EDS EDS and the EDS logo are registered trademarks of Electronic Data Systems Corporation. EDS is an equal opportunity employer and values the diversity of its people. © 2004 Electronic Data Systems Corporation. All rights reserved. CMMI and FPA – the link and benefit of using FPA when rolling out CMMI Christine Green IFPUG - Certified Function Point Specialist IFPUG, San Diego, CA, 2004 ESEPG, London, UK, 2004

Upload: others

Post on 18-Dec-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CMMI and FPA - IFPUG

EDS

EDS and the EDS logo are registered trademarks of Electronic Data Systems Corporation. EDS is an equal opportunity employer and values the diversity of its people. © 2004 Electronic Data Systems Corporation. All rights reserved.

CMMI and FPA– the link and benefit of using FPA when rolling out CMMI

Christine Green

IFPUG - Certified Function Point Specialist

IFPUG, San Diego, CA, 2004

ESEPG, London, UK, 2004

Page 2: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 2

ObjectivesObjectives

• How Function Point Analysis can be used to cover multiple requirements from the CMMI.

• Explain the difference between Function Point Analysis (FPA) and Function Point Size

• To give examples of outputs from an FPA that can be used to back up CMMI goals

• To show why it is recommended to use FPA as an important part of the CMMI focus.

Page 3: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 3

EDS employs more than 33,000 people maintaining and developing applications in more than 90 solution centres in 60 countries, on six continents and with more than 50 spoken languages

Page 4: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 4

Function PointsFunction PointsFunction Points

Function Point = Size ?

This is true – but not the whole truth

Function Point Analysis is the interesting part

M a n a g e m e n t S tra te g y

C o s t a n d P re d ic ta b ility

P ro je c t M a n a g e m e n t

E s t im a te s a n d c o n tro l

C M M R e q u ire m e n ts

Q u a lity

M e tr ic s

B e n c h m a rk c o m p a r is o n

T im e to m a rk e t

H ig hQ u a lity

B e s t in c la s s

C o n tra c ts

T ra c k in g

E s t im a te s

Page 5: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 5

Function Point Counting Process

DetermineType ofCount

IdentifyScope &

ApplicationBoundary

Count DataFunctionTypes

CountTransactional

FunctionTypes

DetermineUnadjusted

FunctionPoint Count

DetermineValue

AdjustmentFactor

CalculateAdjustedFunction

Point Count

CPM v4.1

Page 6: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 6

Function Point AnalysisFunction Point Analysis

External Input (EI)Application Boundary

External Output (EO)

TransactionFile

TransactionFile

DataEntry

DataDisplay

PrintedReport

Internal Logical File(ILF)

Internal Logical File(ILF)

Other Application(s)

DataDisplay

External Interface File(EIF)

External Inquiry (EQ)

14 General System Characteristics

Page 7: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 7

Function Point Analysis – The MethodFunction Point Analysis – The MethodThe Method • Measuring software size, independently

of underlying language and technology, from the user’s logical perspective.

• Breaking down functionality defined by Client

• Evaluation during Software Life Cycle against work products

• Evaluation of work products against Requirements documentation

• Definition of Functionality Scope and size

• Definition of Scope changes and size of changes

• Independent Peer Review of Requirement method defined over +300 pages incl. examples

The Output• A overview diagram• Identification of affected applications• Important input to Top-Down

Estimating tool• Requirement Scope control• Peer Review of Design – in respect

of requirements• Test checklist• Implementation checklist• ”Object” checklist• Assumption and constraint

information• Requirement traceability list• Link work product to requirementsAND SIZE

Page 8: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 8

Function Point – The SizeFunction Point – The Size

• Output from a Function Point Analysis• Recognized size in benchmark and in many companies – such as

EDS• A size measure• Size as accurate as possible• Input for estimation tools• A size of scope• A size of scope changes

Source: The David Consulting Group, Inc.

Count Type Accuracy (+/-) CostIFPUG FP 5% 1-3 DaysIFPUG - Limited 25% 1-3 DaysApproximation 35% ½ DayRatio 50% <½ DayExpert 50% < ½ DayDelphi 100% < 1/4 DayBackfire 100-400% Varies

Page 9: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 9

Function Point Analysis – ResourceFunction Point Analysis – Resource

Expected skill-set• Business awareness• Knowledge about

Requirement notation techniques

• Trained and skilled people• Communication Skills• Project Management Skills• Change Management Skills• Development and design

experience

Remember that Function point is just the size – Function Point Analysis is the method

FPA specialist

• Independent peer review specialist

• Business Analyst

• Estimator on software projects

• Bench marker on software projects

• Constraint/assumption expert

• Quality review on documentation

• Consistent use of documentation

FPA specialist is not a bean counter!

Page 10: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 10

Ad hocAd hoc

DisciplinedProcess

DisciplinedProcess

Standard and Consistent

Process

Standard and Consistent

Process

PredictableProcess

PredictableProcess

Initial(1)

Managed(2)

Defined(3)

QuantitativelyManaged

4)

Optimizing(5)

Continuously Improving

Process

Continuously Improving

Process

FocusOrganizational Innovation and DeploymentCasual Analysis and Resolution

Organizational Process Performance Quantitative Project Management

Quantitative Supplier Mgmt

Requirements DevelopmentTechnical Solution OrganizationProduct Integration Environment forVerification IntegrationValidation Integrated TeamOrganizational Process FocusOrganization Process DefinitionOrganization TrainingIntegrated Project Management*Risk ManagementDecision Analysis and Integrated Supplier Mgmt

ResolutionRequirements ManagementProject planning Supplier SelectionProject Monitoring & Monitoring and Control

Supplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration management

CMMI-SE/SW/IPPD/A - Staged View

Page 11: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 11

Level 2 - Repeatable

SW-CMM V1.1Level 2 - Managed

CMMI-SE/SW V1.1

SW-CMM to CMMI Model Relationships

Requirements ManagementProject PlanningProject Monitoring and

ControlSupplier Agreement

ManagementMeasurement and AnalysisProcess and Product Quality

Assurance

Configuration Management

Requirements Management Software Project PlanningSoftware Project Tracking

and Oversight Software Subcontract

ManagementSoftware Quality AssuranceSoftware Configuration

Management

Page 12: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 12

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

PAs Associated With the Managed LevelPAs Associated With the Managed Level

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Page 13: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 13

PurposeTo manage the requirements of the project's products and product components and to identify inconsistencies between those requirements and the project’s plans and work products.

PurposeTo manage the requirements of the project's products and product components and to identify inconsistencies between those requirements and the project’s plans and work products.

end user

customersolution

consulting*

solutiondevelopment

other groupscustomer

requirements

requirements

systems requirements & interface reqs. allocated

to software

interface or data baserequirements

Requirements ManagementRequirements Management

* or systems engineering

Specific Goal:

Requirements are managed and inconsistencies with project plans and work products are identified

Page 14: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 14

Requirements Management & FPARequirements Management & FPA

• This PA involves:– Manage Requirements

• Obtain an Understanding of Requirements

• Obtain Commitment to Requirements

• Manage Requirements Changes

• Maintain Bi-directional Traceability of Requirements

• Identify Inconsistencies between Project Work and Requirements

FPA can provide:• FPA drawing equals a context

diagram• FPA transaction and data element

list• Link to Client documentation• FPA link to phases, work products

and Changes• FPA link to Change requests –

added, deleted, re-use, change• Requirement status

– Planned, incorporated, designed, etc.

• Requirement traceability matrix

Page 15: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 15

Project PlanningProject Planning

Specific Goals:• Estimates of project planning

parameters are established and maintained

• A project plan is established and maintained as the basis for managing the project

• Commitments to the project plan are established and maintained

PurposeTo establish and maintain plans that define project

activities

PurposeTo establish and maintain plans that define project

activities

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Page 16: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 16

Project Planning & FPAProject Planning & FPA

This PA involves:

• Establish Estimates

– Estimate the Scope of the Project

– Establish Estimates of the Project Attributes

– Define the Project Life Cycle

– Determine Estimates of Effort and Cost

FPA can provide:

• Size input for benchmark estimate

• Size of objects – such as requirements documentation

• No. of transactions

• No. of data elements

• Size tracking against lifecycle –using object references

• Size of scope changes during life cycle

• Approximation FP early in the life cycle – direct the project to make the right decisions

Page 17: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 17

PurposeTo provide an understanding of the project’s progress so that appropriate corrective actions can be taken when the project’s performance deviates

significantly from the plan

PurposeTo provide an understanding of the project’s progress so that appropriate corrective actions can be taken when the project’s performance deviates

significantly from the plan

Project Monitoring and ControlProject Monitoring and Control

Specific Goals:• Actual performance and

progress of the project is monitored against the project plan

• Corrective actions are managed to closure when the project’s performance or results deviate significantly from the plan

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Page 18: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 18

Project Monitoring and Control & FPAProject Monitoring and Control & FPA

This PA involves:

• Monitor Project Against Plan

• Monitor Project Planning Parameters

• Monitor Commitments

• Monitor Project Risks

• Monitor Data Management

• Monitor Stakeholder Involvement

• Conduct Progress Reviews

• Conduct Milestone Reviews

FPA can provide:

• Monitoring of Scope against requirements

• Monitoring of the project risk associated with scope changes

• Monitoring of project quality –defects expected compared to defects found

• Progress and milestone review – by review of FPA against current phase documentation

Page 19: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 19

PurposeTo develop and sustain a measurement capability

that is used to support managementinformation needs.

PurposeTo develop and sustain a measurement capability

that is used to support managementinformation needs.

Measurement and AnalysisMeasurement and Analysis

Specific Goals:

• Measurement objectives and practices are aligned with identified information needs and objectives

• Measurement results that address identified information needs and objectives are provided

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Page 20: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 20

Measurement and Analysis & FPAMeasurement and Analysis & FPA

This PA involves:

• Align Measurement and Analysis Activities

• Establish Measurement Objectives

• Specify Measures

• Specify Data Collection and Storage Procedures

• Specify Analysis Procedures

FPA can provide:

• Size – and a very accurate size

• No. of units with a size

• No. of designs with a size

• No. of requirements, etc.

• Size of projects, application and portfolio

Size is used in most analysis to ensure comparison between applications, projects and organisations and to ensure comparison to industry and historical information

Page 21: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 21

Measurement and AnalysisMeasurement and AnalysisThis PA involves:• Provide Measurement Results

– Collect Measurement Data– Analyze Measurement Data– Store Data and Results– Communicate Results

FP can provide:• Consistency across industry• Comparison between language,

applications, organisations, country, etc.

Language Group

VBOO

JavaIEF/Cool

HTMLDBMS

CAssemble

3GL

Per

cent

of P

roje

cts

100

90

80

70

60

50

40

30

20

10

0

quartiles of FP/FTE

4

3

2

1

417194476356N =

Technical Productivity by Language

Primary Language

VBOO

JavaIEF/Cool

HTMLDBMS

CAssemble

3GL

UFP

per

FTE

80

70

60

50

40

30

20

10

0

2366332287N =

Project Productivity

Year Project Ended

200120001999199819971996

UFP

per

FTE

80

70

60

50

40

30

20

10

0

15161617161517161516N =

Project Productivity by Application Size

deciles of UFP (1 = small, 10 = large)

10987654321

UFP

per

FTE

100

90

80

70

60

50

40

30

20

10

0

Page 22: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 22

PurposeTo establish and maintain the integrity of work

products using configuration identification,configuration control, configuration status

accounting, and configuration audits

PurposeTo establish and maintain the integrity of work

products using configuration identification,configuration control, configuration status

accounting, and configuration audits

Configuration ManagementConfiguration Management

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProduct and Process Quality AssuranceConfiguration Management

Specific Goals:

• Baselines of identified work products are established and maintained

• Changes to work products under configuration management are tracked and controlled

• Integrity of baselines is established and maintained

Page 23: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 23

Configuration ManagementConfiguration Management

This PA involves:

• Establish Baselines

– Identify Configuration Items

– Establish a Configuration Management System

– Create or Release Baselines

FPA can provide:

• A list of all work products that are tracked against requirements

• A list of latest formal reviewed and baseline version of all work products

Page 24: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 24

PurposeTo assure that selected work products

meet their specified requirements.

PurposeTo assure that selected work products

meet their specified requirements.

VerificationVerification

Specific Goals:

• Preparation for verification is conducted.

• Peer reviews are performed on selected work products.

• Selected work products are verified against their specified requirements.

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Page 25: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 25

Requirements DevelopmentRequirements Development

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

PurposeTo produce and analyze

customer, productand product component

requirements.

PurposeTo produce and analyze

customer, productand product component

requirements.

Specific Goals:

• Stakeholder needs, expectations, constraints, and interfaces are collected and translated into customer requirements.

• Customer requirements are refined and elaborated to develop product and product component requirements for the product life cycle.

• The requirements are analyzed and validated, and a definition of required functionality is developed.

Page 26: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 26

Requirements DevelopmentRequirements Development

• This PA involves:– Development of Customer

Requirements– Development of Product

Requirements– Analyze and Validate

Requirements

FPA can provide:• Develop a list of affected

applications

• Identify needed design and test scenarios

• Analyse Requirements from requirement documentation to data elements and transactions

• Identify affected groups and projects by boundary

Page 27: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 27

VerificationVerification

This PA involves:

• Prepare for Verification

• Establish a Verification Strategy

• Establish the Verification Environment

• Define Detailed Verification Procedures

FPA can provide:

• Verification strategy and preparation by the timing of FPA and plan for FPA

• Verification procedure by the way FPA is documented

Page 28: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 28

VerificationVerification

This PA involves:• Perform Peer Reviews

– Prepare for Peer Reviews– Conduct Peer Reviews– Analyze Peer Review Data

• Verify Selected Work Products– Perform Verification– Analyze Verification

Results and Identify Corrective Action

– Perform Re-Verification

FPA can provide:

• Independent peer review

• A list of assumptions and issues found during FPA

• Planning and strategy of peer review

Note that the FPA strategy and planning becomes the independent Peer review strategy and planning

Page 29: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 29

PurposeTo demonstrate that a product or product component

fulfills its intended use when placed in itsintended environment.

PurposeTo demonstrate that a product or product component

fulfills its intended use when placed in itsintended environment.

ValidationValidation

Specific Goals:• Preparation for validation is

conducted.• The product or product

components are validated to ensure that they are suitable for use in their intended operating environment.

Optimizing

QuantitativelyManaged

Defined

Managed

Initial

Continuous processimprovement

Process measured andcontrolled

Process characterizedfor the organization andis proactive

Process characterizedfor projects and is oftenreactive

Process unpredictable,poorly controlled, reactive

Causal Analysis and ResolutionOrganizational Innovation and Deployment

Quantitative Project ManagementOrganizational Process Performance

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

Productivity & Quality

I

S

K

R

Level Characteristic Process Areas Result

5

4

3

2

1

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganization Process FocusOrganization Process DefinitionOrganizational Training Integrated Project ManagementRisk Management Decision Analysis and Resolution

Page 30: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 30

ValidationValidation

FPA can provide:• Identification of all

requirements into transactions and data elements

This PA involves:

• Prepare for Validation

– Establish a Validation Strategy

– Establish the Validation Environment

– Define Detailed Validation Procedures

• Validate Product or Product Components

– Perform Validation

– Capture and Analyze Validation Results

Page 31: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 31

Verification versus ValidationVerification versus ValidationAlthough “verification” and “validation” at

first seem quite similar in CMMI models, on closer inspection you can see that each addresses different issues.

VerificationVerification confirms that work products

properly reflect the requirements specified for them. In other words, verification ensures that “you built it right.”

ValidationValidation confirms that the product, as

provided, will fulfill its intended use. In other words, validation ensures that “you built the right thing.”

This in connection to FPA means

To perform a FPA verifies that the product that you give the client is what the Client requested in their requirements

The FPA output and a completed list of design’s against all identified transactions and data elements – Validates that you have completed a design for all the requirements agreed with the Client

Validate transactions and data elements against requirements to identify missing or mismatch. Such as missing search.

Page 32: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 32

Project ExampleProject Example

• Project to maintain Audit of Sub-suppliers for major company

• All documentation is done using UML

• All detail requirements created using Use Case notation

• All detail requirements broken down to only one Actor – or if multiple they are identifying the function as the same function.

Page 33: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 33

Use Case exampleUse Case example

Maintain Personnel

• Four alternatives

– Find company unit

– Cancel

– Delete

– Update

• View/Search is not mentioned

• Number of fields identified in the basic flow is 10

Admin Officer

(from System Actors)

Maintain Personnel

(from Company Artifacts)

Page 34: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 34

FPA on Use CasePeer review, initial size and analysisFPA on Use CasePeer review, initial size and analysis

Enh. Description * Type FTR/RET DETS Comment Requirement

Maintain PersonnelDel Find Company Unit other use

caseMaintain

personel 1.0Add Personnel - show EQ 2 15 Company

unitMaintain personel 1.1

Personnel - New EI 1 13 Maintain personel 1.0

Personnel - Cancel not uniq Maintain personel 1.0

Personnel - Update EI 1 13 Maintain personel 1.0

Personnel - Delete EI 1 3 Maintain personel 1.0

Personnel ILF 1 11 added ID Maintain personel 1.0

• The Use case does not enable to find/show Personnel – Add

• The function Find Company Unit is a separate use case and therefore not defined as a unique elementary process - Duplicate requirements

Page 35: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 35

FPA on the Project – SIZE +FPA on the Project – SIZE +

Type LOW AVG HIGH TOTAL# WT # WT # WT

ILF 0 7 0 10 15 15 225EIF 0 5 0 7 2 10 20EI 0 3 0 4 23 6 138EO 5 4 0 5 0 7 20EQ 2 3 0 4 21 6 132

UFP = 349

• Overview diagram

• Assumption and constraint list

Independent peer review of all requirements

• Idenification of transactions and data elements incl. type and complexity

• Requirement traceability matrix started incl. size of requirementsdocumentation

Page 36: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 36

Function Point Analysis Function Point Analysis –– graphical overviewgraphical overview

Personnel – newPersonnel – updatePersonnel - delete

Application Boundary

TransactionFile

DataEntry

PersonnelInfo Data

Display

Personnel - show

External Input (EI)

Application Boundary

External Output (EO)

TransactionFile

TransactionFile

DataEntry

DataDisplay

PrintedReport

Internal Logical File(ILF)

Internal Logical File(ILF)

Other Application(s)

DataDisplay

External Interface File(EIF)

External Inquiry (EQ)

• A Project context diagram

• An analysis overview

Page 37: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 37

FPA – Possible other Feedback informationFPA – Possible other Feedback information

• In this Project the boundary diagram was in the High-level Scope diagram and therefore was easy to describe – if this is not the case – walk through the boundary diagram to ensure that scope is correctly defined.

• The Notes describe the assumptions that have been made –validate this with Client

• The output from the FPA identifies the information that is duplicated and what is added. Look for add and deletes in the initial FPA –don’t forget to delete this when the FPA is baselined

• The difference between the FPA of requirements documentation andthe FPA of the design document is more then 50%. It is thereforehighly recommended to do a re-planning of this requirement – the project is still aligned.

• No Average ILF/EIF’s was found – therefore no average transactions – ensure that this fits into the feeling of the application –either small or big tables, etc.

Page 38: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 38

Tracking using the FP and UoSTracking using the FP and UoS

Phase Project FP Enhance % expected FPA Est FPA after review

Define 349 0% 387 448Analyse 363 4% 414 490Design 370 2% 387Produce 378 2%Unit test 381 1%Integration test 385 1%Acceptance test 393 2%Implementation

• Added an expected FP scope change – use historical information ifpossible – otherwise use benchmark

• Track estimate against actual

• Create thresholds for when to re-estimate – based on est./act.

300

320

340

360

380

400

420

Define

Analyse

Design

Produce

Unit tes

tInteg

ratio

n test

Accep

tance

test

Implem

entat

ionPhase

Size

Expected FP UoS Actual FP

Page 39: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 39

FPA used for impact analysisFPA used for impact analysis

Phase add FP

delete FP

Change old FP

Change New FP

Add %

delete %

change %

DefineAnalyse 21 21 27 110% 20% 105%Design 27 42 42 130% 30% 110%Produce 33 150% 60% 120%Unit test 21 33 170% 90% 130%Integration test 95% 150%Acceptance test 21 27 100% 170%

01020304050

Def

ine

Des

ign

Uni

t tes

t

Acc

epta

nce

Add UFP

Delete UFP

Change oldUFPChange NewUFP

300

350

400

450

500

550

Define

Analyse

Design

Produce

Unit tes

tInteg

ratio

n test

Accep

tance

test

Implem

entat

ionPhase

Size

Project FP UoS Pro. UoS

• Reflect time and price to change compared to phases

• Size of project – impact of changes

Page 40: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 40

FPA on Use CaseTraceability, verification and validation

FPA on Use CaseTraceability, verification and validationMaintain Personnel

Del Find Company Unit Maintain personel 1.0

0 0 Personnel 1.0 0

Chg Personnel - show Maintain personel 1.2

7 4 Personnel 1.0 7

Chg Personnel - New Maintain personel 1.2

4 3 Personnel 1.0 4

Personnel - Cancel Maintain personel 1.2

0 0 Personnel 1.0 0

Chg Personnel - Update Maintain personel 1.2

4 3 Personnel 1.0 4

Personnel - Delete Maintain personel 1.2

3 3 Personnel 1.0 3

Chg Personnel Maintain personel 1.2

10 7 ERD Diagram 1.0

10

Add

Pesonnel- summary report

Print - summary personnel 1.0

5 0 Personnel 1.0 5

• Personnel – CR – added 9 fields, additional personnel info detail – 2 RET

• The design includes a monthly report with names and total number of employees – a separate use case

Page 41: CMMI and FPA - IFPUG

EDS© 2004 Electronic Data Systems Corporation. All rights reserved. Page 41

FPA summary – When?FPA summary – When?

• FPA for baseline of requirements• FPA as the independent peer review• FPA for reconciliation of requirements against work products in

checkpoint/verification• FPA for reconciliation of delivered against what was expected and

what is needed.• FPA for re-planning and re-baseline of requirements• FP Size

– FP for estimating and tracking– FP for threshold to do re-planning– FP for application size– FP as a price/re-work indicator