Cleco Transmission Planning Summit 2013. Coughlin Transmission Operations Center. May 9, 2013. 10:00 – 11:00am. Introduction. Welcome. Terry Whitmore, Mgr- Trans Strategy & Support James Simms, Lead Engineer- Transmission Strategy Chris Thibodeaux, Lead Engineer- Transmission Strategy - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Cleco Transmission Planning Summit 2013

Cleco Transmission Planning Summit 2013Coughlin Transmission Operations Center

May 9, 2013

10:00 – 11:00am

Page 2: Cleco Transmission Planning Summit 2013

Welcome

Terry Whitmore, Mgr- Trans Strategy & Support

James Simms, Lead Engineer- Transmission Strategy

Chris Thibodeaux, Lead Engineer- Transmission Strategy

Linh Tran, Associate Engineer- Transmission Strategy

Cindy Guillot, Director Trans Policy and Contracts

Introduction

Page 3: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 4: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 5: Cleco Transmission Planning Summit 2013

Economic Planning Studies

None were requested for 2013

Page 6: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 7: Cleco Transmission Planning Summit 2013

Acadiana Load Pocket

Page 8: Cleco Transmission Planning Summit 2013

Acadiana Load Pocket ProjectYear 2013 Progress Report

• Cleco Upgrades– New 230 kV transmission line from Wells to Labbe (Complete)– Add a Second 500/230 kV Transformer at Wells (Complete)– Reconductor Segura – Hopkins 138KV transmission line (Complete)

• Entergy Upgrades– New 230 kV transmission line from Sellers Rd to Labbe (Complete)

• Lafayette Upgrades– New 230 kV transmission line from Labbe to Bonin (Complete)– 2nd 230/138 kV Autotransformer at Bonin (Complete)

Page 9: Cleco Transmission Planning Summit 2013

Acadia PB2 Purchase Affected System Upgrades

• Cleco Upgrades– New 230/138 kV Autotransformer at Rork (Complete)– Reconductor Acadia to Richard Ckt 2 (Complete)– Redirect Line 1 to connect to the Rork 230/138 kV autotransformer (Complete)

• Entergy Upgrades– Reconductor Acadia to Richard Ckt 3 and 4 (Complete)– Reconductor Hopkins to Moril 138 kV line (Complete)– Tap the existing Scanlin to Scott 138 kV line and add a new substation Bosco

with a 5 ohm Reactor at Bosco (Complete)– Build a new 138 kV line from Bosco to Bloomfield (Tapped between East

Opelousas and Vatican)(Complete)– Change Normally Open breakers at Richard and Scott(Complete)

Page 10: Cleco Transmission Planning Summit 2013

ALP Project & Affected System Upgrades Complete

Page 11: Cleco Transmission Planning Summit 2013

Acadiana Load Pocket Update

Questions ?

Page 12: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 13: Cleco Transmission Planning Summit 2013

Cleco 2013 Transmission Construction Plan

Page 14: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan

Page 15: Cleco Transmission Planning Summit 2013

Cleco 2013 Transmission Construction Plan

Budgeted Projects

• 2nd Cocodrie Autotransformer• Cooper Capacitor Banks • Strung Bus replacement at Plaisance• Many Capacitor Banks

2013

• 2nd Pineville Autotransformer

2014

Page 16: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan2nd Cocodrie 230/138 kV Autotransformer

Page 17: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan

Project: Second 230/138KV Autotransformer at Cocodrie Substation

In-service Date: April 2013

Transmission Project Justification:• This project relieves the potential overload on the existing

Cocodrie Autotransformer FTLO Cocodrie to Ville Platte 230 kV line. This project also eliminates the contingency of the existing Auto-transformer causing overloads on Coughlin to Shady Oaks 138 kV line.

Page 18: Cleco Transmission Planning Summit 2013

2013 Transmission Construction PlanCooper Capacitor Banks

Page 19: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan

Project: Cooper capacitor 2- 36 MVAR bank addition

In-service Date: March 2013

Transmission Project Justification:• This project was approved to allow for maintenance on the

Cooper to Leesville and Cooper to Derrider double circuit 138 kV lines and improve the voltage in the Leesville/ Derrider areas. Operationally there is no way to get an outage on these lines with out risking low voltage for the loss of the Cooper to Penton 230 kV line.

Page 20: Cleco Transmission Planning Summit 2013

2013 Transmission Construction PlanMany Capacitor Bank

Page 21: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan

Project: Many capacitor 23.4 MVAR bank addition

In-service Date: June 2013

Transmission Project Justification:• This project was approved to mitigate potential low voltages

seen in the powerflow models during summer peak conditions at Many 138 kV Substation for the loss of the Many to Fisher 138 kV line.

Page 22: Cleco Transmission Planning Summit 2013

2013 Transmission Construction PlanCoughlin to Plaisance 138 kV line Rating upgrade

Page 23: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan

Project: Transmission element replacements on Plaisance – Coughlin 138KV transmission line (Replace Strung bus at Plaisance)

In-service Date: March 2013

Transmission Project Justification:• This project increases the Plaisance to Coughlin 138 kV line

rating to prevent overloads FTLO Cocodrie to Ville Platte 230 kV line.

• Increase the rating to 360 MVA

Page 24: Cleco Transmission Planning Summit 2013

2013 Transmission Construction PlanPineville 230/138 kV Auto #2

Page 25: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan

Project: Pineville 230/138 kV Auto #2

In-service Date: June 2014

Transmission Project Justification:• This project prevents pre-contingent load shed as a result of

a extended outage of either the Pineville or Twin Bridges 230/138 kV Autotransformers. Operationally with one of these transformers out of service loss of the other autotransformer would lead to low voltage in the Pineville/Alexandria areas and thermal overloads on lines in that region.

Page 26: Cleco Transmission Planning Summit 2013

2013 Transmission Construction Plan

Questions ?

Page 27: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 28: Cleco Transmission Planning Summit 2013

• Remove zero Impedance ties• Valley Load Change• Demco Transaction• Removed the Wells Reactor• Messick 500 kV Tap

Model Review

Page 29: Cleco Transmission Planning Summit 2013

Removed Zero Impedance Ties

• SPP wants to remove the zero impedance ties from the Powerflow models.

• Changed the way we model load connected to external systems which traditionally modeled with a Cleco load on a Cleco bus.

• Now the load ID is Cleco however it is connected to an external bus

Valley Load Change

• Changed the Valley load to be AEP load instead of Cleco load.

• Set up a transaction in the powerflow models for the remainder of the time Cleco is serving the load.

Model Review

Page 30: Cleco Transmission Planning Summit 2013

Demco Transaction

• Set up a transaction from Cleco to Lagn to serve the Demco load starting in 2014.

Removed Wells Reactor

• With the completion of the ALP project and the addition of the second Wells 500/230 kV Autotransformer the Wells reactor was no longer needed to restrict flow into the ALP.

• Cleco went through the approval processes within SPP to remove the Wells SPS and removed the reactor from the models.

• Reactors remain at wells however are not connected.

Model Review

Page 31: Cleco Transmission Planning Summit 2013

Messick 500 kV Tap

• The final SPP models have the Mount Olive to Hartsburg 500 kV line tapped near Messick substation in the 2019 and 2024 models. However the models do not include a 500/230 kV Auto.

• This project is currently being jointly studied by AEP, Cleco, Entergy, SPP and MISO?

• No firm commitment to build has been established at this point.

Model Review

Page 32: Cleco Transmission Planning Summit 2013

Model Review

Page 33: Cleco Transmission Planning Summit 2013

Model Review

Questions ?

Page 34: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 35: Cleco Transmission Planning Summit 2013

2013 SPP Model ACCC Results

• SPP 2013 Models

• 2013 (Spring, Summer Shoulder,

Summer, Fall, Winter)

• 2014(Spring, Low load, Summer

Shoulder, Summer, Fall, Winter)

• 2015 (Spring, Summer, Winter)

• 2019 (Low load, Summer, Winter)

• 2024 (Summer, Winter)

Page 36: Cleco Transmission Planning Summit 2013

2013 SPP Model ACCC Results

• International Paper to Mansfield 138kV transmission line thermal overload

• Powerflow models: 2013, 2014 and 2015 Summer and 2014 Winter peak models

• Contingency: Dolet Hills to S.W.Shreveport 345 kV transmission tie line

• Resolution: The Dolet Hills Operating Guide addresses this outage and resulting overload. The Dolet Hills Plant would be reduced to a level such that the flow on the IP to Mansfield 138 kV transmission line is within limits.

Page 37: Cleco Transmission Planning Summit 2013

2013 SPP Model ACCC Results

• International Paper to Wallace Lake 138kV transmission tie line thermal overload

• Powerflow models: 2013, 2014 and 2015 Summer peak models

• Contingency: Dolet Hills to S.W.Shreveport 345 kV transmission tie line

• Resolution: The Dolet Hills Operating Guide addresses this outage and resulting overload. The Dolet Hills Plant would be reduced to a level such that the flow on the IP to Mansfield 138 kV transmission line is within limits.

Page 38: Cleco Transmission Planning Summit 2013

2013 SPP Model ACCC Results

Contingent Element:Dolet Hills to S.W. Shreveport 345 kV line

IP Mansfield to Wallace Lake 138 kV line 110%

Mansfield to IP Mansfield 138 kV line 105%

Mitigation: Implement the Dolet Hills operating guide

Page 39: Cleco Transmission Planning Summit 2013

2013 SPP Model ACCC Results

• Champagne to Plaisance 138 kV transmission line thermal overload

• Powerflow models: 2014 (Fall, Spring, Summer, Summer Shoulder, Winter), 2015 Winter, 2019 Winter, 2024 (Summer and Winter) models

• Contingency: Cocodrie to Ville Platte 230 kV transmission line

• Resolution: The terminal equipment at Champagne was upgraded to 287 MVA which eliminates this overload condition.

Page 40: Cleco Transmission Planning Summit 2013

2013 SPP Model ACCC Results

Contingent Element:Cocodrie to Ville Platte 230 kV line

Champagne to Plaisance 138 kV line 121% (231 MVA)

Mitigation: Line rating already upgraded to 287 MVA

Page 41: Cleco Transmission Planning Summit 2013

2013 SPP Model ACCC Results

Questions ?

Page 42: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Project Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 43: Cleco Transmission Planning Summit 2013

MISO Discussion

• June 1st MISO becomes Cleco’s RC.

• Cleco begins participating in MTEP 14 June 1st

• Cleco has filed with FERC for Order 1000 Regional requirements under MISO tariff.  Ferc has approved this filing.

            

Page 44: Cleco Transmission Planning Summit 2013

MISO Discussion

• Cleco plans to file with FERC to meet Order 1000 Inter-regional planning under MISO.

• Cleco will administer its tariff until Dec 19, 2012  including:

              -  Transmission Service Request              - Generator Interconnection Queue (Small & Large)

Page 45: Cleco Transmission Planning Summit 2013

MISO Discussion

Questions ?

Page 46: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Project Update

• 2012 Transmission Construction Plan

• Model Review

• 2012 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 47: Cleco Transmission Planning Summit 2013

Stakeholder Business

• Chance for Stakeholders to bring issues up for discussion

Page 48: Cleco Transmission Planning Summit 2013

Agenda

• Introduction

• Economic Planning Studies

• Acadiana Load Pocket Project Update

• 2013 Transmission Construction Plan

• Model Review

• 2013 SPP Model ACCC Results

• MISO Discussion

• Stakeholder Business

• Final Questions

• Adjourn

Page 49: Cleco Transmission Planning Summit 2013

Final Questions?

Page 50: Cleco Transmission Planning Summit 2013

2013 Cleco Transmission Planning Summit

• Oasis

• http://www.oatioasis.com/clec/index.html

• Trueshare

• http://www.trueshare.com/

• Contact info:

Cindy Guillot

Director of Transmission Policy & Contracts

318 838 3166

[email protected]