE CONCRETE. NOTE SLABS ON GRADE DO NOTREQUIRE CONCRETE BLINDING.
6.4 WHERE WALLS ARE LOCATED WITH FILL OR RETAINING SOIL ON ONE OR BOTH SIDES OF THE WALL, THECONSTRUCTOR IS TO NOTE THAT THE WALLS HAVE NOT BEEN DESIGNED TO ACCOMMODATE FORCES ORLOADING FROM LIGHT COMPACTION EQUIPMENT DURING BACKFILLING AND COMPACTION.ONLY LIGHTCOMPACTION EQUIPMENT LESS THAN 1000kg SHALL BE USED WITHIN 1.5m OF THE WALL FACE (2.0m FOR MSEWALLS). UNO, LAYER THICKNESS MAY REQUIRE REDUCTION TO ACHIEVE REQUIRED LEVELS OF COMPACTION.UNLESS IT HAS BEEN DEMONSTRATED THAT ADEQUATE STRENGTH HAS BEEN ACHIEVED, CONCRETE WALLELEMENTS SHOULD NOT BE LOADED UNTIL THEY HAVE ACHIEVED THEIR 28 DAY STRENGTH.
6.5 ALL FOOTINGS SHALL BE CONSTRUCTED AND BACKFILLED AS SOON AS POSSIBLE TO AVOID SOFTENING ORDRYING OUT OF THE SOIL BY EXPOSURE.
6.6 WATER INGRESS INTO EXCAVATIONS SHALL BE PREVENTED IN ACCORDANCE WITH SPECIFICATION CO203.
7. BEAMS
7.1 ALL BEAM CENTRE LINES ARE TO BE LOCATED ON GRID OR CENTRAL TO COLUMNS / PILES UNO.
7.2 THE CONSTRUCTOR IS RESPONSIBLE FOR ALL TEMPORARY WORKS DURING CONSTRUCTION. PROPPING OF ALLBEAMS NOTED UNDER SECTION 9.2 IS THE MINIMUM DESIGN CRITERIA AND ARE NOT INTENDED TO REPLACE THETEMPORARY WORKS AS DEEMED NECESSARY BY THE CONSTRUCTOR.
8. SERVICES PENETRATIONS AND SERVICES
8.1 SERVICES PENETRATIONS SHOWN ON THE STRUCTURAL DRAWINGS HAVE BEEN CO-ORDINATED WITH THESERVICES REQUIREMENTS. WHERE THE CONSTRUCTOR REQUIRES PENETRATIONS IN ADDITION TO THESE, THECONSTRUCTOR SHALL OBTAIN THE DESIGNER'S APPROVAL PRIOR TO PROCEEDING WITH THE INSTALLATION OFADDITIONAL PENETRATIONS.
9. TEMPORARY WORKS
9.1 UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS, ALL INFORMATION SHOWN ON THESTRUCTURAL DRAWINGS REFLECT DETAILS IN THEIR FINAL FORM AND LOCATION.THE INFORMATION PRESENTED REFLECTS THE DESIGN FOR THE PERMANENT WORKS ONLY AND DOES NOTNOT ALLOW FOR ANY STAGING OR CONSTRUCTION PROCEDURE OR TEMPORARY WORKS.
9.2 THE CONSTRUCTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY WORKS AND THIS INCLUDES THEDESIGNS, PROGRAMS AND METHODOLOGY NECESSARY FOR THE CONSTRUCTION AND ERECTION OF SUCHWORKS.
9.3 THE CONSTRUCTOR SHALL REFER TO THE STRUCTURAL DRAWINGS AND SPECIFICATION FOR ANY SPECIFICOR GENERAL REQUIREMENTS.
10. FORMWORK
10.1 DESIGN CERTIFICATION, CONSTRUCTION AND PERFORMANCE OF THE FORMWORK AND FALSE WORK IS THERESPONSIBILITY OF THE CONSTRUCTOR.
10.2 DESIGN AND CONSTRUCTION STRIPPING TIMES SHALL COMPLY WITH AS3610 AND AS3600 UNLESSOTHERWISE APPROVED BY THE DESIGNER.
10.3 DURING CONSTRUCTION, SUPPORT PROPPING WILL BE REQUIRED WHERE LOADS FROM STACKEDMATERIAL, FORMWORK AND OTHER SUPPORTED SLABS INDUCE LOADS IN A SLAB OR BEAM WHICH EXCEEDTHE DESIGN LOAD FOR STRENGTH OR SERVICEABILITY AT THAT AGE. ONCE THE NOMINATED 28 DAYSSTRENGTH HAS BEEN ATTAINED THESE LOADS SHALL NOT EXCEED THE DESIGN SUPERIMPOSED LOADS SETOUT IN THE GENERAL NOTES.
10.4 FORMWORK SHALL NOT BE DESIGNED TO RELY ON RESTRAINT OR SUPPORT FROM THE PERMANENTSTRUCTURE WITHOUT PRIOR APPROVAL FROM THE PROJECT DESIGNER.
11. SHOP DRAWING SUBMISSIONS
11.1 THE CONSTRUCTOR SHALL PRODUCE SHOP DRAWINGS OF ALL PREFABRICATED / PROPRIETARYCOMPONENTS FOR REVIEW BY THE DESIGNER PRIOR TO FABRICATION / CONSTRUCTION.
11.2 SHOP DRAWING REVIEW INDICATES ONLY THAT THE SUPPLIED INTERPRETATION OF THE DESIGN HAS BEENREVIEWED WITHOUT THE NEED FOR FURTHER MODIFICATION, OTHER THAN THE CORRECTIONS INDICATEDON THE DRAWINGS RETURNED.THIS DOES NOT RELIEVE THE CONSTRUCTOR OF THE RESPONSIBILITY FOR ENSURING THE CORRECTNESSOF THE DRAWINGS, SITE DIMENSIONS, THE CO-ORDINATION OF OTHER SERVICES AND TRADES, OR FORCOMPLIANCE WITH THE CONTRACT DOCUMENTS, REVIEWED AND RETURNED SHOP DRAWINGS DO NOTAUTHORISE DEPARTURES FROM THE CONTRACT DOCUMENTS UNLESS SPECIFICALLY NOTED.
11.3 THE CONSTRUCTOR SHALL BE RESPONSIBLE FOR THE ACCURACY OF ALL SHOP DRAWINGS AND DETAILS.FOR SUBMISSION REQUIREMENTS REFER SPECIFICATION.
YYYY = SHEET NUMBER (FIRST DIGIT RELATING TO THE BRIDGE/CULVERT NUMBER)- = SELF REFERENCING (SAME SHEET)
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SA-0
001.D
WG
FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
02/06/19SCN. KHURANA
05/06/19
G.Brown03/06/1903/06/19
01/06/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET GENERAL NOTES STRUCTURAL
6204430-SA-0001 1
CONCRETE SURFACE FINISHES6.
4.
SURFACE FINISHES SHALL BE AS FOLLOWS (REFER NZS 3114 FOR DEFINITIONS) :UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS OR SHOWN ON OTHER PROJECT DRAWINGS,
NZS 3109. ALL CONCRETE SUPPLY AND PRODUCTION SHALL BE IN ACCORDANCE WITH NZS 3104.CONCRETE GRADES ARE SPECIFIED AS '28 DAY SPECIFIED COMPRESSIVE STRENGTHS' AS DEFINED IN
CONCRETE GRADES, SUPPLY AND PRODUCTIONREINFORCED CONCRETE NOTES.
5. REINFORCEMENT CLASS, MANUFACTURING PROCESS AND RESTRICTIONS
5.1
5.2 ALL GRADE 500 REINFORCEMENT SHALL BE MANUFACTURED USING THE MICROALLOY (MA) PROCESS,UNLESS SPECIFICALLY APPROVED OTHERWISE BY THE DESIGNER. GRADE 500 MA REINFORCEMENT
ALL REINFORCEMENT SHALL BE GRADE 500E TO AS/NZS 4671.
8.2
LAYERS OF BEAM REINFORCEMENT SHALL BE SEPARATED WITH R32 BARS AT 1500mm CENTRES.
CARRIED OUT AS SHOWN ON THE STRUCTURAL DRAWINGS OR AS SPECIFICALLY APPROVED BY THE8.5 SPLICING OF REINFORCEMENT, WHETHER BY LAPPING, WELDING OR MECHANICAL SPLICE, SHALL ONLY BE
PLACEMENT OF REINFORCEMENT8.
DRAWINGS, THE WELDING SHALL USE APPROVED QUALIFIED WELDING PROCEDURES AND BE CARRIED OUT WHERE THE WELDING OF REINFORCEMENT HAS BEEN APPROVED OR IS DETAILED ON THE STRUCTURAL9.3
9.5
9.1
WELDING OF REINFORCEMENT
ALL WELDING OF REINFORCEMENT SHALL BE CATEGORY SP WELDS.
9.
9.6 WELDS SHALL NOT BE LOCATED CLOSER THAN 3 BAR DIAMETERS FROM THE START OF A BEND OR ANY
WELDING OF REINFORCEMENT (INCLUDING TACK WELDING) SHALL ONLY BE CARRIED OUT WITH THE EXPRESS APPROVAL OF THE DESIGNER.
CONSTRUCTION JOINTS10.
ALL CONSTRUCTION JOINTS SHALL BE TYPE 'B' CONSTRUCTION JOINTS PREPARED IN ACCORDANCE WITH
10.2 WHERE THE LOCATION OF JOINTS ARE NOT SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS, JOINTS WITHIN SLABS ON GRADE, TOPPINGS, EXPOSED SURFACES ETC, SHALL BE COORDINATED WITH
1.FOR GENERAL NOTES REFER TO SHEET PP2O-DR-SA-0001.1.1
1.2
- SHOP DRAWING SUBMISSION REQUIREMENTS
- QUALITY ASSURANCE, INSPECTION AND TESTING REQUIREMENTS
- REQUIREMENTS FOR THE MANUFACTURE, FABRICATION AND PLACEMENT OF REINFORCEMENT- CONCRETE PLACING, FINISHING AND CURING REQUIREMENTS
- REQUIREMENTS FOR THE SUPPORT OF CONSTRUCTION WORK FROM OTHER PERMANENT WORKS
ARE INCLUDED IN THE SPECIFICATION FOR CONCRETE WORK WHERE APPLICABLE.
GENERAL
NOTE THAT :
- CONCRETE SUPPLY AND PRODUCTION REQUIREMENTS
- REQUIREMENTS FOR PROPRIETARY PRECAST CONCRETE ELEMENTS
a)
2.
2.1 IN ADDITION TO THE STANDARD AND TYPICAL CONCRETE DRAWINGS AND THE SPECIFICATIONREQUIREMENTS, ALL CONCRETE WORK DESCRIBED ON THE STRUCTURAL DRAWINGS SHALL BE
SCOPE
3.1
STANDARD 90° HOOK - PLAN
STANDARD 90° HOOK - ELEVATION
STANDARD 180° (SEMI-CIRCULAR) HOOK - ELEVATION
STANDARD 180° (SEMI-CIRCULAR) HOOK - PLAN
TYPICAL HOOK REPRESENTATIONc)
3. REINFORCEMENT NOTATION AND DESIGNATION EXPLANATION
REINFORCEMENT IS GENERALLY REPRESENTED ON THE STRUCTURAL DRAWINGS AS FOLLOWS :
TYPICAL LAP SPLICE REPRESENTATIONd)
SIDE BY SIDE LAP SPLICE
IN PLANE LAP SPLICECRANKED LAP SPLICE
TYPICAL LAYERING AND EXTENT REPRESENTATIONe)
DH 16 - 300 B1
TYPICAL REINFORCING REFERENCE (REFER 3.1 a) i)
REINFORCING LAYER POSITION RELATIVE TO THE
REQUIRED EXTENT / DISTRIBUTION OF REFERENCED
DH 12 - 150 T1
DH 12 - 150 B2
DH 12 - 150 T2
FURTHEST REINFORCING LAYERS SHOWN DASHED
NEAREST REINFORCING LAYERS SHOWN CONTINUOUS
D - GRADE 300 DEFORMED REINFORCING BARSDH - GRADE 500 DEFORMED REINFORCING BARSR - GRADE 300 PLAIN REINFORCING BARSRH - GRADE 500 PLAIN REINFORCING BARSRB - GRADE 500 'REIDBAR' REINFORCING BARS
4 - DH 16 - 400 EW
REINFORCING BAR SPACING / CENTRES (AS REQUIRED)
REINFORCING BAR DIAMETER
REINFORCEMENT GRADE AND PLAIN / DEFORMED DESIGNATION
NUMBER OF REINFORCING BARS (AS REQUIRED)
TYPICAL MAIN BAR REINFORCEMENT REFERENCE
ADDITIONAL REINFORCEMENT PLACEMENT, LAYERING AND EXTENT NOTES
REFERENCED FACE OF THE MEMBER (E.G. LAYER '1' = THEFIRST OR CLOSEST REINFORCEMENT LAYER TO THEREFERENCED FACE, LAYER '2' = THE SECOND LAYER, ETC)
(TYPICALLY BOTTOM OR FAR FACE LAYERS)
(TYPICALLY TOP OR NEAR FACE LAYERS)
REINFORCEMENT
- REQUIREMENTS FOR SLABS POURED ON GRADE- REQUIREMENTS FOR THE GROUTING OF BOLTS AND STARTER BARS
- ADDITIONAL TOLERANCES
- PRECAST CONCRETE FABRICATION AND ERECTION REQUIREMENTS
- SITE MIXED CONCRETE REQUIREMENTS
- REQUIREMENTS FOR SUSPENDED CONCRETE STRUCTURES
- PROJECT SPECIFIC REQUIREMENTS
- REQUIREMENTS FOR SPECIALIST FINISHES OR COATINGS- REQUIREMENTS FOR THE REPAIR OF DEFECTIVE CONCRETE
(CRANKED OR SIDE BY SIDE)
CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF NZS 3101 AND NZS 3109 (INCLUDING ANY
NOTE THAT IN SOME CASES THE REQUIREMENTS OF THE SPECIFICATION AND STRUCTURAL DRAWINGS MAYEXCEED THE MINIMUM REQUIREMENTS FOR CONCRETE CONSTRUCTION DOCUMENTED IN THE NZS 3101AND NZS 3109 STANDARDS. IN THESE CASES THE REQUIREMENTS OF THE SPECIFICATION AND STRUCTURALDRAWINGS SHALL TAKE PRECEDENCE OVER THE PROVISION OF THE STANDARDS.
- REQUIREMENTS FOR PRESTRESSED AND POST-TENSIONED CONCRETE ELEMENTS
2.2 NO CONCRETE SHALL BE PLACED UNTIL THE DESIGNER HAS HAD THE OPPORTUNITY TO OBSERVE THATTHE DRAWINGS AND SPECIFICATIONS HAVE BEEN COMPLIED WITH.
4.1
6.1
(E.G. TOP SURFACE OF SLABS, ETC) SHALL BE AS NOTED IN TABLE A.THE MINIMUM CONCRETE COVER FOR FORMED (E.G. CAST AGAINST FORMWORK) OR FREE SURFACES
CONCRETE COVER TO REINFORCEMENT FOR DURABILITY AND FIRE PROTECTION7.
ETC WHERE APPLICABLE.THE MINIMUM CONCRETE COVER SHALL BE MEASURED TO THE EDGE OF CHAMFERS, RECESSES, REBATES,
7.1
a)
NO REINFORCEMENT OR WIRE TIES SHALL PROJECT INTO THE MINIMUM CONCRETE COVER THICKNESS.
SHALL BE 75mm. THE MINIMUM CONCRETE COVER FOR CONCRETE CAST DIRECTLY ON OR AGAINST THE GROUND
7.2
UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS, MINIMUM CONCRETE COVERS SHALL BE ASFOLLOWS :
b)
7.3
UTILISING RIGID FORMWORK AND INTENSE COMPACTION, REMOTE FROM FINAL LOCATION.PRECAST IN THE CONTEXT OF THIS TABLE MEANS CONCRETE CAST UNDER PLANT CONTROLLED CONDITIONS,
UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS, CONCRETE SHALL BE AS SHOWN BELOW IN TABLE A.
SHALL NOT BE STRAIGHTENED OR REBENT WITHOUT FOLLOWING A REBENDING PROCEDURE APPROVEDBY THE ENGINEER.
ALL REINFORCEMENT SHALL BE ADEQUATELY SECURED AGAINST DISPLACEMENT AT INTERSECTIONS BYTHE USE OF ANNEALED IRON WIRE TIES WITH A DIAMETER OF GREATER THAN 1.25mm, OR BY APPROVED
8.3 SUPPORTS SHALL BE USED TO MAINTAIN THE CORRECT POSITION OF REINFORCEMENT DURING THE PLACEMENT AND COMPACTION OF CONCRETE. THE NUMBER OF RIGID SUPPORTS SHALL NOT BE LESS THAN:
a) SLAB REINFORCEMENTb) BEAM AND COLUMN REINFORCEMENTc) WALL REINFORCEMENT
- TWO SUPPORTS PER SQUARE METRE- ONE LINE OF SUPPORT PER METRE LENGTH- ONE SUPPORT FOR EVERY TWO SQUARE METRES
8.4
REQUIRED, BUT NOT THROUGH SLAB JOINTS.8.6 WELDED WIRE MESH AND REINFORCEMENT IN SLABS ON GRADE AND IN TOPPINGS SHALL BE SPLICED AS
8.1 REINFORCEMENT SHALL BE CLEAN AND FREE FROM MUD, LOOSE RUST / MILL SCALE, CONCRETE LAITANCE,SALT SPRAY, OIL ETC AT THE TIME CONCRETE IS PLACED.
BY SUITABLY QUALIFIED WELDERS. ALL DETAILS OF THE WELDING SHALL BE IN ACCORDANCE WITH THE
10.1
PORTION OF A BAR WHICH HAS BEEN BENT AND SUBSEQUENTLY RE-STRAIGHTENED.
NZS 3109. METHODS WHICH AVOID SCABBLING ARE PREFERRED FOR INTENTIONALLY ROUGHENING THECONCRETE SURFACE AT CONSTRUCTION JOINTS.
THE DESIGNER. THIS REQUIREMENT SHALL DETERMINE ANY EFFECT ON THEAS BUILT STRUCTURE (SUCH AS THE REQUIREMENT FOR LATE POUR STRIPS, ETC), AND ANYARCHITECTURAL RESTRICTIONS (SUCH AS REFLECTIVE CRACKING IN FLOOR FINISHES AT JOINT LOCATIONS, AESTHETICS OF EXPOSED JOINTS, ETC).
4.2
5.3 THE REPLACEMENT OF REINFORCEMENT WHICH HAS BEEN DETAILED ON THE STRUCTURAL DRAWINGS WITH AN EQUIVALENT STRENGTH WELDED WIRE MESH OR WITH AN EQUIVALENT STRENGTH OF
CLIPS.
REFERENCED STANDARDS).
9.2 NO WELDING OF EARTHING OR LIGHTING PROTECTION TO STRUCTURAL REINFORCEMENT SHALL BEPERMITTED WITHOUT THE APPROVAL OF THE DESIGNER.
b)
6 - R 10 - 4 - 200
STIRRUP / TIE SET SPACING / CENTRES (AS REQUIRED)
REINFORCING BAR DIAMETER
REINFORCEMENT GRADE AND PLAIN / DEFORMED DESIGNATION (REFER ABOVE)
TYPICAL STIRRUP AND TIE REINFORCEMENT REFERENCE
OR THE TOTAL NUMBER OF STIRRUPS AND TIES MAKING UP AN INDIVIDUAL(OPTIONAL) NUMBER OF VERTICAL STIRRUP AND TIE LEGS (BEAMS TYPICALLY),
ENGINEER.
REINFORCEMENT BARS OF A DIFFERENT GRADE SHALL NOT BE PERMITTED UNDER ANY CIRCUMSTANCES.
REQUIREMENTS OF AS/NZS 1554.3.
STIRRUP SET (COLUMNS TYPICALLY)
DOUBLE WELDED LAP SPLICE:
1
MIN WELD THROAT THICKNESS= 0.4 x SMALLER BAR DIA
9.4 THE MINIMUM WELD SIZE (THROAT THICKNESS), FINISHED WELD WIDTH AND WELD LENGTH FOR SINGLEAND DOUBLE SIDED WELDED LAP SPLICES SUITABLE FOR THE SPLICING OF STIRRUPS AND SPIRALS
SINGLE WELDED LAP SPLICE:
(WHERE DETAILED ON THE STRUCTURAL DRAWINGS) SHALL BE AS FOLLOWS:
a)
MIN FINISHED WELD WIDTH= 0.50 x SMALLER BAR DIA
1
MIN WELD THROAT THICKNESS= 0.4 x SMALLER BAR DIA
MIN FINISHED WELD WIDTH= 0.50 x SMALLER BAR DIA
b)
MIN 1 BAR DIAEXTENSION
EACH SIDE TYP
5 BAR DIAEFFECTIVE
WELD LENGTH
MIN 1 BAR DIAEXTENSION
THIS SIDE TYP
10 BAR DIAEFFECTIVE
WELD LENGTH
NUMBER OF SETS (AS REQUIRED)
(AS REQUIRED)
7.4
STANDARD 135° STIRRUP AND TIE HOOK
45°
OR LESS
REINFORCEMENT GRADE BAR DIAMETERMINIMUM BEND DIAMETER
DEFORMED = 6 db
PLAIN = 8 db
UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS THE BENDS FOR STIRRUPS & TIES SHALL11.5
6 BAR DIAMETERS
5 BAR DIAMETERS
25 TO 32
6 TO 20
MINIMUM BEND DIAMETERBAR DIAMETERREINFORCEMENT GRADE
STANDARD 180° (SEMI-CIRCULAR) HOOKSTANDARD 90° HOOK
65 MINOR 4 db
BENDDIAMETER
BENDDIAMETER
DEFO
RMED
= 12
dbPL
AIN
= 16
db
UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS BENDS FOR ALL BARS EXCEPT STIRRUPS11.4
BENDING OF REINFORCEMENT
UNLESS NOTED OTHERWISE ALL HOOKS ON STIRRUPS,TIES AND SPIRALS MUST BE ANCHORED AND FIT CLOSELY AROUND MAIN BARS, THE DIAMETER OF THE BAR BEND SHALL
20 TO 32
6 TO 16 5 BAR DIAMETERS
8 BAR DIAMETERS
6 BAR DIAMETERS3 BAR DIAMETERS25 TO 32
20 TO 32
6 TO 16GALVANISED BEFOREOR AFTER BENDING
GRADE 300 & 500
4 BAR DIAMETERS
8 BAR DIAMETERS
5 BAR DIAMETERS
6 TO 20GRADE 300 & 500
11.2THE STRUCTURAL DRAWINGS OR SPECIFICALLY APPROVED BY THE ENGINEER.REINFORCING BARS PARTIALLY EMBEDDED IN CONCRETE SHALL NOT BE SITE BENT UNLESS SHOWN ON
2 BAR DIAMETERS
2 BAR DIAMETERS
3 BAR DIAMETERS
PLAIN BARS DEFORMED BARS
TABLE B. STANDARD BAR BENDS - MAIN BARS
TABLE C. STANDARD BAR BENDS - TIES & STIRRUPS
BEND
DIAMETER
GALVANISED BEFOREOR AFTER BENDING
GRADE 300 & 500
GRADE 300 & 500
& TIES SHALL BE AS SHOWN BELOW AND IN TABLE B.
BE AS SHOWN BELOW AND IN TABLE C.
BE EQUAL TO THAT OF THE ENCLOSED BAR, BUT NOT LESS THAN THE VALUES IN TABLE C.
11.3OR TO AID CONSTRUCTION SEQUENCING ETC, THE BARS SHALL BE INITIALLY BENT TO A MINIMUM BENDWHERE REINFORCING BARS ARE REQUIRED TO BE BENT AND RE-STRAIGHTENED FOR TRANSPORTATION
11.
DIAMETER OF TWICE THAT NOTED IN TABLE B, USING BENDING TOOLS, WITH THE START OF THE BEND
11.1DIAMETER TO GUARD AGAINST NOTCHING OF BARS.ALL REINFORCING BARS SHALL BE COLD BENT USING PROPER BENDING TOOLS OF THE CORRECT
BEING A MINIMUM OF 3 BAR DIAMETERS FROM THE MEMBER FACE.
B1
EXPOSURE
TABLE A. CONCRETE GRADE MIX REFERENCE AND REINFORCEMENT COVERS
CLASSIFICATIONCONCRETE
GRADE
40 MPa
STRUCTURAL ELEMENT MIN. REQUIREDCOVER
50 mm PRECAST BEAMS
SUPERSTRUCTURE TOPPING SLAB
SETTLEMENT SLABS
B1
B1
40 MPa
40 MPa
50 mm
50 mm
MIXREFERENCE
D
D
20mm CHAMFERS SHALL BE PROVIDED ON ALL FORMED CORNERS UNLESS NOTED OTHERWISE.6.2e)
UNFORMED INTERIOR SLAB FINISHES - U3UNFORMED EXTERIOR SLAB FINISHES
d)- F5
c)- F3
b)PANELS, SLAB EDGES, BARRIER AND FASCIA PANEL ETC. WHICH WILL BE CONCEALED
- F1a)
PANELS, SLAB EDGES, BARRIER AND FASCIA PANEL ETC. WHICH WILL BE EXPOSED FORMED SURFACES OF BEAMS, COLUMNS, WALLS,
FORMED SURFACES OF BEAMS, COLUMNS, WALLS, FORMED FOUNDATION SURFACES
- U5
ABUTMENTS, WINGWALLS B1 40 MPa 50 mm D
E
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SA-0
002.D
WG
FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
02/06/19SCN. KHURANA
05/06/19
G.Brown03/06/1903/06/19
01/06/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
REINFORCED CONCRETE SHEET 1 GENERAL NOTES STRUCTURAL
6204430-SA-0002 1
12db MIN LENGTH CRANK WITH18db MIN BEND DIAMETER
LAP SPLICE LENGTHREFER TABLE D
ALL BEAM AND COLUMN MAIN REINFORCEMENT SHALL BE LAPPED WITH CRANKED LAP SPLICES AS
STANDARD 180° (SEMI-CIRCULAR) HOOKSTANDARD 90° HOOK
ANCHORAGELENGTH
ANCHORAGELENGTH
UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS THE MINIMUM ANCHORAGE LENGTH FOR
REINFORCEMENT ANCHORAGE WITH STANDARD HOOKS13.
HOOKS PAST THE CRITICAL SECTION (SHOWN CS) SHALL BE AS SHOWN BELOW AND IN TABLE E.
ANCHORAGE LENGTHREFER TABLE D
LAP SPLICE LENGTHREFER TABLE D
TABLE E. STANDARD REINFORCEMENT ANCHORAGE (WITH HOOKS)
300
650
250
525
200
425
150
275
125
250
175
350
425325275200175 225
475375325200175 275
DEFORMED / PLAIN BAR DIAMETER
10 12 16 20 25 32
350
750
275
600
225
500
150
325
150
275
200
400
475375325200175 250
REINFORCEMENTGRADE
GRADE 300
550425350225200 30030 & 35 MPa
CONCRETE40 & 45 MPa
CONCRETEGRADE
HOOKTYPE
TYPE H1 HOOK
TYPE H2 HOOK
CONCRETE
GRADE
GRADE 500
GRADE 300
GRADE 500
GRADE
UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS THE MINIMUM ANCHORAGE LENGTH FOR STRAIGHT ANCHORAGES PAST THE CRITICAL SECTION (SHOWN CS) SHALL BE AS SHOWN BELOW AND
13.1
12.1
CS CS
WHERE THE CLEAR SPACING BETWEEN THE BARS
UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS THE MINIMUM LAP SPLICE LENGTH FOR CRANKED AND SIDE BY SIDE LAPS SHALL BE AS SHOWN BELOW AND IN TABLE D.
12.2
a)FOLLOWS.
IN TABLE D.
ALL OTHER REINFORCEMENT SHALL BE LAPPED WITH SIDE BY SIDE LAP SPLICES AS FOLLOWS. b)
EXCEEDS 3 BAR DIAMETERS IN A NON-CONTACT LAP,THEN THE LAP SPLICE LENGTH FROM TABLE D SHALLBE INCREASED BY A MINIMUM OF 1.5 x THE BAR SPACING.
CS
TYPE H1 HOOK
TYPE H2 HOOK
TYPE H1 HOOK
TYPE H2 HOOK
TYPE H1 HOOK
TYPE H2 HOOK
TABLE D. STANDARD REINFORCEMENT ANCHORAGE LAP LENGTHS
OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW THE BARFOR TOP REINFORCEMENT WHERE MORE THAN 300mm
FOR ALL OTHER SITUATIONS
800
1700
650
1325
525
1075
325
675
300
575
425
875
1050825675425350 550
13251050850525450 675
DEFORMED BAR DIAMETER
10 12 16 20 25 32
925
1950
725
1525
600
1250
375
775
325
650
500
1000
1200950775475400 625
REINFORCEMENTGRADE
GRADE 300
15251200975600500 775
30 & 35 MPa
CONCRETE40 & 45 MPa
CONCRETE
TYPE L1 LAP
TYPE L2 LAP
CONCRETEGRADE 500
GRADE 300
GRADE 500
TYPE L1 LAP
TYPE L2 LAP
TYPE L1 LAP
TYPE L2 LAP
TYPE L1 LAP
TYPE L2 LAP
LAPTYPE
TYPE L1 LAP
TYPE L2 LAP
TYPE H1 HOOKGREATER THAN OR EQUAL TO 60mm, AND WITH END COVER TOFOR SIDE COVER NORMAL TO THE PLANE OF THE HOOK OF
THE HOOK EXTENSION OF GREATER THAN OR EQUAL TO 40mm
FOR ALL OTHER SITUATIONSTYPE H2 HOOK
GRADE
GRADE
14. ABBREVIATIONS
ADDNL
APPROX
B
BM
BT
ADDITIONAL
APPROXIMATE / APPROXIMATELY
BOTTOM
BEAM
TEE BEAM CUT FROM UB
ALT ALTERNATE
BLDG BUILDING
BP STELTECH WELDED BEARING PILES
C
CAR
CHS
CL
CONC
CONT
CRS
CVR
CWC
CENTRAL
COVER ALL ROUND
CIRCULAR HOLLOW SECTION
CENTRE LINE
CONCRETE
CONTINUOUS
CENTRES
COVER
CUSTOM WELDED COLUMN
c/c CENTRE TO CENTRE
CB CONCRETE BLOCK
CJ CONSTRUCTION JOINT
COL COLUMN
CONN CONNECTION
COS CHECK ON SITE
CT TEE BEAM CUT FROM UC
CWB CUSTOM WELDED BEAM
D
DET
DHS
DIAG
DIST
DP
DRG
GRADE 300 DEFORMED REINFORCING BAR
DETAIL
DIMOND HI-SPAN PURLINS
DIAGONAL
DISTANCE
DOWN PIPE
DRAWING
db BAR DIAMETER
DH GRADE 500 DEFORMED REINFORCING BAR
DIA DIAMETER
DIM DIMENSION
DOS DETERMINE ON SITE
DPM DAMP PROOF MEMBRANE
EA
ECC
EL or ELEV
EX
EQUAL ANGLE
ECCENTRIC, ECCENTRICITY
ELEVATION
OUT OF
EB STELTECH EQUIVALENT WELDED BEAM
EF EACH FACE
EW EACH WAY
EXTG or (E) EXISTING
FB
FF
FIG
FLG
FRR
FW
FLYBRACE
FAR FACE
FIGURE
FLANGE
FIRE RESISTANCE RATING
FILLET WELD
FDN FOUNDATION
FFL FINISHED FLOOR LEVEL
FL FLAT
FRC FIBRE REINFORCED CONCRETE
FSBW FULL STRENGTH BUTT WELD
FWAR FILLET WELD ALL ROUND
GAGL
GAUGEGROUND LEVEL
GR GRADE
H.D. BOLT
HB
HCBC
HORIZ or (H)
HOLDING DOWN BOLT
STELTECH HEAVY WELDED BEAM
STELTECH HIGH CAPACITY BEAM-COLUMN
HORIZONTAL
HST STEEL & TUBE HIGH STRENGTH PURLIN
H.D. GALV
HCB
HCC
HP
HOT DIP GALVANISED
STELTECH HIGH CAPACITY BEAM
STELTECH HIGH CAPACITY COLUMN
STELTECH WELDED 'H' PILES
IDIL
INSIDE DIAMETERINVERT LEVEL
IP INTERSECTION POINT
LAR
Ld
LL
LAP AT RANDOM
DEVELOPMENT LENGTH
LIVE LOAD
LB
LG
STELTECH LIGHT WELDED BEAM
LONG
MAX
MS
MAXIMUM
MILD STEELMIN
MSE
MINIMUM
MECHANICALLY STABILISED EARTH
(N)
NA or N/A
NDT
NOM
NTS
NEW
NOT APPLICABLE
NON DESTRUCTIVE TESTING
NOMINAL
NOT TO SCALE
N.B.
NB
NF
No.
NOMINAL BORE
STELTECH NARROW WELDED BEAM
NEAR FACE
NUMBER OF
O/A
OD
OVERALL
OUTSIDE DIAMETERO/H
OPP
OVERHEAD
OPPOSITE
PB
PCD
PL
STELTECH PERIMETER WELDED BEAM
PITCH CIRCLE DIAMETER
PLATE
PC
PFC
PSC
PRECAST CONCRETE
PARALLEL FLANGE CHANNEL
PRESTRESSED CONCRETE
R.A.D.
R
RCREF
RH
RL
RSC
REFER ARCHITECTS DRAWINGS
GRADE 300 PLAIN REINFORCING BAR
REINFORCED CONCRETEREFER, REFERENCE
GRADE 500 PLAIN REINFORCING BAR
REDUCED LEVEL
ROLLED STEEL CHANNEL
RAD
RB
REINF
RHS
RSA
RT
RADIUS
GRADE 500 'REIDBAR' REINFORCING BAR
REINFORCEMENT / REINFORCING
RECTANGULAR HOLLOW SECTION
ROLLED STEEL ANGLE
BHP RAILS
S/S
SC
SECT
SIM
SQ
STD
STIFF
SYMM
STAINLESS STEEL
STELTECH STANDARD WELDED COLUMN
SECTION
SIMILAR
SQUARE
STANDARD
STIFFENER
SYMMETRICAL
SB
SDL
SHS
SJ
STA
STG
STRP(S)
STELTECH STANDARD WELDED BEAM
SUPER-IMPOSED DEAD LOAD
SQUARE HOLLOW SECTION
SAW CUT JOINT
STARTER
STAGGER
STIRRUP(S)
T.O.C
T.O.R.C
TFB
THK
TYP
TOP
TOP OF CONCRETE
TOP OF ROUGH CONCRETE
TAPER FLANGE BEAM
THICK
TYPICAL
TT.O.
T.O.G
T.O.S
TFC
TOP OF
TOP OF GRATING
TOP OF STEEL
TAPER FLANGE CHANNEL
TRM TRIMMER
U/G
UA
UBP
UNO
UNDER GROUND
UNEQUAL ANGLE
UNIVERSAL BEARING PILES
UNLESS NOTED OTHERWISE
U/S
UB
UC
UNDERSIDE
UNIVERSAL BEAM
UNIVERSAL COLUMN
VERT or (V) VERTICAL
WBWC
BHP WELDED BEAMBHP WELDED COLUMN
WS STELTECH WIDE SECTIONS
DL DEAD LOAD
ULS ULTIMATE LIMIT STATE
SLS SERVICEABILITY LIMIT STATE
QT QUENCHED & TEMPERED REINFORCEMENT
MA MICROALLOYED REINFORCEMENT
ARCH ARCHITECT / ARCHITECTURAL
SLL STRUCTURAL SLAB LEVEL
GP GENERAL PURPOSE CATEGORY WELD
SP STRUCTURAL PURPOSE CATEGORY WELDS.O.P. SET OUT POINT
M## METRIC BOLT(## = BOLT DIAMETER)
1000
2100
1300
1650
40
1150
2450
1500
1900
NCF NO CHAMFER OR FILLET
REINFORCED CONCRETE NOTES, CONT.
REINFORCEMENT ANCHORAGE AND LAP SPLICES WITH DEFORMED STRAIGHT BARS12.
CH CHAINAGE
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SA-0
003.D
WG
FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
02/06/19SCN. KHURANA
05/06/19
G.Brown03/06/1903/06/19
01/06/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
REINFORCED CONCRETE SHEET 2 GENERAL NOTES STRUCTURAL
6204430-SA-0003 1
NOTES:1. REFERENCES
1.1 REFER TO SA-0001 - SA-0003 FOR GENERAL NOTES.
2. DRAWING LIST
2.1. FOR THE LIST OF STRUCTURAL DRAWINGSAPPLICABLE TO THIS BRIDGE, REFER TO DRG.6204430-ZA-0000.
3. SET OUT
3.1. BRIDGE SOP COORDINATES ARE PROVIDED ON DRAWING. 6204430-SB-0201
4. SERVICES
4.1. SERVICES SHOWN ARE THOSE THAT ARE KNOWN. THE NUMBER, TYPE, AND POSITION OF THOSE SHOW IS INDICATVE ONLY.
4.2. THE CONSTRUCTOR SHALL LOCATE AND IDENTIFY ALL SERVICES PRIOR TO COMMENCING CONSTRUCTION
BRID
GE ℄
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
100.D
WG
FOR CONSTRUCTION
OUTLINE OF EXISTING BRIDGE
IPIIN=7654895.165E=418556.647
IPIN=7654885.503E=418602.343
ONAIL XXIVN=7654885.941E=418690.884
OIPXXVN=7654915.551E=418629.624
SOP 2N=7654879.121E=418613.223SOP 1
N=7654878.382E=418601.346
OUTLINE OF PROPOSED BRIDGE
SCALE 1 : 200EXISTING SITE PLAN
MAIN ROADMAIN ROAD
AVAT
IU S
TREA
M
LEGENDSOP = SET OUT POINT
200DIA RING MAIN(TO BE RELOCATED TO THE BRIDGE)
90DIA SUB-MAIN(TO BE RELOCATED TO THE BRIDGE)
ICI FOR PORTS(TO BE RELOCATED TO THE BRIDGE)
100mm DUCT(TO BE RELOCATED TO THE BRIDGE)
FIRST LEAD CABLE
TELECOMMUNICATIONS CABLES (IN SERVICETHROUGHOUT CONSTRUCTION)
PUNANGANUI MARKET
EXISTING BUILDING
EXISTINGBUILDING
TOP
OF B
ANK
TOP
OF B
ANK
N
FLOW
FLOW
FIRST LEAD CABLE
TOP O
F BAN
K
TOP O
F BAN
K
100mm DUCT
O/H LV CABLES
U/G HV CABLES TO MEATCO SUB
U/C LV CABLES
90DIA SUB-MAIN
200DIA RINGMAIN
EAST ABUTMENT℄℄
WEST ABUTMENTEXISTING WATER VALVE
EXISTING WATER VALVE 3No.EXISTINGTELECOMMUNICATIONS CABLES(MUST REMAIN IN SERVICETHROUGHOUT CONSTRUCTION)
EXISTINGBUILDING
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
02/06/19SCN. KHURANA
05/06/19
G.Brown03/06/1903/06/19
01/06/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET EXISTING SITE PLAN STRUCTURAL
6204430-SB-0100 1
SETTLEMENT SLAB
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
101.D
WG
8000
6000
1400
0
OUTLINE OF EXISTING BRIDGE(TO BE DEMOLISHED)
SETTLEMENT SLAB
FOOTPATH
FOOTPATH
1000
EXISTING COBBLEDRETAINING WALL
FOR CONSTRUCTIONSCALE 1 : 100GENERAL ARRANGEMENT-PLAN
MAIN ROADMAIN ROAD
AVAT
IU S
TREA
M
HANDRAIL WITH TIMBERINFILL. REFER TO SB-0401
POWERPOLE
BRID
GE ℄
EXISTING SIGN (MAINTAIN IF POSSIBLE)
HANDRAIL WITH TIMBER INFILLINFILL. REFER TO SB-0401
POWERPOLE
PUNANGANUI MARKET
EXISTINGBUILDINGEXISTINGBUILDING
TOP
OF B
ANK
TOP
OF B
ANK
FLOW
FLOW
TOP
OF B
ANK
N
EXISTING WINGWALLTO BE DEMOLISHED
EXISTING WINGWALLTO BE DEMOLISHED
10850
11900
EAST ABUTMENT℄
WEST ABUTMENT℄
CONSTRUCTION JOINT TO ALLOW FORSTAGING. REFER SB-0901
TIE BACK BAR. REFER TOSB-0313 FOR DETAILS
TIE BACK PILE CAP. REFER SB-0313FOR DETAILS
POWERPOLE
OUTLINE OF PROPOSED BRIDGE
EXISTING SIGN (TO BE REMOVED)
TIE BACK PILE CAP. REFERSB-0313 FOR DETAILS
TIE BACK BAR. REFER TOSB-0313 FOR DETAILS
2500
GABION BASKETS / SCOUR PROTECTIONREQUIRED WHEN STREAM IS WIDENED INFUTURE. EXTENT AND ARRANGEMENT TOBE CONFIRMED AT THE TIME OF WIDENING
NOTES:1. REFERENCES
1.1 REFER TO SA-0001 FOR GENERAL NOTES.
1.2 ALL LEVELS GIVEN ARE TO STRUCTURALSURFACES UNO.
1.3 ALL DIMENSIONS IN MILLIMETES, UNO.
2. DESIGN STANDARDS
2.1 NZTA BRIDGE MANUAL, THIRD EDITION (2018)MODIFIED IN ACCORDANCE WITH THEBRIDGE DESIGN STATEMENT ANDINFRASTRUCTURE COOK ISLANDS
2.2 NZS 3101.2006 CONCRETE STRUCTURES(INCLUDING 3rd AMENDMENT).
3. DESIGN LOADING
3.1 SUPERIMPOSED DEAD LOAD ALLOWANCESa) SURFACING = 2.0kPa (INCLUDING 0.5kPa
FOR LEVELLING COURSE)b) SERVICES = ALLOWANCES ARE MADE
FOR AS FOLLOWS: i) UNIFORMLY DISTRIBUTED LOAD
APPLIED OVER ENTIRE DECK AREAOF 0.25kPa.
ii) REFER TO DESIGN STATEMENT FORWEIGHT AND ALLOWANCES OFSPECIFIC SERVICES.
3.2 TRAFFIC LOAD HN-HO-72 AND SPECIFIEDPORT VEHICLE (HYSTER H-1050ECONTAINER LIFTER).
3.3 TEMPERATURE AND DIFFERENTIALTEMPERATURE AS PER NZTA BRIDGEMANUAL.
3.4 CREEP AND SHRINKAGE BASED ON AS3600AND NZTA BRIDGE MANUAL 3rd EDITIONFOR RELATIVE HUMIDITY OF 84%.
4. DRAWING LIST
4.1 FOR THE LIST OF STRUCTURAL DRAWINGSAPPLICABLE TO THIS BRIDGE, REFER TODRG. 6204430-ZA-0000.
5. CONSTRUCTION LOADS
5.1 BRIDGE BEAMS ARE DESIGNED FORCONSTRUCTION LIVE LOAD OF 1.5kPa.
6. SET OUT
6.1 BRIDGE SOP COORDINATES ARE PROVIDEDON DRAWING. 6204430-SB-0201
LEGEND:
= TEMPORARY TIE BACK BARS
= PERMANENT TIE BAK BARS
TEMPORARY SHEET PILES. REFERSB-0201 FOR SET OUTADJUST LOCATION OF SHEET PILEON SITE TO AVOID OBSTRUCTIONWITH U/G HV CABLES
ADJUST LOCATION OF SHEET PILES ON SITE TOAVOID OBSTRUCTION WITH O/H LV CABLES AND DUCT
TEMPORARY SHEET PILES.REFER SB-0201 FOR SETOUT
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
PLANGENERAL ARRANGEMENT STRUCTURAL
6204430-SB-0101 1
11900
WEST ABUTMENT℄
FALL 1.5%
500
AVATIU STREAM
SETTLEMENT SLAB CORBEL
TEMPORARY TIE BACKS(REFER SB-0313 FOR DETAILS)
℄BRIDGE40002000
FOOTPATH2000
FOOTPATH6000
LANE3500
LANE3500
SHOULDER/TURNING2500
FALL 1.5% KERB, 200 HIGH
FALL 3%FALL 3%PRECAST 'U' BEAM.(REFER SB-0351)
INLAND SIDE LAGOON SIDE
1100 HIGH PEDESTRIANBARRIER. (REFER SB-0401)
FOR CONSTRUCTION
PRECAST 'U' BEAMREFER SB-0351
APPROXIMATE EXISTINGSTREAM BANK
INDICATIVE EXISTING ARCHPROFILE (TO BE DEMOLISHED)
200 THK. TOPPING SLAB
SP3 SHEET PILES (REFER SB-0201 FORSETTING OUT AND SB-0311 FOR DETAILS)
REINFORCED CONCRETE PILE FACING BOTHSIDE(REFER SB-0311 FOR DETAILS)
PILE CAP (REFER SB-0311)
200 DIA RING MAIN
3-150 DIA UPVC ELECTRICAL DUCTS
3-EXISTINGTELECOMMUNICATIONS CABLES(MUST REMAIN IN SERVICETHROUGHOUT CONSTRUCTION)
2-100 DIA UPVC DUCTS FORFUTURE SERVICES
24GAP TYPICAL
2-100 DIA UPVC DUCTS FORFUTURE SERVICES
1-100 DIA UPVC ELECTRICAL DUCTS
KERB, 200 HIGH
2-100 DIA UPVC FIBRE OPTICS DUCTS
SURFACING (30 LEVELLINGCOURSE + 40 AC14)
FALL 0.5%
NOTES:1. REFER TO DRG SA-0001 - SA-0003
FOR GENERAL NOTES.
2. REFER TO DRG SB-0350 FORNOTES FOR PRECAST BRIDGEBEAMS.
1100 HIGH PEDESTRIANBARRIER. (REFER SB-0401)
ROAD PAVEMENT. REFER TO ICISTANDARD PAVEMENT SPECIFICATIONROAD PAVEMENT. REFER TO ICI
STANDARD PAVEMENT SPECIFICATION
PROPOSED STREAMBED PROFILE
90 DIA PE SUB-MAIN
SURFACING (30 LEVELLINGCOURSE + 40 AC14)
DECK SLAB.(REFER SB-0312FOR DETAILS)
EAST ABUTMENT℄
SCALE 1 : 25TYPICAL LONG SECTION
SCALE 1 : 25TYPICAL DECK CROSS-SECTION
0.50m
(TYP
)
BROOM FINISH TO FOOTPATHAND DECK SURFACE (TYP)
0.50m
(TYP
)
1.00m(TYP)
TYPE B CJ
200
TYPE B CJ
1.00m(TYP)
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
102.D
WG
SETTLEMENT SLAB (REFER SB-0312)TEMPORARY TIE BACKS(REFER SB-0313 FOR DETAILS)
SHOULDER500
1st STAGE OFCONSTRUCTION
2nd STAGE OFCONSTRUCTION
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
ELEVATIONS AND SECTIONSGENERAL ARRANGEMENT STRUCTURAL
6204430-SB-0102 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
201.D
WG
EAST ABUTMENT℄
℄ BRIDGE
FOR CONSTRUCTION
LEGENDSOP = SET OUT POINT
PILE
℄ 3
N
SCHEDULE 1
SHEET PILE VERTICALGEOTECHNICAL ULTIMATE
CAPACITY
TYPE A1 TYPE B1 TYPE C4 TYPE D2,4
140kN 25kN -- --
SHEET PILE DEPENDABLEVERTICAL CAPACITY (DESIGN) 110kN 20kN -- --
EXPECTED 'SHALLOW'PILE TOE LEVEL3
RL. -2.0mTO -3.0m
RL. -2.0mTO -3.0m
3.0m EMBEDMENT BELOWGROUND LEVEL
MINIMUM EMBEDMENT TODELETE TIE BACK SYSTEM RL. -4.0m RL. -4.0m
EXPECTED 'DEEP' PILETOE LEVEL3 RL. -6.0m RL. -6.0m
1. REFER TO SB-0302 FOR TYPE A AND B DEFINITION2. TEMPORARY SHEET PILES TO BE REMOVED AFTER DECK TOPPING SLAB HAS CURED FOR A MINIMUM OF 7 DAYS.3. IT IS EXPECTED THAT THE SHEET PILES WILL BE UNABLE TO PENETRATE THE CORAL LAYERS WHICH EXISTS AT THE
'SHALLOW' REFUSAL LEVEL. AT THIS EMBEDMENT, THE SHEET PILES REQUIRE TIE BACK ANCHORS (TEMPORARYAND PERMANENT) AS SHOWN IN THE PILING SETOUT PLAN. IF THE SHEET PILES ARE ABLE TO PENETRATE THECORAL LAYER AND ACHIEVE THE REQUIRED END BEARING CAPACITY AT A TOE LEVEL BELOW RL. -4.0m THEN THETIE BACK (PILE TYPE C AND D, AND ASSOCIATED TIE BACK BARS) CAN BE DELETED.
4. THE POSITION OF PILE TYPE C AND TYPE D MAY BE ADJUSTED BY A MAXIMUM OF 500mm FROM THE POSITIONSHOWN TO AVOID BURIED SERVICE OR OTHER OBSTRUCTION. THE MINIMUM TIE BACK LENGTH SHALL REMAIN7000mm.
SCALE 1 : 75PILING SETOUT PLAN
SOP 3N=7654886.412E=418604.378
36 S
P3 S
HEET
PILE
S
SOP 5N=7654872.533E=418599.138
6 SP3SHEET PILES
SOP 6N=7654872.380E=418596.670
SOP 2N=7654879.121E=418613.223
38 S
P3 S
HEET
PILE
S
SOP 7N=7654887.715E=418616.468
SOP 8N=7654892.629E=418617.018
SOP 9N=7654873.065E=418610.936
SOP 10N=7654868.128E=418611.214
SOP 1N=7654878.382E=418601.346
12 SP3 SHEET PILES
SOP 4N=7654888.159E=418599.752
7000
7000
7000
7000
REFER TO SB-0100FOR COORDINATES OFEXISTING SURVEY MARKERS
114.25°65.75°
WEST ABUTMENT℄
7000
PILE ℄ 1
7000
PILE ℄ 2
9 TYP
E D
TEMP
ORAR
Y SP
3 SHE
ET P
ILES
1 TYPE C PERMANENTSP3 SHEET PILE
2 TYPE C PERMANENTSP3 SHEET PILES
5 TYP
E C
PERM
ANEN
TSP
3 SHE
ET P
ILES
12 S
P3 S
HEET
PILE
S
INSTALL FSP3 SHEET PILE CORNERCONNECTORS IN ACCORDANCE WITHMANUFACTURERS GUIDELINES
INSTALL FSP3 SHEET PILE CORNERCONNECTORS IN ACCORDANCE WITHMANUFACTURERS GUIDELINES
INSTALL FSP3 SHEET PILE CORNERCONNECTORS IN ACCORDANCE WITHMANUFACTURERS GUIDELINES
ADJUST ORIENTATION OFTYPE D SHEET PILE ON SITETO AVOID CLASHING WITHTYPE C SHEET PILE PILE CAP.
ADJUST ANGLE OF TIE BAR ONSITE TO AVOID CLASHING WITHTYPE C SHEET PILE PILE CAPTYPE D SHEET PILE ORIENTATIONTO ADJUST ACCORDINGLY.
9 TYP
E D
TEMP
ORAR
Y SP
3 SHE
ET P
ILES
GALVANISED RB20 COUPLERS ,WHERE REQUIRED
GALVANISED RB20COUPLERS, WHEREREQUIRED
PILE ℄
PILE
℄
PILE
℄ 4
PILE
℄
PILE ℄
INSTALL FSP3 SHEET PILE CORNERCONNECTORS IN ACCORDANCE WITHMANUFACTURERS GUIDELINES
12 S
P3 S
HEET
PILE
S
NOTES:1. GENERAL
1.1. REFER SA-0001 - SA-0003 FOR GENERAL NOTES.1.2. THE CONTRACTOR SHALL PROTECT ALL EXISTING SERVICES. THE LOCATION OF SERVICES SHOWN ON DRAWING
6204430-SB-0102 IS INDICATIVE ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION ANDTYPE OF SERVICES ON SITE.
1.3. THE CONTRACTOR SHALL PROTECT THE STREAM FROM ANY CONSTRUCTION ACTIVITIES OR SPILLING OFCONSTRUCTION MATERIALS INTO THE WATERWAY.
2. DRIVEN SHEET PILES - GENERAL
2.1. SP3 STEEL SHEET PILES SHALL BE GRADE 300.2.2. SHEET PILES ARE DESIGNED AS SINGLE LENGTH PILE AND NO SPLICING IS PERMITTED.2.3. SHEET PILES SHALL BE DRIVEN TO FOUND WITHIN A DENSE SAND OR GRAVEL STRATA IDENTIFIED FROM
BOREHOLE INVESTIGATION TO OCCUR BELOW RL-1.0m. PILE PENETRATION RATES SHALL BE RECORDED TOCONFIRM THE TOP OF FOUNDING LAYER.
2.4. THE SHEET PILING TOLERANCES SHALL BE AS FOLLOWS:
- AT THE TOP CUT OFF POSITION, THE SHEET PILE SHALL NOT VARY MORE THAN 75mm HORIZONTALLY AND25mm VERTICALLY FROM THEIR TRUE POSITION AS GIVEN IN THE DRAWINGS.
- THE MAXIMUM PERMITTED DEVIATION OF THE FINISHED SHEET PILES FROM A VERTICAL LINE AT ANY LEVEL IS1 IN 100.
3. DRIVEN SHEET PILES - PROCEDURE
3.1. PRE-DRILLING SHALL NOT BE UNDERTAKEN WITHOUT FIRST CONSULTING THE DESIGNER.3.2. THE SHEET PILE GEOTECHNICAL ULTIMATE CAPACITY SHALL BE ASSESSED USING THE HILEY DRIVING FORMULA.3.3. SHEET PILE INSTALLATION PROCEDURE:
a) THE SHEET PILE SHALL BE DRIVEN TO THE SPECIFIED PILE TOE LEVEL. THE SET AND REBOUND SHALLTHEN BE RECORDED.
i) IF THE CALCULATED (HILEY) ULTIMATE CAPACITY IS GREATER THAN THE PILE GEOTECHNICAL ULTIMATECAPACITY (SEE SCHEDULE 1), DRIVING IS COMPLETE AND MAY BE HALTED.
ii) IF THE CALCULATED (HILEY) ULTIMATE CAPACITY IS LESS THAN THE PILE GEOTECHNICAL ULTIMATECAPACITY (SEE SCHEDULE 1), DRIVING SHALL BE HALTED AND THE PILE ALLOWED TIME TO SET UP.
b) FOLLOWING SHEET PILE SET UP, THE SHEET PILE SHALL BE REMOBILISED. THE SET AND REBOUND SHALLTHEN BE RECORDED AGAIN AND THE HILEY ULTIMATE CAPACITY RECALCULATED.
i) ON SHEET PILE REMOBILISATION, IF THE CALCULATED (HILEY) ULTIMATE CAPACITY IS GREATER THAN THEPILE GEOTECHNICAL ULTIMATE CAPACITY (SEES CHEDULE 1) DRIVING IS COMPLETE AND MAY BE HALTED.
ii) ON SHEET PILE REMOBILISATION, IF THE CALCULATED (HILEY) ULTIMATE CAPACITY IS LESS THAN THEPILE GEOTECHNICAL ULTIMATE CAPACITY (SEE SCHEDULE 1),THE SHEET PILE SHALL BE DRIVEN UNTIL THEREQUIRED CAPACITY IS ACHIEVED. DRIVING SHALL BE HALTED AND SHEET PILE ALLOWED TIME TO SET UPWHEN SHEET PILES REACH A DEPTH WHERE A SPLICE WOULD BE REQUIRED TO CONTINUE DRIVING.
iii) ON SHEET PILE MOBILISATION, IF THE CALCULATED (HILEY) ULTIMATE CAPACITY IS LESS THAN THE PILEGEOTECHNICAL ULTIMATE CAPACITY (SEE SCHEDULE 1),THE SHEET PILE SHALL BE DRIVEN UNTIL THEREQUIRED CAPACITY IS ACHIEVED. NOTE THAT THE SHEET PILE MUST NOT BE DRIVEN 0.9m FURTHER THANTHE DESIGN TOE LEVEL (SEE SCHEDULE 1) / THE TOE LEVELS OF ADJACENT SHEET PILES. DRIVING SHALLBE HALTED AND THE SHEET PILE ALLOWED TIME TO SET UP WHEN SHEET PILES REACH A DEPTH WHERE ASPLICE WOULD BE REQUIRED TO CONTINUE DRIVING.
3.4. REQUIRED DRIVING RESISTANCE FOR SHEET PILES IS EQUIVALENT TO SHEET PILE GEOTECHNICAL ULTIMATECAPACITY GIVEN IN SCHEDULE 1. (VALUES FOR INDIVIDUAL SHEET PILES)
4 TYP
E C
PERM
ANEN
TSP
3 SHE
ET P
ILES
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET PILING SETOUT PLAN STRUCTURAL
6204430-SB-0201 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
301.D
WG
NOTES:
FOR CONSTRUCTION
CP4CP3
CP = CHANGE IN PLANE AT FRONT FACE OF PILE CAPPING BEAM
= FOLD LINE
1. REFER DRAWING NO. SA-0001, FOR GENERAL NOTES.
2. REFER DRAWING NO. SA-0002 & SA-0003 FORREINFORCED CONCRETE GENERAL NOTES.
3. CURING TO BE UNDERTAKEN AS PER THEREQUIREMENT OF NZS3109 & PROJECTSPECIFICATIONS.
4. ALL CONSTRUCTION JOINT 'CJ' TO BE TYPE B AS PERNZS3109 UNO. THE LOCATION OF CONSTRUCTIONJOINTS SHOWN ON THE DRAWINGS REPRESENT THEDESIGN INTENT. ALTERNATIVE CONSTRUCTIONJOINTS MAY BE DEVELOPED THROUGHCONSULTATION WITH THE DESIGNER.
5. REFER DRAWING SB-0901 FOR PROPOSEDCONSTRUCTION SEQUENCE.
6. ALL DIMENSIONS IN MILLIMETRES, UNO.
SCALE 1 : 75ABUTMENT ARRANGEMENT PLAN
N
LEGEND:
6581
4387
600 WIDE. 2nd STAGE ABUTMENT POUR
850 WIDE. PILE CAPPING BEAMSUPPORTED ON SHEET PILE WALLALONG ABUTMENT ℄
1096
8
250 THK. SETTLEMENTSLAB. (REFER SB-0311.)
TYPE B CJ (LOCATIONTBC WITH CONTRACTOR)
6581
4387
1096
8
5582
CHANGE INABUTMENT SLOPE.(REFER SB-0302.)
250 THK. SETTLEMENTSLAB. (REFER SB-0311. )
TIE BACK BAR. REFER TOSB-0313 FOR DETAILS
TYPE B CJ (LOCATIONTBC WITH CONTRACTOR)
CHANGE IN ABUTMENT SLOPE.(REFER SB-0302.)
CORBEL BEHIND ABUTMENTBACKWALL. (REFER SB-0311FOR DETAILS)
PILE
℄ 4
300300
425
175250
300
300
PILE ℄1
250
175425
300
300PILE ℄ 2
WEST ABUTMENT℄5250
2500
EAST ABUTMENT℄
PILE
℄ 3
300 300
NORTHEAST WINGWALL TO TIE INTO EXISTINGCOBBELED RETAINING WALL. (REFER SB-0101)
CP1
CP2
5000
CP6
200065.75°
156.1
0°
PILE ℄
PILE ℄
PILE
℄
PILE
℄
3945
TIE BACK BAR. REFER TOSB-0313 FOR DETAILS
PERMANENT TIE BACK PILE CAP.REFER SB-0313 FOR DETAILS
3150
TIE BACK BAR. REFER TOSB-0313 FOR DETAILS
PERMANENT TIE BACK PILE CAP.REFER SB-0313 FOR DETAILS
6801500
TIE BACK BAR. REFER TOSB-0313 FOR DETAILS
PERMANENT TIE BACK PILE CAP.REFER SB-0313 FOR DETAILS
PERMANENT TIE BACK PILE CAP.REFER SB-0313 FOR DETAILS
8127
647
263
6315
113
113
3190
113
6317
26364
731
90
8127
113
℄ BRIDGE
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
SHEET 1 OF 2CONCRETE GEOMETRY
ABUTMENT STRUCTURAL
6204430-SB-0301 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
302.D
WG
647
8774
9114689263
6581
792 4208
900
WEST ABUTMENT ELEVATION (FOLDED)SCALE 1:50
EAST ABUTMENT ELEVATION (FOLDED)SCALE 1:50
50005600
2194 5934 4124 2194113
2081113
680
900
900
℄ BRIDGE
℄ BRIDGE
647
8774
1067 4183263
6581 5250
2194593441242194113113
605
388
487 467
850 WIDE PILE CAPPING BEAM
TYPE B CJ
600 WIDE. BACKWALL 2nd STAGEABUTMENT POUR
BACKWALL TO MATCH FOOTPATHPROFILE BOTH SIDESWINGWALL
WINGWALL
WINGWALL WINGWALL
BACKWALL TO MATCH FOOTPATHPROFILE BOTH SIDES850 WIDE PILE
CAPPING BEAM
TYPE B CJ
600 WIDE. BACKWALL 2ndSTAGE ABUTMENT POUR
SP3 SHEET PILES
SP3 SHEET PILES
NOTES:
1. REFER DRAWING NO. SA-0001, FOR GENERALNOTES.
2. REFER DRAWING NO. SA-0002 & SA-0003 FORREINFORCED CONCRETE GENERAL NOTES.
3. CURING TO BE UNDERTAKEN AS PER THEREQUIREMENT OF NZS3109 & PROJECTSPECIFICATIONS.
4. ALL CONSTRUCTION JOINT 'CJ' TO BE TYPE B ASPER NZS3109 UNO. THE LOCATION OFCONSTRUCTION JOINTS SHOWN ON THEDRAWINGS REPRESENT THE DESIGN INTENT.ALTERNATIVE CONSTRUCTION JOINTS MAY BEDEVELOPED THROUGH CONSULTATION WITHTHE DESIGNER.
5. REFER DRAWING SB-0901 FOR PROPOSEDCONSTRUCTION SEQUENCE.
6. ALL DIMENSIONS IN MILLIMETRES, UNO.
7. SHEET PILE TOE LEVELS ARE SHOWN ON SB-021
8. TYPE A AND TYPE B REFER TO THE FOUNDINGREQUIREMENTS FOR THE SP3 SHEET PILES
2081
CP = CHANGE IN PLANE AT FRONT FACE OF PILE CAPPING BEAM
= FOLD LINE
LEGEND:
REINFORCED CONCRETE PILE FACING
CP5CP6CP4CP3
CP2 CP1
RL +3.180
RL +2.457 RL +2.465
RL +3.276 RL +3.185
RL +2.700RL +2.750
RL +3.248
RL +2.255
RL +3.167
RL +3.122RL +3.204 RL +3.190
RL +2.191RL +2.407 RL +2.399
RL +2.225
RL +3.213 RL +3.251
RL +3.155 RL +3.185
RL +2.276
RL +3.164RL +3.213RL +3.218
RL +1.291
RL +1.355
RL BRL A
RL +0.30
200
TYP
47 TYPE A SHEET PILES 7 TYPE B SHEET PILES
43 TYPE A SHEET PILES 8 TYPE B SHEET PILES11 TYPE B SHEET PILES
RL BRL A
RL +0.30
4274
RL +3.193
FINISHED GROUND LEVEL
REINFORCED CONCRETE PILE FACING
200
TYP
FINISHED GROUND LEVEL
FOR CONSTRUCTION
PROVISIONS FOR SERVICES(DUCTS CAST DIRECTLYINTO THE ABUTMENT)
PROVISIONS FOR SERVICES (DUCTS CAST DIRECTLY INTO THE ABUTMENT)
1895
2500
288890
0
TIE BACK BAR CONNECTION TO SHEETPILE REFER SB-0313 FOR DETAILS
TIE BACK BAR CONNECTION TO SHEETPILE REFER SB-0313 FOR DETAILS
4274
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
SHEET 2 OF 2CONCRETE GEOMETRY
ABUTMENT STRUCTURAL
6204430-SB-0302 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
311.D
WG
FOR CONSTRUCTION
ABUTMENT℄
425250600
SETTLEMENT SLAB
PRECAST "U" BEAM. (REFER SB-0351)
250
3-DH16 SIDE BARS EF
DH20 300 WITH 4FW TO SP3SHEET PILE
100
SURFACING (30 LEVELLING COURSE +40 AC14)
900(
MIN.
)
5-DH20 TOP BARS EQUALLYSPACED
2-
1-
(THROUGH SETTLEMENT SLAB)
ABUTMENT CROSS SECTION (TYP)SCALE 1:25 (THROUGH FOOTPATH)
ABUTMENT CROSS SECTION (TYP)SCALE 1:25
WINGWALL CROSS SECTIONSCALE 1:25
900
425
250600
1-
SECTIONSCALE 1:10( RC PILE FACING)
DH20-300 WITH 4FW 75mmLONG AT EACH SHEET PILE
SHEET PILE (SP 3)
2-
SECTIONSCALE 1:10( RC PILE CAP)
CONCRETE FACING SE62 MESH
B
A
A
A
A B60
0 (W
INGW
ALL)
850 (
ABUT
MENT
BEA
M)
500
20070
500
200
4-DH25 SHEAR DOWELSTHROUGH Ø30 HOLE IN SHEETPILES PER PILE
1-
1-
BACKFILL / NATURAL SOIL
SE62 MESH
100 x 6 ELASTOMERIC BEARINGSTRIP (FOR BEAM PLACEMENTIN CONSTRUCTION)
VARI
ES30
010
0
25020
040
0450
A-
SETTLEMENT SLAB SEATING DETAILSCALE 1:5
175 75DH16-200 U-BAR INSTALL TO MATCH BRIDGE SKEW3-DH16 TOP BARSTYPE B CJABUTMENT BACKWALL 2nd STAGE POUR
3-DH20 SIDE BARS EQUALLYSPACED EF.
4-DH20 BOTTOM BARSMAINTAIN 50 COVER FROMFACE OF SHEET PILE
BACKFILL / NATURAL SOILSP3 SHEET PILE
RB16 STARTER BARS WITHFLANGENUTS (REFER SB-0351)
2000
125
100
MIN
EQ. EQ. EQ. EQ. EQ. EQ.
TYPE B CJDECK REINFORCEMENT (REFER SB-0312)
FOOTPATH REINFORCEMENT (REFER SB-0312)
900 (
MIN.
)
100 x 6 ELASTOMERIC BEARINGSTRIP (FOR BEAM PLACEMENTIN CONSTRUCTION)
PILE℄
3-DH20 TOP BAR EQUALLYSPACED3-DH20 SIDE BARS EQUALLYSPACED EF.
2-DH16 BOTTOM BARS.
2-DH25 SHEAR DOWELSTHROUGH SHEET PILESSTIRRUP SET A OR B. REFERSECTION 2
DH25 SHEAR DOWEL STRAIGHT BARTHROUGH Ø30 HOLE IN SHEET PILE. 650LONG IN PILE CAPPING BEAM 400 LONG INWINGWALLS, PLACED CENTRALLY IN LINEWITH STIRRUP A. 4 DOWELS PER SHEETPILE
2- 2
-
DH25-600 DOWEL BAR,GALVANISED
100x6 ELASTOMERICBEARING STRIP
5mm THICK DENSO TAPEWRAPPED AROUND THETOP 250mm OF THEDOWEL BAR
2-DH12 LONGITUDINALBARS ALONG FACE OFCORBEL
DH12 T&B
DH12-150
250
250
125 125
1050
150
450
A-
SOIL/FILL
SOIL/FILL
DH16-200 E/W T&B FALL 3%
DH16-200 U-BAR INSTALL TO MATCH BRIDGE SKEW
ABUTMENT℄
175
300
200
100
PRECAST "U" BEAM. (REFER SB-0351)
DH20 300 WITH 4FW TO SP3SHEET PILE
4-DH25 SHEAR DOWELSTHROUGH SHEET PILES PER PILE
SE62 MESH
SP3 SHEET PILE
200
4-DH25 SHEAR DOWELSTHROUGH SHEET PILES PER PILE
SE62 MESH
SP3 SHEET PILEDH20 AT 300 CTRS.(MAX) WITH4FW TO SP3 SHEET PILE
STIRRUP A
NOTES:1. REFER TO DRG SA-0001 - SA-0003
FOR GENERAL NOTES.
2. REFER TO DRG SB-0350 FOR NOTESFOR PRECAST BRIDGE BEAMS.
3. ALL LONGITUDINAL BARS INABUTMENT AND WINGWALL TO BEL-BARS AT ENDS OF MEMBERS TOREINFORCE END FACES.
STIRRUP B
+
140
0
140
0
200
THROUGH Ø20 HOLE INSHEET PILE
600
DECK REINFORCEMENT (REFER SB-0312)
3-DH16 TOP BARS
3-DH16 SIDE BARSEF
140
0
140
0
300
DH16
DH16
DH16
STIRRUP SET A OR B. REFER SECTION 2
STIRRUP SET A OR B. REFER SECTION 2
300
300
75175
CONTINUOUS POLYSTYRENE
20x6 SIKAFLEX TANK OR ICIAPPROVED EQUIVALENT
REFER ABUTMENT CROSS SECTION(THROUGH SETTLEMENT SLAB) FORLONGITUDINAL REINFORCEMENT
TIE BACK BARSB
SB-0313
PERMANENT TIE BACK BARSREFER SB-0313.
TEMPORARY TIE BACK BARSREFER SB-0313.
TEMPORARY TIE BACK BARSREFER SB-0313.
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
SHEET 1 OF 3CONCRETE DETAILS
DECK SLAB AND ABUTMENT STRUCTURAL
6204430-SB-0311 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
312.D
WG
FOR CONSTRUCTION
FALL 3%
DH12 -200DH12 -200DH12 -200
DH12 -200
2000
50 C
OVER
4000 6000 (TO EDGE OF DECK)
BAR SPACING ADJUSTEDON SITE TO LOCATE DH12BARS IN EYE OF STIRRUPHOOK.
BRIDGE℄
FALL 1.5%
SCALE 1 : 20TYPICAL DECK SECTION (PART)
VARI
ES
600 VARI
ES
PEDESTRIAN BARRIER.(REFER SB-0401) RH12 -200
STIRRUPS, THUS
BOTTOM 3 LAYERS OF DH20 BARSIN PILE CAPPING BEAM THROUGHØ25 HOLE IN SHEET PILESTIRRUP SETS A. REFER DRAWINGSB-0311
DH16 U-BARS AT END OF WINGWALLTO LAP WITH SIDE BARS
5250
DH16 SIDE BARS HOOK AT END OFWINGWALL. REFER WINGWALLCROSS SECTION ON DRAWINGSB-0311
PILE ℄2
PILE ℄ 1
ABUTMENT℄
2650
90°
2750
WINGWALL
WINGWALL
BOTTOM 3 LAYERS OF DH20 BARSIN PILE CAPPING BEAM THROUGHØ25 HOLE IN SHEET PILE
DH20 PILE CAPPING BEAMS SIDE BARS. REFER ABUTMENTCROSS SECTION (TYP.) ON DRAWING SB-0311
NOTES:1. REFER TO DRG SA-0001 - SA-0003
FOR GENERAL NOTES.
ABUTMENT℄
DH16 STIRRUPS A AND B. (REFERDRAWING SB-0311 FOR DETAILS)
DH16 STIRRUPS A AND B. (REFERDRAWING SB-0311 FOR DETAILS)
LAP1075
1075
200
RB12 REID BAR COUPLEREPOXY FILLED INACCORDANCE WITHMANUFACTURER'SGUIDELINES
A-
DECK CONSTRUCTION JOINTSCALE 1:10
2-DH16 U-BARS 400
400
DH16-200 BACKWALL U-BARS PLACEDPARALLEL TO THE BEAM CENTRELINE
STIRRUP SET A AND B IN PILECAPPING BEAM PLACEDPERPENDICULAR TO ABUTMENT ℄
A-
2-DH16 U-BARS 400
400
DH16 U-BARS
400
400
400
100
OR
WHERE CLASHESWITH SHEET PILE
LAP
BACK
WAL
L
PILE
CAP
PING
BEA
M
DH20 PILE CAPPING BEAMS BARS.REFER ABUTMENT CROSS SECTION(TYP.) ON DRAWING SB-0311
300
DH16-200 BACKWALL U-BARS PLACEDPARALLEL TO THE BEAM CENTRELINE
STIRRUP SET A AND B IN PILECAPPING BEAM PLACEDPERPENDICULAR TO ABUTMENT ℄
BACK
WAL
L
PILE
CAP
PING
BEA
M
STIRRUP SETS B. REFER DRAWINGSB-0311
DH12
-200
T&B
DH12-200 T&B
DH16-200 UBARS
140
0
140
0
DH16-200 T&BL-BARS
200
SCALE 1 : 40 TYPICAL DECK PLAN (PART)
ABU
TMEN
T
SCALE 1 : 40ABUTMENT CORNER REINFORCEMENT PLAN DETAILS
(WINGWALL 91°-180° FROM BACKWALL)
SCALE 1 : 40ABUTMENT CORNER REINFORCEMENT PLAN DETAILS
(WINGWALL 90° FROM BACKWALL)
LAP
LAP
DH12-200 UBARS
200
PRECAST UNITS
4335
50mm COVER TO COUPLER
2500
2750
TYPE B CJ
PERMANENT TIE BACK BARSREFER SB-0313.
TEMPORARY TIE BACK BARSREFER SB-0313.
DH16 SIDE BARS. REFER WINGWALLCROSS SECTION ON DRAWINGSB-0311
LAP POSITION TO SUITCONSTRUCTION JOINT
PERMANENT TIE BACK BARSREFER SB-0313.
TEMPORARY TIE BACK BARSREFER SB-0313.
LAP850
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
SHEET 2 OF 3CONCRETE DETAILS
DECK SLAB AND ABUTMENT STRUCTURAL
6204430-SB-0312 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
313.D
WG
FOR CONSTRUCTION
ABUTMENT℄
SETTLEMENT SLAB
PERMANENT TIE BACK AT WINGWALL (TYP.)SCALE 1:25
BACKFILL / NATURAL SOIL
SP3 SHEET PILE
PILE℄
NOTES:1. REFER TO DRG SA-0001 - SA-0003
FOR GENERAL NOTES.
2. MAINTAIN 75 COVER FOR ALLCONCRETE CAST AGAINST GROUND.
3. REFER SCHEDULE ON SB-0201 FORSHEET PILE AND SET OUT.
4. CONTRACTOR SHALL LOCATE ANDIDENTIFY ALL SERVICES IN THE AREAOF WORK PRIOR TO COMMENCINGEARTHWORKS OR PILING.
ISSUED FOR CONSTRUCTION0 31/07/19GBLCARK
AS SHOWN
HALF SHOWNB. FLYNNL. CHEN
02/06/19SCN. KHURANA
31/07/19
G.Brown31/07/1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
SHEET 3 OF 3CONCRETE DETAILS
DECK SLAB AND ABUTMENT STRUCTURAL
6204430-SB-0313 0
BSB-0311
TIE BACK CONNECTION DETAILSCALE 1:2
REID DOMED BASE PLATE BPLATE 201006 ORAPPROVED EQUIVALENT
REID SPHERICAL WASHER RB20 SWG ORAPPROVED EQUIVALENTRB20 REID NUT RB20N OR APPROVEDEQUIVALENT
10MIN
100 M
IN
SP3 SHEET PILE
TEMPORARY RB20 REID BARS.REFER SB-0201 FOR ARRANGEMENT.
PERMANENT RB20 GALVANISEDTIE BACK BARS. REFER SB-0201FOR ARRANGEMENT.
7000 NOM.(REFER TO SB-0201 FOR SET OUT)
7000 NOM.(REFER TO SB-0201 FOR SET OUT)
ANCHOR PILE SP3 SHEET PILEREFER TO SB-0201
500
SP3 SHEET PILE
350
VARIES (REFER TO SB-0301)
DH12 INVERTED U-BAR PLACEDNEAR CTR OF SHEET PILE3 DH12 STIRRUPS BETWEEN PILES ASINDICATED (200mm MAXIMUM SPACING)
SP3 SHEET PILE
3-DH12 STIRRUP EQUALLY SPACED
PLAN - PERMANENT TIE BACK PILE CAPSCALE 1:10
A-
SECTION (PERMANENT TIE BACK PILE CAP)SCALE 1:10
DH12 INVERTED U-BAR
RB20 TIE BACK BARS
SP3 SHEET PILE
3-DH12 STIRRUPS EQUALLY SPACED.
7530
075
450
250
175 175
ANCHOR PILE℄
℄
75 COVER
TEMPORARY TIE BACK AT ABUTMENT (TYP.)SCALE 1:25
75 COVER
RB20 THROUGH Ø28 HOLE IN SHEET PILE
GALVANISED RB20 COUPLERSRB20CS OR APPROVEDEQUIVALENT FOR TEMPORARYREID BARS ONLY.
2500
EQ. EQ.
ANCHOR PILE℄
350
CONSTRUCTION STAGING REQUIREMENTS FOR BACKFILLING AND TIE BACKS:ANY DEVIATION FROM THIS SEQUENCE MUST BE APPROVED BY THE DESIGNER. REFER TO SB-0901 FOR THE FULLPROPOSED CONSTRUCTION SEQUENCE.
1. INSTALL SHEET PILES FOR THE ABUTMENT, WINGWALLS, AND ANCHOR PILES.
2. EXCAVATE AROUND THE PILE HEADS AND FOR EACH TIE BACK BAR.
3. INSTALL PILE CAP REINFORCING CAGES AND TIE BARS.
4. TENSION TIE BARS SO THAT THERE IS LESS THAN 50mm DEFLECTION AT THE MIDDLE OF THEIR SPAN.
5. INSTALL DENSO TAPE ON THE PERMANENT TIE BACK BARS AND THEN POUR PILE CAPS.
6. BACKFILL AND COMPACT STAGE 1.
7. REMOVE STAGE 3 FILL AND EXISTING BRIDGE IN FRONT OF THE ABUTMENTS.
8. PLACE BRIDGE BEAMS.
9. POUR REMAINING PORTION OF THE ABUTMENT BEAM AND DECK TOPPING SLAB - CURE FOR A MINIMUM OF 7 DAYS.
10. REMOVE TEMPORARY TIE BACK BARS AND ANCHOR PILES.
11. CONSTRUCT SETTLEMENT SLAB AND COMPACT THE STAGE 2 BACKFILL.
340340
RB20 TO BE WRAPPED IN DENSO TAPETO MANUFACTURERS SPECIFICATION(MINIMUM 55% TAPE OVERLAP)
TEMPORARY ANCHOR PILESP3 SHEET PILE REFER TOSB-0201
STAGE 2 COMPACTEDBACKFILL
STAGE 1 COMPACTED BACKFILL(AFTER TIE BAR INSTALLATION)
STAGE 3 REMOVEFILL (UNDER BRIDGE)
2850
350
21
21
ANCHOR PILE℄
STAGE 2 COMPACTEDBACKFILL
150
STAGE 3 REMOVEFILL (FUTURE)
150
STAGE 1 COMPACTED BACKFILL(AFTER TIE BAR INSTALLATION)
150
70 MIN
FULL STIRRUPS BETWEEN PILES (BEYOND)B-
(HANDED)
B-
A-
B-
(HANDED)
B-
..................................
.................................................................................................................................
.................................................................
..........................................................................
.........................................................................................................
SPECIFIED CONCRETE COMPRESSIVE STRENGTHS
REINFORCEMENT
CONCRETE COVER (MINIMUM)
DESIGN LOADING
SPECIFICATION
TOLERANCES
HANDLING
METHOD OF MANUFACTURE
SURFACE FINISHES
1.
2.
3.
4.
5.
6.
7.
8.
9.
CURING10.
CASTING11.
LIFTING AND STORAGE12.
N.T.S.
BEAM
N.T.S.
DIAGRAM A
DIAGRAM B
ACTUAL OVERALL LENGTH AND SQUARENESS
5mm
±5mm ±10mm ±20mm
±10mm
±10mm ±5mm
40 MPa
TYPE B CONSTRUCTION JOINTTYPE B CONSTRUCTION JOINTF1F4
DECK POUR INSTALLATION.
COMPACTED IN ACCORDANCE WITH NZS3109.
UNLESS OTHERWISE NOTED.
APPROPRIATE LIFTING POINTS AND BRACING SYSTEM REQUIRED TO ENSURE THE STABILITYOF THE BEAMS DURING LIFTING AND TRANSPORTATION.
'EAST / WEST'
LIFTING GEAR, BRACING/ RESTRAINTS, EDGE FORMWORK AND SERVICE SUPPORT SYSTEM. THEIRNEED AND POSITION SHALL BE CO-ORDINATED IN SHOP DRAWINGS.
4.1 HN-HO-72 (INCLUDING SLS LIVE LOAD FACTOR OF 1.35)
2.1 ALL REINFORCEMENT SHALL BE GRADE 500E TO AS/NZS4671
2.2 COMPONENTS PREFIXED RB ARE REIDBAR ITEMS. REIDBAR SHALL BE GRADE 500E TO AS/NZS4671.
3.1 COVER TO ALL REINFORCEMENT EXPOSED SURFACE COVER TO ALL REINFORCEMENT INTERNAL SURFACE COVER ADJACENT TO CORED HOLES COVER TO BRIDGE DECK & ALL CAST INSITU CONCRETE
50mm50mm50mm50mm
5.1 THE DESIGN IS BASED ON NZTA BRIDGE MANUAL 3rd EDITION.
a) THE BEAM END SURFACES SHALL LIE WITHIN THE "TOLERANCE BOXES" SHOWN IN
b) PLANE SURFACE, DEVIATION FROM A 1.5m STRAIGHT EDGEc) BEAM HOGGING (REFER TO BRIDGE BEAM SPECIFIC DRAWINGS)d) CROSS SECTION DIMENSIONS UP TO 0.5me) CROSS SECTION DIMENSIONS 0.5m TO 2.0mf) HORIZONTAL BOW OF LONGITUDINAL AXIS
a) LONGITUDINAL STEEL ARRANGEMENT
6.1 DIMENSIONS AT TIME OF CASTING
6.2 DIMENSIONS AT TIME OF ERECTION
b) LOCATION OF AN ITEM IN RELATION TO ANY OTHER ITEM WITHIN ITS GROUP ORTO THE MIDPOINT OF THE BEAM ENDS
c) PRETENSIONING PRESTRESSING STRANDS IN ANY DIRECTION
DIAGRAM A
7.1 EXTREMES OF VERTICAL LIFTING POINTS OR GROUND SUPPORT SHOWN SHADED.CENTRAL SUPPORT POSITION AS SHOWN IS PREFERRED (BEAM IN UPRIGHT POSITIONAT ALL TIMES).
8.1 BEAMS SHALL BE MANUFACTURED UNDER FACTORY CONDITIONS.
9.1 BEAMSa) TOP SURFACE OF FLANGEb) IN DIRECT CONTACT WITH INSITU CONCRETEc) HIDDEN FORMED SURFACEd) ALL OTHER FORMED SURFACES
10.1 ACCELERATED TEMPERATURE CURING IS PERMITTED.10.2 CONSTRUCTOR TO DEMONSTRATE THAT MINIMUM CONCRETE STRENGTH
OF 20MPa IS ACHIEVED BEFORE BEING REMOVED FROM THE FORM.
11.1 ALL BEAMS TO BE CAST A MINIMUM OF 30 DAYS PRIOR TO
11.4 BEAMS SHALL BE CAST HORIZONTAL.
11.5 BEAMS SHALL BE CAST IN FORMWORK COMPLYING WITH NZS3109 AND
11.6 STIRRUP SETS SHALL BE PLACED PERPENDICULAR TO BEAM CENTRE LINE
11.2 EXPOSURE CLASSIFICATION B2 IN ACCORDANCE WITH NZS3101. REFER TO CURING REQUIREMENTS IN SPECIFICATION, MINIMUM 3 DAYS DURATION.
11.3 DIMENSIONED LENGTH OF GIRDERS GIVEN IS THE NOMINAL REQUIRED TRUE LENGTH AT THE TIME OF INSTALLATION. THE CONSTRUCTOR SHALL MAKE ALLOWANCE FOR
12.1 THE CONSTRUCTOR SHALL DESIGN AND PROVIDE APPROPRIATE LIFTING FIXTURES FOR BEAMS.THE CONSTRUCTOR SHALL DOCUMENT THE METHOD OF REMOVAL OF LIFTING HOOKS AND MAKINGTHE BEAM SURFACE GOOD. THIS METHODOLOGY SHALL BE AGREED WITH THE DESIGNER.
12.4 FOR BEAMS WITH UNEQUAL FLANGES, THE CONSTRUCTORS SHALL DETERMINE THE
12.5 EVERY BEAM SHALL BE CLEARLY MARKED AT EACH END WITH INSTALLATION DIRECTION, E.G.
12.6 DRAWINGS DO NOT SHOW ANY CAST-IN ITEMS THAT MAY BE REQUIRED FOR ATTACHMENT OF
1.1 PRECAST BEAMS AT 28 DAYS
PRECAST AND NOTES:
OVERALL LENGTH
10001000 10001000
SPECIFIED OVERALL LENGTH
1010 1010TOLERANCE BOXES
90°
90°
12.2 DURING STORAGE BEAMS SHALL BE KEPT IN AN UPRIGHT POSITION AND SUPPORTED NO MORETHAN 2000mm FROM EACH END. BEAMS MAY BE TRANSPORTED, HANDLED AND ERECTED USINGTHE ABOVE SUPPORT POSITIONS, OR USING THE LIFTING ARRANGEMENT SHOWN ONTEMPORARY WORKS DRAWINGS ONCE CONCRETE STRENGTH REACHES SPECIFIED STRENGTH(REFER TO BRIDGE BEAM SPECIFIC DRAWINGS).
12.3 CONSTRUCTOR SHALL BE RESPONSIBLE FOR DESIGN AND INSTALLATION OF BRACING TO PREVENTTRANSLATION AND OVERTURNING OF BEAMS PRIOR TO THE COMPLETION OF ABUTMENT POURS ANDDECK POURS.
SHRINKAGE UP TO THE TIME OF ERECTION. IN ADDITION THE CONSTRUCTOR SHALLALLOW APPROPRIATE TOLERANCE TO ENSURE THAT MINIMUM SEATINGREQUIREMENTS SHOWN ON BRIDGE SPECIFIC DRAWINGS ARE ACHIEVED. ANYALLOWANCES FOR TOLERANCE, ARE TO BE AGREED WITH THE DESIGNER.
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
350.D
WG
FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
02/06/19SCN. KHURANA
05/06/19
G.Brown03/06/1903/06/19
01/06/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET
BRIDGE BEAMSNOTES FOR PRECAST STRUCTURAL
6204430-SB-0350 1
4335
A-
1-
SECTION: TYPICAL REINFORCEMENTSCALE 1:10
RH12 STIRRUPS. HOOK AROUNDDECK REINFORCEMENT. REFERTO ELEVATION FOR SPACING
2-DH16-SIDE BARS EF
BEAM℄
800
PREC
AST
UNIT
500
160160 480
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
351.D
WG
EASTWEST
℄ BE
ARIN
G
℄ BEAM
2850NO LAP ZONE
℄ BE
ARIN
G
800
TYPE B CJ ON END FACES
400
3000RH12-100 STIRRURS
5520RH12-200 STIRRURS
3000RH12-100 STIRRURS
8-RB16 REID BARS WITHCOUPLERS AND FLANGE NUT
STAGGER 50%OF LAPS
25 DIA DRAINAGE HOLES
H3.2 PLYWOOD SACRIFICIALFORMWORK, TYPICAL.
180 440
25
A-
DETAILSCALE 1:2.5
180
2016
0
25
3235 (STAGGERED BARS) / 4285
500
400
400
EASTWEST
2-
SECTION: REID BAR ARRANGEMENTSCALE 1:10
2-RB16 REID BARS EF. CLEARSPACING TO CLOSEST LONGITUDINALBAR NOT TO EXCEED 50mm
800
PREC
AST
UNIT
500
160160 480
4-RB16 BOTTOM LAYER REID BARS
8-DH25 B1
1-
25 DIA. DRAINAGE HOLE
2-
FOR CONSTRUCTION
115204335
25 DIA. DRAINAGE HOLESEQUALLY SPACED.
2-DH25 B1 + 2-DH25 B2 BARSTO LAP WITH DH20 BARS.REMAINING DH25 BARSTERMINATE AT END FACES.
ALL DH20 BARS BENT UP ATBEAM END FACE.
2-DH20 B1 L-BARS REFERBEAM ELEVATION.
TYPE B CJ FINISH TO TOP OFWEBS
150 105
3235 / 4285 (STAGGERED BARS)
RB16 BOTTOM LAYER REIDBARS.
25 DIA. DRAINAGE HOLE
2-DH25 BARS (FROM 10-DH25) TO BE LAPPED WITHDH20 BARS. REFER BEAM PLAN AND BEAMELEVATION.
1050STAGGERED
BARS LAP HERE
600 750
2-DH16 FULL LENGTH EACHWEB
50mm
MIN
.CO
VER
TYP
50mm
MIN
.CO
VER
TYP
600750
25 DIA.DRAINAGE HOLE
SCALE 1 : 20BEAM PLAN
SCALE 1 : 20BEAM ELEVATION
1050LAP LENGTH
700 875LAP LENGTH
1050LAP LENGTH
700875LAP LENGTH
400
2-DH25 B2 BARS TO BE LAPPED WITHDH20 BARS. REFER BEAM PLAN ANDBEAM ELEVATION.
10-DH25 B1
BEAM℄
8-DH25 B1+2-DH20 B1+2-DH20 B2
10-DH25 B1+2-DH25 B2
2-DH16 SIDE BARS EF8-DH25 B1+2-DH20 B1+2-DH20 B2
1050STAGGERED
BARS LAP HERE
24.25°
2-DH20 B2 BARS L-BARS
150
ALL DH20 BARS BENT UP ATBEAM END FACE.
12512524.25°
240
240
STIRRUPS REFER TOELEVATION FOR SPACING
STIRRUPS SPLAYED AT ENDSMINIMUM SPACING 50mm MAXIMUMSPACING 100mm. BOTH ENDS
NOTES:1. REFER TO DRAWING SA-0001-SA-0003 FOR GENERAL NOTES.
2. REFER TO DRAWING SB-0350 FOR NOTES FOR PRECAST BRIDGE BEAMS.
3. ALL DIMENSIONS IN MILLIMETRES, UNO.
4. BAR LAPS MAY BE OMITTED IF 12.0m LENGTHS OF REINFORCING ARE ABLETO BE SUPPLIED.
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
02/06/19SCN. KHURANA
05/06/19
G.Brown03/06/1903/06/19
01/06/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET PRECAST "U" BEAM DETAILS STRUCTURAL
6204430-SB-0351 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
401.D
WG
1000
100
1. FINISH ALL TIMBER EDGES WITH 5 mm. RADIUS
2. ALTERNATIVE HARD WOOD TIMBER ISPREFERED TO PINE/DOUGLAS FIR. (I.E.KWILA/CEDAR OR SIMILAR)
3. GALVANISED ELEMENTS SHALL BE HOT DIPGALVANISED TO HDG600 IN ACCORDANCE WITHNZS2312
4. ALL WELDS ARE GP GRADE UNO
5. BARRIER TO EXTEND THE FULL LENGTH OF THEBRIDGE AND WINGWALLS
6. BARRIER MUST TERMINATE AND CHANGEDIRECTION WITH A POST
7. CONSTRUCTOR TO CONFIRM ON SITE THELAYOUT OF POSTS BASED ON AS-BUILTGEOMETRY
8. GAPS BETWEEN TIMBER BATTENS TO BEUNIFORM OVER FULL LENGTH OF BARRIER(VERTICAL AND DIAGONAL BATTENS).
9. TIMBER RAILS AND BATTENS TO BE MSG8TIMBER TO AS/NZS 1748-AS/NZS 4490
NOTES:
SHS POST
EA RAIL (NOTCHED AROUNDPOST & WELDED)
" "2000 (MAXIMUM)
℄BRIDGE MIDSPAN℄
POST℄
POST
STAINLESS STEEL SCREW(SKEW) (BATTEN TO TOPTIMBER RAIL) TYP.
GAP 100 MAX.
GAP 100 MAX.
100
TIMBER INFILLBATTENS. 50x50
TIMBER TOP RAIL(100x175)
STAINLESS STEEL SCREW(BATTEN TO BOTTOMTIMBER RAIL AND BOTTOMBATTEN) TYP.
H4 TIMBER RAIL(100x50)
STEEL RAILS
FOR CONSTRUCTION
300(MAX)
SPLICE STEEL RAIL SPLICE.REFER TO SPLICE DETAIL
TOP OF FOOTPATH
6FW
SEAL WELD TOP PLATE(THICKNESS TO MATCH EA)TO TOP OF SHS
6FW (TO UNDERSIDE OF EA)BOTH SIDES
75 x 6 x 240 PL ON UNDERSIDE OFHORIZONTAL FLANGE
4 - M8 BOLTS
4040
40
4040
40
75
1-
JOINT
125
250
250
375
375
100
100
75 x 75 x10 mm. THICK PLASTIC SHIMSAT BOLT LOCATIONS.
M16 STAINLESS STEEL. THREADED RODTHROUGH POST FIXED INTO THREADEDRAMSET INSERT, DRILLED AND EPOXIEDINTO DECK/FOOTPATH USING EPCONC6, OR APPROVED EQUIVALENT.NEOPRENE WASHERS SHALL BEPROVIDED BETWEEN THE STAINLESSSTEEL NUT/WASHER AND POST.
100x50 MSG8 H4 TIMBER RAIL.BOLTED TO EA.
M8 ROUNDED HEAD BOLTS.GALV. AT 1000 MAX C/C.
EA RAILS GALV WELDED TO POST(90x90x6 EA) TYP. RUN CONTINUIOUSINFRONT/ON TOP OF POST.REFER TO POST TO RAIL DETAIL
100x175 MSG8 H4 TIMBER TOP RAIL
M8 ROUNDED HEAD BOLTS. GALV. AT1000 MAX C/C
40x40 CHAMFER
50x50 MSG8 TIMBER INFILL.H4 FIXED TO TIMBER RAILS USING 8GSTAINLESS STEEL SCREWS.
100x100x6 SHS STEEL POST. AT2000 MAX C/C GALV.
1-
BARRIER DETAILSCALE 1:10
FOOTPATH
DECK
SCALE 1 : 50PEDESTRIAN BARRIER PART ELEVATION
TIMBER BOTTOM BATTEN
SCALE 1 : 5POST TO RAIL DETAIL
SCALE 1 : 5RAIL SPLICE DETAIL
SCALE 1 : 5POST TO TOP RAIL DETAIL
4FW
4FW
14035
SCALE 1 : 200BARRIER POST LAYOUT PLAN
3 SPACES OF 1700
7 SPACES OF 1600
3 SPA
CES
OF 18
00
7 SPACES OF 1600
3 SPA
CES
OF 16
00
OUTLINE OF BRIDGEAND WINGWALLS
WEST ABUTMENT℄
EAST ABUTMENT℄
℄ BRIDGE
2 SPACES OF1700
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET PEDESTRIAN BARRIER STRUCTURAL
6204430-SB-0401 1
2.80
2.84
2.96
3.12
3.002.94
2.85
2.97
2.74
2.53
2.75
2.88 2.91
2.90
3.08
2.96
2.82
3.213.14
3.12 3.24
Punanganui Market
3.12R4786215
BRID
GE ℄
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
801.D
WG
FOR CONSTRUCTIONSCALE 1 : 100CIVIL AND BACKFILL
MAIN ROADMAIN ROAD
AVAT
IU S
TREA
M
PUNANGANUI MARKET
EXISTINGBUILDING
EXISTINGBUILDING
TOP
OF B
ANK
TOP
OF B
ANK
FLOW
FLOW
TOP
OF B
ANK
℄
WEST ABUTMENTCONTINUE 2.00m WIDE FOOTPATHAROUND
NEW SUMP TO COLLECT WATERFROM BRIDGE AT END OF KERB
MAINTAIN SIGN IF POSSIBLE
2.00m WIDE FOOTPATHTO TIE INTO FUTUREROUNDABOUT DESIGN
2.00m WIDE FOOTPATHTO TIE INTO FUTUREROUNDABOUT DESIGN
EAST ABUTMENT℄
NOTES:1. ABUTMENT BACKFILLING AND COMPACTION SHALL BE
CARRIED OUT AFTER BACKWALL HAS REACHED ITS 28DAY STRENGTH.
2. BACKFILL SHALL BE INSTALLED WITH A MAXIMUMDIFFERENTIAL BETWEEN ABUTMENTS OF 0.5m.
3. ALL CONSTRUCTION PLANT AND OTHER VEHICLESHAVING A MASS OF OR GREATER THAN 1500kg SHALL BEKEPT A MINIMUM OF 2m AWAY FROM THE BACK OF THEWALLS.
4. THE PLANT USED FOR COMPACTING FILL MATERIAL SHALLBE RESTRICTED TO
4.1 VIBRATING ROLLERS, HAVING A MASS PER METRE WIDTH OF ROLLER NOT EXCEEDING 1300kg WITH
TOTAL MASS NOT EXCEEDING 1500kg.
4.2 VIBRATING PLATE COMPACTORS HAVING A MASS NOT EXCEEDING 100kg.
4.3 VIBRO TAMPERS HAVING A MASS NOT EXCEEDING75kg.
5. BACKFILL MATERIAL BEHIND ABUTMENT
5.1 SHALL BE COMPACTED IN ACCORDANCE WITH ICISTANDARD PRACTICE
5.2 SHALL BE GAP 65 OR APPROVED EQUIVALENT
6. ASPHALT SURFACING TO BE 50 THICK AC14 OR ICIAPPROVED EQUIVALENT DENSE GRADE ASPHALT
7. LEVELING COURSE IS A DG10 (DENSE GRADED NOMINALAGGREGATE SIZE OF 7 - 10mm) ON A WATERPROOFINGMEMBRANE (BITUMEN), OR ICI APPROVED EQUIVALENT
8. REFER TO NZTA M10:2014 FOR PAVEMENTSPECIFICATIONS
9. ALL PAVEMENT JOINTS TO BE SEALED
10. FOOTPATHS OFF THE BRIDGE TO BE CONSTRUCTED WITH100mm THICK, 20MPa UNREINFORCED CONCRETE ON TOPOF A MINIMUM OF 100mm GRANULAR FILL. FORMED CONTRACTION JOINTS OF 3-5mm DEPTH ARE TO BE PROVIDED AT THE INTERFACE WITH THE BRIDGE DECKAND THEN AT A MAXIMUM SPACING OF 1.20m TRANSVERSALLY ACROSS THE FOOTPATH, OR AN ICI APPROVED EQUIVALENT.
EXISTINGBUILDING
OUTLINE OF EXISTING BRIDGE(TO BE DEMOLISHED)
OUTLINE OF PROPOSED BRIDGE
FOOTPATH
FOOTPATH
N
STANDARD KERB AND CHANNEL
PAVEMENT FILL BUILD UP CONTOURS
DROP KERBS
STANDARD KERB AND CHANNEL
PAVEMENT FILL BUILD UP CONTOURS
0.00m0.05m
0.10m0.15m0.20m
0.25m0.00m0.05m
0.10m
0.15m
0.20m
0.25m
SCALE 1 : 10STANDARD KERB AND CHANNEL
130 20 300
170
3015
0
350
450
R 4.80m
R 65
.00m
* OR APPROVED EQUIVALENT
R1.70
m
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET CIVIL AND BACKFILL DETAILS STRUCTURAL
6204430-SB-0801 1
No. AppdRevision By Chk Date
Drawing Originator:
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original DesignConstruction*
Date
Approved For Client: Project:
IF IN DOUBT ASK.
Title:
Drawing No.
Discipline
Docu
ment
No.
Rev.
Drawing Plotted: 30 Jul 2019 7:15 PM
6204
430-
SB-0
901.D
WG
FOR CONSTRUCTION
INSTALL SHEET PILES
TEMPORARY BARRIER
STAGE 1: INSTALL SHEET PILES BEHIND EXISTING ABUTMENTS STAGE 2: CONSTRUCT ABUTMENT PILE CAPS STAGE 3: DEMOLISH PORTION OF EXISTING BRIDGEDEMOLISH TO THE EDGE OF THE EXISTING ARCH SECTION(APPROX. 10m. WIDTH)
EXCAVATE BEHIND EXISTINGABUTMENT AND CONSTRUCTLOWER PORTION OF PILE CAPOVER SOUTHERN SIDE OF THEABUTMENT
EXCAVATE BEHIND EXISTINGABUTMENT AND CONSTRUCTLOWER PORTION OF PILECAP OVER SOUTHERN SIDEOF THE ABUTMENT
CONSTRUCT SHEET PILECONCRETE FACING.
INSTALL PRECAST U BEAMS
CONSTRUCT SETTLEMENTSLAB
POUR ABUTMENT BACKWALLPOUR DECK
STAGE 4: PLACE PRECAST BEAMS STAGE 5: POUR ABUTMENT BACKWALL STAGE 6: POUR DECK SLAB THEN BACKFILL BEHIND ABUTMENT (AFTER 7 DAYS)
STAGE 7: POUR FOOTPATH AND INSTALL BARRIERS
INSTALL PEDESTRIAN BARRIER
POUR FOOTPATH
TEMPORARY BARRIER
STAGE 8: SWITCH TRAFFIC AND REPEAT STAGES 1-7 FOR NORTHERN SIDE
TEMPORARY BARRIER
INSTALL SURFACING ANDROAD MARKINGS
BACKFILL TO TOPOF PILE CAP
CONSTRUCT WING WALLS.
TYPE B CJ TYPE B CJ
TYPE B CJ TYPE B CJ TYPE B CJ
TYPE B CJ
REMAINING PORTION OFEXISTING BRIDGE
REMAINING PORTION OFEXISTING BRIDGE
LIVE FOOTPATH
LIVE TRAFFIC
LIVE FOOTPATH
LIVE TRAFFIC
LIVE FOOTPATH
LIVE TRAFFIC
LIVE FOOTPATH
LIVE TRAFFIC
LIVE FOOTPATH
LIVE TRAFFIC
LIVE FOOTPATH
LIVE TRAFFIC
LIVE FOOTPATH
LIVE TRAFFIC
LIVE FOOTPATH
LIVE TRAFFIC
NOTES:
1. REFER DRAWING NO. SA-0001 FORGENERAL NOTES.
2. REFER DRAWING NO. SA-0002 &SA-0003 FOR REINFORCEDCONCRETE GENERAL NOTES.
3. ALL CONSTRUCTION JOINT 'CJ' TOBE TYPE B AS PER NZS3109 UNO.THE LOCATION OF CONSTRUCTIONJOINTS SHOWN ON THE DRAWINGSREPRESENT THE DESIGN INTENT.ALTERNATIVE CONSTRUCTIONJOINTS MAY BE DEVELOPEDTHROUGH CONSULTATION WITH THEDESIGNER.
4. ONE LANE OF TRAFFIC AND ONEFOOTPATH TO BE KEPT OPEN FORPUBLIC ACCESS AT ALL TIMES.
5. IT IS SUGGESTED THAT PARTIALDEMOLITION OF THE BRIDGESHOULD BE DONE ALONG THEINTERFACES BETWEEN THEVARIOUS BRIDGE TYPES THAT MAKEUP THE EXISTING BRIDGE(ARCH/PRECAST BEAMS, ETC.)
6. CONTRACTOR TO SUBMITPROPOSED CONSTRUCTIONSEQUENCE TO ENGINEER FORREVIEW.
7. CONTRACTOR TO CONSIDER THESTABILITY OF THE EXISTINGSTRUCTURE DURING NEW BRIDGECONSTRUCTION AND PROVIDE ANYTEMPORARY WORKS REQUIRED FORSTABILITY.
℄ BRIDGE
EAST ABUTMENT℄
WEST ABUTMENT ℄
EAST ABUTMENT℄
WEST ABUTMENT ℄
EAST ABUTMENT℄
WEST ABUTMENT ℄
EAST ABUTMENT℄
WEST ABUTMENT ℄
EAST ABUTMENT℄
WEST ABUTMENT ℄
EAST ABUTMENT℄
WEST ABUTMENT ℄
EAST ABUTMENT℄
WEST ABUTMENT ℄
EAST ABUTMENT℄
WEST ABUTMENT ℄
TEMPORARY RETAINING
TEMPORARY RETAINING
RELOCATE SERVICES
INSTALL SHEET PILESFOR TIE-BACK SYSTEM
CONSTRUCT PILE CAP FORPERMANENT TIE-BACKSHEET PILES
INSTALL TIE-BACK BARS
REMOVE TEMPORARY TIE-BACKBARS AND TEMPORARY SHEETPILES 7 DAYS MINIMUM AFTERDECK POUR
DEMOLISH EXISTING BRIDGE ANDEXCAVATE OUT IN FRONT OF THE SHEETPILES. (NOTE SOME EXCAVATION WILL NOTBE POSSIBLE ADJACENT TO THE REMAININGSECTION OF BRIDGE ABUTMENT)
℄ BRIDGE℄ BRIDGE
℄ BRIDGE ℄ BRIDGE ℄ BRIDGE
℄ BRIDGE ℄ BRIDGE
TEMPORARY BARRIER TEMPORARY BARRIER
TEMPORARY BARRIER TEMPORARY BARRIER TEMPORARY BARRIER
ISSUED FOR CONSTRUCTION1ISSUED FOR CONSTRUCTION0
31/07/19GBBJFARK06/06/19GBBJFARK
NTS
NTSB. FLYNNL. CHEN
30/07/19SCN. KHURANA
31/07/19
G.Brown31/07//1931/07/19
25/07/19
BRIDGE REPLACEMENTAVATIU PUNANGANUI MARKET PROPOSED CONSTRUCTION SEQUENCE STRUCTURAL
6204430-SB-0901 1