Page 1: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

CJLOTS 2013Daily Synch – 11APR13

Page 2: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

Schedule – 12APR13

Friday, 12APR13

0900 CUB Rehearsal

1530 Daily Synch Brief

Page 3: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

Marshalling Yard/DLA Yard

LSA

498

II (+)

CSSB

551ICTC

I (-)

II (+)

10

Trident Pier OPNS

    Barber     Power    Beds

    Showers

    Laundry    DFAC

LSA OPNS

    Shuttle

IPDS/OPDS OPNS

    Usage    Mvmt    Bld

Marshall Yard OPNS

    Sp-SY

    Pax    Trucks

    MHE

    Sp-JLOTS    Sp-DLA

    Sp-ROK

    Beach

    Mar Yard

    On Mvmt

    Dnload

Ssang Yong OPNS

Beach Head OPNS

    ROK

    Weather

    Terrain

    MHE

ARFOR Reception

    Staff

    Facility

    PAX

   FOC

   IOC

   Not Started

   Critical Issue X (-)

501SBDE

LAST 24 Hours10APR JTF CDR arrives in Korea, JTF Temp TOC set-up10APR DCO meeting by TF498 with Reserves on IPDS build10APR Marshalling Yard ROC Drill10APR Camp Carroll LOGPAC10APR HSV ISO IIIMEF arrives 10APR Barber Shop opens on the LSANEXT 24-48 Hours11APR LSV 4 arrives from Hawaii11APR 2x LCU 2000’s arrived from Japan11APR Combined Convoy with ROK for CL I resupply to Busan12APR Laundry, Galley, Barber Shop operational at LSA12APR Camp Carroll LOGPAC12-13APR Duck Pond Build (D7 Dozer)

Pohang BOGTotal ARFOR 555Total JTF/Other 299Total BOG 854

SIGACT: NSTR

CCIRs Activated: FIR #7

JRC Incheon

JRC Gimhae

    Staff

    Shuttle

    PAX

    Staff

    Shuttle

    PAX

Essential Node Legend

    In-Brief

    ROWPU

Pier 9 OPNS

    BD Crane

    MHE

    HCCC

    TF 498 TOC

    TF 10 TOC

    ARFOR TOC

    MWR     PX

    Coms

    CLI/Wtr

    FMST

    Beach Stab

    Duck Pond

    MCS Segments

    Trial Runs

    Latrines

ARFOR COP

Pohang View

11 APR 13

COMMANDERS COMMENTS:

COMM STAT   * Network provided by ARFOR Assets

  ARFOR  LSA BEACH PIER 9 MARSH YARDJNN 1/1 N/A 1/1* N/A N/ACOVN-K 1/1 1/1 1/1* N/A N/ACPN N/A 1/1 N/A N/A N/ABFT TOC KIT 1/1 1/1 N/A N/A N/AFM 8/8 22/22 1/1 1/1 1/1HF 1/1 1/1 N/A N/A N/ASC-TACSAT 1/1 0/1 N/A N/A N/ACSSVSAT N/A N/A N/A N/A 1/1MAR BAND N/A N/A 1/1 1/1 N/A

    Showers

501st SBDE Top 10 Critical Fleet  ITEM QTY FMC NMC  M175 PLS 11 11 0 100%

M1120 LHS HEMTT 8 8 0 100%

M1077 FLATRACK 19 19 0 100%M3 CROP 9 9 0 100%

ATLAS 10K FORK LIFT 6 5 0 83%RT240 KALMAR 7 7 0 100%

M997 AMBULANCE 2 2 0  100%ROWPU 3K 2 0 2 0%ROWPU 600 GAL 3 2 1 67%LWP 3 3 0 100%SMFT 3 3 0 100%

M984A4 HEMTT WRK 4 4 0 100%

M969A1 FUEL TANKER 3 3 0 100%M1083 TPU 4 4 0 100%

M978 HEMTT TANKER 3 3 0 100%

OVER ALL TOTAL 87 84 3 97%

Page 4: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

NBG 1 Update – 11APR13

Last 24 Hours-Continued fabrication of decking.- Continued establishment of C2 nodes & supporting facilities at the beach and pier.  (Facilities at Dogu Beach include:  JLCC, J-Staff admin tent, NSE comms tent & SIPR tent.  Facilities at the pier include:  Lighterage Support Center (LSC), Lighterage Repair Facility (LRF), Battalion Aid Station (BAS) (medical), Underwater Construction Team (UCT) admin/ops tent, and warming tent.)- Held additional meetings with Army & Marine counterparts to discuss the flow of cargo at the beach and beach space management.- Received NSE main body (143 total personnel from PHIBCB ONE (114), ACU-1 (17), UCT TWO (7) & NBG-1 (4)) tonight.

Next 24 Hours

Comments/Concerns

190 NSE personnel currently on board the LSA

- Continue work at beach & pier C2 nodes and supporting facilities.

- Participate in additional coordination meetings as required for beach throughput and space management.

- Prepare for opening of galley, laundry & barber services.

Page 5: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

Daily Status Report

-Staff continues to gather; Coast Guard, ROK, 501st LNOs have reported in and begun operations.  CNFK observers are on station.

-Conducted JOC leveling/Conops brief with watchstanders and MSC personnel.

-LSV arrival is expected at 0200L this evening (4 hours later than projected). 

-2 LCU's arrived as expected this afternoon.

-Continued coordination of beach area to support layout of IPDS has not produced a solution yet. 

Page 6: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

Work in Progress

-Retrograde Planning (CDR Sumagaysay)

-CUB Shell (LTJG Weston / CPT Gerlach)

-ISDN Listing (MSgt Lawson)

-Night Order Shell (OS2 Bryant)

-AAR Tracking/Reporting (CDR Freeman)

Page 7: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

POC

CUB Collators:-ABWC: LTJG Jill Weston -ABWC: CPT Eddie Gerlach-ABWC: LT Rob Mack

Page 8: CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

Requirements

-