Status – 22 may 2012
• Document « Civil engineering for increasing the radiation shielding on the route Goward. Passage over the PS » completed → EDMS approval procedure ongoing (25 may 2012)
• CE execution drawings completed → EDMS approval procedure ongoing (22 may 2012)• Tender documents completed → EDMS approval procedure completed (16 may 2012)• Market survey completed → list of firms to be finalized ( translation in english of the tender
documents to be confirmed depending on the nationality of the selected firms)
NEXT STEPS • Launch call of tender• Organize an information campaign to the attention of the occupants of the center of the ring
NEW ! • Two “sondages” requested by RP to determine if the ground around the PS is contaminated →
potential impacts on the method of execution and the cost / delay of work Reminder: the assumption for this project was that there was no RP constraints for materials and/or workers
![Page 3: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/3.jpg)
Installation de chantier
![Page 4: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/4.jpg)
Démolition et démontage
![Page 5: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/5.jpg)
Terrassement et accès provisoire
![Page 6: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/6.jpg)
Pieux
![Page 7: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/7.jpg)
Dalle
![Page 8: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/8.jpg)
Mur bâtiment 365
![Page 9: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/9.jpg)
Mur de soutènement du parking
![Page 10: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/10.jpg)
Mur de soutènement sud-est
![Page 11: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/11.jpg)
Situation finale
![Page 12: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/12.jpg)
Profil en long de la route
![Page 13: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/13.jpg)
Marquage et signalisation
![Page 14: Civil engineering for LIU – PS Shielding of route Goward](https://reader035.vdocument.in/reader035/viewer/2022062417/551d9db6497959293b8db211/html5/thumbnails/14.jpg)
Provisional Schedule
Travaux préparatoires avant chantier de génie civil:
-Evacuation des transformateurs –EN/EL-Abattage des arbres GS/IS-Dépose des candélabres – GS/SE-Dépose des moniteurs RP - DGS/RP- Autres??