ck21 presentation team 2

27
4 6 W E S T G A T E R D STRUCTURAL DESIGN TEAM 2 RYAN THOMPSON GABRIEL ROBINS JONATHAN SOUTHGATE

Upload: campus

Post on 15-Jun-2015

834 views

Category:

Education


0 download

TRANSCRIPT

Page 1: Ck21 presentation team 2

4 6WESTGATE

RD

STRUCTURAL DESIGNTEAM 2

RYAN THOMPSONGABRIEL ROBINS

JONATHAN SOUTHGATE

Page 2: Ck21 presentation team 2

4 6WESTGATE

RDINTRO UCTION

“...Appointed to design a new building tailored to the Arts, both visual & auditory, exploring the ver-tical space...”

SCHEDULE OF ACCOMMODATION

• Open Plan Gallery Spaces• Visual & Auditory Spaces• Individual studios• Toilets,• Accessible Lift• Reception area• Building services provision

Page 3: Ck21 presentation team 2

4 6WESTGATE

RD

SITE & CONS RAINTS

Physical Constraints

• Existing buildings on both flanks• Vacant Plot at the rear• Existing Footpath• Front Facade line

Page 4: Ck21 presentation team 2

4 6WESTGATE

RD

DATA AQUISI ION

Page 5: Ck21 presentation team 2

4 6WESTGATE

RD

Page 6: Ck21 presentation team 2

4 6WESTGATE

RD

PRECED NT

Huangshan Theatre

Area - 13,200sq Seats - 800Stage - 27 x 27m Cost - £23,000,000Construction - June 2011

Page 7: Ck21 presentation team 2

4 6WESTGATE

RD

PRECED NT

Architects: K-architecturesLocation: Saint-Nazaire, FranceConsultants: Khephren (structure)Budget: 16.4 M€ Area: 3,900 sqmYear: 2012

LE HEATRE

Page 8: Ck21 presentation team 2

4 6WESTGATE

RD

DESIGN DEVELOPM NT

Page 9: Ck21 presentation team 2

4 6WESTGATE

RD

SPATIAL D SIGN

Page 10: Ck21 presentation team 2

4 6WESTGATE

RDSKETCH ESIGN

Page 11: Ck21 presentation team 2

4 6WESTGATE

RD

INITIAL D SIGN

Page 12: Ck21 presentation team 2

4 6WESTGATE

RD

STRUCTURAL DEV LOPMENT

Page 13: Ck21 presentation team 2

4 6WESTGATE

RD

FACADE DEV LOPMENT

Page 14: Ck21 presentation team 2

4 6WESTGATE

RD

CURRENT D SIGN

Page 15: Ck21 presentation team 2

4 6WESTGATE

RD

Page 16: Ck21 presentation team 2

4 6WESTGATE

RD

GENERAL ARRANGEMENT & INTERIOR DESIGN GROUND FLOOR

Page 17: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 18: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 19: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 20: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 21: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 22: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 23: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 24: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 25: Ck21 presentation team 2

4 6WESTGATE

RDSTRUCTURAL BUIL UP

Page 26: Ck21 presentation team 2

4 6WESTGATE

RD

STRUCTURAL ISSU S

Page 27: Ck21 presentation team 2

4 6WESTGATE

RD

SITE BARRIER

BASEMENT BARRIER

SITE BARRIER

SUPPLY ROAD

EXISTING TREES

BASEMENT BARRIER

C M

ISSUES

DEMOLITIONEXCAVATIONSITE ACCESSSAFETYFUTURE MAIN-TENANCE