classification: internal gullfaksvillage2010 gullfaks sør omega project some cost data and economic...
TRANSCRIPT
Classification: Internal
GullfaksVillage2010Gullfaks Sør Omega Project
Some cost data and economic assumptions
Classification: Internal
Gullfaks Omega - suggested cost data•Subsea development
– One four slot template with all pipelines: 1 500 MNOK
– Two four slot template with all pipelines: 2 500 MNOK ( + 1 000 MNOK/template)
•Fixed platform
– Wellhead platform with 15 slots: 4 000 MNOK
– Jacket with 20 slot drilling unit: 7 000 MNOK
•Drilling
– Semi-submercible 400 MNOK/well
– Jack-up 300 MNOK/well
– Own drilling rig 150 MNOK/well
– For all three altenatives: Drill four wells pr year
Classification: Internal
Gullfaks Omega – suggested cost data•Omega operations cost
– Operations sub-sea 100 NOK/bbl oe
– Operations jack-up 80 NOK/bbl oe
– Operations jacket 50 NOK/bbl oe
•Gullfaks operations cost
– Operations 10 NOK/bbl oe
– Transportation 1 NOK/bbl oe
•Plugging and abandonment
– Sub-sea 200 MNOK
– Jack-up 300 MNOK
– Jacket 400 MNOK
Classification: Internal
Suggested economic assumptions and sensitivities
•Economics assumptions– Oil price: 400 NOK/bbl increasing 3 % p.a.
– Gas price: 200 NOK/bbl oe increasing 3 % p.a
– Inflation: 1 %
– Discount factor: 5 %
•Run before tax economics
– Value and Net Present Value
– Internal Rate of Return (IRR, %)
•Sensitivities– Oil and gas prices increasing 5% p. a./decreasing 2 % p. a.
– Production +/- 30 %
– Investments: +/- 40 %
Classification: Internal
Block 34/10Oil field development in Norwegian - a history about courage.
Classification: Internal
GullfaksVillage2010 – Bergen 3/3 2010
Program 11:00 Welcome to Statoil in Bergen Petter Eltvik
11:30 Tapas lunch Outside Auditorium
12:00 Experts in Team in Statoil Gullfaks Ole Jørgen Birkenes
12:15 Some cost data and economic assumptions Petter Eltvik
12:30 Review of part A reports and part B assignments in individual groups
Group 1 : LU007 Petter Eltvik/ Karl Sigurd Årland
Group 2 : LU004 Johan Eck-Olsen/Petter Eltvik
Groups 3&4 : L1004 Knut Muller/Ole Jørgen Birkenes
Group 5 : L1003 Eli Gule/Petter Eltvik
Group 6 : L1001 Esther Matland/Leif-Kristian Tveiterå
13:30 – 15:00 Review of Gullfaks Sør Statfjord in Cave Gunnar Halvorsen
Groups 3&4 kl 13:30, Groups 5&6 kl 14:00 and Groups 1&2 kl 14:30
15:00 Review of the day/Summary Auditoriet
16:00 Departure for Dolly Dimples, Kokstad
Classification: Internal
GullfaksVillage 2010
Overview over Statoil contactsGroup 1: Environmental Challenges by adding Chemicals to the WI
Contact in Statoil: Petter Eltvik; [email protected]. (also Karl Sigurd Årland)
Group 2: Drilling through depleted Brent Gr. Contact in Statoil: Johan Eck-Olsen; [email protected]
Group 3: Improved oil recovery with Smart wells. Contact in Statoil: Knut Muller; [email protected]
Group 4: Improved oil recovery with Smart wells Contact in Statoil: Ole Jørgen Birkenes; [email protected]
Group 5: Improved oil recovery with WI Contact in Statoil: Eli Gule [email protected]
Group 6: Geological and Geophysical uncertainties Contact in Statoil: Esther Matland [email protected] (also Kristian Tveiterå)
Classification: Internal
Gullfaks Sør Omega Project – suggested cost and economic assumptions
Petter EltvikProject Manager GO [email protected], tel: +47 91 82 09 39www.statoil.com
Thank you