civil eng.m.sayed c.v & cover letter last

5
Dear Mr/Ms , I was excited to learn about the vacancy in your company for the post of civil engineer. I am delighted and would like to apply for the post and present my serviced as a civil Project engineer for your reputed company. As a civil Project engineer I have gained a good in-depth knowledge of the field. I worked with HASSAN ALLAM CONSTRUCTION) as a project engineer wherein I learned a lot of what kind of work is mostly involved on a particular site & Technical office. In fact, working for More than Eight years in several companies to get the most amounts of experience and knowledge in the shortest possible time, I was able to get some of that in Eight large projects that were all fast track or super fast track projects (more than 12 hr par day), I was considered as one of the good members in this field. I also have a good experience as a Civil Site, Foundation, QC, and QS engineer and have worked in various projects. This is mentioned in one of the requirements in your job requirements. I have become progressively involved in the environmental side from the engineering point of view and have found interests shifting towards environmental specifications in construction projects. I believe and hope that my Experience and rapport with network of developers and construction companies would be beneficial for the project work of your organization. I am well aware of your esteemed company's reputation in balancing growth and also conservation needs. You will find my experience in my Attached CV . I hope to see you soon and discuss in details these issues. You can contact me at Tel: 002 – 01009354643 & 0122 639 0741 Email : [email protected] Linkedin : http://eg.linkedin.com/pub/mohamed-sayed/6b/325/723/ Skype : [email protected] Or Eng.Mohamed sayed Thanks for reviewing my letter. Sincerely, Eng, Mohamed Sayed …………………………… Page 1 of 5

Upload: mohamed-sayed

Post on 07-Jul-2015

225 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Civil eng.m.sayed c.v & cover letter last

Dear Mr/Ms ,

I was excited to learn about the vacancy in your company for the post of civil engineer. I am delighted and would like to apply for the post and present my serviced as a civil Project engineer for your reputed company. As a civil Project engineer I have gained a good in-depth knowledge of the field. I worked with HASSAN ALLAM CONSTRUCTION) as a project engineer wherein I learned a lot of what kind of work is mostly involved on a particular site & Technical office. In fact, working for More than Eight years in several companies to get the most amounts of experience and knowledge in the shortest possible time, I was able to get some of that in Eight large projects that were all fast track or super fast track projects (more than 12 hr par day), I was considered as one of the good members in this field. I also have a good experience as a Civil Site, Foundation, QC, and QS engineer and have worked in various projects. This is mentioned in one of the requirements in your job requirements. I have become progressively involved in the environmental side from the engineering point of view and have found interests shifting towards environmental specifications in construction projects. I believe and hope that my Experience and rapport with network of developers and construction companies would be beneficial for the project work of your organization. I am well aware of your esteemed company's reputation in balancing growth and also conservation needs. You will find my experience in my Attached CV . I hope to see you soon and discuss in details these issues. You can contact me at Tel: 002 – 01009354643 & 0122 639 0741 Email : [email protected] Linkedin : http://eg.linkedin.com/pub/mohamed-sayed/6b/325/723/ Skype : [email protected] Or Eng.Mohamed sayed Thanks for reviewing my letter. Sincerely, Eng, Mohamed Sayed ……………………………

Page 1 of 5

Page 2: Civil eng.m.sayed c.v & cover letter last

Mohammed Sayed Abd El-All 108 Madinat El-fat'h, Nasr City, Cairo, Egypt.

002 (02) 227 57 316 – 002 (0122) 639 0741 / 002 (0100) 935 4643 Email : [email protected]

Career Objective I have a wealth of Commercial experience in the residential development sector of the construction industry Civil Site, Foundation, Technical Office Management, Quantity Surveying, & Commercial Works, in addition to more than 150 study hours in Project Management, Contractual and Legal Matters, further to academic background in Civil Engineering .

EEXXPPEERRIIEENNCCEE

Career Cornerstones & Achievements:- • Gabal El Asfar WASTWATER TREATMENT PLANT –Stage II – Phase II –Egypt (162,000,000 € "Million EURO") • Polaris AlZamil Industrial Park – Gulsan Egypt- Nonwoven Industries (150,000,000 L.E "Million EGP"). • Smart Village-Egyptian Financial Supervisory Authority-Two Office Building (307,000,000L.E"Million EGP C.W") • El-Salheya – Ismailia – Egypt: AL-SHABAB- Power Station - More than (2, 000,000,000 L.E "Billion EGP"). • Cairo – Egypt : Cairo Metro Line 3 phase two (4,300,000 € " Million EURO") • Ain Sokhna - Suez – Egypt: SAINT GOBAIN Glass Factory (300,000,000 "Million EGP C.W"). • New Cairo – Egypt: EL-MAMLKA - Resort (160,000,000 "Million EGP C.W") • Cairo – Egypt : Cairo Metro Line 3 phase one (4,200,000,000 L.E "Billion EGP ")

EEMMPPLLOOYYMMEENNTT HHIISSTTOORRYY

HASSAN ALLAM SONS December 2010 ---- Present CCOONNSSTTRRUUCCTTIIOONN CCOOMMPPAANNYY

4th/ Sr.Project Eng “Quantity Survey” at: " Gabal El Asfar Wastewater Treatmenr Plant " Apr 2014 --- Present

Introduction

Gabal El Asfar WWTP Project will be the biggest & largest station in the world with Daily peak flow → 650,000 m3/d Construction Authority for Potable Water and Wastewater (CAPW) has received a loan from African Development Bank and French Development Agency (AFD) (162,000,000 € "Million EURO") to finance Plant Design, Build, Operate, and maintain Stage II – Phase II of Gabal El Asfar

CLIENT:

THE CONSTRUCTIO AUTHORITY FOR POTABLE WATER AND WASTE WATER

ENGINEER: -

- SOGREAH - AL DAR - EWWE - Dorsch Gruppe

CONTRACTOR :

- HASSAN ALLAM SONS - Passavabt Roediger - acciona

Job Description:

1. Devising the bill of quantities / Material Take-off (MTO) from drawings and specifications; tracking Bill of Quantity (BOQ) measurements according to the approved construction drawings.

2. Prepare Monthly Payments for the Employer and Subcontractors& Cost Reports. 3. Monitoring contractor's progress and monthly payment applications 4. Assist in preparing Variations, Contracts and Addendums. 5. Reviewing tender and contract documents for the client 6. Assist on timely procurement and agreement of subcontractors conditions to ensure completion of project on time and

within budget.

Page 2 of 5

Page 3: Civil eng.m.sayed c.v & cover letter last

3rd /Project Eng “Quantity survey at: “Gulsan Egypt Nonwoven Industries " March 2013 --- Apr 2014

Introduction

Gulsan Egypt Nonwoven Industries “Fast Track Project” is a new fabrics plant located within the Polaris AlZamil Industrial Park (PZIP).

Owner: Gulsan Egypt Nonwoven Industries S.A.E Consultant: E.C.G. Contractor: HASSAN ALLAM SONS

Job Description:

1- Assistant Technical Manager at procurement, credentials materials, selection sub-contractors, Manufacturer and supplier. 2- Devising the bill of quantities / Material Take-off (MTO) from drawings and specifications; tracking Bill of Quantity

(BOQ) measurements according to the approved construction drawings. 3- Prepare Monthly Payments for the Employer and Subcontractors& Cost Reports. 4- Monitoring contractor's progress and monthly payment applications 5- Assist in preparing Variations, Contracts and Addendums. 6- Assist on timely procurement and agreement of subcontractors conditions to ensure completion of project on time and within budget.

7- Reviewing tender and contract documents for the client

2nd /Project Engineer at: "Egyptian Financial Supervisory Authority" October 2011--- February 2013 “8 hr par day”

Introduction

The project was constructing Egyptian Financial Supervisory Authority -Smart Village – 6th of October City, Consists of Two office building on 1400 Square meters (Five floors of administrative buildings + two floors underground garages beneath each building + Steel bridge connecting two buildings with each other + High-level finishes )

Owner: Egyptian Financial Supervisory Authority Consultant: E.C.G. Contractor: HASSAN ALLAM SONS

Job Description: Q.S “Quantity survey” from April 2012 to Present

After 5 months from joining the project I was selected by the P.M & T.O.M “Project Manager & Technical office Manager” to be one of the rescue team members in the technical office to be responsible for:-

1. Quantity survey of the finishing work items according to the approved shop drawings. 2. Preparing the monthly invoices for the client in addition to the payments for the sub-contractors in comparison with the

project's BOQ. 3. Checking the actual in-site measurements for the As-Built drawings preparation.

Note : from October 2011 to April 2012 work as a civil site eng Responsible for:

1. All works till fine finish (steel ,formwork, repair, plastering & painting and Interior works) 2. Strengthening ,Consolidation & Repair of concrete structures "building works" (steel, carbon fibers, grouting ) 3. Performing Finishing activities & Organizing work group for reinforcement works 4. Coordinating sub-contractors (contracts and inputs) according to the project time schedule. 5. Developing Construction implementation and operational documentation and procedures. 6. Checking the quality by using Project Specifications and International codes through all project phases.

1st /Q.C (Quality Control) at:"AL-SHABAB Power Station- Ismailia" From December 2010 -- October 2011“12 hr par day

Introduction

The project was constructing AL SHABAB Power Station PROJECT- Ismailia (Power Station 1000 MW) super fast track project and it is the largest and fastest gas power plant in Egypt.

Consultant: PEGESCO, E.C.G. Contractor: KHARAFI NATIONAL, LAFARGE. SUB-Contractor: HASSAN ALLAM SONS

Sequence of Construction:

Implementation of ( Turbine assembly , turbine power land , all buildings (Administration ,control ,GIS control , 6.6,3.3 , LV , MV, warehouse , roads, tanks, Pipes…)Full compliance with the standards, specifications and high quality of the project

Page 3 of 5

Page 4: Civil eng.m.sayed c.v & cover letter last

Job Description:

Q.C “Quality Control” engineers is responsible for:-

1. Receipt and follow up all construction activities till fine fishing (steel ,form works, Turbine Footings & framework , power land , roads, tanks, Pipe trench, repair, Painting and decorating)

2. Ensure that all works are carried out according to the specification & applicable standards. 3. Examination of project documents and the work of scrutiny to all phases of implementation 4. Ensuring that all test equipment is calibrated; tests are conducted in accordance with the test reports verified to meet the

requirements. 5. Auditing proper reviews on all submittals, shop drawings, certificates of compliance, 6. Perform inspections on materials, construction activities and workmanship. 7. Checking the quality by using Project Specification and International codes throw all works.

VINCI CONSTRUCTION GRAND PROJETS from Nov 2009 – September 2010“12 hr par day” FFRREENNCCHH CCOONNTTRRAACCTTIINNGG CCOOMMPPAANNYY

Introduction

On March 15th 2006, The Egyptian-French JV for Civil Works has submitted an offer for carrying out Civil Works (‘Group 2’) for phase one of the new Cairo Metro Line 3

The Egyptian French JV for Civil Works:

VINCI, ARAB Contractors, BOUYGUES TP, ORASCOM & LAFARGE

Sequence of works for the construction of stations:

Diaphragm walls, Slurry walls, Grouting of bottom plug, Main civil works, Completion of remaining concrete structures (Roof, columns, stairs& escalators, walls), Finishing and decorating Completion of arrangements

Job Description:

• Work as a foundation engineer responsible for all activities (Diaphragm walls, Grouting, water wells and TBM) etc. • Giving maximum solutions for site problems & checking the quality by using Project Specification and International codes. • Modern TBM typically consist of the rotating cutting wheel, called a cutter head, followed by a main bearing, a thrust

system and trailing support mechanisms. The type of machine used depends on the particular geology of the project, the amount of ground water present and other factors.

HASSAN ALLAM SONS from October 2008 – August2009 “9 hr par day” CCOONNSSTTRRUUCCTTIIOONN CCOOMMPPAANNYY

Introduction

The project was constructing glass factory for SAINT GOBAIN GLASS EGYPT FACTORY in AIN SOKHNA- Suez, Hassan Allam Construction delivered one of the largest float glass plants in Middle East in the coastal district of Suez. The project was completed within 18 months, meeting world class safety requirements (Built on a fast track program) 12 hr par day

Owner: SAINT GOBAIN Consultant: EGEC. Contractor: HASSAN ALLAM SONS

Job Description:

• I was responsible for all Works for Structural and Finishing Works at ware house (Area of 4 Feds.). • Arrangement for all project requirements.

DAR EL-MAMAR from July 2008 – Sep 2008 “8 hr par day” CCOONNSSTTRRUUCCTTIIOONN CCOOMMPPAANNYY Site Engineer - EL-MAMLKA Resort

Consultant: MASHAREA PROJECT MANAGEMENT Contractor: DAR EL-MAMAR.

Page 4 of 5

Page 5: Civil eng.m.sayed c.v & cover letter last

Job Description :

• I was responsible for all Works for Structural and Finishing Works • Arrangement for all project requirements.

VINCI From Jan 2008 – June 2008 “12 hr par day” FFRREENNCCHH CCOONNTTRRAACCTTOORRSS CCOOMMPPAANNYY Site Engineer- Cairo Metro Line 3 phase one Job Description -:

• Work in TPM shaft station from start to before two month from finishing the project. • Arrangement for all project requirements.

EEDDUUCCAATTIIOONN && CCOOUURRSSEESS::

University Degree

•• BB..SSCC.. IINN CCIIVVIILL EENNGGIINNEEEERRIINNGG Higher Technology institute, Faculty of Engineering ,Civil Engineering ,G.Y 2007

Courses

• P.M.P (Project Management Professional) & special workshop. • T.Q.M (Total Quality Management) • T.O.T (Train Of Trainer ) • OSHA (occupational safety and health administration)

1- Osha construction SAFETY & HEALTH (29 cfr 1926) 30-hour. 2- Osha general industry safety & health (29 cfr 1910) 30-hour.

3-Conducted by: Dr. Wagdi Fouad Seffain (Authorized OSHA Trainer) in A.U.E

Other Courses

• Attended some courses in Leadership skills. • Take a grant from the KHARAFI NATIONAL by EMAK International Academy (How to develop your skills). • Attended a course in Role in human development in CANADIAN center with Dr. IBRAHIM ELFIKY phD.Mht

,CHA,CMM Comprehensive the power hour titles THE Power OF Love & Forgiveness • Courses with ZEDNY association (Thinking different, How to make a friend & Fast Reading). • Attended many lectures in human development & manage your live.

TTEECCHHNNIICCAALL SSKKIILLLLSS::

Languages Skills: -Arabic - English

Computer Skills: AutoCAD 2D, Sap, Primavera, MS Projects, Microsoft Office (Word, Excel)

PPEERRSSOONNAALL DDAATTAA::

- Nationality: Egyptian - Date of Birth: Aug , 1983

PPEERRSSOONNAALL SSKKIILLLLSS::

• Authored novels, stories and poetry. • Self motivated, Ability to achieve high performance, Realization of the importance of team work. • Participating in the development of civil society associations • Attend seminars, scientific, intellectual and literary • Playing Football (College team Captain), Wushu Kung Fu (2nd Grade on Cairo), decoration, painting, Traveling,

Reading and surfing the Internet.

Page 5 of 5