cleaning method statements 2004 uk
TRANSCRIPT
![Page 1: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/1.jpg)
37The NHS Healthcare Cleaning Manual
This section of the Manual contains detailed Method Statements for the most‘common’ cleaning tasks carried out by cleaning service departments. The sectionshould be read, and applied, in conjunction with the notes shown below.
Important Notes for the Correct Implementation of the NHSHealthcare Cleaning Manual
• Refer to Trust policy and Standards of Cleanliness in the NHS forguidance on all cleaning processes, cleaning frequencies, colour-coding, equipment, protective clothing, fluids and methods
• For all cleaning materials, fluids, electrical and mechanical machinery,always refer to manufacturers’ instructions
• Cleaning equipment used, must be safe and appropriate for eachapplication
• Ensure all equipment is clean and dry before starting procedure
• Plan work route and when necessary, remove furniture andequipment
• Always use clean hazard-warning signs and position at the start of thetask where they are most effective and people will know cleaning is inprogress. Remove, clean and return to the storage area when the taskis completed and the floor is dry.
• When cleaning or using cleaning equipment, items must be checkedfor damage or wear which would impair future use or endanger thesafety of any individual. If damaged do not use, report to supervisor,label as faulty and remove from use.
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report tosupervisor/manager
Introduction to SECTION 5.0
Cleaning Method Statements
NHS cleaning manualv2 Amend 14/4/04 10:45 am Page 53
![Page 2: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/2.jpg)
38The NHS Healthcare Cleaning Manual
Cleaning Method Statements
The Method Statements have been designed to meet current Health and Safety,and infection control requirements and dovetail with recommendations fromthe British Institute of Cleaning Science and National Vocational Qualificationsregulations.
• On completion of machine safety checks briefly test each machine tocheck it is in working order.
• When using electrical equipment a circuit breaker should be used.Most organisations have in-built systems, check with Facilities andobtain written confirmation that independent circuit breakers are/arenot required.
• When operating electrical machinery, always keep the cable behindthe machine
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• Do not adjust or change the fittings on the machine when it isplugged in
• Wear goggles when preparing cleaning solutions. Goggles should beworn during processes when there is a likelihood of splashing forexample, when kneeling down scouring the floor
• A general rule of cleaning it to start cleaning at the highest point andwork towards the lowest; and from outside to the inside. Also towork from the cleanest to the dirtiest.
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions and safety data sheets)
• Always ventilate any area where chemicals are used
• For Health and Safety reasons, always add the cleaning agent towater, preventing the possibility of the cleaning agent being splashedinto the eyes.
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 54
![Page 3: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/3.jpg)
39The NHS Healthcare Cleaning Manual
Cleaning Method Statements
The Method Statements have been trialled in three hospitals and reviewedby the Association of Domestic Management and British Institute ofCleaning Science.
Each Method Statements comprise of four sections:
• Task
• Equipment Required
• Health and Safety
• Method
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 55
![Page 4: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/4.jpg)
FLOOR CLEANING ................................................................................45
HARD AND SEMI-HARD FLOORS............................................................45a) Dust Controlling........................................................................45
b) Mopping .....................................................................................47Damp Mopping (single bucket/single solution) ..........................47Damp Mopping (double bucket/double solution).......................50Damp Mopping (spot)................................................................53Flat Mopping ..............................................................................55
c) Spray Cleaning ..........................................................................58
d) Ultra High Speed Buffing/Burnishing ......................................62
e) Floor Scrubbing .........................................................................66
f) Automatic Scrubber Drying ......................................................70
g) Floor Stripping ..........................................................................74
h) Applying Polish ..........................................................................78
i) Sealing .......................................................................................81
j) Stains .........................................................................................84
k) Suction Cleaning .......................................................................88
l) Water Extraction .......................................................................91
SOFT FLOORS....................................................................................... 94m) Carpet Shampoo ........................................................................94
41The NHS Healthcare Cleaning Manual
Cleaning Method Statements
SECTION 5.0
Cleaning Method Statements
NHS cleaning manualv2 Amend 14/4/04 10:45 am Page 57
![Page 5: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/5.jpg)
GENERAL CLEANING............................................................................98
a) Damp Dusting ...........................................................................98Horizontal and Vertical Surfaces .................................................98Lamp ........................................................................................101Chair/Settee ..............................................................................103Radiator ....................................................................................106Beds ........................................................................................108
b) Glass ........................................................................................110Internal Glass and Mirrors ........................................................110External Glass ...........................................................................112
c) High Dusting ...........................................................................114
d) Furniture Polishing .................................................................116
e) Walls ........................................................................................118Wall Washing ............................................................................118Spot cleaning ............................................................................121
KITCHEN CLEANING..........................................................................122
a) Ice-Making Machine................................................................122
b) Manual Washing Up ...............................................................125
c) Mechanical Waste Disposal Unit ..........................................127
d) Microwave ............................................................................130
e) Ovens ....................................................................................133
f) Refrigerator...........................................................................136
g) Sinks ....................................................................................139
42The NHS Healthcare Cleaning Manual
Cleaning Method Statements
NHS cleaning manualv2 Amend 14/4/04 10:45 am Page 58
![Page 6: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/6.jpg)
WASHROOM CLEANING ....................................................................141
a) Bath ....................................................................................141
b) Hand Wash Basin .................................................................144
c) Replenishing Consumables ....................................................147Soap Dispenser..........................................................................147Paper Towel Holder...................................................................149Toilet Roll/Tissue ......................................................................151
d) Shower .....................................................................................153
SANITARY CLEANING .........................................................................156
a) Toilet Area ............................................................................156Bidet ........................................................................................156Sluice ........................................................................................159Toilet ........................................................................................162Urinal........................................................................................165
SPECIALIST CLEANING......................................................................168
a) Curtain Changing .................................................................168
b) Isolation Clean......................................................................171
c) Steam Cleaning.....................................................................175
d) Terminal Clean of Vacated Room .........................................178
43The NHS Healthcare Cleaning Manual
Cleaning Method Statements
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 59
![Page 7: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/7.jpg)
Floor Cleaning
Hard and Semi-Hard Floors
a) Dust Controlling
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Several floor cloth should be used for the ward, a clean cloth for eachbed area
• Do not ever use a sweeping brush in a patient area
• All equipment should be left clean, dry and tidy in storage area after use
• Colour-Coded Dustpan and Brush
• Colour-Coded Dust Control System Floor Cloth/Mop
• Colour-Coded Gloves
• Colour-Coded Scraper
• Dust Control System Applicator Tool for example, Colour-CodedStatic Mop/Impregnated Mop
• Warning Signs
Dust Controlling
45The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 61
![Page 8: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/8.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Attach the floor cloth/mop to the dust control tool
45. Pick up all large items of litter, for example, crisp packets, tissues
5. Use a scraper to remove any chewing gum from the floor area
6. Starting with the edges, dust the area using an overlapping figure-of-eight (8) pattern
7. Dust from the furthest point and work towards the door
NOTE The floor cloth should be kept in contact with the floor at all times
8. When the floor cloth/mop is full, remove and dispose
9. Replace with a new floor cloth/mop and continue the process
10. Use a dustpan and brush to remove remaining particles
11. Dispose of the cloth when the task is completed
12. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
13. Remove gloves and wash hands
46The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 62
![Page 9: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/9.jpg)
b) Mopping
Task
Equipment Required
• Colour-Coded Bucket with Compatible Wringer
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Cleaning Trolley
• Dust Control System (refer to the Dust Controlling MethodStatement)
• Laundry Bag
• Suction Cleaner (refer to Suction Cleaning Method Statement)
• Warning Signs
• Floor Cleaner or General Purpose Detergent
Damp Mopping (single bucket/single solution)
47The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 63
![Page 10: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/10.jpg)
Health and Safety
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Dust control the floor (refer to the Dust Controlling methodstatement) or suction clean (refer to the Suction Cleaning methodstatement).
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Attach the mop head to the mop handle
6. Submerge the mop into the cleaning solution and remove excesssolution from the mop in the Wringer
7. Mop the floor in 1-2 metre square sections
8. Mop edges of the floor with a straight stroke, use a figure-of-eight (8)pattern, turning the mop frequently, leaving the floor as dry aspossible after cleaning the rest of the section.
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Work in small square sections to prevent over stretching
• Ensure the area is first Dust Controlled or Suction Cleaned
• When mopping a corridor, mop half first leaving a clearly identifieddry area for patients/ visitors to walk on
• Do not over-wet floor
• If mopping stairs, ensure area is cordoned-off and warning signs aredisplayed
• All equipment should be left clean, dry and tidy in storage area afteruse
48The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 64
![Page 11: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/11.jpg)
9. Avoid splashing other surfaces and remove any splashes that do occur
NOTE Regularly replace the mop head and water
10. On completion, remove mop head and place in a laundry bag
11. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
12. Remove gloves and wash hands
49The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 65
![Page 12: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/12.jpg)
Task
Equipment Required
• Colour-Coded Bucket x 2 with Compatible Wringer
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Cleaning Trolley
• Dust Control System (refer to the Dust Controlling MethodStatement)
• Laundry Bag
• Suction Cleaner (refer to Suction Cleaning Method Statement)
• Warning Signs
• Floor Cleaner or General Purpose Detergent
Damp Mopping (double bucket/double solution)
50The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 66
![Page 13: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/13.jpg)
Health and Safety
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Dust control the floor (refer to the Dust Controlling methodstatement) or suction clean (refer to the Suction Cleaning methodstatement).
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions), adding solution to one bucket andfilling the other bucket with water
5. Attach the mop head to the mop handle
6. Submerge the mop into the cleaning solution and remove excesssolution from the mop in the Wringer
7. Mop the floor in 1-2 metre square sections
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Work in small square sections to prevent over-stretching
• Ensure the area is first Dust Controlled or Suction Cleaned
• When mopping a corridor, mop half first leaving a clearly identifieddry area for patients/ visitors to walk on
• Do not over-wet floor
• If mopping stairs, ensure area is cordoned-off and warning signs aredisplayed
• All equipment should be left clean, dry and tidy in storage area after use
51The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 67
![Page 14: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/14.jpg)
8. Mop edges of the floor with a straight stroke, use a figure-of-eight (8)pattern, turning the mop frequently, leaving the floor as dry aspossible after cleaning the rest of the section.
9. When the mop is completely dirty, submerge into the second bucket(water) and wring.
10. Avoid splashing other surfaces and remove any splashes that occur
NOTE Regularly replace the mop head and water
11. On completion, remove mop head and place in a laundry bag
12. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
13. Remove gloves and wash hands
52The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 68
![Page 15: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/15.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Work in small square sections to prevent over stretching
• Ensure the area is first Dust Controlled or Suction Cleaned
• Always use a warning sign ‘cleaning in progress’, position to be effective
• When mopping a corridor, mop half first leaving a clearly identifieddry area for patients/ visitors to walk on
• Colour-Coded Bucket with Compatible Wringer
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Cleaning Trolley
• Dust Control System (refer to the Dust Controlling Method Statement)
• Laundry Bag
• Suction Cleaner (refer to Suction Cleaning Method Statement)
• Warning Signs
• Floor Cleaner or General Purpose Detergent
Damp Mopping (spot)
53The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 69
![Page 16: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/16.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Dust control the floor (refer to the Dust Controlling methodstatement) or suction clean (refer to the Suction Cleaning methodstatement).
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
5. Attach the mop head to the mop handle
6. Submerge the mop into the cleaning solution and remove excesssolution from the mop in the Wringer
7. Spot mop the floor to remove stains/spillages, leaving the floor as dryas possible
8. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
9. Remove gloves and wash hands
• Do not over-wet floor
• All equipment should be left clean, dry and tidy in storage area after use
54The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 70
![Page 17: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/17.jpg)
Flat Mopping
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Work in small square sections to prevent over stretching
• Ensure the area is first Dust Controlled or Suction Cleaned
• When mopping a corridor, mop half first leaving a clearly identifieddry area for patients/ visitors to walk on.
• Do not over wet floor
• Colour-Coded Bucket with Compatible Wringer
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Cleaning Trolley
• Dust Control System (refer to the Dust Controlling Method Statement)
• Laundry Bag
• Suction Cleaner (refer to Suction Cleaning Method Statement)
• Warning Signs
• Floor Cleaner
Flat Mopping
55The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 71
![Page 18: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/18.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Dust control the floor (refer to the Dust Controlling methodstatement) or suction clean (refer to the Suction Cleaning methodstatement).
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Attach the flat mop head to the mop handle
6. Submerge the mop into the cleaning solution and remove excesssolution from the mop in the Wringer
7. Mop the floor in 1-2 metre square sections
8. Mop edges of the floor with a straight stroke, use a figure-of-eight (8)pattern, turning the mop frequently leaving the floor as dry aspossible
9. Avoid splashing other surfaces and remove any splashes that do occur
NOTE Regularly replace the mop head
10. On completion, remove mop head and place in a laundry bag
11. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
12. Remove gloves and wash hands
• If mopping stairs, ensure area is cordoned-off and warning signs aredisplayed
• All equipment should be left clean, dry and tidy in storage area after use
56The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 72
![Page 19: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/19.jpg)
57The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 73
![Page 20: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/20.jpg)
c) Spray Cleaning
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Do not attempt this procedure unless you have been trained andcompetently assessed
• Ensure hands are dry when plugging or unplugging electricalmachinery.
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• Colour-Coded Gloves
• Colour-Coded Labelled Spray Bottle
• Damp Mop System (Refer to the Damp Mopping Method Statement)
• Dust Control System (Refer to the Dust Controlling Method Statement)
• Floor Pad and Drive Disk/Board
• High Speed Machine
• Laundry Bag
• Warning Signs
• Floor Cleaner or General Purpose Detergent
Spray Cleaning
58The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 74
![Page 21: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/21.jpg)
Health and Safety
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. If non-available, ask a supervisor before unplugging any other machines
• Do not adjust or change the fittings on the machine when it isplugged in
• When changing or turning a floor pad, make sure the machine isswitched off, the handle raised and the machine laid down.
• Beware of an initial ‘slight kick’ in the High Speed Machine when it isswitched on.
• Always keep cable behind the High Speed Machine when operating.
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Do not use a dirty pad, the pad should be turned and washed when itbecomes dirty.
• Ensure the spray bottle is appropriately labelled.
• Always use a warning sign ‘cleaning in progress’, position to be effective,
• Ensure High Speed Machine is clean prior to use.
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report to supervisor
• Should the machine switch off automatically, refer to supervisor
• Do not store or transport the High Speed Machine with the floor padfolded in the water tank.
• If the High Speed Machine vibrates or miss-handles, check equipment.
• All equipment should be left clean, dry and tidy in storage area after use.
59The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 75
![Page 22: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/22.jpg)
Method
1. Plan work route and when necessary, remove furniture andequipment
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible
4. Dust Control the area (refer to the Dust Controlling methodstatement)
5. Damp mop if necessary (refer to Damp Mopping MethodSatatement) ensuring the floor is dry before spray cleaning.
6. Attach the floor pad to the High Speed Machine (refer tomanufacturers’ instructions)
7. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
8. Unwind cable and plug into a mains socket and a circuit breaker ifappropriate
9. Adjust handle to a suitable/comfortable height making sure arms arestraight.
10. Ensure the High Speed Machine is held firmly in contact with thebody and the cable is behind.
11. Switch the machine on (beware of initial “kick”)
12. Spray a fine mist of the cleaning solution over the floor area to becleaned, (one spray covers approximately 2-3 square metres of floor).
NOTE Do not over-spray the area as this can result in slippery floors.
13. Spray clean the floor area by moving the High Speed Machine incontinuous, small side to side movements.
14. On completion or if the floor pad is dirty, remove the floor pad andplace in a laundry bag.
15. With dry hands, remove the plug from the mains socket and re-windthe electricity cable.
60The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 76
![Page 23: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/23.jpg)
16. When the area is completely dry, return the furniture to originalposition.
17. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
18. Remove gloves and wash hands
61The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Note: Operator should spray more closely tothe surface to be cleaned to minimiseaerosols.
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 77
![Page 24: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/24.jpg)
d) Ultra High Speed Buffing/Burnishing
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Do not attempt this procedure unless you have been trained andcompetently assessed
• Ensure hands are dry when plugging or unplugging electricalmachinery
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. If non-available, ask a supervisor before unplugging any other machines
• Colour-Coded Gloves
• Damp Mopping (Refer to the Damp Mopping Method Statement)
• Dust Control System (Refer to the Dust Controlling Method Statement)
• Floor Pad and Drive Disk/Board
• Laundry Bag
• Ultra High Speed Machine (with or without Suction Unit)
• Warning Signs
Ultra High Speed Buffing/Burnishing
62The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 78
![Page 25: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/25.jpg)
• Do not adjust or change the fittings on the machine when it isplugged in
• When changing or turning a floor pad, make sure the machine isswitched off, the handle raised and the machine laid down.
• Beware of initial ‘slight kick’ in Ultra High Speed Machine when it isswitched on
• Always keep cable behind the machines when scrubbing.
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• If the Ultra High Speed machine has a suction unit, check the filterand bag, replace if necessary
• Do not use a dirty floor pad, the pad should be washed when itbecomes dirty.
• Always use a warning sign ‘cleaning in progress’, position to be effective
• Ensure Ultra High Speed Machine is clean prior use
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, report to supervisor
• Should the machine switch off automatically, refer to supervisor
• Do not store or transport the machine with the floor pad folded inthe water tank.
• If the Ultra High Speed Machine vibrates or mis-handles, checkequipment
• .If you doubt that it is the correct floor for buffing/burnishing pleasesee your supervisor
• All equipment should be left clean, dry and tidy in storage area after use
63The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 79
![Page 26: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/26.jpg)
Method
1. Plan work route and when necessary, remove furniture and equipment
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible
4. Dust control the floor (refer to the Dust Controlling method statement).
5. Damp mop if there is light soiling (refer to Damp Mopping Statement)
6. Ensure the floor is dry before buffing/burnishing.
7. Attach the drive disk/board and floor pad to the Ultra High SpeedMachine (refer to manufacturers’ instructions)
8. Unwind cable (if present) and plug into a mains socket and a circuitbreaker if appropriate.
9. Adjust handle to a suitable/comfortable height making sure arms arestraight
10. Ensure the Ultra High Speed machine is held firmly in contact withthe body and the cable is behind.
11. Switch the machine and suction unit on (beware of initial “kick”)
12. Start buffing/burnishing the floor by continuously moving themachine side-to-side without over stretching, in a straight line
13. Buff/Burnish the edges first and fill in with overlapping passes
NOTE If Ultra High Speed Machine remains over one area, it may burnthe floor
14. On completion, remove the floor pad and place in a laundry bag
15. If the machine does not have a combined suction unit, Dust Controlmop the area (refer to the Dust Controlling method statement)
16. With dry hands, remove the plug from the mains socket and re-windthe electricity cable.
64The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 80
![Page 27: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/27.jpg)
17. When the area is completely dry, return the furniture to originalposition.
18. After use, all equipment should be checked, cleaned, dried andreturned to the storage area.
19. Remove gloves and wash hands.
65The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 81
![Page 28: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/28.jpg)
e) Floor Scrubbing
Task
Equipment Required
• Colour-Coded Bucket
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Dust Control System (refer to the Dust Controlling MethodStatement)
• Edge Cleaning Tool and pad
• Floor Pad and Drive Disk/Board (Or Polypropylene Brush)
• Laundry Bag
• Scouring Pad
• Standard Speed Rotary Machine including Tank
• Suction Cleaner (refer to Suction Cleaning Method Statement)
• Warning Signs
• Floor Cleaneror General Purpose Detergent
Floor Scrubbing(to be used in conjunction with Water Extraction Method Statement)
66The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 82
![Page 29: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/29.jpg)
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Do not attempt this procedure unless you have been trained andcompetently assessed
• Ensure hands are dry when plugging or unplugging electricalmachinery.
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. Ifnon-available, ask a supervisor before unplugging any other machines
• When changing or turning a floor pad, make sure the machine isswitched off, the handle raised and the machine laid down.
• Do not adjust or change the fittings on the machine when it isplugged in
• Beware of initial ‘slight kick’ when the Rotary Scrubbing Machine isswitched on.
• Always keep cable behind the Rotary Scrubbing Machine whenscrubbing.
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Always use a warning sign ‘cleaning in progress’, position to beeffective
• Ensure the Rotary Scrubbing Machine is clean prior use
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report tosupervisor
• Should the machine switch off automatically, refer to supervisor
67The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 83
![Page 30: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/30.jpg)
Method
1. Plan work route and when necessary, remove furniture andequipment
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible
4. Dust control the floor (refer to the Dust Controlling methodstatement) or suction clean (refer to the Suction Cleaning methodstatement).
5. Clean and prepare the floor edges using the Edge Cleaning Tool andpad, if necessary
6. Attach the floor pad or polypropylene brush to the Rotary ScrubbingMachine (refer to manufacturers’ instructions)
7. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions) and add to the Scrubbing Machine tank
8. Unwind cable and plug into a mains socket and a circuit breaker ifappropriate
9. Adjust handle to a suitable/comfortable height making sure arms arestraight.
10. Ensure the Standard Speed Rotary Machine is held firmly in contactwith the body and the cable is behind.
11. Switch the machine on (beware of initial “kick”)
• Do not store or transport the Rotary Scrubbing Machine with a floorpad folded in the water tank.
• If the Rotary Scrubbing Machine vibrates or mis-handles, checkequipment.
• Do not store the Rotary Scrubbing Machine on the base
• All equipment should be left clean, dry and tidy in storage area after use
68The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 84
![Page 31: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/31.jpg)
12. Start scrubbing the floor at a point furthest from the door in 5-metresquare sections, by releasing a small amount of the Floor Cleanersolution.
13. Remove any excess water residue (refer to the Water ExtractionMethod Statement) and splashes from skirting boards and walls
14. When cleaning a large area, always check floor pad regularly
NOTE Regularly replace the floor pad. For stubborn stains use ascouring pad/abrasive pad
15. On completion, remove the floor pad and place in a laundry bag.
16. With dry hands, remove the plug from the mains socket and re-windthe electricity cable.
17. Empty the water tank (refer to manufacturers’ instructions)
18. If necessary, mop the floor with clean water.
19. When the area is completely dry, return the furniture to originalposition.
20. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
21. Remove gloves and wash hands
69The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 85
![Page 32: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/32.jpg)
f) Automatic Scrubber Drying
Task –Hard Floors
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Check battery level before use
• Automatic Scrubber Dryer
• Colour-Coded Bucket
• Colour-Coded Cloth Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Dust Control System (refer to the Dust Controlling Method Statement)
• Edge Cleaning Tool and Pad
• Floor Pad and Drive Disc/Board Board (Or Polypropylene Brush)
• Laundry Bag
• Scrubber Drier
• Warning Signs
• Floor Cleaner or General Purpose Detergent
Automatic Scrubber Drying
70The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 86
![Page 33: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/33.jpg)
• Ensure hands are dry when plugging or unplugging electricalmachinery
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. If non-available, ask a supervisor before unplugging any other machines
• Do not adjust or change the fittings on the machine when it isplugged in
• When changing or turning a floor pad, make sure the machine isswitched off, the handle raised and the machine laid down.
• Always use a warning sign ‘cleaning in progress’, position to be effective
• Ensure all parts of the machines are clean and dry before use
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report tosupervisor
• Ensure squeegee blade is free from debris and the overflow or floatvalve is in place
• Periodically flush through clean water tank to remove stagnant water
• Ensure all water has been collected when machine is in action
• Should the machine switch off automatically, refer to supervisor
• Remove any excess water (with mop or cloth if required)
• Ensure warning signs/lights are operating and functional
• Remove any excess water (with mop or cloth if required)
• All equipment should be left clean, dry and tidy in storage area after use
71The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 87
![Page 34: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/34.jpg)
Method
1. Plan work route and when necessary, remove furniture and equipment
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible
4. Dust control the area (refer to the Dust Controlling method statement)
5. Clean and prepare the floor edges using the Edge Cleaning Tool andpad if necessary
6. Attach the floor pad or polypropylene brush to the AutomaticScrubber Drier machine (refer to manufacturers’ instructions)
7. Prepare the cleaning solution in a well-ventilated area ( refer tomanufacturers’ instructions) and add to the Scrubber Drier tank
8. Start scrubbing the floor at a point furthest from the door in 5-metresquare sections, by releasing a small amount of the cleaning solution,ensure any extraction system is set correctly and switched on (refer tomanufacturers’ instructions). Do not under or over wet the floor
9. Move the machine forward and scrub the floor
NOTE Regularly check the clean water level in the Scrubber Drier toensure there is sufficient water in the tank and replenish as necessary
10. Regularly empty and replace the dirty water tank
11. Wipe any splashes from the skirting boards as required
12. On completion, remove the floor pad and place in a laundry bag
13. Empty the water tank (refer to manufacturers’ instructions)
14. When the area is completely dry, return the furniture to original position.
15. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
16. Remove gloves and wash hands
72The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 88
![Page 35: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/35.jpg)
73The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 89
![Page 36: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/36.jpg)
g) Floor Stripping
Task
Equipment Required
• Colour-Coded Bucket
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Colour-Coded Scraper
• Damp Mop System (Refer to the Damp Mopping MethodStatement)
• Dust Control System (Refer to the Dust Controlling MethodStatement)
• Edge Cleaning Tool and Pad
• Floor Pad and Disk Drive/Board
• Floor Stripper
• Goggles
• Knee Pads
• Standard Speed Rotary Floor Machine
• Suction Cleaner (refer to Suction Cleaning Method Statement)
• Warning Signs
• Wet Pick-Up Machine
Floor Stripping
74The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 90
![Page 37: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/37.jpg)
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Do not attempt this procedure unless you have been trained andcompetently assessed
• Ensure hands are dry when plugging or unplugging electrical machinery.
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. If non-available, ask a supervisor before unplugging any other machines
• Do not adjust or change the fittings on the machine when it isplugged in
• When changing or turning a floor pad, make sure the machine isswitched off, the handle raised and the machine laid down.
• Always keep cable behind the Rotary Floor Machine when operating.
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Always use a warning sign ‘cleaning in progress’, position to be effective
• Ensure the Rotary Floor Machine is clean prior to use.
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report to supervisor
• Should the machine switch off automatically, refer to supervisor
• If the Rotary Floor Machine vibrates or mis-handles, check equipment
• Wear goggles when preparing cleaning solutions
• If there is a polish build up around the edges use a stronger strippersolution and increase contact time
• All equipment should be left clean, dry and tidy in storage area after use
75The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 91
![Page 38: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/38.jpg)
Method
1. Plan work route and when necessary, remove furniture and equipment.
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible
4. Dust control the floor (refer to the Dust Controlling methodstatement) or suction clean (refer to the Suction Cleaning methodstatement).
5. Remove old polish from floor edges and chewing gum using an EdgeCleaning Tool/Scraper
6. Attach the floor pad to the Rotary Floor machine (refer tomanufacturers’ instructions)
7. Put on goggles
8. Prepare the Floor Stripper solution in a well-ventilated area (refer tomanufacturers’ instructions) and add to the Rotary Machine tank
9. Remove goggles
10. Unwind cable and plug into a mains socket and a circuit breaker ifappropriate.
11. Adjust handle to a suitable/comfortable height making sure arms arestraight
12. Switch the machine on
13. Start stripping the floor at a point furthest from the door in 5-metresquare sections by moving the Rotary Floor machine in small side-to-side, overlapping movements.
NOTE Regularly change the Floor Pad. Hard and semi-hard floors canbe damaged if the floor stripping solution is too strong and has a long acontact time (refer to manufacturers’ instructions). Do not let the floordry while carrying out stripping
14. Use a Wet Pick Up Machine to remove the additional ‘slurry’.
76The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:36 am Page 92
![Page 39: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/39.jpg)
15. Ensure all polish has been removed and if there is any polishremaining, re-apply the process.
16. On completion of stripping, allow the area to dry
17. With dry hands, remove the plug from the mains socket and re-windthe electricity cable
18. Damp Mop the floor with clean water to rinse and neutralise (refer tothe Damp Mopping Method Statement). Check the pH of the floorcovering with Universal Indicator Paper. The floor must be clean, dryand neutral pH 7.
19. Dust Control the floor to remove any additional dust (refer to theDust Controlling Method Statement)
20. When the area is completely dry, return the furniture to original position.
21. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
22. Remove gloves and wash hands.
77The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 93
![Page 40: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/40.jpg)
h) Applying Polish
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Ensure that different floor polish products are not mixed together inthe bucket or on the mop.
• Do not spray clean for approximately 24 hours
• Be aware of a possible waxy effect following a seal being laid.
• All equipment should be left clean, dry and tidy in storage area after use
• Colour-Coded Bucket
• Colour-Coded Flat Mop Head (Polish Applicator)
• Colour Coded Mop Handle
• Colour-Coded Gloves
• Floor Stripping System (refer to the Floor Stripping MethodStatement)
• Laundry Bag
• Floor Polish
• Warning Signs
Floor Polishing – Vinyl Floor
78The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 94
![Page 41: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/41.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Remove all furniture and equipment from the room (if possible).
4. Prepare the floor for polishing (refer to the Floor Stripping methodstatement)
5. Pour a small amount of floor polish into the bucket
6. Attach the mop head to the mop handle
7. Place the mop head into the bucket, so that the floor polish isabsorbed onto the mop; do not submerge the mop.
8. When taking the mop out of the bucket it should not be dripping
9. The first stroke on the floor should be 15cm (6 inches) from and inline with the wall, leaving a substantial line of polish, (the 6 inch -15cm gap should be left around all the edges).
10. Work from the furthest point of the room to the door. Keep the mopin contact with the floor at all times (lift only to re-apply polish).
11. Using the mop, draw floor polish across the room ensuring a uniformamount is spread across the floor area, with no bare patches, streaks orbubbles. Re-working of polish can be done with the mop up to 30-60seconds after application to the floor to cover areas missed or ensure auniform coat. After this period do not touch
12. When the area is completed, allow it to dry. Do not walk on the areauntil it is dry.
13. The second coat should then be applied (in the same manner as 8, 9and 10) except the floor polish should be laid in the opposite directionto the first coat using a clean bucket and mop head.
NOTE Ensure that different floor polish products are not mixedtogether in the bucket or on the mop. Some polishes may requirebuffing between coats (refer to manufacturers’ instructions)
79The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 95
![Page 42: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/42.jpg)
14. If a third coat is required, apply in the same manner as 8, 9 and 10, inthe direction of the first coat
15. On completion, remove the mop head and place in a laundry bag
16. When the area is completely dry, return the furniture to originalposition
17. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
18. Remove gloves and wash hands
80The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 96
![Page 43: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/43.jpg)
81The NHS Healthcare Cleaning Manual
Cleaning Method Statements
i) Sealing
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Ensure that different floor seal products are not mixed together in thebucket or on the mop
• If floor is worn / porous, discuss with supervisor the use of two coatsof floor seal first (refer to manufacturers’ instructions)
• Do not spray clean for approximately 24 hours
• Be aware of a possible waxy effect following a seal being laid.
• All equipment should be left clean, dry and tidy in storage area after use
• Colour-Coded Bucket
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Dust Control System (Refer to the Dust Controlling MethodStatement)
• Floor Seal
• Floor Stripping System (refer to the Floor Stripping Method Statement)
• Laundry Bag
• Warning Signs
Sealing
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 97
![Page 44: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/44.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Remove all furniture and equipment from the room (if possible).
4. Prepare the floor for sealing (refer to the Floor Stripping methodstatement)
5. Pour a small amount of floor seal into the bucket.
6. Attach the mop head to the mop handle
7. Place the mop head into the bucket, so that the floor seal is absorbedonto the mop; do not submerge the mop.
8. When taking the mop out of the bucket it should not be dripping.
9. The first stroke on floor should be 15cm (6 inches) from; and inlinewith the wall, leaving a substantial line of floor polish.
10. Work from the furthest point of the room to the door. Keep the mopin contact with the floor at all times (lift only to re-apply seal).
11. Using the mop, draw floor seal across the room ensuring a uniformamount is spread across the floor area. Ensure that all of the is floorcovered with no bare patches, streaks or bubbles. Re-working of floorseal can be done with the mop up to 30-60 seconds after applicationto the floor to cover areas missed or ensure a uniform coat. After thisperiod do not touch.
12. When the area is completed, allow it to dry. Do not walk on the areauntil it is dry.
13. The second coat should then be applied (in the same manner as 8, 9and 10) except the floor seal should be laid in the opposite direction tothe first coat using a clean bucket and mop head.
NOTE Ensure that different floor seal products are not mixed togetherin the bucket or on the mop. Some polishes may require buffingbetween coats (refer to manufacturers’ instructions)
82The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 98
![Page 45: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/45.jpg)
14. The third coat of floor seal should be applied (in the same manner as8, 9 and 10). However, this coat should be up to the edge and appliedin the direction of first coat.
15. On completion, remove the mop head and dispose in a laundry bag.
16. When the area is completely dry, return the furniture to originalposition.
17. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
18. Remove gloves and wash hands.
83The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 99
![Page 46: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/46.jpg)
j) Stains
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Always use a warning sign ‘cleaning in progress’, position to beeffective
• Try to remove stain before cleaning takes place.
• Check fabric for colour fastness, test in a less obvious patch
• Always use the mildest treatment first
• All equipment should be left clean, dry and tidy in storage area after use
• Colour-Coded Cloth/ Paper
• Colour-Coded Gloves
• Colour-Coded Scraper
• Laundry Bag
• Warning Signs
• General Surface Cleaner or Chewing Gum/Graffiti/Adhesive Remover
Stain Removal
84The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 100
![Page 47: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/47.jpg)
Method
Types of stains include:
• Chewing gum
• Oil and water based stains
There are two types of stain removal:
a) Physical method
b) Chemical method
a) Physical method
Absorption water based stains
1. Wash hands and put on gloves
2. Use a cloth or paper towel to absorb the liquid.
3. Display the warning sign over the stained area, until area has dried
4. Always start from the outer edge of the stain and work towards themiddle. This prevents the spreading of the stain.
5. Dispose of the cloth or paper towel when the task is completed
6. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
7. Remove gloves and wash hands
Friction removal water staining
1. Wash hands and put on gloves
2. This involves scraping, brushing, rubbing or scrubbing to removedried-on stains.
3. It is important to rub gently to avoid damage to the surface.
85The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 101
![Page 48: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/48.jpg)
4. Always start from the outer edge of the stain and work towards themiddle.
5. Display the warning sign over the stained area, until area has dried
6. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
7. Remove gloves and wash hands.
NOTE never rub the stain into the carpet/fabric
Should the friction method not work use the chemical method:
b) Chemical method
1. Wash hands and put on gloves
2. Display the warning sign over the stained area, until the area has dried
3. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
4. Pour a small amount of the chosen cleaning solution onto the stain
5. Allow the cleaning solution to have contact time with the stain.
6. Using a scraper and cloth, start from the outer edge of the stain andwork towards the middle until stain is removed
7. Dispose of the cloth when the task is completed
8. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
9. Remove gloves and wash hands
86The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 102
![Page 49: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/49.jpg)
87The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 103
![Page 50: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/50.jpg)
k) Suction Cleaning
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Ensure hands are dry when plugging or unplugging electrical machinery.
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• Always make sure to plug the machine into a free plug socket. Ifnon-available, ask a supervisor before unplugging any other machines
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report tosupervisor/manager, do not use, label as faulty and remove from use.
• Do not adjust or change the fittings on the machine when it isplugged in
• Before starting, carefully check the internal dust bag is not full anddoes not contain potentially dangerous items, for example sharps. Ifit is full, replace it with a new dust bag and check the internal filtersare clean and free from debris.
• Colour-Coded Gloves
• Suction Cleaner (Cylinder or Upright)
• Suction Cleaner Attachment for example, Crevis Tool, Floor Tool
• Warning Signs
Suction Cleaning
88The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 104
![Page 51: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/51.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible.
3. Move furniture so the area to be cleaned is freely available. Manuallypick up all large items for example, crisp packets, tissues
4. Attach the appropriate tool onto the vacuum cleaner (refer tomanufacturers’ instructions)
5. Unwind cable and plug into a mains socket and a circuit breaker ifappropriate
6. For floor cleaning, adjust the floor tool so that the bristles are:
a. Hard floor – Bristles down
b. Soft floor – Bristles up
7. Switch the vacuum cleaner on.
8. Start vacuuming the floor at a point furthest from the door, payingparticular attention to edges and corners in busy areas
9. Suction clean the floor in parallel, overlapping lanes all the floor area.Several passes may be needed
• Always keep cable behind the machines when suction cleaning.
• Do not place cable over shoulder at any time.
• Place a safety sign over the lead/cable
• Report any issues with work area and/or equipment
• All equipment should be left clean, dry and tidy in storage area after use.
89The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 105
![Page 52: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/52.jpg)
10. Always finish in the same direction that the carpet pile runs.
11. On completion, re-wind the electricity cable
12. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
13. Remove gloves and wash hands
90The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 106
![Page 53: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/53.jpg)
l) Water Extraction
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Ensure hands are dry when plugging or unplugging electricalmachinery
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. If non-available, ask a supervisor before unplugging any other machines
• Colour-Coded Bucket
• Colour-Coded Gloves
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Attachment for example, Hose Wand
• Warning Signs
• Wet Pick Up Machine With Circuit Breaker
Water Extraction(normally used in conjunction with scrubbing and stripping procedures orif flooding occurs)
91The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 107
![Page 54: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/54.jpg)
Method
1. Plan work route, when necessary, remove furniture and equipment.
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible
4. Unwind cable and plug into a mains socket and a circuit breaker ifappropriate.
5. Switch the machine on and ensure the cable is behind
6. Move the Wet Pick Up machine slowly over the liquid to remove itfrom the floor
7. Use the attachment hose to pick up liquid under restricted areas.
8. On completion, or if the machine is full, switch the Wet Pick Upmachine off and empty the water in an identified disposal area.
9. With dry hands, remove the plug from the mains socket and re-windthe electricity cable
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report tosupervisor/manager, do not use, label as faulty and remove from use.
• Do not adjust or change the fittings on the machine when it isplugged in
• Check motor cut-out flow valve is free and movable.
• Ensure the Wet Pick Up machine is clean before use.
• Identify area and method of disposal of dirty water prior to starting
• Always stand on dry floor areas if possible, great care must be taken ifthe floor is wet
• All equipment should be left clean, dry and tidy in storage area after use.
92The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Har
d an
d Se
mi-
Har
d Fl
oors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 108
![Page 55: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/55.jpg)
10. Mop all small liquid patches remaining (refer to Spot Mop MethodStatement)
11. When the area is completely dry, return the furniture to originalposition.
12. After use, all equipment should be checked, cleaned, dried andreturned to the storage area. Make sure the lid of the WaterExtraction machine is left open or taken off as appropriate to allow airto circulate and avoid smells.
13. Remove gloves and wash hands
93The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– H
ard
and
Sem
i-H
ard
Floo
rs
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 109
![Page 56: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/56.jpg)
Soft Floors
m) Carpet Shampoo
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Always keep cable behind the machine when carpet shampooing.
• Ensure hands are dry when plugging or unplugging electricalmachinery.
• Colour-Coded Cloth
• Colour-Coded Gloves
• Colour-Coded Labelled Spray Bottle
• Carpet Shampoo Machine
• Carpet Stain Remover
• Suction Cleaner with Crevis Tool (refer to Suction Cleaning MethodStatement)
• Warning Signs
• Carpet Deoderisor
• Carpet Shampooor Chewing Gum/Graffiti/Adhesive Remover
Carpet Shampoo
94The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Soft
Flo
ors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 110
![Page 57: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/57.jpg)
Method
1. Plan work route, when necessary, remove furniture and equipment.
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible
4. Suction clean the floor (refer to the Suction Cleaning method statement).
5. Test an area of carpet first for colour fastness, by spraying a smallamount of Carpet Stain Remover in an area not usually visible, thenwiping over with a cloth to see if colour comes out of the carpet (referto the Stain Removal method statement)
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. If non-available, ask a supervisor before unplugging any other machines
• Do not adjust or change the fittings on the machine when it isplugged in
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Always use a warning sign ‘cleaning in progress’, position to beeffective
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, report to supervisor/manager
• Should the machine switch off automatically, refer to supervisor
• Ensure the Carpet Shampoo machine is clean before use
• Protect any furniture which cannot be removed
• All equipment should be left clean, dry and tidy in storage area after use
95The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– So
ft F
loor
s
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 111
![Page 58: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/58.jpg)
6. Prepare the carpet shampoo solution (refer to manufacturers’instructions) in a well-ventilated area and add to the CarpetShampooing machine tank.
Note If there is an odour in the carpet, Carpet Deodoriser can be addedto the carpet shampoo solution. Pre-spray traffic lanes or heavy trafficareas
7. Unwind cable and plug into a mains socket and a circuit breaker ifappropriate.
8. Turn on the water and extraction switches of the Carpet Shampooingmachine
9. Start shampooing the carpet from the furthest edge, moving theCarpet Shampooing machine slowly forwards and backwards in astraight line on the area to be cleaned
10. Move the Carpet Shampooing machine across the carpet in paralleloverlapping movements.
11. Carry out 1 or 2 further passes over the same section using suctiononly
12. For areas inaccessible to the carpet machine, use the crevice toolattachment
13. When the area has been shampooed or if the dirty water tank of theCarpet Shampooing machine is full, empty the dirty water tank in to asluice (refer to the manufacturers’ instructions)
14. On completion of shampooing, allow the area to dry
15. With dry hands, remove the plug from the mains socket and re-windthe electricity cable.
16. Suction clean the carpet (refer to the Suction Cleaning methodstatement)
17. When the area is completely dry, return the furniture to original
96The NHS Healthcare Cleaning Manual
Cleaning Method StatementsFl
oor
Cle
anin
g –
Soft
Flo
ors
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 112
![Page 59: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/59.jpg)
18. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
19. Remove gloves and wash hands
97The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Floo
r C
lean
ing
– So
ft F
loor
s
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 113
![Page 60: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/60.jpg)
General Cleaning
a) Damp Dusting
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not climb on furniture or overreach
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Cleaning Trolley
• General Purpose Detergent or General Surface Cleaner
Horizontal and Vertical Surfaces
98The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 114
![Page 61: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/61.jpg)
Method
1. Wash hands and put on gloves
2. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
3. Place the bucket onto a cleaning trolley
4. Dampen or rinse a cloth in the cleaning solution
5. Remove items from the surface to be cleaned
6. To Damp Dust flat surfaces, wipe in straight lines cleaning the edgesfirst
7. If cleaning a bedside table, extend it and wipe underneath
8. Wipe the main surfaces in a figures of eight (8) pattern
NOTE Frequently turn the cloth and rinse in the cleaning solution.Change the cleaning solution when it becomes soiled.
9. Use the chosen cleaning solution to remove any grease marks orstubborn stains
10. Replace items on to the clean surface After use, all equipment shouldbe checked, cleaned, dried and returned to the storage area. Disposeof cloth.
11. Remove gloves and wash hands
99The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 115
![Page 62: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/62.jpg)
100The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 116
![Page 63: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/63.jpg)
TASK
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Beware of a hot bulb when handling the lamp
• Do not climb on furniture or overreach
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Cleaning Trolley
• General Purpose Detergent or General Surface Cleaner
Lamp
101The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 117
![Page 64: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/64.jpg)
Method
1. Wash hands and put on gloves
2. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
3. Place the bucket onto a cleaning trolley
4. Turn off the lamp.
5. Extend the lamp to full length.
6. Dampen or rinse a cloth in the cleaning solution
7. Starting at the base, wipe all lamp surfaces excluding the bulb andbulb fitting
NOTE Frequently turn the cloth and rinse in the cleaning solution.Change the cleaning solution when necessary
8. Use the chosen cleaning solution to remove any grease marks orstubborn stains
9. Leave the lamp to dry
10. Replace the lamp to original position.
11. Dispose of the cloth (refer to Trust policy) when the task is completed
12. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
13. Remove gloves and wash hands
102The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 118
![Page 65: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/65.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Beware of manual handling techniques when moving chair/settee
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Cleaning Trolley
• Suction Cleaner with Crevis tool (refer to Suction Cleaning MethodStatement)
• General Purpose Detergent or General Surface Cleaner
Chair/Settee
103The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 119
![Page 66: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/66.jpg)
Method
1. Wash hands and put on gloves
2. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
3. Place the bucket onto a cleaning trolley
4. Use a crevis tool attachment to clean debris between cushions refer toSuction Cleaning method statement)
5. Dampen or rinse a cloth in the cleaning solution
6. To Damp Dust flat surfaces, wipe in straight lines cleaning the edgesfirst. Start from the top of the chair working towards the base.
7. Wipe the main surfaces in a figures of eight (8) pattern
NOTE Frequently turn the cloth and rinse in the cleaning solution.Change the cleaning solution when it becomes soiled.
8. Use the chosen cleaning solution to remove any grease marks orstubborn stains
9. Dispose of the cloth (refer to Trust policy) when the task is completed
10. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
11. Remove gloves and wash hands
104The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 120
![Page 67: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/67.jpg)
105The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 121
![Page 68: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/68.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Radiator covers should be removed prior to cleaning as required
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Cleaning Trolley
• Radiator Tool
• General Purpose Detergent or General Surface Cleaner
Radiator
106The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 122
![Page 69: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/69.jpg)
Method
1. Wash hands and put on gloves
2. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
3. Place the bucket onto a cleaning trolley
4. Dampen or rinse a cloth in the cleaning solution.
5. To Damp Dust flat surfaces wipe in straight lines cleaning edges first
6. Wipe main surfaces in a figures of eight (8) pattern.
7. Use a Radiator Tool to clean behind the radiator
NOTE Frequently turn the cloth and rinse in the cleaning solution.Change the cleaning solution when it becomes soiled.
8. Use the chosen cleaning solution to remove any grease marks orstubborn stains
9. Dispose of the cloth (refer to Trust policy) when the task is completed
10. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
11. Remove gloves and wash hands
107The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 123
![Page 70: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/70.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• If patient on bed seek permission from nurse in charge to pump upbed, always ensure cot side up and explain to patient what you aredoing.
• Use Knee Pads if required to kneel on the floor when cleaning underthe bed
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Cleaning Trolley
• Knee Pads
• General Purpose Detergent or General Surface Cleaner
Beds
108The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 124
![Page 71: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/71.jpg)
Method
1. Wash hands and put on gloves
2. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
3. Place the bucket onto a cleaning trolley.
4. Raise/ lower the bed to a convenient cleaning height
5. Dampen or rinse a cloth in the cleaning solution
6. Wipe the bed framework, starting from the top working downwards tothe base and to the castor/ wheels
NOTE Frequently turn the cloth and rinse in the cleaning solution.Change the cleaning solution when it becomes soiled.
7. Use the chosen cleaning solution to remove any grease marks orstubborn stains
8. Leave to dry
9. Lower/ raise the bed to the original position
10. Dispose of the cloth (refer to Trust policy) when the task is completed
11. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
12. Remove gloves and wash hands
109The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 125
![Page 72: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/72.jpg)
b) Glass
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• External window cleaning procedure can be used for internal glass
• Report any defects to your supervisor
• If cleaning an electric-movable door, then switch it off
• All equipment should be left clean/dry and tidy in storage area afteruse
• Colour-Coded Cloths x 2
• Colour-Coded Gloves
• Colour-Coded Labelled Spray Bottle
• Glass Cleaner
• General Purpose Detergent or General Surface Cleaner
Internal Glass and Mirrors
110The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 126
![Page 73: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/73.jpg)
Method
1. Wash hands and put on gloves
2. Prepare the cleaning solution in a well ventilated area (refer tomanufacturers’ instructions)
3. Spray the Glass Cleaner or cleaning solution onto the cloth.
4. Wipe the glass surface, starting from the top and working down in afigure-of-eight (8) pattern covering all of the surface.
5. Buff to a shine with a second cloth to remove smears
6. Dispose of the cloth (refer to Trust policy) when the task is completed
7. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
8. Remove gloves and wash hands.
111The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 127
![Page 74: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/74.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Refer to Trust step ladder Health and Safety policy
• All equipment should be left clean/dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloth or Applicator
• Colour-Coded Gloves
• Colour-Coded Scraper/Non-Abrasive Pad
• Extension Pole
• Squeegee Blade
• Step Ladder
• Warning Signs
• Glass Cleaner or General Purpose Cleaner
External Glass
112The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 128
![Page 75: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/75.jpg)
Method
1. Plan work route
2. Wash hands and put on gloves
3. Display the warning signs in the area, ensuring all signs are visible.
4. Assemble the equipment and check for safety
5. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
6. Using the cloth or applicator apply the cleaning solution.
7. Using a Squeegee Blade, wipe the glass surface, starting from the topand working down in a figure-of-eight (8) pattern. Use an extensionpole for windows beyond reach.
NOTE The Squeegee Blade should be wiped after each completedstroke or if it is lifted from the surface
8. Use a scraper or non abrasive pad to remove stubborn stains.
9. Wipe the window frames with a clean colour-coded cloth.
10. Dispose of the cloth (refer to Trust policy) when the task is completed
11. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
12. Remove gloves and wash hands.
113The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 129
![Page 76: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/76.jpg)
Dusting
c) High Dusting
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Check pictures, hangings and clocks are secure
• Do not over-stretch when using the telescopic facility
• Do not climb on chairs
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Cloth Roll/Static Head
• Colour-Coded Gloves
• Laundry Bag
• Telescopic Tool
High Dusting
114The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 130
![Page 77: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/77.jpg)
Method
1. Wash hands and put on gloves
2. Place the cloth or static head on the High Dusting tool and adjust tothe correct height
3. Hold the telescopic tool and draw the cloth roll/static head along topsurfaces; pipes, ledges around light fittings and window ledgesensuring no dust falls down.
4. Replace the cloths/static heads when they become dirty
5. Dispose of the cloths (refer to Trust policy) when the task is completedor if re-usable heads, place in a laundry bag
6. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
7. Remove gloves and wash hands
115The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 131
![Page 78: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/78.jpg)
d) Furniture Polishing
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Report any defects to your supervisor
• All equipment should be clean and dry and tidy before use.
• Colour-Coded Cloths x 2
• Colour-Coded Gloves
• Damp Dust System (refer to the Damp Dusting Method Statement)
• Furniture Polish
Furniture Polishing
116The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 132
![Page 79: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/79.jpg)
Method
1. Plan work route, when necessary, remove furniture and equipment.
2. Wash hands and put on gloves
3. Remove items from the surface to be cleaned
4. Damp dust all surfaces (refer to the Damp Dusting method statement)
5. Apply the furniture polish on to the cloth
6. Polish the furniture, wiping in overlapping straight lines
7. Buff to a shine with a second cloth
8. Dispose of the cloth (refer to Trust policy) when the task is completed
9. Replace items on to the clean surface
10. When the area is completely dry, return the furniture to originalposition.
11. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
12. Remove gloves and wash hands
117The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 133
![Page 80: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/80.jpg)
e) Walls Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Ensure hands are dry when plugging or unplugging electricalmachinery.
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Colour-Coded Goggles
• Colour-Coded Labelled Spray Bottle
• Abrasive Pad
• Access Equipment for example, Platform Steps
• High Dusting Equipment (Refer to the High Dusting MethodStatement)
• Masking Tape (To Cover Electrical Sockets)
• Plastic Sheeting (if required)
• Wall Washing Machine with Circuit Breaker
• Warning Signs
• General Surface Cleaner or General Purpose Detergent
Wall Washing
118The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 134
![Page 81: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/81.jpg)
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• When using electrical equipment, a circuit breaker should be used ifappropriate
• Always make sure to plug the machine into a free plug socket. If non-available, ask a supervisor before unplugging any other machines
• Do not adjust or change the fittings on the machine when it isplugged in
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Ensure circuit breaker is in power socket before inserting a machine plug
• Always keep cable behind the Wall Washing Machine
• Always use a warning sign ‘cleaning in progress’, position to beeffective
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report tosupervisor
• If possible, work from ground level rather than use access equipment
• Check access equipment carefully before use and when moving fromone area to another
• Cover electric sockets with masking tape
• Check the condition of the wall, paint or finish to ensure suitability ofcleaning agent
• Avoid splashes of General Surface Cleaner on furniture, curtains or floor.
• Report any damage to surfaces to your supervisor.
• Do not over stretch.
• All equipment should be left clean, dry and tidy in storage area after use
119The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 135
![Page 82: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/82.jpg)
Method
1. Wash hands and put on gloves
2. Put on goggles
3. Display the warning signs in the area, ensuring all signs are visible.
4. Assemble the equipment and check for safety.
5. Cover the electric sockets with masking tape
6. Place dust sheets or plastic sheeting on floors, to protect from spillages
7. Remove furniture or cover with dust sheets
8. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
9. Ventilate the area
10. High dust to remove loose dust and dirt (refer to the High Dustingmethod statement)
Clean the wall by: either• apply the cleaning solution to the wall wiping from bottom to top,
allowing a short time for the cleaning agent to work. Then rinse-wipethe wall from top to bottom, to leave the wall as dry as possible.
Or• insert a circuit breaker into a power socket keeping the cable behind,
plug in a Wall Washing machine, then apply cleaning solution to thewall working from bottom to top. Allow a short time for the cleaningagent to work. Then rinse- wipe the wall from top to bottom, to leavethe wall as dry as possible.
11. Remove drips and runs as they occur.
12. With dry hands, remove the plug from the mains socket and re-windthe electricity cable when task is completed
13. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
14. Remove gloves and wash hands.
120The NHS Healthcare Cleaning Manual
Cleaning Method StatementsG
ener
al C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 136
![Page 83: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/83.jpg)
Spot cleaning15. Rinse and wring out a cloth in the cleaning solution.
16. Wipe the soiled area from the outside of the mark towards the centre
17. Rinse with water
18. Remove drips and runs as they occur.
19. Dispose of the cloth (refer to Trust policy) when the task is completed
20. When the area is completely dry, return the furniture to originalposition.
21. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
22. Remove gloves and wash hands
121The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Gen
eral
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 137
![Page 84: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/84.jpg)
Kitchen Cleaning
a) Ice-Making Machine
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Ensure hands are dry when plugging or unplugging electricalmachinery
• Clean areas contaminated by your cleaning
• Report any malfunction or damage of equipment tosupervisor/manager
• Mop up any spillages on floor
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloths
• Colour-Coded Gloves
• Non-Abrasive Pad
• General Purpose Detergent
Ice-Making Machine
122The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 138
![Page 85: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/85.jpg)
Method
1. Wash hands and put on gloves
2. Disconnect the Ice-Making machine from the mains socket
3. Empty the ice bin and dispose of the ice
4. Transfer the ice to a freezer if necessary
5. Remove all detachable parts
6. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
7. Dampen or rinse a cloth in the cleaning solution and wring out well
8. Clean all surfaces of the bin including the dispensing area anddrainage area
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
9. Rinse with clear water
10. Pour some of the cleaning solution down the drain of the Ice-Makingmachine to clean
11. Clean the overflow of the Ice-Making machine
12. Re-assemble the detachable parts correctly
13. Plug the Ice-Making machine into the mains socket and test forcorrect operation
14. After use, all equipment should be checked, cleaned, dried andreturned to the storage area. Dispose of the cloth (refer to Trust policy)when the task is completed
15. Remove gloves and wash hands
123The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 139
![Page 86: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/86.jpg)
124The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 140
![Page 87: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/87.jpg)
b) Manual Washing Up
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Report any damage/breakages
• All equipment should be left clean, dry and tidy in storage area afteruse
• Colour-Coded Cloth/Paper
• Colour-Coded Gloves
• Colour-Coded Scraper
• Abrasive Pad
• Polypropylene Scrubbing Brush
• General Purpose Detergent
Manual Washing Up
125The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 141
![Page 88: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/88.jpg)
Method
1. Wash hands and put on gloves
2. Remove all residual waste from crockery and place in a waste container
3. Empty the sink of any utensils
4. Sort the items for washing into soil categories, (cleanest to dirtiest).
5. Pre-wash heavily soiled items first
6. Fill the sink with hot water, adding recommended General PurposeDetergent (refer to manufacturers’ instructions)
7. Immerse soiled items into the hot cleaning solution water,
8. Transfer clean items to a rinsing sink and disinfect if necessary.
9. Rinse all items thoroughly and wipe with cloth/paper or leave to dry.
10. Clean sink, drainers, splashbacks, taps and plugs thoroughly, (refer tothe sink cleaning method).
11. Ensure all surrounding areas are clean and uncontaminated
12. Dispose of the cloth (refer to Trust policy) when the task is completed
13. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
14. Remove gloves and wash hands
126The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 142
![Page 89: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/89.jpg)
c) Mechanical Waste Disposal Unit
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Ensure hands are dry when plugging or unplugging electrical machinery.
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• Do not adjust or change the fittings on the machine when it isplugged in
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Always use a warning sign ‘cleaning in progress’, position to be effective
• Ensure the Floor Cleaning Machine is clean prior use
• Colour-Coded Bucket
• Colour-Coded Cloths
• Colour-Coded Gloves
• Non-Abrasive Pad
• Warning Signs
• General Purpose DetergentGeneral Surface Cleaner or Degreaser
Mechanical Waste Disposal Unit
127The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 143
![Page 90: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/90.jpg)
Method
1. Wash hands and put on gloves
2. Operate the waste unit to dispose of any residual waste.
3. Disconnect equipment from the mains socket.
4. Dismantle the waste disposal unit, (follow manufacturers’ instructionsor supervisors instructions)
5. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
6. Dampen or rinse a cloth in the cleaning solution and wring out well
7. Thoroughly wipe clean all detachable parts, rinse and dry.
8. Clean all the outer casing, pipes and cable thoroughly.
9. Clean the surrounding area and avoid further contamination.
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
10. Re-assemble the Waste Unit
11. Plug the Waste Unit into the mains socket and test for correctoperation.
12. After use, all equipment should be checked, cleaned, dried andreturned to the storage area.
13. Dispose of the cloth (refer to Trust policy) when the task is completed
14. Remove gloves and wash hands.
• Ensure the Floor Cleaning Machine is clean prior use
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, do not use, remove and report to supervisor
• All equipment should be left clean, dry and tidy in storage area after use.
128The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 144
![Page 91: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/91.jpg)
129The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 145
![Page 92: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/92.jpg)
d) Microwave
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Ensure hands are dry when plugging or unplugging electricalmachinery.
• Ensure all areas contaminated by cleaning are thoroughly cleaned
• Report any malfunction or damage of equipment tosupervisor/manager
• All equipment should be left clean, dry and tidy in storage area after use
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Paper Towel Roll
• General Purpose Detergent
General Surface Cleaner or Degreaser
Microwave
130The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 146
![Page 93: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/93.jpg)
Method
1. Wash hands and put on gloves
2. Disconnect the microwave from the mains socket
3. Remove all detachable parts to a safe cleaning area
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Thoroughly clean all detachable parts, rinse and dry.
6. Remove excess soil and food debris from the interior of the microwave
7. Dampen or rinse a cloth in the cleaning solution and wring out well
8. Clean all internal and external surfaces of the microwave, payingparticular attention to the corners and top
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
9. Rinse with clear water and dry with a paper towel roll.
10. Re-assemble the detachable parts correctly
11. Plug the microwave into the mains socket
12. After use, all equipment should be checked, cleaned, dried andreturned to the storage area.
13. Dispose of the cloth (refer to Trust policy) when the task is completed.
14. Remove gloves and wash hands
131The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 147
![Page 94: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/94.jpg)
132The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 148
![Page 95: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/95.jpg)
e) Ovens
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• When removing items beware parts of the oven could be hot
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Ensure hands are dry when plugging or unplugging electricalmachinery
• Colour-Coded Cloths
• Colour-Coded Gauntlet Gloves or Safety Gloves
• Colour-Coded Labelled Spray Bottle
• Colour-Coded Scraper
• Goggles
• Mask
• Non-Abrasive Pads
• Plastic Sheeting (if required)
• Warning Signs
• General Purpose DetergentDegreaser or Oven Cleaner
Ovens
133The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 149
![Page 96: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/96.jpg)
Method
1. Wash hands and put on gloves
2. Put on goggles and mask
3. Display the warning signs in the area, ensuring all signs are visible.
4. Place plastic sheeting on to the floor, to protect from spillages
5. Switch the gas/electricity off
6. Ensure the equipment is at the correct temperature for the task
7. Remove all detachable parts to a safe cleaning area (or soak tank).
8. Remove internal shelves and panels
9. Remove excess soil
10. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
11. Dampen or rinse a cloth in the cleaning solution and wring out well
12. Thoroughly wipe clean all detachable parts, rinse and dry.
13. For stubborn stains/soil use oven cleaner/degreaser, (refer tomanufacturers’ instructions)
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
14. Pay particular attention cleaning inside of the oven, especially where ahot oven is required.
• Ensure all areas contaminated by cleaning are thoroughly cleaned
• Report any malfunction or damage of equipment tosupervisor/manager
• All equipment should be left clean, dry and tidy in storage area after use.
134The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 150
![Page 97: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/97.jpg)
15. Allow sufficient contact time for the cleaning solution to soften soil.
16. Remove all cleaning solution from the surface, rinse and leave to dry.
17. Clean inside and outside of the oven and its immediate environment.
18. Re-assemble the detachable parts correctly
19. Re-connect the gas/electricity. Test for correct operation. Re-ignite,pilot lights where necessary.
20. After use, all equipment should be checked, cleaned, dried andreturned to the storage area.
21. Dispose of the cloth (refer to Trust policy) when the task is completed.
22. Remove gloves and wash hands.
135The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 Amend 14/4/04 10:45 am Page 151
![Page 98: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/98.jpg)
f) Refrigerator
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Report any items of damage, heavy soiling and disrepair
• Report any signs of infestation
• Clean areas contaminated by your cleaning
• Mop up any spillages on floor
• All equipment should be left clean, dry and tidy in storage area afteruse.
• Colour-Coded Bucket
• Colour-Coded Cloths
• Colour-Coded Gloves
• Non-Abrasive Pad
• General Purpose Detergent
Refrigerator
136The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 152
![Page 99: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/99.jpg)
Method
1. Wash hands and put on gloves
2. Remove food to another suitable storage area
NOTE Discard any out-of-date or unlabelled food
3. Remove all loose debris and excess soiling
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Dampen or rinse a cloth in the cleaning solution and wring out well
6. Remove and clean all shelves, hanging rails and drip trays and take to acleaning area to dry.
7. Clean accessible fan parts, door seals and handles
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
8. Return the shelves, hanging rails and drip trays to the correct position
9. Replace food in the correct order (but only when the correctrefrigerator temperature has been reached)
10. Check the refrigerator temperature is correct. If it is not report to asupervisor.
11. After use, all equipment should be checked, cleaned, dried andreturned to the storage area.
12. Dispose of the cloth (refer to Trust policy) when the task is completed.
13. Remove gloves and wash hands
137The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 153
![Page 100: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/100.jpg)
138The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 154
![Page 101: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/101.jpg)
g) Sinks
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Mop up any spillages on floor
• All equipment should be left clean, dry and tidy in storage area afteruse
• Colour-Coded Cloths
• Colour-Coded Gloves
• Colour-Coded Scraper
• Abrasive Pads
• General Purpose Detergent
Sinks
139The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Kit
chen
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 155
![Page 102: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/102.jpg)
Method
1. Wash hands and put on gloves
2. Empty the sink and remove debris.
3. Thoroughly rinse the sink and drainer before cleaning.
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Dampen or rinse a cloth in the cleaning solution and wring out well
6. Wipe clean the framework of the sink and pipework.
7. Clean the sink, drainer and taps.
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
8. Replenish soap dispenser (refer to the Soap Dispenser method statement)
9. Clean any splash back and surrounding areas.
10. Rinse the sink and drainer with clean water.
11. After use, all equipment should be checked, cleaned, dried andreturned to the storage area.
12. Dispose of the cloth (refer to Trust policy) when the task is completed.
13. Remove gloves and wash hands.
140The NHS Healthcare Cleaning Manual
Cleaning Method StatementsK
itch
en C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 156
![Page 103: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/103.jpg)
Washroom Cleaning
a) Bathroom
Task
Equipment Required
• Colour-Coded Bucket or Colour-Coded Labelled Spray Bottle
• Colour-Coded Cloth
• Colour-Coded Gloves
• Bottle Brush
• Non-Abrasive Pad/Cloth
• Pair of Tweezers
• Supply of Soaps/Paper Towels and Waste Bags (to replenish stock)
• Warning Signs
• General Purpose DetergentGeneral Surface Cleaneror Bath/Washbasin/Shower/Bidet Cleaner
Bath
141The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 157
![Page 104: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/104.jpg)
Health and Safety
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Ventilate the area (for example, open a window)
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Remove any objects from the bath (for example, soap)
6. Remove any hair or other items from the plug, plug-hole and plugchain with the tweezers.
7. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Start cleaning from outside and work towards the inside
8. Wipe the surrounding surfaces of the bath, including wall tiles, ledges,pipes, underneath the bath, paper towel dispenser, soap dispenser
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions).
• Throughout the cleaning, regularly clean the cloth and rinse incleaning solution.
• Do not scratch with abrasive items as scratches may harbour harmfulbacteria.
• Report faults for example, cracked or broken items or any build up ofscale to your supervisor.
• Display warning signs and ensure they are clearly visible.
• All equipment should be left clean, dry and tidy in storage area after use
142The NHS Healthcare Cleaning Manual
Cleaning Method StatementsW
ashr
oom
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 158
![Page 105: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/105.jpg)
9. Polish stainless steel or chrome with the cloth
10. Wipe the inside of the bath, including the plug, plug chain, taps andoverflow.
11. With running tap water, rinse the bath thoroughly, directing waterinto the overflow. Clean the overflow with a bottlebrush.
12. To remove any build-up of soap and grease, repeat steps 10 and 11applying the cleaning solution and using a non abrasive pad.
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
13. Remove any splashes or marks from the walls and wipe door handles.
14. Dispose of the cloth (refer to Trust policy) when the task is completed
15. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
16. Remove gloves and wash hands
143The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 159
![Page 106: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/106.jpg)
b) Hand Wash Basin
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Throughout the cleaning, regularly clean the cloth and rinse incleaning solution.
• Do not scratch with abrasive items as scratches may harbour harmfulbacteria.
• Colour-Coded Bucket or Colour-Coded Labelled Spray Bottle
• Colour-Coded Cloth
• Colour-Coded Gloves
• Bottle Brush
• Non-Abrasive Pad
• Pair of Tweezers
• Supply of Soaps/Paper Towels and Waste Bags (to replenish stock)
• Warning Signs
• General Purpose DetergentGeneral Surface Cleaneror Bath/Washbasin/Shower/Bidet Cleaner
Hand Wash Basin
144The NHS Healthcare Cleaning Manual
Cleaning Method StatementsW
ashr
oom
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 160
![Page 107: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/107.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Ventilate the area (for example, open a window)
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Remove any objects from the basin, (for example, patient personalitems)
6. Remove any hair or other items from the plug, plug-hole and plugchain with the tweezers.
7. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Start cleaning from outside and work towards the inside.
8. Wipe the surrounding surfaces of the bowl, including wall tiles, ledges,pipes, underneath the basin, paper towel dispenser, soap dispenser
9. Wipe the inside of the bowl, including the plug, plug chain, taps andoverflow with a cloth rinsed and wrung out in the cleaning solution..
10. With running tap water, rinse the basin thoroughly, directing waterinto the overflow. Clean the overflow with a bottlebrush.
11. To remove any build-up of soap and grease, repeat steps 10 and 11applying the cleaning solution and using a non abrasive pad.
• Report faults for example, cracked or broken items or any build up ofscale to your supervisor.
• Display warning signs and ensure they are clearly visible
• All equipment should be left clean, dry and tidy in storage area after use
145The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 161
![Page 108: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/108.jpg)
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
12. Polish stainless steel or chrome
13. Replace items removed to original position, replenish soap and papertowels (refer to the Replenishing Consumables method statements)
14. Dispose of the cloth (refer to Trust policy) when the task is completed
15. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
16. Remove gloves and wash hands
146The NHS Healthcare Cleaning Manual
Cleaning Method StatementsW
ashr
oom
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 162
![Page 109: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/109.jpg)
c) Replenishing Consumables
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not overfill or supply may not dispense correctly
• Beware of foreign objects inside units
• All equipment should be left clean, dry and tidy in storage area after use.
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Damp Dusting (refer to the Damp Dusting Method Statement)
• Dispenser Key (if required)
• Hand Soap Refills
• General Purpose Detergent or General Surface Cleaner
Soap Dispenser
147The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 163
![Page 110: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/110.jpg)
Method
1. Wash hands and put on gloves
2. Check if the soap dispenser is empty
3. If the soap dispenser needs refilling, open the dispenser and removethe contents (refer to manufacturers’ instructions)
4. Damp Dust and clean all surfaces of the soap dispenser to remove anygrease marks or stubborn stains (refer to the Damp Dusting methodstatement)
5. Dispose of the cloth (refer to Trust policy) when the task is completed
6. Refill, then close the dispenser
7. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
8. Remove gloves and wash hands
148The NHS Healthcare Cleaning Manual
Cleaning Method StatementsW
ashr
oom
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 164
![Page 111: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/111.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not overfill or supply may not dispense correctly
• Do not open new pockets of paper towels until required and do notplace on the floor or on the shelf
• Beware of foreign objects inside units
• All equipment should be left clean, dry and tidy in storage area after use
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Damp Dusting (refer to the Damp Dusting Method Statement)
• Dispenser Key (if required)
• Hand Towels
• General Purpose Detergent or General Surface Cleaner
Paper Towel Holder
149The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 165
![Page 112: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/112.jpg)
Method
1. Wash hands and put on gloves
2. Check if the hand towel dispenser is empty
3. If the hand towel dispenser needs refilling, open the dispenser andremove the contents (refer to manufacturers’ instructions)
4. Damp Dust and clean all surfaces of the hand towel dispenser toremove any grease marks or stubborn stains (refer to the DampDusting method statement)
5. Dispose of the cloth (refer to Trust policy) when the task is completed
6. Refill, then close the dispenser
7. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
8. Remove gloves and wash hands
150The NHS Healthcare Cleaning Manual
Cleaning Method StatementsW
ashr
oom
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 166
![Page 113: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/113.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not overfill dispenser or supply may not dispense correctly
• Do not open new pockets of toilet roll until required and do not placeon the floor or on the shelf
• Beware of foreign objects inside units
• All equipment should be left clean dry and tidy in storage area after use
• Colour-Coded Bucket
• Colour-Coded Cloth
• Colour-Coded Gloves
• Damp Dusting (refer to the Damp Dusting Method Statement)
• Dispenser Key (if required)
• Toilet Roll/Tissue
• General Purpose Detergent or General Surface Cleaner
Toilet Roll/Tissue
151The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 167
![Page 114: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/114.jpg)
Method
1. Wash hands and put on gloves
2. Check if the toilet tissue/roll dispenser is empty.
3. If toilet tissue/roll dispenser needs refilling, open the dispenser andremove the contents (refer to manufacturers’ instructions)
4. Damp Dust and clean all surfaces of the toilet tissue/roll dispenser toremove any grease marks or stubborn stains (refer to the DampDusting method statement)
5. Dispose of the cloth (refer to Trust policy) when the task is completed
6. Refill, then close the dispenser
7. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
8. Remove gloves and wash hands
Note: would recommend use of disposable plastic aprons for sanitarycleaning because of the risk of splashing uniform.
152The NHS Healthcare Cleaning Manual
Cleaning Method StatementsW
ashr
oom
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 168
![Page 115: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/115.jpg)
d) Shower Room
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions).
• Throughout cleaning operation regularly clean cloth and rinse incleaning solution.
• Do not scratch with abrasive items as scratches may harbour harmfulbacteria.
• Colour-Coded Buckets or Colour-Coded Labelled Spray Bottle
• Colour-Coded Cloth
• Colour-Coded Gloves
• Bottle Brush
• Non-Abrasive Pad
• Pair of Tweezers
• Warning Signs
• General Purpose DetergentGeneral Surface Cleaner or Bath/Washbasin/Shower/Bidet Cleaner
Shower
153The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 169
![Page 116: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/116.jpg)
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible
3. Ventilate the area (for example, open a window)
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Empty waste bins
6. Remove any objects from the bath, bowl and shower (for example,soap and rubber mats)
7. Remove any hair or other items from the plug, plug-hole and plugchain with the tweezers.
8. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Start cleaning at the highest point and work towards the lowest,from outside to the inside and from clean to dirty
9. Clean the curtain rail, then starting at the highest point of the shower,wipe the wall tiles from clean to dirty areas.
10. Check the shower curtain; wipe clean and dry; change if necessary.
11. Wipe the showerhead, hose, taps and soap tray.
12. If a shower tray is present, clean the inside and outside with a wrungout cloth.
13. Wipe around the inside of the shower cubicle
• Report faults for example, cracked or broken items or any build up ofscale to your supervisor.
• Display warning signs and ensure they are clearly visible.
• All equipment should be left clean, dry and tidy in storage area after use.
154The NHS Healthcare Cleaning Manual
Cleaning Method StatementsW
ashr
oom
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 170
![Page 117: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/117.jpg)
14. Clean the overflow with a bottlebrush.
15. To remove any build-up of soap and grease, repeat steps 13 and 14applying the cleaning solution and using a non abrasive pad.
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
16. Rinse the shower cubicle thoroughly with clean water, swilling thewater into the overflow
17. Where rubber mats are present, thoroughly clean and dry (forexample, by airing)
18. Polish stainless steel or chrome
19. Dispose of the cloth (refer to Trust policy) when the task is completed
20. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
21. Remove gloves and wash hands
155The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Was
hroo
m C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 171
![Page 118: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/118.jpg)
Sanitary Cleaning
a) Toilet Area
Task
Equipment Required
• Colour-Coded Buckets
• Colour-Coded Cloths
• Colour-Coded Gloves
• Colour-Coded Labelled Spray Bottle
• Bottle Brush
• Non Abrasive Pad
• Warning Signs
• Replacement Waste Bags
• Supply of Toilet Paper (to replenish stock)
• Toilet Brush
• Tweezers
• General Purpose DetergentGeneral Surface Cleaneror Bath/Washbasin/Shower/Bidet Cleaner
Bidet
156The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSa
nita
ry C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 172
![Page 119: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/119.jpg)
Health and Safety
Method
1. Wash hands and put on gloves
2. Assemble the equipment and check for safety.
3. Display the warning signs in the area, ensuring all signs are visible
4. Ventilate the area (for example, open a window)
5. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
6. Fill a spray bottle with the cleaning solution and spray internalsurfaces.
7. Remove any hair or other items from the plug, plug hole and plugchain with the tweezers
8. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Start cleaning at the highest point and work towards the lowest,from outside to the inside and from clean to dirty
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not splash walls and fixtures
• Do not scratch with abrasive items as scratches may harbour harmfulbacteria
• Report faults and damages to your supervisor immediately
• Display warning signs and ensure they are clearly visible.
• All equipment should be left clean, dry and tidy in storage area after use.
157The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Sani
tary
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 173
![Page 120: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/120.jpg)
9. Wipe the surrounding areas including external surfaces and pipe work
10. Rinse the cloth in the cleaning solution and wipe internal surfaces, payparticular attention to water marks and drains.
11. To remove any build-up of soap and grease, repeat steps 8 and 9applying further cleaning solution and use a non abrasive pad.
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
12. Rinse the bidet with clear water.
13. Channelled urinal splash backs should be carefully sprayed with thecleaning solution and wiped clean with clear water.
14. If required, replenish toilet blocks with toilet paper (refer to theReplenishing Consumables method statement)
15. Dispose of the cloth (refer to Trust policy) when the task is completed
16. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
17. Remove gloves and wash hands
158The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSa
nita
ry C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 174
![Page 121: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/121.jpg)
Task
Equipment Required
• Colour-Coded Bucket•
Colour-Coded Cloths
• Colour-Coded Gloves
• Colour-Coded Labelled Spray Bottle
• Abrasive Pad
• Warning Signs
• Bottle Brush
• Toilet Brush
• Tweezers
• General Purpose DetergentGeneral Surface Cleaneror Bath/Washbasin/Shower/Bidet Cleaner
Sluice
159The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Sani
tary
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 175
![Page 122: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/122.jpg)
Health and Safety
Method
1. Wash hands and put on gloves
2. Assemble the equipment and check for safety.
3. Display the warning signs in the area, ensuring all signs are visible
4. Ventilate the area (for example, open a window)
5. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
6. Fill a spray bottle with the cleaning solution and spray internalsurfaces.
7. Remove any hair or other items from the plug, plug hole and plugchain with the tweezers
8. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Start cleaning at the highest point and work towards the lowest,from outside to the inside and from clean to dirty
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not splash walls and fixtures
• Do not scratch with abrasive items as scratches may harbour harmfulbacteria
• Report faults and damages to your supervisor immediately
• Display warning signs and ensure they are clearly visible.
• All equipment should be left clean, dry and tidy in storage area after use.
160The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSa
nita
ry C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 176
![Page 123: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/123.jpg)
9. Wipe the surrounding areas including external surfaces and pipe work
10. Rinse the cloth in the cleaning solution and wipe internal surfaces, payparticular attention to water marks and drains.
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
11. Rinse the sluice with clear water.
12. Channelled Urinal splash backs should be sprayed with the cleaningsolution and wiped clean with clear water.
13. Dispose of the cloth (refer to Trust policy) when the task is completed
14. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
15. Remove gloves and wash hands
161The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Sani
tary
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 177
![Page 124: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/124.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not splash walls and fixtures
• Take care when cleaning behind the toilet and underneath pipes andbeware of foreign objects
• Do not scratch with abrasive items as scratches may harbour harmfulbacteria
• Colour-Coded Bucket
• Colour-Coded Cloths
• Colour-Coded Gloves
• Colour-Coded Labelled Spray Bottle
• Non-Abrasive Pad
• Supply of Toilet Paper (to replace used items) General PurposeDetergent
• Toilet Brush
• Warning Signs
• General Surface Cleaneror Toilet Bowl Cleaner
Toilet
162The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSa
nita
ry C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 178
![Page 125: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/125.jpg)
Method
1. Wash hands and put on gloves
2. Assemble the equipment and check for safety.
3. Display the warning signs in the area, ensuring all signs are visible
4. Ventilate the area (for example, open a window)
5. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
6. Flush the toilet with the seat lid down
7. Lower the water level using the toilet brush by pushing the water backdown the U-bend to expose the water line
8. Apply the cleaning agent to the inside of bowl, including under therims and allow to soak (leave the toilet brush in the bowl)
9. Remove any splashes or marks from the wall
10. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Start cleaning at the highest point and work towards the lowest,from outside to the inside and from clean to dirty
11. Wipe outside and around the toilet bowl, including the toilet rollholder, pipework, sanitary bins, cistern, toilet seat lid, top andunderneath and hinges, (including sanitary bins).
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
• Report faults and damages to your supervisor immediately
• Ensure warning signs are displayed
• All equipment should be left clean, dry and tidy in storage area after use.
163The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Sani
tary
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 179
![Page 126: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/126.jpg)
12. Scrub the toilet bowl with a toilet brush, particularly any stains, waterlines and under rims.
13. Flush the toilet, rinsing the brush in flushing water.
14. Wipe the brush holder and replace the brush
15. Wipe the toilet seat and flush handle with the cloth, then close the lid.
16. Check and replenish toilet paper, if necessary.
17. Dispose of the cloth (refer to Trust policy) when the task is completed
18. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
19. Remove gloves and wash hands
164The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSa
nita
ry C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 180
![Page 127: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/127.jpg)
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Do not splash walls and fixtures
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Do not scratch with abrasive items as scratches may harbour harmfulbacteria
• Report faults and damages to your supervisor immediately
• Colour-Coded Bucket
• Colour-Coded Cloths
• Colour-Coded Gloves
• Colour-Coded Labelled Spray Bottle
• Bottle Brush
• Non Abrasive Pad
• Supply of Toilet Paper (to replace used items)
• Toilet Brush
• Tweezers
• Warning Signs
• General Purpose Detergent
Urinal
165The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Sani
tary
Cle
anin
g
NHS cleaning manualv2 Amend 14/4/04 10:45 am Page 181
![Page 128: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/128.jpg)
Method
1. Wash hands and put on gloves
2. Assemble the equipment and check for safety.
3. Display the warning signs in the area, ensuring all signs are visible
4. Ventilate the area (for example, open a window)
5. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
6. Fill a spray bottle with the cleaning solution and spray internalsurfaces.
7. Remove any hair or other items from the plug, plug hole and plugchain with the tweezers
8. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Start cleaning at the highest point and work towards the lowest,from outside to the inside and from clean to dirty
9. Wipe the surrounding areas including external surfaces and pipe work
10. Rinse the cloth and wipe internal surfaces, pay particular attention towater marks and drains.
11. To remove any build-up of soap and grease, repeat steps 8 and 9applying the cleaning solution and using a non abrasive pad.
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
12. Rinse the urinal with clear water.
• Ensure warning signs are displayed
• All equipment should be left clean, dry and tidy in storage area after use.
166The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSa
nita
ry C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 182
![Page 129: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/129.jpg)
13. Channelled Urinal splash backs should be carefully sprayed with thecleaning solution and wiped clean with clear water.
14. Dispose of the cloth (refer to Trust policy) when the task is completed
15. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
16. Remove gloves and wash hands
167The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Sani
tary
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 183
![Page 130: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/130.jpg)
Specialist Cleaning
a) Curtain Changing
Task
Frequency
Equipment Required
• Colour-Coded Bucket
• Colour-Coded Cloths
• Colour-Coded Gloves
• Apron (disposable)
• Damp Dust System (Refer to the Damp Dusting Method Statement)
• Laundry Bags
• Spare Curtain Hooks
• Step Ladder
• General Purpose Detergent or General Surface Cleaner
Curtains should be cleaned at least six monthly or when there is visiblecontamination. Infection control teams should be consulted followingdischarge/death of a patient with infection.
Curtain Changing
168The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSp
ecia
list
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 184
![Page 131: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/131.jpg)
Health and Safety
Method
1. Wash hands and put on gloves
2. Prepare cleaning solution (refer to manufacturers’ instructions)
3. Assemble the equipment and check for safety
4. Remove curtain hooks from the curtain
5. Fold and place the curtains in a laundry bag
6. Damp Dust curtain rails (refer to the Damp Dusting methodstatement)
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Wear flat, firm, soled shoes
• Check that the step ladder is locked in the correct position
• Always have both feet on the ladder
• Never stand on the top handrail to gain extra height
• Do not lean step ladder against window
• Do not over stretch.
• Make sure the correct curtains are hung in the right ward
• For Health and Safety reasons, when climbing ladders ensure anotherperson is at the foot of the ladder
• Display the warning signs in the area, ensuring all signs are visible
• Beware of very hot water
• All equipment should be left clean, dry and tidy in storage area after use
169The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Spec
ialis
t C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 185
![Page 132: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/132.jpg)
7. Remove gloves and wash hands
8. Replace the curtain hooks onto a clean curtain, space evenly (forexample, 3” - 4” for a window, 4” - 6” for a bed curtain)
9. Place the curtain over shoulder when ascending the step ladder.
10. Re-hang the curtains starting from one end, ensuring the curtain is onthe correct way round.
11. Wash hands
170The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSp
ecia
list
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 186
![Page 133: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/133.jpg)
b) Isolation Clean
Report daily to the Nurse in Charge BEFORE entering the room/area toensure that it is convenient for cleaning to be carried out and to receive anyspecial additional instructions; checklist in Appendix 3 should be completedby the Nurse in Charge to indicate precautions required.
Task
Equipment Required
• Colour-Coded Bucket
• Colour-Coded Cloth (Disposable)
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Colour-Coded Mop Roll
• Cleaning Trolley
• Damp Dust System (Refer to the Damp Dusting Method Statement)
• Damp Mop System (Refer to the Damp Mopping Method Statement)
• Disposable Apron
• Disposable Gloves
• Dust Control System Applicator Tool (refer to the Dust ControllingMethod Statement)
• Facial Protection/Mask
• High Dusting Mop
Isolation Clean (during and after occupancy by an infected individual)
CLEANING CHECKLIST FOR ISOLATION ROOMS
171The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Spec
ialis
t C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 187
![Page 134: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/134.jpg)
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• All equipment used for Isolation Cleans should be stored in a suitable,secure area separate from any other equipment and not in theisolation room.
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Work in small square sections to prevent over stretching whenmopping
• Always use a warning sign ‘cleaning in progress’, position to beeffective
• All equipment should be left clean, dry and tidy in storage area after use.
• Check with a supervisor before commencing cleaning in an isolationroom.
• High Dusting Tool
• Ladder
• Safety Goggles
• Warning Signs
• General Purpose Detergent or General Surface Cleaner
172The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSp
ecia
list
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 188
![Page 135: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/135.jpg)
Method
1. Wash hands and put on disposable gloves and apron
2. Display the warning signs in the area, ensuring all signs are visible.
3. High Dust the area (refer to the High Dusting method statement)
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions)
5. Place the bucket onto the cleaning trolley
6. Dampen or rinse a cloth in the cleaning solution and wring out well
NOTE Frequently rinse the cloth in the cleaning solution. Change thecleaning solution when it becomes soiled.
7. Damp Dust all ledges, surfaces and fixed equipment ; lamps, chairs,lockers, bedside table / desk, radiator (refer to the Damp Dust methodstatement)
8. If visibly soiled, hand wash the wall to hand height (refer to the WallWashing method statement)
9. Clean the basin
10. Dust Control the floor area (refer to the Dust Controlling methodstatement)
11. Damp mop the floor area (refer to the Damp Mopping methodstatement)
12. Dispose of the cloth (refer to Trust policy) when the task is completed
13. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
14. Remove and dispose disposable gloves and apron.
15. Wash hands
173The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Spec
ialis
t C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 189
![Page 136: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/136.jpg)
NOTE Disposable Single Use Gloves
174The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSp
ecia
list
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 190
![Page 137: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/137.jpg)
c) Steam Cleaning
Task
Equipment Required
Health and Safety
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• This procedure should not be attempted until training is completedand competency is tested.
• Ensure hands are dry when plugging or unplugging electricalmachinery
• When plugging a machine into an electric socket, make sure theswitch is in the off position
• Do not adjust or change the fittings on the machine when it isplugged in
• Check the power supply cables and plug for damage, report and labelif necessary, remove and do not use
• Ensure that portable appliance testing (PAT) has been undertaken inthe last 12 months. If not, report to supervisor
• When using the Steam Cleaner, safety glasses and safety gloves mustbe worn.
• Colour-Coded Cloths
• Colour-Coded Gauntlet Gloves or Safety Gloves
• Safety Glasses
• Steam Cleaner with Accessories
• Warning Signs
Steam Cleaning
175The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Spec
ialis
t C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 191
![Page 138: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/138.jpg)
Method
1. Plan work route, when necessary, remove furniture and equipment
2. Wash hands and put on gloves and safety glasses
3. Display the warning signs in the area, ensuring all signs are visible.
4. Fill the Steam Cleaner with water (refer to manufacturers’instructions).
5. Attach the appropriate accessories onto the Steam Cleaner, dependenton the item to be cleaned.
6. Unwind cable and plug into a mains socket and a circuit breaker ifappropriate and switch on. (refer to manufacturers’ instructions)
7. Wait for the water to warm up (refer to manufacturers’ instructions)
8. The Steam Cleaner is now ready for use.
9. To operate the Steam Cleaner, refer to manufacturers’ instructions
10. If necessary, use maximum steam power
11. Use the suction cleaner accessory to remove water if necessary
• Avoid placing open skin near the steam pressure nozzle.
• All equipment should be clean and dry before use.
• Always use a warning sign ‘cleaning in progress’, position to beeffective
• Be aware that excess steam may activate fire/smoke detectors
• Avoid steam cleaning any electrical equipment.
• If wall cleaning, cover electrical plug sockets
• All equipment should be left clean dry and tidy in storage area after use
176The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSp
ecia
list
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 192
![Page 139: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/139.jpg)
12. Empty and clean the dirty water tank
13. Wipe and clean all surfaces of the Steam Cleaner, remove and wash allaccessories
14. Collect all accessories and place them back on the trolley
15. Re-wind electricity cable around the connector on the handle.
16. When the area is completely dry, return the furniture to originalposition.
17. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
18. Wash hands and remove gloves
177The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Spec
ialis
t C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 193
![Page 140: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/140.jpg)
d) Terminal Clean of Vacated Room
Task
Equipment Required
• Colour-Coded Bucket
• Colour-Coded Mop Handle
• Colour-Coded Mop Head
• Colour-Coded Mop Roll
• Cleaning Trolley
• Damp Mop System (Refer to the Damp Mopping MethodStatement)
• Disposable Apron
• Disposable Cloth
• Disposable Gloves
• Dust Control System Applicator Tool (refer to the Dust ControllingMethod Statement)
• Facial Protection/Mask
• High Dusting Tool
• High Dusting Mop Head
• Safety Goggles
• Warning Signs
• General Purpose Detergent
Terminal Clean of Vacated Room
178The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSp
ecia
list
Cle
anin
g
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 194
![Page 141: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/141.jpg)
Health and Safety
Method
1. Wash hands and put on gloves
2. Display the warning signs in the area, ensuring all signs are visible.
3. High Dust the area (refer to the High Dust method statement)
4. Prepare the cleaning solution in a well-ventilated area (refer tomanufacturers’ instructions).
5. Place the bucket onto the cleaning trolley
6. Strip the beds
7. Dispose of waste correctly
8. Dampen or rinse a cloth in the cleaning solution and wring out well
9. Damp Dust the beds, tables/desks, chairs, lockers lamps, radiator ,bedside lockers (inside, outside and base) and any other furniture,fixtures and fittings (refer to the Damp Dusting method statement)
10. Clean all clinical equipment for example, monitors and suctionapparatus (use Damp Dusting method statement)
• Refer to Trust policy for guidance on all cleaning processes, colour-coding, equipment, protective clothing, fluids and methods
• Never mix cleaning agents, as poisonous gases could result (refer tomanufacturers’ instructions)
• Work in small square sections to prevent over stretching whenmopping
• Always use a warning sign ‘cleaning in progress’, position to beeffective
• All equipment should be left clean, dry and tidy in storage area after use.
179The NHS Healthcare Cleaning Manual
Cleaning Method Statements
Spec
ialis
t C
lean
ing
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 195
![Page 142: Cleaning method statements 2004 uk](https://reader034.vdocument.in/reader034/viewer/2022042602/55785132d8b42a2f6a8b4eb6/html5/thumbnails/142.jpg)
11. Damp Dust all ledges, surfaces and fixed equipment (refer to theDamp Dusting method statement)
12. Remove furniture and equipment from the room
13. Clean the basin
14. Dust Control the area (refer to the Dust Controlling methodstatement)
15. Damp mop the floor area, (refer to the Damp Mopping methodstatement) take the opportunity to scrub and spray clean if instructedby a Supervisor.
16. Replace all furniture and inform ward staff that the room is ready foroccupation.
17. Dispose of the cloth (refer to Trust policy) when the task is completed
18. When the area is completely dry, return the furniture to originalposition.
19. After use, all equipment should be checked, cleaned, dried andreturned to the storage area
20. Remove gloves and wash hands
180The NHS Healthcare Cleaning Manual
Cleaning Method StatementsSp
ecia
list
Cle
anin
g
NOTE Disposable Single Use Gloves
NHS cleaning manualv2 TXT V6 14/4/04 10:37 am Page 196