PROCESS ASSESSMENT

• Definitions and motivation

• Software process models

• SEI capability maturity model

• Maturity assessment process

• Experience

MOTIVATION

• Risk reduction

• Quality improvement

• Productivity increase

Capability Maturity Model (CMM)

• Developed by the Software Engineering Institute (SEI) with DoD funding

• Designed for large organizations doing routine development – Assessment AND evaluation

• What's the difference?

• Five levels of maturity

• Key processes

THE SEI PROCESS MATURITY MODEL Level Characteristic Key Problem Areas

Optimizing Process improvement

Automation

Managed (quantitative) Process Measured

Changing technology Problem analysis Problem prevention

Defined (qualitative) Process defined and institutionalized

Process measurement Process analysis Quantitative quality plans

Repeatable (intuitive) Process dependant on individuals

Training Technical practice reviews, testing Process focus standards, process groups

Initial (ad hoc / chaotic) Project management Project planning Configuration management Software quality assurance

Results

Productivity Quality

Risk

Levels

• Level 1: Initial – Instable; dependent on individuals

• Level 2: Repeatable – Policies; use of experience in planning; discipline

• Level 3: Defined – Documented process; process group; readiness and

completion criteria • Level 4: Managed

– Quantitative goals; data collection • Level 5: Optimized

– Continuous process improvement

LEVEL 1: Initial Process

• Ill-defined inputs; cost and schedule overruns

• Undefined process; no repeatability

• Simple metrics of size, staff effort

• Baseline for later comparison

LEVEL 2: Repeatable Process

• Identified process inputs, outputs, and constraints • No knowledge of how outputs are produced • Measures of size:

– Lines of code (LOC), function points, object and method counts

• Requirements volatility • Extent of personnel experience determines success

– Domain / applications, development architecture, tools / methods, overall years of experience, turnover

• Key areas – Requirements, management, project planning, project tracking,

subcontract management, QA, CM

LEVEL 3: Defined Process

• Activities with definitions and entry / exit criteria • Measures of requirements complexity, design

modules, code complexity, test paths, pages of documentation

• Software Engineering Process Groups (SEPGs) • Quality metrics

– Failures discovered, failure density for each activity area

• Key areas – Organizational process definition, training program,

integrated management, product engineering, intergroup coordination, peer reviews

LEVEL 4: Managed Process

• Feedback from early activities is used to set priorities for later stages

• Data collected – Process type, extent of reuse (production and

consumption), when are defects detected, testing completion criteria, use of configuration management, change control, traceability links, module completion rate

• Key areas – Process measurement and analysis, quality

management

LEVEL 5: Optimizing Process

• Measures of activities are used to change the process

• Analogy with Statistical Process Control (SPC)

• Key Areas – Defect prevention, technology innovation,

process change management

Assessment

• Selection of assessment team • Management commitment

– Assessment agreement

• Preparation – Training, survey questionnaire

• Assessment – Questionnaire analysis; discussions with projects and functional

area representatives; findings; feedback; presentation

• Report • Follow Up

– Action plan, reassessment after 18 months

Assessment Details - 1

• Assessment team has 6-8 members, some internal, some external – Either SEI or a vendor

• Team members have > 10 years experience; team leader has > 20 years experience

• Assessment itself takes 3-5 days • 78 YES / NO questions

Assessment Details - 2

• Four or five projects are examined per organization

• Interviews with 8-10 functional area representatives (FARs) from each area – QA, integration testing, coding and unit test,

requirements and design

• Implementation process takes 12-18 months

• Follow-up at the end of this time

Questionnaire - 1 2.3 Data Management and Analysis

Data management deals with the gathering and retention of process metrics. Data management requires standardized data definitions, data management facilities, and a staff to ensure that data is promptly obtained, properly checked, accurately entered into the database and effectively managed.

Analysis deals with the subsequent manipulation of the process data to answer questions such as, "Is there a relatively high correlation between error densities found in test and those found in use?" Other types of analyses can assist in determining the optimum use of reviews and resources, the tools most needed, testing priorities, and needed education.

Questionnaire - 2 2.3.1 Has a managed and controlled process database been

established for process metrics data across all projects? 2.3.2 Are the review data gathered during design reviews

analyzed? 2.3.3 Is the error data from code reviews and tests analyzed to

determine the likely distribution and characteristics of the errors remaining in the product?

2.3.4 Are analyses of errors conducted to determine their process related causes?

2.3.5 Is a mechanism used for error cause analysis? 2.3.6 Are the error causes reviewed to determine the process

changes required to prevent them.? 2.3.7 Is a mechanism used for initiating error prevention actions? 2.3.8 Is review efficiency analyzed for each project? 2.3.9 Is software productivity analyzed for major process steps?

Case Study: Hughes Aircraft - 1

• 1987: Level 2; 1990: Level 3

• $45K assessment cost; $400K improvement cost; $2M savings; 2% increased overhead; 18 months implementation (78 staff months); 5x improvement in expenditure estimation

• 500 people in part of one division

Case Study: Hughes Aircraft - 2

• Major 1987 recommendations – Central data repository, process group, more

involvement in requirements process, technology transition organization

• Major 1990 recommendations – More division-wide data analysis;

opportunities for automation

CMM Benefits • Level 2 leads to superior product quality • CMM encapsulates industry best practices • DOD sponsorship has enforced process improvement throughout

Defense community • Quality movement has led to CMM being quite widely used in other

sectors • Enhanced understanding of the development process • Increased control and risk reduction • Migration path to a more mature process • More accurate cost estimation and scheduling • Objective evaluations of changes in tools and techniques • Standardized training • Marketing

CMM Criticisms

• Lots of room for interpretation of assessment rules • Purpose and potential misuse of model

– Originally for self-assessment and organizational learning – Increasingly used by DoD for contractor evaluation and

qualification

• Tends to ignore different needs of different development environments – Emphasis on DoD contractual development – Emphasis on big, mission-critical projects

• Deemphasis of design risk • Deemphasis on satisfaction of customer requirements

SURVEY

• SEI – 1990: 113 Projects

• 85% At Level 1

• 14% At Level 2

• 1% At Level 3

Process Improvement

Process Mistakes(McConnell)

• Overly optimistic schedules

• Insufficient risk management

• Contractor failure

• Insufficient planning

• Abandonment of planning under pressure

• Wasted time during fuzzy front end

• Short-changed upstream activities

More Process Mistakes

• Inadequate design

• Short changes quality assurance

• Insufficient management controls

• Premature or overly frequent convergence

• Omitting necessary tasks from estimates

• Planning to catch up later

• "Code-like-hell" programming

McConnell Fixes

• Identify and fix classical mistakes • Miniature milestones • Milestone-based schedule • Track schedule meticulously • Record reasons for missed milestones • Recalibrate early and often • Don't commit to a new schedule until you can do

so meaningfully Manage risks painstakingly

Process Improvement(Shewart Cycle)

• Plan– What and why?

• Do– How, when, and how much?

• Check– How will you know it worked?

• Act– How do you plan to fully adopt?

Act Plan

Check Do

The Dilbert Cycle

ACT

Blame someone else for catastrophe

Adopt unproven process or technology

Make wild guess at what is wrong

Plan

• Identify problem or opportunity • Vision

– Where do you want to be?

• Describe the current process • Is the process in control? Is it repeatable? • Identify possible weaknesses • Strategic impact

– Cost / benefit analysis, how effort supports core-competence, risk of not doing

Do

• Determine what changes might help • Develop or purchase an evolution plan • Implementation tactics

– Major deliverables, organization maturity considerations, key role of infrastructure, coordination with other groups, timing to match user projects, hand-off criteria

• Select and implement a change on a pilot project • People and resources

– Sponsor and champion roles, user partners, people and expertise needed, hardware, software, space

• Schedule risks, contingency plans

Check

• Measure effect of change – Baseline measurement, prechange

environmental characteristics, expected effect

• Postproject review, degree of adoption – Percentage of engineers using improvement,

range of uses, maturity of usage

Act

• Adopt across organization

• Support strategy – Infrastructure changes, documentation,

training, consulting, packaging, maintenance, feedback

• Continue cycle

Metrics and Measurement

Get the data first, then distort it with your judgment.

--Mark Twain

You can’t control what you can’t measure. --Tom Demarco

If you don’t know where you are going any map will do, If you don’t know where you are, a map won’t help.

--Watts Humphr

Getting the data

• How do we decide what data to collect?

• Goal, Question Metric (GQM) (Basili) – Goal, e.g. reduce defects to 6/KLOC in code – Question, e.g. what is the defect rate now? – Metric, e.g. defect count per KLOC

Key Metrics

• Lines of code

• Staff months

• Calendar months

• Defects

Defect Analysis

• Origin (where) – Requirements / specification, design, code,

environment support, documentation

• Type (what)

• Mode (why) – Missing, unclear, wrong, changed, better way

Defect Types

• Requirement / analysis: functionality • Specification / design: HW / SW / User

interfaces, functional description • Design: Communication, data definition, module

design, logic description, error checking, standards

• Code: Logic, computation, data handling, module interface implementation, standards

• Environment: Test SW, Test HW, development tools, integration SW

Root Cause Analysis

• Determination of the underlying process deficiency that causes a class of product defects – Collect defect data – Determine causes – Organizational buy-in (tie to business goals) – Assign responsibility

• Variations – One-shot, postproject, continuous

One-Shot Root Cause Analysis(Requires prior defect data collection but no

prior causal analysis)

• Train on defect analysis; indicate goals • Select 50-75 defects randomly • Classify; pie chart • Pick top two defect types; fishbone diagram • Improvement recommendations • Present results; assign responsibility; implement

change

Postproject Root Cause Analysis

(Prior understanding of defect patterns)

• Premeeting – Identify primary business goal – Data analysis (champion and facilitator) – Select two defect types for brainstorming

• Invitations to engineers • Bring examples of their faults (in selected

categories) • Guess at root cause • Suggested prevention mechanism

Meeting

• State meeting goal and rules • Select issues • Review defects/causes/solutions brought

to meetings Analyze defects (fishbone diagram)

• Brainstorm solutions • Assure organizational commitment • Plan for change (responsibilities and

dates)

Postmeeting

• Champion and facilitator review meeting – Prepare meeting summary

• Champion captures process baseline data – Before and after process description and data

Fishbone Diagram(Cause and Effect Diagram)

• Write suggested causes of a class of defects on note cards

• Organize into affinity groups

• Use lines to indicate "is a cause of" or "is a prerequisite of"

• Spine is major defect class

• Major branches are affinity groups

Example

USER INTERFACE

LACK OF FEEDBACK LACK OF GUIDELINES

(DIFFERENTPERSPECTIVES) OOPS (FORGOTTEN)

GUIDELINESNOT FOLLOWED

Too busy to do them

Some productparts don’tresemble others

Noasthetics

No good model

Prototypenot enough

Users notfocused on

new product

Some panelsnot used as much

Tests don’t modeluser environment

adequately

No processto provide

early feedback

Lack ofresources

Int. customersdecide based on

functionality

Result of changes

Too many details

In a hurry

Decided based onincompletecustomer base

Corner cases,particularproblems

Resource limits

Too manycombinations

of features

Don’t readthem

No time

No centrallocation

Third Party Audits / Assessments

• CMM: maturity model

• ISO9001: international standard

• SQPA: business practices; functional model

• QMS: business model

• Baldridge: Department of commerce; weighted criteria

CMM

Legend:

Level Title

• Characterized by

• Achieved when

• Primary Concept

• N/A

• Organizational starting point

Not Performed

• SE process area not being done

• Essential elements performed

• Doing systems engineering

Performed Informally

• Individual heroics

• Projects using defined process

• Controlling local chaos

Planned & Tracked

• Work is planned & managed

• Projects use org. std. process

• Sharing organizational learning

Well Defined

• Development of org. std. process

• Process metrics captured

• Managing processes by data

Quantitatively Controlled

• Definition of quantitative goals

• Processes improved

• Improvement based on data

Continuously Improving

• Quantitative strategic goals

0

I

II

III

IV

V

11SA-

ISO 9000 Series• Actually a series of specifications that allow companies

to be “certified” • Doesn’t focus on improvement—just current state • Addresses minimum criteria for a quality system • Strongly paper-trail oriented • Checklist assessment • Generic—not software specific • Principle: Every important process should be

documented

Guidelines for Process Improvement

• Incremental rather than big-bang implementation – Contrast with “Paradigm Shift", "BPR”

• Use data

• Treat root causes not symptoms

• Workers know best how to do a process – Avoid consultants

More Guidelines

• Today’s problems come from yesterday’s solutions

• The harder you push, the harder the system pushes back

• The easy way out usually leads back in • The cure can be worse than the disease

Still More Guidelines

• Faster is slower • Cause and Effect are not closely related in time

and space • Small changes can produce big results, but the

areas of highest leverage are the least obvious • You can have your cake and eat it too, but not at

the same time • Dividing an elephant in half does not produce

two small elephants • "Fix the problem, not the blame"