cjlots 2013 daily synch – 11apr13. schedule – 12apr13 friday, 12apr13 0900 cub rehearsal 1530...
TRANSCRIPT
CJLOTS 2013Daily Synch – 11APR13
Schedule – 12APR13
Friday, 12APR13
0900 CUB Rehearsal
1530 Daily Synch Brief
Marshalling Yard/DLA Yard
LSA
498
II (+)
CSSB
551ICTC
I (-)
II (+)
10
Trident Pier OPNS
Barber Power Beds
Showers
Laundry DFAC
LSA OPNS
Shuttle
IPDS/OPDS OPNS
Usage Mvmt Bld
Marshall Yard OPNS
Sp-SY
Pax Trucks
MHE
Sp-JLOTS Sp-DLA
Sp-ROK
Beach
Mar Yard
On Mvmt
Dnload
Ssang Yong OPNS
Beach Head OPNS
ROK
Weather
Terrain
MHE
ARFOR Reception
Staff
Facility
PAX
FOC
IOC
Not Started
Critical Issue X (-)
501SBDE
LAST 24 Hours10APR JTF CDR arrives in Korea, JTF Temp TOC set-up10APR DCO meeting by TF498 with Reserves on IPDS build10APR Marshalling Yard ROC Drill10APR Camp Carroll LOGPAC10APR HSV ISO IIIMEF arrives 10APR Barber Shop opens on the LSANEXT 24-48 Hours11APR LSV 4 arrives from Hawaii11APR 2x LCU 2000’s arrived from Japan11APR Combined Convoy with ROK for CL I resupply to Busan12APR Laundry, Galley, Barber Shop operational at LSA12APR Camp Carroll LOGPAC12-13APR Duck Pond Build (D7 Dozer)
Pohang BOGTotal ARFOR 555Total JTF/Other 299Total BOG 854
SIGACT: NSTR
CCIRs Activated: FIR #7
JRC Incheon
JRC Gimhae
Staff
Shuttle
PAX
Staff
Shuttle
PAX
Essential Node Legend
In-Brief
ROWPU
Pier 9 OPNS
BD Crane
MHE
HCCC
TF 498 TOC
TF 10 TOC
ARFOR TOC
MWR PX
Coms
CLI/Wtr
FMST
Beach Stab
Duck Pond
MCS Segments
Trial Runs
Latrines
ARFOR COP
Pohang View
11 APR 13
COMMANDERS COMMENTS:
COMM STAT * Network provided by ARFOR Assets
ARFOR LSA BEACH PIER 9 MARSH YARDJNN 1/1 N/A 1/1* N/A N/ACOVN-K 1/1 1/1 1/1* N/A N/ACPN N/A 1/1 N/A N/A N/ABFT TOC KIT 1/1 1/1 N/A N/A N/AFM 8/8 22/22 1/1 1/1 1/1HF 1/1 1/1 N/A N/A N/ASC-TACSAT 1/1 0/1 N/A N/A N/ACSSVSAT N/A N/A N/A N/A 1/1MAR BAND N/A N/A 1/1 1/1 N/A
Showers
501st SBDE Top 10 Critical Fleet ITEM QTY FMC NMC M175 PLS 11 11 0 100%
M1120 LHS HEMTT 8 8 0 100%
M1077 FLATRACK 19 19 0 100%M3 CROP 9 9 0 100%
ATLAS 10K FORK LIFT 6 5 0 83%RT240 KALMAR 7 7 0 100%
M997 AMBULANCE 2 2 0 100%ROWPU 3K 2 0 2 0%ROWPU 600 GAL 3 2 1 67%LWP 3 3 0 100%SMFT 3 3 0 100%
M984A4 HEMTT WRK 4 4 0 100%
M969A1 FUEL TANKER 3 3 0 100%M1083 TPU 4 4 0 100%
M978 HEMTT TANKER 3 3 0 100%
OVER ALL TOTAL 87 84 3 97%
NBG 1 Update – 11APR13
Last 24 Hours-Continued fabrication of decking.- Continued establishment of C2 nodes & supporting facilities at the beach and pier. (Facilities at Dogu Beach include: JLCC, J-Staff admin tent, NSE comms tent & SIPR tent. Facilities at the pier include: Lighterage Support Center (LSC), Lighterage Repair Facility (LRF), Battalion Aid Station (BAS) (medical), Underwater Construction Team (UCT) admin/ops tent, and warming tent.)- Held additional meetings with Army & Marine counterparts to discuss the flow of cargo at the beach and beach space management.- Received NSE main body (143 total personnel from PHIBCB ONE (114), ACU-1 (17), UCT TWO (7) & NBG-1 (4)) tonight.
Next 24 Hours
Comments/Concerns
190 NSE personnel currently on board the LSA
- Continue work at beach & pier C2 nodes and supporting facilities.
- Participate in additional coordination meetings as required for beach throughput and space management.
- Prepare for opening of galley, laundry & barber services.
Daily Status Report
-Staff continues to gather; Coast Guard, ROK, 501st LNOs have reported in and begun operations. CNFK observers are on station.
-Conducted JOC leveling/Conops brief with watchstanders and MSC personnel.
-LSV arrival is expected at 0200L this evening (4 hours later than projected).
-2 LCU's arrived as expected this afternoon.
-Continued coordination of beach area to support layout of IPDS has not produced a solution yet.
Work in Progress
-Retrograde Planning (CDR Sumagaysay)
-CUB Shell (LTJG Weston / CPT Gerlach)
-ISDN Listing (MSgt Lawson)
-Night Order Shell (OS2 Bryant)
-AAR Tracking/Reporting (CDR Freeman)
POC
CUB Collators:-ABWC: LTJG Jill Weston -ABWC: CPT Eddie Gerlach-ABWC: LT Rob Mack
Requirements
-