client - fuelled

24

Upload: others

Post on 16-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Client - Fuelled
Page 2: Client - Fuelled

Client:

Project: Tower 03-07 Sweet Gas Plant

Location:

Contract Number:

Inquiry Number:

PO Number:

Equipment Service:

Item Tag(s):

CENTRIFUGAL PUMP

DATA SHEET

Encana Corporation

Dawson Creek, BC, Canada

A6UE-4-0607-03-07-RQ-01

A6UE

Produced Water Disposal Pumps

TOW0307-P-9104A/B/C

Sheet:Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Fluor Form Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. 000.256.DS4601

Rev Date Description

Approved

10Of1

Document Number: TOW0307-C-070-EDS-P-9104

A 5-Mar-15 Issued for Review SG HL RK DSB 20-Mar-15 Issued for Quotation HL RC RK DS

By CheckedProcess Checked

TOW0307-PM-9104A/B/C

Page 3: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

COOLING WATER: Not AvailableLOCATION:

UNDER ROOFHEATEDINDOOR

MOUNTED AT: TROPICALIZATION REQ'D TEMP

DIFFERENTIAL HEAD: m

m

KW

SITE AND UTILITY DATA

°C MAX

DESIGNRETURNINLET

m³/h

kPa g

kPa g

kPa

50.0

10329

10324.0

6.47 (Note 2)

FLOW:

DISCHARGE PRESS: (6.3.2)

HYDRAULIC POWER:

NPSHA:

DIFFERENTIAL PRESS.:

MINIMUM

VAPOR PRESSURE:

1.300 0.797

kPa(a)

945.1

-4.8

143.5 (Note 3)

NORMAL PARTICULATE SIZE (DIA. IN MICRONS):

CHLORIDE CONCENTRATION (ppm):

H2S CONCENTRATION (ppm): (6.12.1.12)

kJ/kgºC

1132 1114

4.318

PARTICULATE CONCENTRATION (ppm):

CORROSION DUE TO: (6.12.1.19)RELATIVE DENSITY:

VISCOSITY:

Max & Min values refer only to the property listed

Pa s

4.313

1.264.24

LIQUID TYPE OR NAME:

SPECIFIC HEAT:

Produced Water Produced Water

UNITS NOTEMINIMUMMAXIMUM SERVICE : INTERMITTENT

Proposal

NO. REQ'D :

Site: Dawson Creek, BC, Canada

Encana Corporation

Inquiry No.:

Item tag(s):

Tower 03-07 Sweet Gas Plant

MANUFACTURER: MODEL:

10

A6UE-4-0607-03-07-RQ-01

CLIENT:

3 PUMP SIZE :

SERVICE: Produced Water Disposal Pumps PLANT: Tower 03-07 Sweet Gas Plant

SERIAL NO.:

of

NO. STAGES :

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

B Date: 20-Mar-15

Contract:

TOW0307-P-9104A/B/C

Revision:

A6UE

P.O. No.:

Unit:

Sheet 2

TYPE:

PARALLEL

DRIVER: TOW0307-PM-9104A/B/C APPLICABLE TO :

EROSION DUE TO: (6.12.1.19)

MAXIMUM

°C

C.L. IMPELLER

30.0

LIQUID CHARACTERISTICS

(Note 4)

SUCTION PRESSURE:

NPSHa Datum

PUMPING TEMP.:

UNITS

OPERATING CONDITIONS

RATED

*IF INTERMITTENT NO. OF STARTS / DAY

PUMPS OPERATE IN:

28 ELECTRICAL AREA CLASSIFICATION:

29

30 COOLING WATER CHLORIDE CONCENTRATION:

31 ELEVATION (MSL):

32 / INSTRUMENT AIR:

33 /

34

35

36

37

38

39

40

41

42

43

44

45 The required horsepower was calculated using the density of produced water (1114kg/m3) and the differential head at rated flow

46 The Produced Water chloride level is 142000 ppmw. Produced Water also contains 12 ppmw O2.

47

48

49

50

51

52

53

54

55

56

57

58

59

60

CLASS:

NPSH Available is based on pump suction and discharge nozzle centerline at 1750mm above grade and includes 1m safety margin.

Non API pump is required for the service even with API pump template being used.

2

1

NOTES

HERTZ

MIN

kPa g

MAXTEMP °C

575 208/120 120 MAX

HEATINGDRIVERS

VOLTAGE

3

MIN

PHASE

60 60 60

3

4

1 1

TEMP ID:ZONE: SOURCE

PRESSURE MINUNCLASSIFIED

kPa gMAX: 730

UTILITY CONDITIONS:

-40

Normal Press: 690 kPag @ 27 deg C normal, 35 deg C max.

HEATINGDRIVERS

SITE DATA:

795.6 m BAROMETER: 92 kPa a

STEAM: Not Available

PRESS.

UNUSUAL CONDITIONS:

ELECTRICITY: SHUTDOWNCONTROL

%

°C kPa g MIN: 414

RELATIVE HUMIDITY: MIN / MAX

RANGE OF AMBIENT TEMPS: MIN / MAX 35

kPa g

ppm

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9104Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

Page 4: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15 /

16 /

17

18

19

20

21

22

23

24

25

26

27

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

CASING TYPE: (6.3.10)

°C

CASE PRESSURE RATING:

CASING MOUNTING:

OH3 BACKPULLOUT LIFTING DEVICE REQ'D (9.1.2.6)

@MAWP: (6.3.6) kPa g

TOW0307-P-070-DSX-PM-9104

BEARING TYPE:

RADIAL:

THRUST:

STARTING METHOD:

SEE DRIVER DATA SHEET:

CONSTRUCTION

EST. MAX SOUND POWER LEVEL (dBA)

MAX. SOUND POWER LEVEL REQ'D (6.1.14) (dBA)

85 (dBA)

SUCTION SPECIFIC SPEED LIMIT: gpm,rpm,ft

SUCTION SPECIFIC SPEED: m³/s,rpm,m

11,000

HORIZONTAL

FRAME OR MODEL:

ORIENTATION:

LUBE:

PREFERRED OPERATING REGION: (6.1.11)

ALLOWABLE OPERATING REGION:

STABLE :THERMAL :

to

KW

MANUFACTURER:

NAMEPLATE POWER:

NOMINAL RPM:

RATED LOAD RPM:

m³/s

900 ENDSUCTION

m

SPECIFIC SPEED: (6.1.9) m³/s,rpm,m

NOZZLE CONNECTIONS: (6.5.5)

SIZE FACING RATING POSITION

EST. MAX SOUND PRESS. LEVEL

OTHER:

m³/s

RATED CURVE BEP FLOW (at rated impeller dia.)

IMPELLER DIA.: RATED: MAX:

EFFICIENCY:

MIN:

m³/s

KW

YES

SOURCE OF VARIABLE SPEED: MOTOR%

mm

API PUMP TYPE:

MAX. HEAD @ RATED IMPELLER:

mt

BB4 [Based on API 610 Definitions]

MIN. FLOW

to

m³/s

(dBA)

MAX. ALLOW. SOUND PRESS. LEVEL REQ'D (6.1.14)

m³/s

m

KW

m

m CL PUMP TO U/S BASEPLATE:

NPSHR at RATED FLOW :

NPSHR MARGIN at RATED FLOW :

10

DRIVER TYPE:RPM INDUCTION MOTOR

NO

VARIABLE SPEED REQUIRED:

RATED POWER:

A6UE

P.O. No.:

Unit:

Sheet

Contract:

TOW0307-P-9104A/B/C

Tower 03-07 Sweet Gas Plant

of

Item tag(s):

Revision:

A6UE-4-0607-03-07-RQ-01Inquiry No.:

B Date: 20-Mar-15

3

DRIVER (7.1.5)PERFORMANCE

PROPOSAL CURVE NO.:

GEAR:As Tested Curve No.:

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

couplings shall be balanced to ISO 1940-1 balance quality grade 2.5.

NOTES

5 All casing connections shall be braced with gussets in two orthogonal planes.

6 Drive train components, including but not limited to impeller, pump rotor, motor rotor, shall be dynamically balanced to ISO 1940 G1.0. Transmission units of

WINDOW ON COUPLING GUARD

COUPLING IN COMPLIANCE WITH (7.2.4)

COUPLING GUARD STANDARD PER (7.2.13.a) Non-Sparking

COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11)

COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3)

COUPLING WITH HYDRAULIC FIT (7.2.10) NO

Note 6

mm

1.5 Min.

NORIGID

SPACER LENGTH

SERVICE FACTOR

MODEL:

RATING (POWER/100 RPM)

COUPLING: (7.2.3) (7.2.13.F)

MANUFACTURER:

SHRINK FIT LIMITED MOVEMENT IMPELLERS (9.2.2.3)

Note 6

ROTOR:

SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3)

- PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS:

- BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION:

- IMPELLERS INDIVIDUALLY SECURED:

HYDROTEST OH PUMP AS ASSEMBLY

SUCTION PRESS. REGIONS DESIGNED FOR MAWP

ROTATION: (VIEWED FROM COUPLING END)

YES

HYDROTEST: °C@

VENT VALVE SUPPLIED BY

DRAIN VALVE SUPPLIED BY

DRAINS MANIFOLDED

DRAIN TO SKID EDGE

YES

SUPPLIER

PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)

GUSSET SUPPORT REQUIRED Note 5

MACHINED AND STUDDED CONNECTIONS (6.4.3.12)

VS 6 DRAIN

First Critical Speed Wet (Multi stage pumps only)

COMPONENT BALANCE TO ISO 1940 G1.0

kPa g

VENTS MANIFOLDED

THREADED CONS FOR PIPELINE SERVICE & < 50°C (6.4.3.2)

SPECIAL FITTINGS FOR TRANSITIONING (6.4.3.3)

CYLINDRICAL THREADS REQUIRED (6.4.3.8)

YES

RF

WARM-UP LINE

NO. SIZE TYPE

DRAIN

VENT

PRESSURE GAGE

TEMP GAGE

BALANCE/LEAK OFF

DISCHARGE 900 TOP

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9104Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

FACING RATING POSITION

Page 5: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18 7. All pumps and drivers shall be provided with flats in two planes to permit

19 the use of hand held vibration monitoring equipment.

20

21

22

23

24

25 LOCATION OF PRESSURIZED LUBE OIL SYSTEM MOUNTED ON BASEPLATE:

26

27

PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET

OTHER:

engineering notes.

Please refer to specific baseplate requirements in the requisition

YES

NOTES

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

INTERCONNECTING PIPING PROVIDED BY: SUPPLIER

8. API D2 Super Duplex SS (A 890 grade 5A or 6A) shall be quoted as an option.

ISO 10438 DATA SHEETS ATTACHED

REVIEW AND APPROVE THRUST BEARING SIZE: (9.2.5.2.4)

LUBRICATION: (6.10.2.2) (6.11.3) (9.6.1) Oil Lubricated

/

/

PRESSURIZED LUBE OIL SYSTEM MTD. ON PUMP BASEPLATE

PRESSURE LUBE SYSTEM TO ISO 10438- (9.2.6.5)

THRUST

RADIAL

BEARINGS AND LUBRICATION (6.10.1.1)

BEARING (TYPE / NUMBER): (6.11.4)

BOWL (IF VS TYPE):

AISI 4140

IMPELLER WEAR RING:

IMPELLER:

CASE WEAR RING:

12% Cr

-29 °C

INSPECTION CLASS:

YES

YES

- GROUT VENT HOLES

- DRAIN CONNECTION

SUPPLIED WITH:

MOUNTING PADS SIZED FOR BASEPLATES LEVELING (7.3.5)

ENTIRE BASEPLATE DRAIN RIM

MOUNTING: BOLTED ON STEEL WORK

NON-GROUT CONSTRUCTION: (7.3.13) REQUIRED

VERTICAL LEVELING SCREWS: REQUIRED

LONGITUDINAL DRIVER POSITIONING SCREWS: REQUIRED

YES

MOUNTING PADS TO BE MACHINED (7.3.6)

A6UE

P.O. No.:

Unit:

Sheet 4 10

Tower 03-07 Sweet Gas Plant

Item tag(s):

of

Revision:

TOW0307-P-9104A/B/C

Contract:

Inquiry No.: A6UE-4-0607-03-07-RQ-01

B Date: 20-Mar-15

CONSTRUCTION (CONT'D)

12% Cr

MATERIAL (6.12.1.1)

REDUCED HARDNESS MATERIALS REQ'D (6.12.1.12.1)

CS + Internal Coating

BASEPLATE

API BASEPLATE NUMBER:

SHAFT:

FULL TOP DECKINGBASEPLATE CONSTRUCTION (7.3.14)

BASEPLATE DRAINAGE (7.3.1)

APPENDIX H CLASS: S-6: CS / 12% Cr (Note 8)

MINIMUM DESIGN METAL TEMP (6.12.4.1)

DIFFUSERS:

CASE:

BARREL:

APPLICABLE HARDNESS STANDARD (6.12.1.12.3)

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)

VENT

DRAIN

COOLING WATER

TAG ALL ORIFICES (7.5.2.4)

m³/s

PIPING & APPURTENANCES

OTHER:

HEATING PIPING:

COOLING REQ'D

FITTINGS

COOLING WATER PIPING MATERIALS

COOLING WATER REQUIREMENTS:

BEARING HOUSING:

HEAT EXCHANGER:

NO

ADDITIONAL CENTRAL FLUSH PORT (6.8.9)

SEE ATTACHED ISO 21049/API 682 DATA SHEET YES

MECHANICAL SEAL (6.8.1)

INTERCONNECTING PIPING BY: SUPPLIER

SEAL SUPPORT SYSTEM MOUNTING

SEAL SUPPORT MOUNTED ON PUMP BASEPLATE (7.5.1.4):

IDENTIFY LOCATION ON BASEPLATE:

YES

Remarks

SOCKET WELD CONN ON SEAL GLAND (7.5.2.8)

N/A

YES

YES

HEATING MEDIUM

TOTAL COOLING WATER: m³/s

m³/s

HEATING AND COOLING (6.1.17)

COOLING WATER PIPING PLAN

COOLING WATER PIPING

N/AHEATING JACKET REQ'D (6.8.11)

PRESSURE GAGE TYPE:

TEMP GAGES (WITH THERMOWELLS) (9.1.3.6) NO

NUMBER PER THRUST BEARING INACTIVE SIDE

°C

NUMBER PER THRUST BEARING ACTIVE SIDE

NUMBER PER RADIAL BEARING

THRUST BEARING TEMP.:

PROVISION FOR VIB. PROBES NO

TEMPERATURE (7.4.2.3)

RADIAL BEARING TEMP.: °C

MONITORS AND CABLES SUPPLIED BY (7.4.2.4)

NUMBER PER RADIAL BEARING

NUMBER PER AXIAL BEARING

VIBRATION PROBES (7.4.2.2)

PROVISION FOR VIB. PROBES NO

NUMBER OF ACCELEROMETERS Note 7

MOUNTING LOCATION OF ACCELEROMETERS

MOUNTING LOCATION OF ACCELEROMETERS

FLAT SURFACE REQUIRED (6.10.2.11) YES

NUMBER OF ACCELEROMETERS

PROVISION FOR MTG ONLY (6.10.2.10) NO

INSTRUMENTATION

MOUNTING LOCATION OF ACCELEROMETERS

NOSEE ATTACHED API-670 DATA SHEET

ACCELEROMETER (7.4.2.1)

NUMBER OF ACCELEROMETERS

CONSTANT LEVEL OILER: REQUIRED (TRICO)

OIL VISC. ISO GRADE

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9104Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

Page 6: Client - Fuelled

REV

1

2

3

4 SPECIFICATION NUMBER:

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

RESIDUAL BALANCE TEST (J.4.1.2)

YESNOTIFICATION OF SUCCESSFUL SHOP PER. TEST (8.1.1.c)(8.3.3.5)

PMI TESTING REQUIRED (8.2.2.8)

COMPONENTS TO BE TESTED:

FOR

METHOD

HARDNESS TEST REQUIRED (8.2.2.7)

ADDITIONAL SUBSURFACE EXAMINATION (6.12.1.5)(8.2.1.3)

NO

NO

LIQUID PENETRANT YES

ULTRASONIC

MAG PARTICLE YES

RADIOGRAPHY

YES

INSPECTION REQUIRED FOR CASTINGS

YESCASTING REPAIR WELD PROCEDURE APPR. REQ'D (6.12.2.5)(6.12.3.1)

(6.12.3.4.e) MAG PARTICLE

INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)

YES

YES

YES

OTHER

SHOP INSPECTION (8.1.1)

PERFORMANCE CURVE & DATA APPROVAL PRIOR TO SHIPMENT

TEST WITH SUBSTITUTE SEAL (8.3.3.2.b)

IMPELLER

CASING

SHAFT

YES

YES

NO

YESMATERIAL CERTIFICATION REQUIRED:

Note 9 (6.12.1.8)

RADIOGRAPHY

LIQUID PENETRANT

ULTRASONIC

N2 PURGE (9.2.8.4)

DRIVERPUMP

FINISH COAT:

DETAILS OF LIFTING DEVICES:

SHIPMENT: (8.4.1) EXPORT

FINISH COAT:

START-UP YES

NORMAL MAINTENANCE

WEIGHTS kg

SPARE PARTS

ITEM No. TOTALBASEGEAR

PRIMER:

SHIPPING & STORAGE CONTAINER FOR VERT. STORAGE (9.2.8.3)

ROTOR STORAGE ORIENTATION (9.2.8.2)

SPARE ROTOR ASSEMBLY PACKAGED FOR:

YES

YESOUTDOOR STORAGE MORE THAN 6 MONTHS

EXPORT BOXING REQUIRED

Tower 03-07 Sweet Gas Plant

TESTSURFACE PREPARATION AND PAINT

PUMP SURFACE PREPARATION:

PRIMER:

YESSUPPLIER'S STANDARD

OTHER (SEE BELOW)

PUMP:

BASEPLATE:

BASEPLATE SURFACE PREPARATION:

A6UE

P.O. No.:

Unit:

Sheet

Contract:

TOW0307-P-9104A/B/C

5 10

A6UE-4-0607-03-07-RQ-01Inquiry No.:

Item tag(s):

of

Revision: B Date: 20-Mar-15

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60 REMOVE CASING AFTER TEST

PER ASME SECTION VIII

PER EN 13445IMPACT TEST (6.12.4.3)

OBSERVE

REMOVE / INSPECT HYDRODYNAMIC BRGS. AFTER TEST (9.2.7.5)

AUXILIARY EQUIPMENT TEST (8.3.4.6)

RETEST ON SEAL LEAKAGE (8.3.3.2.d)

RETEST REQUIRED AFTER FINAL HEAD ADJ. (8.3.3.7.b)

NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3)

TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)

OBSERVE

NON-WIT

OBSERVE

4 HR. MECH RUN TEST (8.3.4.2.2)

BEARING HOUSING RESONANCE TEST (8.3.4.7)

SOUND LEVEL TEST (8.3.4.5)

CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)

LOCATION OF CLEANLINESS INSPECTION

CHECK FOR CO-PLANAR MOUNTING PAD SURFACES

MECHANICAL RUN TEST UNTIL OIL TEMP STABLE

TEST DATA POINTS TO (8.3.3.3)

OBSERVE

OBSERVE

OBSERVENPSH (8.3.4.3.1)(8.3.4.3.4)

NPSH-1ST STAGE ONLY (8.3.4.3.2)

TEST TOLERANCES TO (8.3.3.4)

YESBASEPLATE TEST (7.3.21)

STRUCTURAL RESONANCE TEST (9.3.9.2)

NOZZLE LOAD TEST

4 HR. MECH RUN TEST AFTER OIL TEMP STABLE (8.3.4.2.1)

COMPLETE UNIT TEST (8.3.4.4.1)

LOCATION OF AUX. EQUIPMENT TEST

EQUIPMENT TO BE INCLUDE IN AUX TESTS

HYDROSTATIC

HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2)

PERFORMANCE TEST

TEST IN COMPLIANCE WITH (8.3.3.2)

CADMIUM PLATED BOLTS PROHIBITED

VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.C)

VENDOR TO SUBMIT TEST PROCEDURES (8.3.1.1)

SUBMIT INSPECTION CHECK LIST (8.1.5)

YES

YES

CONNECTION BOLTING (7.5.1.7)

YES

YES

FLANGES REQ'D INPLACE OF SKT WELD UNIONS (7.5.2.8)

INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3)

YES

IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e)

CASING RETIREMENT THICKNESS DRAWING (10.3.2.3)

INSTALLATION LIST IN PROPOSAL (10.2.3.1)

VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3)

TRANSIENT TORSIONAL RESPONSE (6.9.2.4)

BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)

ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1)

YES

CONNECTION DESIGN APPROVAL (9.2.1.4)

TORSIONAL ANALYSIS / REPORT (6.9.2.10)

PROGRESS REPORTS

OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5)

OPERATION TO TRIP SPEED

MAX DIA. IMPELLERS AND / OR NO. OF STAGES

YES

MAXIMUM DISCHARGE PRESSURE TO INCLUDE

COORDINATION MEETING REQUIRED (10.1.3)

MAX RELATIVE DENSITY

OTHER PURCHASER REQUIREMENTS

LATERAL ANALYSIS REQUIRED (9.1.3.4)(9.2.4.1.3)

Document NumberTOW0307-C-070-EDS-P-9104

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agreesto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.

DYNAMIC BALANCE ROTOR (6.9.4.4) YES

MODAL ANALYSIS REQUIRED (9.3.9.2)

Page 7: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 14 ) (8.2.2.5)

FOR CASTINGSFOR FABRICATIONS

VISUAL INSPECTION (ALL SURFACES)

TYPE OF INSPECTION

RADIOGRAPHY

ULTRASONIC INSPECTION

MAGNETIC PARTICLE INSPECTION

LIQUID PENETRANT INSPECTION

METHOD

NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS

THESE REFERENCES MUST BE LISTED BY THE PURCHASER DEFAULT TO TABLE 15

MATERIAL INSPECTION

MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES

POSTWELD HEAT TREATMENT

POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS

A6UE

Tower 03-07 Sweet Gas Plant

Item tag(s):

Contract:

Unit:

Sheet 6

TOW0307-P-9104A/B/C

Revision:

P.O. No.:

B Date: 20-Mar-15

PRESSURE VESSEL DESIGN CODE REFERENCES

THESE REFERENCES MUST BE LISTED BY THE SUPPLIER:

CASTING FACTORS USED IN DESIGN (TABLE 3)

SOURCE OF MATERIAL PROPERTIES

A6UE-4-0607-03-07-RQ-01

10of

Inquiry No.:

WELDING AND REPAIRS (Please Refer to ECA-WELD-S01)

THESE REFERENCES MUST BE LISTED BY THE PURCHASER (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)

ALTERNATIVE WELDING CODES AND STANDARDS

WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD)

WELDER/OPERATOR QUALIFICATION

WELDING PROCEDURE QUALIFICATION

28

29

30 Purchaser's authorized inspector shall verify the surface flatness and surface finish of the machined underside of the baseplates.

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

A516 Gr. 70N; Alloy Components: A352 - CA6NM

This activity shall be witnessed by Purchaser's inspector during final release inspection.

11 Auxiliary system materials shall be low temperature carbon steel where applicable, A333-6, A350 LF2 Cl1, A352 - LCB/LCC,

Material certificates shall be provided for casings, cover, impellers, shafts9

10

NOTES

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9104Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

Page 8: Client - Fuelled

REV

1

2 Pump and System Curves

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22 System Sketch

23

24

25

26

27

A6UE-4-0607-03-07-RQ-01

10of

Inquiry No.:

P.O. No.:

Sheet 7

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

Item tag(s):

Contract:

Unit:

B

A6UE

TOW0307-P-9104A/B/C

Date: 20-Mar-15

Tower 03-07 Sweet Gas Plant

Revision:

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOW0307-C-070-EDS-P-9104Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agreesto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.

Document Number

Page 9: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

B Date:

NBR vs

Other :

Other : or UNS S31635 Other :

or UNS N06455 UNS N10276

EPM / EPDM SS-SIC RB-SIC UNS N08020

Spiral Wound Gasket SIC vs SIC UNS N07718 (TypeC)

UNS S31600 UNS N08020

UNS N10276 (TypeB) UNS N10276 UNS S31600 / S31635FKM FFKM CARBON vs SIC

62

Gas

MATERIALS (REFERENCE 6.1.6 & ANNEX B)

SECONDARY SEALS SEAL FACES METAL BELLOWS SPRINGS METAL PARTS

74

SLEEVE-SHAFT DRIVE Set-Screw Onto Shaft Alternative (6.1.3.13) SPECIFY :

11 32 53C3NC-FB

02 14 53B

61 54

3CW-FF Tang. LBO Conn.

01 13 53A

31 52 7132 61 72

3 (3.4)

Ba

rrie

r Liquid 3CW-FB 3CW-BB FX

3NC-FF3NC-BB

75Tangential LBO Connection 02 14

23 41 62Dist. Flush 01 1376

2 (3.3)

Bu

ffer Liquid 2CW-CW FX

21

Gas 2CW-CS 2NC-CS FX 21Dist. Flush 11

1114 31 51

32 61

62Alternative Bush 02

13 23 501CW-FL Dist. Flush 011 (3.2) 1CW-FX

(CODE CW) Type C (3.74)

TYPE Type A (3.72) Type B (3.73) Alternate Stationary (Type A&B)

Single Spring (Type A)

ARR'GT Default Configuration Alternate Design Flush Plans (See Annex G)

Alternate Rotating (Type C)

By Manufacturer or Purchaser

Seal Specification - (Ref. 4.1, Figures 1 to 6)

CATEGORY Seal Category 1 Seal Category 2 Seal Category 3

NOTES: Information Below to be Completed : By Purchaser By Manufacturer

Seal Code (Annex D)

Inquiry No.: A6UE-4-0607-03-07-RQ-01

Sheet 8

MECHANICAL SEAL DATA SHEET

Contract: A6UE

Item No: TOW0307-P-9104A/B/C

Revision:

of 10

Client: Encana Corporation Vendor:

Service: Produced Water Disposal Pumps Plant: Tower 03-07 Sweet Gas Plant

No. Required: 3 Site: Dawson Creek, BC, Canada

20-Mar-15

Unit: Tower 03-07 Sweet Gas Plant

Note: This data sheet has been modified from that in the annex of API Standard 682, Third Edition.

P.O. No.:

28

29

30

31

32 /33

34

35

36

37

38

39

40

41

42

43

44

45

46 /

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Document Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. TOW0307-C-070-EDS-P-9104

NOTES

14. Supplier to confirm the seal selection and arrangement

Shaft Speed : RPM

Shaft Rotation (Viewed From Driver) : CCW CW

kPa gMSSP (3.44) :

Suction Press. (Rated) : kPa g

Shaft Horizontal Vertical Diameter :

Seal Chamber Press. Normal : kPa g Min / Max MDSP :

Pump Operating Pressure Discharge Press. : kPa g

Size :

kPa g

Case Material :

Chamber Cooling

PUMP DATA - Refer to Sheet 2

Manufacturer : Model :

Floating Throat Bushing Fixed Throat Bushing Chamber Heating

Bolt-On Chamber (6.1.2.5) Seal Chamber Flush Port Req'd Seal Chamber Vent Req'd

Tapered ISO 3069-C Other :

SEAL CHAMBER DATA (REFERENCE 6.1.2.4)

ISO 13709 ASME B73.1&2 Cylindrical

Alternative Seal For Pump Performance Test Total Seal Axial Thrust on Shaft : N

kW

Modified Faces For Pump Performance Test Heat Soak at Normal Conditions : kW

Vendor's Seal Code : Generated Heat at Normal Conditions :

°C

Seal Drawing No. : Min. Design Metal Temperature (6.1.6.11.1): -29 °C

Size / Type : Maximum Allowable Temperature (3.40) :

Data Requirements Form (Annex J) Static Sealing Pressure Rating (3.69) : kPa g

MECHANICAL SEAL DATA

Seal Vendor : John Crane Dynamic Sealing Pressure Rating (3.19) : kPa g

Page 10: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17 /

18 /

19 /

20 /

21

22

23

24

25 /

26 /

27

B Date:

cP

Fluid Temperature Specific Heat Capacity at Const. Press.: kJ/kgK

Atmospheric Boiling Point °C

Supply Pressure Max. / Min. : kpag Viscosity at Normal Pump Temperature :

kpaa Max. Temp : kpaa

Flow Rate Required Max. / Min. : m3/hr

Seal Vendor Review Purchaser Review Normal Temperature :

@ Max. Temp. :

Purchaser Selection Seal Vendor Selection Vapor Pressure at

m3/hr

BUFFER / BARRIER MEDIUM Specific Gravity:

Type or Name : @ Normal Temperature :

Type or Name : Flow Rate Required Max. / Min. :

kpaa

QUENCH MEDIUM (PLAN 51, 62) Supply Temperature Max. / Min. : ppm

m3/hr

Spec. Gravity at Temp Indct'd @ Norm Temp @ Max Temp Pressure Req'd Max / Min

Flow Rate Req'd Max / MinFluid Temp Min Norm Max

Type or Name : Conc'n : % kpaa

Seal Vendor Review Required Atmos. Boiling pt °C Visc. at Norm Pump Temp

@ Norm Temp kpaa @ Max Temp

cP

Alt. Process Fluids(incl. Commissioning) Specify

FLUSH FLUID (PLAN 32) If flush is pumpage, then flush data is not req'd Vapor Pressure

kpaa Regulation Level : ppmAtmos. Boiling pt Visc. At Norm Pump Temp

at Norm Temp: kpaa at Max Temp:

cP Special Pump Cleaning Procedures:

Vapor Pressure Pumped Stream is Regulated For Fugitive or Other Emissions

Pumped Stream Can Plate Out or Decompose :Spec. Gravity at Norm Temp: at Max Temp: Specify Conditions :

Norm °C Max °CSpecify Agents : @ Temp : °C

Pumping Temp. Min °C

Concentration : Mass Fraction

Solid Contaminant Pumped Stream Contains Agents That Polymerize

Other : @ ppmCl2 ppm

Flammable

°C

Solidifies: °C

Pumped Stream Solidifies Under Shear

Revision:

of 10

Dissolved Contaminant H2S ppm Wet

Type or Name : Concentration : % Fluid Solid at Ambient

Hazardous

FLUID DATA

PUMPED STREAM

Pour pt:

20-Mar-15

Unit: Tower 03-07 Sweet Gas Plant

Note: This data sheet has been modified from that in the annex of API Standard 682, Third Edition.

P.O. No.:

Inquiry No.: A6UE-4-0607-03-07-RQ-01

Sheet 9

MECHANICAL SEAL DATA SHEET

Contract: A6UE

Item No: TOW0307-P-9104A/B/C

28

29

30

31

32 /

33 /

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Document Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. TOW0307-C-070-EDS-P-9104

Closed

NOTES

Cooling Water Flow Rate : m3/hr

Sight Flow Indicators (8.4.3) Open

Tubing Galvanized Piping (8.4.2)

Equipment Reference / Code : High Flow Alarm Switch For Plan 75(8.6.5.3)Cooling Water Line Supplier : Test Connection (8.6.5.4)

Heat Exchanger Supplier : PLAN 75 and 76 SYSTEMWater Cooled Air Cooled ISO 15649 Equipment Supplier :

Thermal Relief Valves Required (9.8.3) Equipment Supplier :COOLING SYSTEM (PLAN 21,22,23,41,53B,53C) High Flow Alarm Switch (8.6.6.5)

Type and Spec. of Heat Tracing (8.6.5.8)

PLAN 72 and 74 SYSTEM

Utility Manifold Connections Required (8.4.4) Plan 32 Flow Indicator Plan 32 Temp. Indicator

Define : Cyclone Separator Supplier :

Special Cleaning and Decontamination Requirements Plan 32 Equipment Supplier :

Tubing Piping (8.5.2.2)

Special Requirements For Hazardous Service : Restriction Orifice Nipple in Flush Line (8.5.2.4)

Pipe Taper Threads (8.1.9) ISO 7 ASME B1.20.1

ACCESSORIES (Clauses 8 and 9)

GENERAL PLAN 11, 12, 13, 14, 21, 23, 31, 32 and 41 SYSTEMS

Joint User / Vendor Layout of Equipment (8.1.4) Connecting Line Supplier :

CAT

TCLASS

Design Ambient (Min. / Max.) : °C ATEX (Ex Directive 94/9/EC): GR

ppm

Area Classification CL. Zone.

Hz: Cooling Water Supply Temp °C

kpagDiv. Cooling Water Press. Norm/Design :

SITE AND UTILITIES

Control Voltage V : P :

Max. : °C Cooling / Heating RequiredMin. : °C Normal : °C

Cl2 :

Unclassified

Page 11: Client - Fuelled

REV

1

2

3

4

5

6 /

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

Date:

LEVEL INDICATORS (9.6)

Weld Pad External, Removable (9.6.2)

Flow Instruments (9.7) Transmitters (9.7.3)

Transmitters (9.5.3.2)

Hydrostatic Capacitance Ultrasonic

Pressure Switches (9.5.2) Transmitters (9.5.2.3) Level Switches (9.5.3)

User Specification Reference For Instrument / Controls :

MPSTD-A-000-GEN-00042-0000

PRESSURE GAUGES (9.4)

Oil Filled Pressure Gauges (9.4.3)

ASME Code Stamp Required

INSTRUMENTATION

Equipment Support Supplier : Test Based H / Q Curve For Internal Circulating Device

Filling System Supplier : External Circulating Pump (8.6.3.1)

psigTubing SCH. 80 Piping (8.5.4.4.9) High Level Alarm Required (8.5.4.2.i)

Rising Pressure (Arr 2) Set at : psigConnecting Line Supplier : Falling Pressure (Arr 3) Set at :

Primary Equipment Supplier : PRESSURE SWITCH (8.5.4.2.h) TO ACTIVATE ON :Supplier Reference / Code :

Alternative Fabrication Standard : Temperature Indicator (Plan 53B,53C)

psig

System Hold-Up Period (Plans 53B & 53C) : days

Dimensional Variations To Standard Figure G28 Set Pressure Range, Max. / Min.

A6UE

Item No:

Reservoir MAWP (3.4.1) psig

galDimensional Variations To Standard Figure G27 NLL to Gland Plate Height ft

Standard (Fig. G27) Alternative (Fig. G28) Reservoir Capacity (8.5.4.3) :

B

TOW0307-P-9104A/B/C

Revision:

of 10

ACCESSORIES (Clauses 8 and 9) CONT'D

PLAN 52 and 53 SYSTEMS EN 13445 or Other Code Applicable

20-Mar-15

Unit: Tower 03-07 Sweet Gas Plant

Note: This data sheet has been modified from that in the annex of API Standard 682, Third Edition.

P.O. No.:

Inquiry No.: A6UE-4-0607-03-07-RQ-01

Sheet 10

MECHANICAL SEAL DATA SHEET

Contract:

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Document Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. TOW0307-C-070-EDS-P-9104

NOTES

Hardness Test (10.2.3k) Required For : Alternate Seal Pump Test (10.3.5.2) See Page 2 Line 32

Purchaser Approval Req'd For Welded Optional Qualification Testing Required (10.3.1.1.2)

Connection Design (6.1.6.10.5) Mod. Faces For Pump Test (10.3.5.1) See Page 2 Line 31

Liquid Penetrant

Inspector's Check List (10.1.7 & Annex H) Radiographic Ultrasonic

Specify : Magnetic Particle

INSPECTION AND TESTING

Purchaser Participation in Inspection & Test 100% Inspection of All Welds (6.1.6.10.5) Using :

Page 12: Client - Fuelled
Page 13: Client - Fuelled

Client:

Project: Tower 03-07 Sweet Gas Plant

Location:

Contract Number:

Inquiry Number:

PO Number:

Equipment Service:

Item Tag(s):

CENTRIFUGAL PUMP

DATA SHEET

Encana Corporation

Dawson Creek, BC, Canada

A6UE-4-0607-03-07-RQ-01

A6UE

FRAC Water Supply Pumps

TOW0307-P-9105A/B/C

Sheet:

By CheckedProcess Checked

TOW0307-PM-9105A/B/C

A 05-Mar-15 Issued for Review SG HL RK DSB 20-Mar-15 Issued for Quotation HL RC RK DS

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Fluor Form Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. 000.256.DS4601

Rev Date Description

Approved

10Of1

Document Number: TOW0307-C-070-EDS-P-9105

Page 14: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

LIQUID CHARACTERISTICS

(Note 4)

SUCTION PRESSURE:

NPSHa Datum

PUMPING TEMP.:

UNITS

OPERATING CONDITIONS

RATED

*IF INTERMITTENT NO. OF STARTS / DAY

PUMPS OPERATE IN: PARALLEL

DRIVER: TOW0307-PM-9105A/B/C APPLICABLE TO :

EROSION DUE TO: (6.12.1.19)

MAXIMUM

°C

C.L. IMPELLER

30.0

SERIAL NO.:

of

NO. STAGES :

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

B Date: 20-Mar-15

Contract:

TOW0307-P-9105A/B/C

Revision:

A6UE

P.O. No.:

Unit:

Sheet 2

TYPE:NO. REQ'D :

Site: Dawson Creek, BC, Canada

Encana Corporation

Inquiry No.:

Item tag(s):

Tower 03-07 Sweet Gas Plant

MANUFACTURER: MODEL:

10

A6UE-4-0607-03-07-RQ-01

CLIENT:

3 PUMP SIZE :

SERVICE: FRAC Water Supply Pumps PLANT: Tower 03-07 Sweet Gas Plant

UNITS NOTEMINIMUMMAXIMUM SERVICE : INTERMITTENT

Proposal

RELATIVE DENSITY:

VISCOSITY:

Max & Min values refer only to the property listed

Pa s

4.313

1.264.24

LIQUID TYPE OR NAME:

SPECIFIC HEAT:

Produced Water (Note 3)

10.0

NORMAL PARTICULATE SIZE (DIA. IN MICRONS):

CHLORIDE CONCENTRATION (ppm):

H2S CONCENTRATION (ppm): (6.12.1.12)

kJ/kgºC

1132 1114

4.318

PARTICULATE CONCENTRATION (ppm):

CORROSION DUE TO: (6.12.1.19)

FLOW:

DISCHARGE PRESS: (6.3.2)

HYDRAULIC POWER:

NPSHA:

DIFFERENTIAL PRESS.:

MINIMUM

VAPOR PRESSURE:

1.300 0.797

kPa(a)

444.0

0.76 -1.21

121.3 (Note 3)

INLET

m³/h

kPa g

kPa g

kPa

90.0

4851.0

6064 4850.0

6.9 (Note 2)

TEMP

DIFFERENTIAL HEAD: m

m

KW

SITE AND UTILITY DATA

°C MAX

DESIGNRETURN

COOLING WATER: Not AvailableLOCATION:

UNDER ROOFHEATEDINDOOR

MOUNTED AT: NOTE 4 TROPICALIZATION REQ'D

28 ELECTRICAL AREA CLASSIFICATION:

29

30 COOLING WATER CHLORIDE CONCENTRATION:

31 ELEVATION (MSL):

32 / INSTRUMENT AIR:

33 /

34

35

36

37

38

39

40

41

42

43

44

45 The required horsepower was calculated using the density of produced water (1114kg/m3) and the differential head at rated flow

46 The Produced Water chloride level is 142000 ppmw. Produced Water also contains 12 ppmw O2.

47

48

49

50

51

52

53

54

55

56

57

58

59

60

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9105Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

RELATIVE HUMIDITY: MIN / MAX

RANGE OF AMBIENT TEMPS: MIN / MAX 35

kPa g

ppmSITE DATA:

795.6 m BAROMETER: 92 kPa a

STEAM: Not Available

PRESS.

UNUSUAL CONDITIONS:

ELECTRICITY: SHUTDOWNCONTROL

%

°C kPa g MIN: 414 kPa gMAX: 730

UTILITY CONDITIONS:

-40

Normal Press: 690 kPag @ 27 deg C normal, 35 deg C max.

HEATINGDRIVERS

TEMP ID:ZONE: SOURCE

PRESSURE MINUNCLASSIFIED

PHASE

60 60 60

3

4

1 1

575 208/120 120 MAX

HEATINGDRIVERS

VOLTAGE

3

MIN

CLASS:

NPSH Available is based on pump suction and discharge nozzle centerline at 1750mm above grade and includes 1m safety margin.

Non API pump is required for the service even with API pump template being used.

2

1

NOTES

HERTZ

MIN

kPa g

MAXTEMP °C

Page 15: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15 /

16 /

17

18

19

20

21

22

23

24

25

26

27

VARIABLE SPEED REQUIRED:

RATED POWER:

A6UE

P.O. No.:

Unit:

Sheet

Contract:

TOW0307-P-9105A/B/C

Tower 03-07 Sweet Gas Plant

of

Item tag(s):

Revision:

A6UE-4-0607-03-07-RQ-01Inquiry No.:

B Date: 20-Mar-15

3

DRIVER (7.1.5)PERFORMANCE

PROPOSAL CURVE NO.:

GEAR:As Tested Curve No.:

10

DRIVER TYPE:RPM INDUCTION MOTOR

NO

API PUMP TYPE:

MAX. HEAD @ RATED IMPELLER:

MAX. POWER @ RATED IMPELLER: (6.8.9)

BB4 [Based on API 610 Definitions]

MIN. FLOW

to

m³/s

(dBA)

MAX. ALLOW. SOUND PRESS. LEVEL REQ'D (6.1.14)

m³/s

m

KW

m

m CL PUMP TO U/S BASEPLATE:

NPSHR at RATED FLOW :

NPSHR MARGIN at RATED FLOW :

OTHER:

m³/s

RATED CURVE BEP FLOW (at rated impeller dia.)

IMPELLER DIA.: RATED: MAX:

EFFICIENCY:

MIN:

m³/s

KW

YES

SOURCE OF VARIABLE SPEED: MOTOR%

mm

m

SPECIFIC SPEED: (6.1.9) m³/s,rpm,m

NOZZLE CONNECTIONS: (6.5.5)

SIZE FACING RATING POSITION

EST. MAX SOUND PRESS. LEVEL

900 ENDSUCTION

PREFERRED OPERATING REGION: (6.1.11)

ALLOWABLE OPERATING REGION:

STABLE :THERMAL :

to

KW

MANUFACTURER:

NAMEPLATE POWER:

NOMINAL RPM:

RATED LOAD RPM:

m³/s

CONSTRUCTION

EST. MAX SOUND POWER LEVEL (dBA)

MAX. SOUND POWER LEVEL REQ'D (6.1.14) (dBA)

85 (dBA)

SUCTION SPECIFIC SPEED LIMIT: gpm,rpm,ft

SUCTION SPECIFIC SPEED: m³/s,rpm,m

11,000

HORIZONTAL

FRAME OR MODEL:

ORIENTATION:

LUBE:

TOW0307-P-070-DSX-PM-9105

BEARING TYPE:

RADIAL:

THRUST:

STARTING METHOD:

SEE DRIVER DATA SHEET:

CASING MOUNTING:

OH3 BACKPULLOUT LIFTING DEVICE REQ'D (9.1.2.6)

@MAWP: (6.3.6) kPa g

CASING TYPE: (6.3.10)

°C

CASE PRESSURE RATING:

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9105Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

FACING RATING POSITION

DISCHARGE 900 TOP

WARM-UP LINE

NO. SIZE TYPE

DRAIN

VENT

PRESSURE GAGE

TEMP GAGE

BALANCE/LEAK OFF

RF

GUSSET SUPPORT REQUIRED Note 5

MACHINED AND STUDDED CONNECTIONS (6.4.3.12)

VS 6 DRAIN

First Critical Speed Wet (Multi stage pumps only)

COMPONENT BALANCE TO ISO 1940 G1.0

kPa g

VENTS MANIFOLDED

THREADED CONS FOR PIPELINE SERVICE & < 50°C (6.4.3.2)

SPECIAL FITTINGS FOR TRANSITIONING (6.4.3.3)

CYLINDRICAL THREADS REQUIRED (6.4.3.8)

YES

YES

HYDROTEST: °C@

VENT VALVE SUPPLIED BY

DRAIN VALVE SUPPLIED BY

DRAINS MANIFOLDED

DRAIN TO SKID EDGE

YES

SUPPLIER

PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)

- IMPELLERS INDIVIDUALLY SECURED:

HYDROTEST OH PUMP AS ASSEMBLY

SUCTION PRESS. REGIONS DESIGNED FOR MAWP

ROTATION: (VIEWED FROM COUPLING END)

Note 6

ROTOR:

SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3)

- PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS:

- BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION:

MODEL:

RATING (POWER/100 RPM)

COUPLING: (7.2.3) (7.2.13.F)

MANUFACTURER:

SHRINK FIT LIMITED MOVEMENT IMPELLERS (9.2.2.3)

Non-Sparking

COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11)

COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3)

COUPLING WITH HYDRAULIC FIT (7.2.10) NO

Note 6

mm

1.5 Min.

NORIGID

SPACER LENGTH

SERVICE FACTOR

couplings shall be balanced to ISO 1940-1 balance quality grade 2.5.

NOTES

5 All casing connections shall be braced with gussets in two orthogonal planes.

6 Drive train components, including but not limited to impeller, pump rotor, motor rotor, shall be dynamically balanced to ISO 1940 G1.0. Transmission units of

WINDOW ON COUPLING GUARD

COUPLING IN COMPLIANCE WITH (7.2.4)

COUPLING GUARD STANDARD PER (7.2.13.a)

Page 16: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18 7. All pumps and drivers shall be provided with flats in two planes to permit

19 the use of hand held vibration monitoring equipment.

20

21

22

23

24

25 LOCATION OF PRESSURIZED LUBE OIL SYSTEM MOUNTED ON BASEPLATE:

26

27

CONSTRUCTION (CONT'D)

12% Cr

MATERIAL (6.12.1.1)

REDUCED HARDNESS MATERIALS REQ'D (6.12.1.12.1)

CS + Internal Coating

BASEPLATE

API BASEPLATE NUMBER:

SHAFT:

FULL TOP DECKINGBASEPLATE CONSTRUCTION (7.3.14)

BASEPLATE DRAINAGE (7.3.1)

APPENDIX H CLASS: S-6: CS / 12% Cr (Note 8)

MINIMUM DESIGN METAL TEMP (6.12.4.1)

DIFFUSERS:

CASE:

BARREL:

APPLICABLE HARDNESS STANDARD (6.12.1.12.3)

A6UE

P.O. No.:

Unit:

Sheet 4 10

Tower 03-07 Sweet Gas Plant

Item tag(s):

of

Revision:

TOW0307-P-9105A/B/C

Contract:

Inquiry No.: A6UE-4-0607-03-07-RQ-01

B Date: 20-Mar-15

-29 °C

INSPECTION CLASS:

YES

YES

- GROUT VENT HOLES

- DRAIN CONNECTION

SUPPLIED WITH:

MOUNTING PADS SIZED FOR BASEPLATES LEVELING (7.3.5)

ENTIRE BASEPLATE DRAIN RIM

MOUNTING: BOLTED ON STEEL WORK

NON-GROUT CONSTRUCTION: (7.3.13) REQUIRED

VERTICAL LEVELING SCREWS: REQUIRED

LONGITUDINAL DRIVER POSITIONING SCREWS: REQUIRED

YES

MOUNTING PADS TO BE MACHINED (7.3.6)

BEARINGS AND LUBRICATION (6.10.1.1)

BEARING (TYPE / NUMBER): (6.11.4)

BOWL (IF VS TYPE):

AISI 4140

IMPELLER WEAR RING:

IMPELLER:

CASE WEAR RING:

12% Cr

/

/

PRESSURIZED LUBE OIL SYSTEM MTD. ON PUMP BASEPLATE

PRESSURE LUBE SYSTEM TO ISO 10438- (9.2.6.5)

THRUST

RADIAL

INTERCONNECTING PIPING PROVIDED BY: SUPPLIER

8. API D2 Super Duplex SS (A 890 grade 5A or 6A) shall be quoted as an option.

ISO 10438 DATA SHEETS ATTACHED

REVIEW AND APPROVE THRUST BEARING SIZE: (9.2.5.2.4)

LUBRICATION: (6.10.2.2) (6.11.3) (9.6.1) Oil Lubricated

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

YES

NOTES

PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET

OTHER:

engineering notes.

Please refer to specific baseplate requirements in the requisition

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9105Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

CONSTANT LEVEL OILER: REQUIRED (TRICO)

OIL VISC. ISO GRADE

NUMBER OF ACCELEROMETERS

PROVISION FOR MTG ONLY (6.10.2.10) NO

INSTRUMENTATION

MOUNTING LOCATION OF ACCELEROMETERS

NOSEE ATTACHED API-670 DATA SHEET

ACCELEROMETER (7.4.2.1)

NUMBER OF ACCELEROMETERS

NUMBER OF ACCELEROMETERS Note 7

MOUNTING LOCATION OF ACCELEROMETERS

MOUNTING LOCATION OF ACCELEROMETERS

FLAT SURFACE REQUIRED (6.10.2.11) YES

MONITORS AND CABLES SUPPLIED BY (7.4.2.4)

NUMBER PER RADIAL BEARING

NUMBER PER AXIAL BEARING

VIBRATION PROBES (7.4.2.2)

PROVISION FOR VIB. PROBES NO

NUMBER PER RADIAL BEARING

THRUST BEARING TEMP.:

PROVISION FOR VIB. PROBES NO

TEMPERATURE (7.4.2.3)

RADIAL BEARING TEMP.: °C

PRESSURE GAGE TYPE:

TEMP GAGES (WITH THERMOWELLS) (9.1.3.6) NO

NUMBER PER THRUST BEARING INACTIVE SIDE

°C

NUMBER PER THRUST BEARING ACTIVE SIDE

Remarks

SOCKET WELD CONN ON SEAL GLAND (7.5.2.8)

N/A

YES

YES

HEATING MEDIUM

TOTAL COOLING WATER: m³/s

m³/s

HEATING AND COOLING (6.1.17)

COOLING WATER PIPING PLAN

COOLING WATER PIPING

N/AHEATING JACKET REQ'D (6.8.11)

INTERCONNECTING PIPING BY: SUPPLIER

SEAL SUPPORT SYSTEM MOUNTING

SEAL SUPPORT MOUNTED ON PUMP BASEPLATE (7.5.1.4):

IDENTIFY LOCATION ON BASEPLATE:

YES

COOLING REQ'D

FITTINGS

COOLING WATER PIPING MATERIALS

COOLING WATER REQUIREMENTS:

BEARING HOUSING:

HEAT EXCHANGER:

NO

ADDITIONAL CENTRAL FLUSH PORT (6.8.9)

SEE ATTACHED ISO 21049/API 682 DATA SHEET YES

MECHANICAL SEAL (6.8.1)

MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)

VENT

DRAIN

COOLING WATER

TAG ALL ORIFICES (7.5.2.4)

m³/s

PIPING & APPURTENANCES

OTHER:

HEATING PIPING:

Page 17: Client - Fuelled

REV

1

2

3

4 SPECIFICATION NUMBER:

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

A6UE

P.O. No.:

Unit:

Sheet

Contract:

TOW0307-P-9105A/B/C

5 10

A6UE-4-0607-03-07-RQ-01Inquiry No.:

Item tag(s):

of

Revision: B Date: 20-Mar-15

Tower 03-07 Sweet Gas Plant

TESTSURFACE PREPARATION AND PAINT

PUMP SURFACE PREPARATION:

PRIMER:

YESSUPPLIER'S STANDARD

OTHER (SEE BELOW)

PUMP:

BASEPLATE:

BASEPLATE SURFACE PREPARATION:

PRIMER:

SHIPPING & STORAGE CONTAINER FOR VERT. STORAGE (9.2.8.3)

ROTOR STORAGE ORIENTATION (9.2.8.2)

SPARE ROTOR ASSEMBLY PACKAGED FOR:

YES

YESOUTDOOR STORAGE MORE THAN 6 MONTHS

EXPORT BOXING REQUIRED

FINISH COAT:

DETAILS OF LIFTING DEVICES:

SHIPMENT: (8.4.1) EXPORT

FINISH COAT:

START-UP YES

NORMAL MAINTENANCE

WEIGHTS kg

SPARE PARTS

ITEM No. TOTALBASEGEAR

N2 PURGE (9.2.8.4)

DRIVERPUMP

MATERIAL CERTIFICATION REQUIRED:

Note 9 (6.12.1.8)

RADIOGRAPHY

LIQUID PENETRANT

ULTRASONIC

SHOP INSPECTION (8.1.1)

PERFORMANCE CURVE & DATA APPROVAL PRIOR TO SHIPMENT

TEST WITH SUBSTITUTE SEAL (8.3.3.2.b)

IMPELLER

CASING

SHAFT

YES

YES

NO

YES

YESCASTING REPAIR WELD PROCEDURE APPR. REQ'D (6.12.2.5)(6.12.3.1)

(6.12.3.4.e) MAG PARTICLE

INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)

YES

YES

YES

OTHER

LIQUID PENETRANT YES

ULTRASONIC

MAG PARTICLE YES

RADIOGRAPHY

YES

INSPECTION REQUIRED FOR CASTINGS

PMI TESTING REQUIRED (8.2.2.8)

COMPONENTS TO BE TESTED:

FOR

METHOD

HARDNESS TEST REQUIRED (8.2.2.7)

ADDITIONAL SUBSURFACE EXAMINATION (6.12.1.5)(8.2.1.3)

NO

NO

RESIDUAL BALANCE TEST (J.4.1.2)

YESNOTIFICATION OF SUCCESSFUL SHOP PER. TEST (8.1.1.c)(8.3.3.5)

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Document NumberTOW0307-C-070-EDS-P-9105

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agreesto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.

DYNAMIC BALANCE ROTOR (6.9.4.4) YES

MODAL ANALYSIS REQUIRED (9.3.9.2)

LATERAL ANALYSIS REQUIRED (9.1.3.4)(9.2.4.1.3)

OTHER PURCHASER REQUIREMENTS

OPERATION TO TRIP SPEED

MAX DIA. IMPELLERS AND / OR NO. OF STAGES

YES

MAXIMUM DISCHARGE PRESSURE TO INCLUDE

COORDINATION MEETING REQUIRED (10.1.3)

MAX RELATIVE DENSITY

ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1)

YES

CONNECTION DESIGN APPROVAL (9.2.1.4)

TORSIONAL ANALYSIS / REPORT (6.9.2.10)

PROGRESS REPORTS

OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5)

FLANGES REQ'D INPLACE OF SKT WELD UNIONS (7.5.2.8)

INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3)

YES

IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e)

CASING RETIREMENT THICKNESS DRAWING (10.3.2.3)

INSTALLATION LIST IN PROPOSAL (10.2.3.1)

VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3)

TRANSIENT TORSIONAL RESPONSE (6.9.2.4)

BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)

CADMIUM PLATED BOLTS PROHIBITED

VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.C)

VENDOR TO SUBMIT TEST PROCEDURES (8.3.1.1)

SUBMIT INSPECTION CHECK LIST (8.1.5)

YES

YES

CONNECTION BOLTING (7.5.1.7)

YES

YES

YESBASEPLATE TEST (7.3.21)

STRUCTURAL RESONANCE TEST (9.3.9.2)

NOZZLE LOAD TEST

4 HR. MECH RUN TEST AFTER OIL TEMP STABLE (8.3.4.2.1)

COMPLETE UNIT TEST (8.3.4.4.1)

LOCATION OF AUX. EQUIPMENT TEST

EQUIPMENT TO BE INCLUDE IN AUX TESTS

HYDROSTATIC

HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2)

PERFORMANCE TEST

TEST IN COMPLIANCE WITH (8.3.3.2)

TEST DATA POINTS TO (8.3.3.3)

OBSERVE

OBSERVE

OBSERVENPSH (8.3.4.3.1)(8.3.4.3.4)

NPSH-1ST STAGE ONLY (8.3.4.3.2)

TEST TOLERANCES TO (8.3.3.4)

OBSERVE

NON-WIT

OBSERVE

4 HR. MECH RUN TEST (8.3.4.2.2)

BEARING HOUSING RESONANCE TEST (8.3.4.7)

SOUND LEVEL TEST (8.3.4.5)

CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)

LOCATION OF CLEANLINESS INSPECTION

CHECK FOR CO-PLANAR MOUNTING PAD SURFACES

MECHANICAL RUN TEST UNTIL OIL TEMP STABLE

REMOVE CASING AFTER TEST

PER ASME SECTION VIII

PER EN 13445IMPACT TEST (6.12.4.3)

OBSERVE

REMOVE / INSPECT HYDRODYNAMIC BRGS. AFTER TEST (9.2.7.5)

AUXILIARY EQUIPMENT TEST (8.3.4.6)

RETEST ON SEAL LEAKAGE (8.3.3.2.d)

RETEST REQUIRED AFTER FINAL HEAD ADJ. (8.3.3.7.b)

NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3)

TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)

Page 18: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

PRESSURE VESSEL DESIGN CODE REFERENCES

THESE REFERENCES MUST BE LISTED BY THE SUPPLIER:

CASTING FACTORS USED IN DESIGN (TABLE 3)

SOURCE OF MATERIAL PROPERTIES

A6UE-4-0607-03-07-RQ-01

10of

Inquiry No.:

WELDING AND REPAIRS (Please Refer to ECA-WELD-S01)

THESE REFERENCES MUST BE LISTED BY THE PURCHASER (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)

ALTERNATIVE WELDING CODES AND STANDARDS

WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD)

WELDER/OPERATOR QUALIFICATION

WELDING PROCEDURE QUALIFICATION

A6UE

Tower 03-07 Sweet Gas Plant

Item tag(s):

Contract:

Unit:

Sheet 6

TOW0307-P-9105A/B/C

Revision:

P.O. No.:

B Date: 20-Mar-15

NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS

THESE REFERENCES MUST BE LISTED BY THE PURCHASER DEFAULT TO TABLE 15 YES

MATERIAL INSPECTION

MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES

POSTWELD HEAT TREATMENT

POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS

ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 14 ) (8.2.2.5)

FOR CASTINGSFOR FABRICATIONS

VISUAL INSPECTION (ALL SURFACES)

TYPE OF INSPECTION

RADIOGRAPHY

ULTRASONIC INSPECTION

MAGNETIC PARTICLE INSPECTION

LIQUID PENETRANT INSPECTION

METHOD

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

28

29

30 Purchaser's authorized inspector shall verify the surface flatness and surface finish of the machined underside of the baseplates.

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9105Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

NOTES

A516 Gr. 70N; Alloy Components: A352 - CA6NM

This activity shall be witnessed by Purchaser's inspector during final release inspection.

11 Auxiliary system materials shall be low temperature carbon steel where applicable, A333-6, A350 LF2 Cl1, A352 - LCB/LCC,

Material certificates shall be provided for casings, cover, impellers, shafts9

10

Page 19: Client - Fuelled

REV

1

2

3 Pump and System Curves

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24 System Sketch

25

26

27

CENTRIFUGAL PUMP

DATA SHEET

Note: This data sheet has been modified for that in Annex N of API 610, 11th Edition. (Note 1)

Item tag(s):

Contract:

Unit:

B

A6UE

TOW0307-P-9105A/B/C

Date: 20-Mar-15

Tower 03-07 Sweet Gas Plant

Revision:

A6UE-4-0607-03-07-RQ-01

10of

Inquiry No.:

P.O. No.:

Sheet 7

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

to return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished.Document Number

TOW0307-C-070-EDS-P-9105Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees

Page 20: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

Client: Encana Corporation Vendor:

Service: FRAC Water Supply Pumps Plant: Tower 03-07 Sweet Gas Plant

No. Required: 3 Site: Dawson Creek, BC, Canada

20-Mar-15

Unit: Tower 03-07 Sweet Gas Plant

Note: This data sheet has been modified from that in the annex of API Standard 682, Third Edition.

P.O. No.:

Inquiry No.: A6UE-4-0607-03-07-RQ-01

Sheet 8

MECHANICAL SEAL DATA SHEET

Contract: A6UE

Item No: TOW0307-P-9105A/B/C

Revision:

of 10

By Manufacturer or Purchaser

Seal Specification - (Ref. 4.1, Figures 1 to 6)

CATEGORY Seal Category 1 Seal Category 2 Seal Category 3

NOTES: Information Below to be Completed : By Purchaser By Manufacturer

Seal Code (Annex D)

TYPE Type A (3.72) Type B (3.73) Alternate Stationary (Type A&B)

Single Spring (Type A)

ARR'GT Default Configuration Alternate Design Flush Plans (See Annex G)

Alternate Rotating (Type C)

1 (3.2) 1CW-FX

(CODE CW) Type C (3.74)

62Alternative Bush 02

13 23 501CW-FL Dist. Flush 01

1114 31 51

32 612 (3.3)

Bu

ffer Liquid 2CW-CW FX

21

Gas 2CW-CS 2NC-CS FX 21Dist. Flush 11

75Tangential LBO Connection 02 14

23 41 62Dist. Flush 01 1376

3 (3.4)

Ba

rrie

r Liquid 3CW-FB 3CW-BB FX

3NC-FF3NC-BB

31 52 7132 61 72

02 14 53B

61 54

3CW-FF Tang. LBO Conn.

01 13 53A

62

Gas

MATERIALS (REFERENCE 6.1.6 & ANNEX B)

SECONDARY SEALS SEAL FACES METAL BELLOWS SPRINGS METAL PARTS

74

SLEEVE-SHAFT DRIVE Set-Screw Onto Shaft Alternative (6.1.3.13) SPECIFY :

11 32 53C3NC-FB

UNS N10276 (TypeB) UNS N10276 UNS S31600 / S31635FKM FFKM CARBON vs SIC

or UNS N06455 UNS N10276

EPM / EPDM SS-SIC RB-SIC UNS N08020

Spiral Wound Gasket SIC vs SIC UNS N07718 (TypeC)

UNS S31600 UNS N08020

NBR vs

Other :

Other : or UNS S31635 Other :

B Date:

28

29

30

31

32 /33

34

35

36

37

38

39

40

41

42

43

44

45

46 /

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Data Requirements Form (Annex J) Static Sealing Pressure Rating (3.69) : kPa g

MECHANICAL SEAL DATA

Seal Vendor : John Crane Dynamic Sealing Pressure Rating (3.19) : kPa g

°C

Seal Drawing No. : Min. Design Metal Temperature (6.1.6.11.1): -29 °C

Size / Type : Maximum Allowable Temperature (3.40) :

Alternative Seal For Pump Performance Test Total Seal Axial Thrust on Shaft : N

kW

Modified Faces For Pump Performance Test Heat Soak at Normal Conditions : kW

Vendor's Seal Code : Generated Heat at Normal Conditions :

SEAL CHAMBER DATA (REFERENCE 6.1.2.4)

ISO 13709 ASME B73.1&2 Cylindrical

Bolt-On Chamber (6.1.2.5) Seal Chamber Flush Port Req'd Seal Chamber Vent Req'd

Tapered ISO 3069-C Other :

Case Material :

Chamber Cooling

PUMP DATA - Refer to Sheet 2

Manufacturer : Model :

Floating Throat Bushing Fixed Throat Bushing Chamber Heating

Discharge Press. : kPa g

Size :

kPa g MSSP (3.44) :

Suction Press. (Rated) : kPa g

Shaft Horizontal Vertical Diameter :

Seal Chamber Press. Normal : kPa g Min / Max MDSP :

Pump Operating Pressure

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Document Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. TOW0307-C-070-EDS-P-9105

NOTES

14. Supplier to confirm the seal selection and arrangement

Shaft Speed : RPM

Shaft Rotation (Viewed From Driver) : CCW CW

kPa g

Page 21: Client - Fuelled

REV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17 /

18 /

19 /

20 /

21

22

23

24

25 /

26 /

27

FLUID DATA

PUMPED STREAM

Pour pt:

20-Mar-15

Unit: Tower 03-07 Sweet Gas Plant

Note: This data sheet has been modified from that in the annex of API Standard 682, Third Edition.

P.O. No.:

Inquiry No.: A6UE-4-0607-03-07-RQ-01

Sheet 9

MECHANICAL SEAL DATA SHEET

Contract: A6UE

Item No: TOW0307-P-9105A/B/C

Revision:

of 10

Dissolved Contaminant H2S ppm Wet

Type or Name : Concentration : % Fluid Solid at Ambient

Hazardous Flammable

°C

Solidifies: °C

Pumped Stream Solidifies Under ShearSolid Contaminant Pumped Stream Contains Agents That Polymerize

Other : @ ppmCl2 ppm

Specify Agents : @ Temp : °CPumping Temp. Min °C

Concentration : Mass Fraction

Vapor Pressure Pumped Stream is Regulated For Fugitive or Other Emissions

Pumped Stream Can Plate Out or Decompose :Spec. Gravity at Norm Temp: at Max Temp: Specify Conditions :

Norm °C Max °C

kpaa Regulation Level : ppmAtmos. Boiling pt Visc. At Norm Pump Temp

at Norm Temp: kpaa at Max Temp:

cP Special Pump Cleaning Procedures:

Alt. Process Fluids(incl. Commissioning) Specify

FLUSH FLUID (PLAN 32) If flush is pumpage, then flush data is not req'd Vapor Pressure

Type or Name : Conc'n : % kpaa

Seal Vendor Review Required Atmos. Boiling pt °C Visc. at Norm Pump Temp

@ Norm Temp kpaa @ Max Temp

cP

Fluid Temp Min Norm Max

kpaa

QUENCH MEDIUM (PLAN 51, 62) Supply Temperature Max. / Min. : ppm

m3/hr

Spec. Gravity at Temp Indct'd @ Norm Temp @ Max Temp Pressure Req'd Max / Min

Flow Rate Req'd Max / Min

@ Max. Temp. :

Purchaser Selection Seal Vendor Selection Vapor Pressure at

m3/hr

BUFFER / BARRIER MEDIUM Specific Gravity:

Type or Name : @ Normal Temperature :

Type or Name : Flow Rate Required Max. / Min. :

kpaa Max. Temp : kpaa

Flow Rate Required Max. / Min. : m3/hr

Seal Vendor Review Purchaser Review Normal Temperature :

cP

Fluid Temperature Specific Heat Capacity at Const. Press.: kJ/kgK

Atmospheric Boiling Point °C

Supply Pressure Max. / Min. : kpag Viscosity at Normal Pump Temperature :

B Date:

28

29

30

31

32 /

33 /

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Unclassified

SITE AND UTILITIES

Control Voltage V : P :

Max. : °C Cooling / Heating RequiredMin. : °C Normal : °C

Cl2 : ppm

Area Classification CL. Zone.

Hz: Cooling Water Supply Temp °C

kpagDiv. Cooling Water Press. Norm/Design :

ACCESSORIES (Clauses 8 and 9)

GENERAL PLAN 11, 12, 13, 14, 21, 23, 31, 32 and 41 SYSTEMS

Joint User / Vendor Layout of Equipment (8.1.4) Connecting Line Supplier :

CAT

TCLASS

Design Ambient (Min. / Max.) : °C ATEX (Ex Directive 94/9/EC): GR

Tubing Piping (8.5.2.2)

Special Requirements For Hazardous Service : Restriction Orifice Nipple in Flush Line (8.5.2.4)

Pipe Taper Threads (8.1.9) ISO 7 ASME B1.20.1

Define : Cyclone Separator Supplier :

Special Cleaning and Decontamination Requirements Plan 32 Equipment Supplier :

Type and Spec. of Heat Tracing (8.6.5.8)

PLAN 72 and 74 SYSTEM

Utility Manifold Connections Required (8.4.4) Plan 32 Flow Indicator Plan 32 Temp. Indicator

ISO 15649 Equipment Supplier :

Thermal Relief Valves Required (9.8.3) Equipment Supplier :COOLING SYSTEM (PLAN 21,22,23,41,53B,53C) High Flow Alarm Switch (8.6.6.5)

Galvanized Piping (8.4.2)

Equipment Reference / Code : High Flow Alarm Switch For Plan 75(8.6.5.3)Cooling Water Line Supplier : Test Connection (8.6.5.4)

Heat Exchanger Supplier : PLAN 75 and 76 SYSTEMWater Cooled Air Cooled

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Document Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. TOW0307-C-070-EDS-P-9105

Closed

NOTES

Cooling Water Flow Rate : m3/hr

Sight Flow Indicators (8.4.3) Open

Tubing

Page 22: Client - Fuelled

REV

1

2

3

4

5

6 /

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

TOW0307-P-9105A/B/C

Revision:

of 10

ACCESSORIES (Clauses 8 and 9) CONT'D

PLAN 52 and 53 SYSTEMS EN 13445 or Other Code Applicable

20-Mar-15

Unit: Tower 03-07 Sweet Gas Plant

Note: This data sheet has been modified from that in the annex of API Standard 682, Third Edition.

P.O. No.:

Inquiry No.: A6UE-4-0607-03-07-RQ-01

Sheet 10

MECHANICAL SEAL DATA SHEET

Contract: A6UE

Item No:

Reservoir MAWP (3.4.1) psig

galDimensional Variations To Standard Figure G27 NLL to Gland Plate Height ft

Standard (Fig. G27) Alternative (Fig. G28) Reservoir Capacity (8.5.4.3) :

B

Alternative Fabrication Standard : Temperature Indicator (Plan 53B,53C)

psig

System Hold-Up Period (Plans 53B & 53C) : days

Dimensional Variations To Standard Figure G28 Set Pressure Range, Max. / Min.

Primary Equipment Supplier : PRESSURE SWITCH (8.5.4.2.h) TO ACTIVATE ON :Supplier Reference / Code :

psigTubing SCH. 80 Piping (8.5.4.4.9) High Level Alarm Required (8.5.4.2.i)

Rising Pressure (Arr 2) Set at : psigConnecting Line Supplier : Falling Pressure (Arr 3) Set at :

Equipment Support Supplier : Test Based H / Q Curve For Internal Circulating Device

Filling System Supplier : External Circulating Pump (8.6.3.1)

User Specification Reference For Instrument / Controls :

MPSTD-A-000-GEN-00042-0000

PRESSURE GAUGES (9.4)

Oil Filled Pressure Gauges (9.4.3)

ASME Code Stamp Required

INSTRUMENTATION

Transmitters (9.5.3.2)

Hydrostatic Capacitance Ultrasonic

Pressure Switches (9.5.2) Transmitters (9.5.2.3) Level Switches (9.5.3)

LEVEL INDICATORS (9.6)

Weld Pad External, Removable (9.6.2)

Flow Instruments (9.7) Transmitters (9.7.3)

Date:

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

INSPECTION AND TESTING

Purchaser Participation in Inspection & Test 100% Inspection of All Welds (6.1.6.10.5) Using :

Liquid Penetrant

Inspector's Check List (10.1.7 & Annex H) Radiographic Ultrasonic

Specify : Magnetic Particle

Hardness Test (10.2.3k) Required For : Alternate Seal Pump Test (10.3.5.2) See Page 2 Line 32

Purchaser Approval Req'd For Welded Optional Qualification Testing Required (10.3.1.1.2)

Connection Design (6.1.6.10.5) Mod. Faces For Pump Test (10.3.5.1) See Page 2 Line 31

NOTES

Notice: This drawing has not been published and is the sole property of Fluor, and is lent to the borrower for his confidential use only, and in consideration of the loan of this drawing, the borrower agrees Document Numberto return it upon request and agrees that it shall not be reproduced, copied, lent or otherwise disposed of directly or indirectly, nor used for any purpose other than that for which it is specifically furnished. TOW0307-C-070-EDS-P-9105

Page 23: Client - Fuelled

FORM 085 265 F0181 (12Mar02)

Page 1 of 1

Data Sheet - LV Motors

Tag No.: TOW0307-PM-9104A/B/C Client: Encana Corporation

Service: Produced Water Disposal Pump Project: Cutbank Ridge Program

RFQ No.: A6UE-4-0607-03-07-RQ-01 Contract No.: A6UE

By: ACG Rev. B Date: 03/23/2015 Ck By: KZ Location: Dawson Creek, BC

Document No.: TOW0307-P-070-DSX-PM-9104

ELECTRICAL AREA CLASSIFICATION:

DRIVE TYPE: Will be specified later

UNCLASSIFIED

DRIVE MFG.: MODEL: Will be specified later

CLASS: GP: ZONE: AUTO IGN. TEMP:

CONSTANT TORQUE LOAD VARIABLE TORQUE LOAD

AMBIENT TEMP: MIN: -40°C MAX: +35°C

(NOTE 4) SPEED RANGE: Will be specified at later stage

ELEVATION: 795.6 MSL

OTHER REQUIRMENTS:

SEISMIC CONDITIONS: Sa(0.2) = 0.132, Sa(0.5) = 0.08, Sa(1.0) = 0.04, Sa(2.0) = 0.073

NAMEPLATE kW: TBD SERVICE FACTOR: 1.0 MANUFACTURER: TBD

VOLTAGE: 575V PHASE: 3 HZ.: 60 MODEL: TBD

SYN SPEED: TBD FRAME: TBD

INSULATION CLASS: F RISE CLASS: B

MANUFACTURER'S DATA

DRIVEN EQUIP VENDOR AND/OR MOTOR VENDOR TO COMPLETE ALL APPLICABLE BLANKS NOT COMPLETED BY PURCHASER

DESIGN DATA - MECHANICAL PERFORMANCE DATA

SITE CONDITIONS

DESIGN DATA - ELECTRICAL

VARIABLE FREQUENCY DRIVE APPLICATIONS

ENCLOSURE: TEFC TEFC-EP TENV FLA TBD LRA TBD STATOR TEMP RISE: TBD

OTHER FULL LOAD SPEED: TBD RPM

LOAD CONNECTION:

LOADING FULL 3/4 1/2

DIRECT CONNECTED BELT CONNECTED

EFFICIENCY

MOUNTING POSITION:

POWER FACTOR

HORIZONTAL VERTICAL

SHAFT POSITION (for vertical mounting):

SHAFT UP SHAFT DOWN

1-

NEMA TORQUE DESIGN: TBD MOTOR THRUST LOAD: TBD

ROTATION: TBD 2- Motors over 75 kW shall be supplied with space heater.

3- Motors will be controlled by ASD.

CW CCW BI-DIRECTIONAL 4-

(Facing end opposite drive shaft)

SPECIAL REQUIREMENTS:

COMMENTS: 1. TBD: information to be provided by Supplier

2. Motors shall be in compliance with Encana specification ECA-ELEC-S-04 AC Low Voltage Induction Electric Motors.

3. Motor quantity is 3 and tagged as follows: TOW0307-PM-9104A; TOW0307-PM-9104B; TOW0307-PM-9104C

4. Design temperature for outside design conditions is min -40 to max +27 degree C and design temperature for inside design

conditions is min +10 to maximum +35 degree C. Refer to HVAC design Basis (MPSTD-R-000-PHL-10000-0000).

Description

FOR: REV.

LOCATION:

Motors over 150 kW shall be equipped with at least two stator RTDs per phase for winding and one RTD per bearing for Over-Temp protection. RTDs shall be wired out to a separate auxiliary terminal box.

OTHER REQUIREMENTS

B 23-Mar-15 Issued for Bid ACG KZ JT

A 09-Mar-15 Issued for Review RC JT MN

NO. DATE By Chk'd Appr'd Job # A6UE

Motors rated 75 kW to 149 kW shall be equipped with a minimum of one RTD per phase. RTD will be individually wired out to a separate auxilliary box.

SWEET GAS PLANT DOCUMENT NO.

DAWSON CREEK, BC TOW0307-P-070-DSX-PM-9104B

LOW VOLTAGE MOTOR

DATA SHEET

SERVICE: Page 1 of 1Produced Water Disposal Pump

Page 24: Client - Fuelled

FORM 085 265 F0181 (12Mar02)

Page 1 of 1

Data Sheet - LV Motors

Tag No.: TOW0307-PM-9105A/B/C Client: Encana Corporation

Service: Frac Water Supply Pumps Project: Cutbank Ridge Program

RFQ No.: A6UE-4-0607-03-07-RQ-01 Contract No.: A6UE

By: ACG Rev. B Date: 03/23/2015 Ck By: KZ Location: Dawson Creek, BC

Document No.: TOW0307-P-070-DSX-PM-9105

ELECTRICAL AREA CLASSIFICATION:

DRIVE TYPE: Will be specified later

UNCLASSIFIED

DRIVE MFG.: MODEL: Will be specified later

CLASS: GP: ZONE: AUTO IGN. TEMP:

CONSTANT TORQUE LOAD VARIABLE TORQUE LOAD

AMBIENT TEMP: MIN: -40°C MAX: +35°C

(NOTE 4) SPEED RANGE: Will be specified at later stage

ELEVATION: 795.6 MSL

OTHER REQUIRMENTS:

SEISMIC CONDITIONS: Sa(0.2) = 0.132, Sa(0.5) = 0.08, Sa(1.0) = 0.04, Sa(2.0) = 0.073

NAMEPLATE kW: TBD SERVICE FACTOR: 1.0 MANUFACTURER: TBD

VOLTAGE: 575V PHASE: 3 HZ.: 60 MODEL: TBD

SYN SPEED: TBD FRAME: TBD

INSULATION CLASS: F RISE CLASS: B

MANUFACTURER'S DATA

DRIVEN EQUIP VENDOR AND/OR MOTOR VENDOR TO COMPLETE ALL APPLICABLE BLANKS NOT COMPLETED BY PURCHASER

DESIGN DATA - MECHANICAL PERFORMANCE DATA

SITE CONDITIONS

DESIGN DATA - ELECTRICAL

VARIABLE FREQUENCY DRIVE APPLICATIONS

ENCLOSURE: TEFC TEFC-EP TENV FLA TBD LRA TBD STATOR TEMP RISE: TBD

OTHER FULL LOAD SPEED: TBD RPM

LOAD CONNECTION:

LOADING FULL 3/4 1/2

DIRECT CONNECTED BELT CONNECTED

EFFICIENCY

MOUNTING POSITION:

POWER FACTOR

HORIZONTAL VERTICAL

SHAFT POSITION (for vertical mounting):

SHAFT UP SHAFT DOWN

1-

NEMA TORQUE DESIGN: TBD MOTOR THRUST LOAD: TBD

ROTATION: TBD 2- Motors over 75 kW shall be supplied with space heater.

3- Motors will be controlled by ASD.

CW CCW BI-DIRECTIONAL 4-

(Facing end opposite drive shaft)

SPECIAL REQUIREMENTS:

COMMENTS: 1. TBD: information to be provided by Supplier

2. Motors shall be in compliance with Encana specification ECA-ELEC-S-04 AC Low Voltage Induction Electric Motors.

3. Motor quantity is 3 and tagged as follows: TOW0307-PM-9105A; TOW0307-PM-9105B; TOW0307-PM-9105C

4. Design temperature for outside design conditions is min -40 to max +27 degree C and design temperature for inside design

conditions is min +10 to maximum +35 degree C. Refer to HVAC design Basis (MPSTD-R-000-PHL-10000-0000).

Description

FOR: REV.

LOCATION:

Motors over 150 kW shall be equipped with at least two stator RTDs per phase for winding and one RTD per bearing for Over-Temp protection. RTDs shall be wired out to a separate auxiliary terminal box.

OTHER REQUIREMENTS

Motors rated 75 kW to 149 kW shall be equipped with a minimum of one RTD per phase. RTD will be individually wired out to a separate auxilliary box.

NO. DATE

LOW VOLTAGE MOTOR

DATA SHEET

A 09-Mar-15 Issued for Review RC JT MN

B 23-Mar-15 Issued for Bid ACG KZ JT

DAWSON CREEK, BC TOW0307-P-070-DSX-PM-9105B

By Chk'd Appr'd

SWEET GAS PLANT DOCUMENT NO.

Job # A6UE

SERVICE: Page 1 of 1Frac Water Supply Pumps