CMS Area Working Group Meeting. Emergency (AUG) stops systems in CMS underground areas. Goal: To have 2 separate AUG networks UXC55 USC55 (no exception for LHC or Magnet areas) Avoid fast discharge of Magnet Implications: - PowerPoint PPT PresentationTRANSCRIPT
26/09/2007 [email protected] 1
CMS Area Working Group Meeting
26/09/2007 [email protected] 2
Emergency (AUG) stops systems in CMS underground areas
→Goal: To have 2 separate AUG networks→UXC55→USC55 (no exception for LHC or Magnet areas)→Avoid fast discharge of Magnet
→Implications: →Emergency stops in UXC55 must cut power on equipment
located in the UXC55 even if the power comes from the USC55→A list of such devices has been drafted but needs to be
completed:→Coil racks in X4Near balcony→Magnet diffusion pumps on YB0→All types of AI, He return heaters→Vacuum sensors, combined gauges(>1000V)
→Related issue→The grounding scheme of the experiment might be compromised
if unfiltered power is used on devices located on YB0 (ie pumps)→G Perinic & B Cure are to send their grounding schemes to S
Lusin
26/09/2007 [email protected] 3
UXC55 Racks: X2 Near Side
2 coil racks will be powered on the LV network
26/09/2007 [email protected] 4
Emergency (AUG) stops systems in CMS underground areas
→Suggestions by TS-EL:→Do not cut UPS power networks by AUG (red strips to be
applies)→Use equipment stops (or similar means) on racks no connected
to AUG→Install AULs in the laser room that is considered as a separate
building. Activating these devices will not generate an alarm and call the fire brigade
→Install a hardware switch at substation level to shut down the whole underground area (from CMS CR)
→Use the LV network to power devices in UXC55 when appropriate
→Filtered power (grounding issue addressed)→Network cut by AUGs in UXC55
→Ok for coil racks- need to be connect to 230V contactors →For other devices such as diffusion pumps, sensors, R Lassausaie
proposed scheme has been endorsed (see his presentation)
26/09/2007 [email protected] 6
Présentation des installations de contrôle et de sécurité de l’aimant CMS (by N Bourgeois)
Supply arrangement and AUG/AUL actions
1 2 3 4 5 6 7 8 9
Dessiné par : N.Bourgeois
Folio suivant : 3
Magnet Control SystèmMise à jour : 02/02/2007
FULL FILENAME\\CERN.CH\DFS\USERS\B\BOURGEOI\EXPERIENCES\CMS\230V 400V\BPEOPT5 DEFINITF.VSD
PAGE
1 OF 8
Table
CP1CP2
MC
S
MS
S
E D
01
07
01
DCCT
S4C02S4A01
S4L01
48V dc
07
Arm
oire
Arm
oire
Arm
oire
Reseau assuré (diesel)
Reseau UPS
Reseau Normal
Tres Basse Tension USC55
Zone S4
UXC55 Pompes à diffusion
Rack Saclay
USC55 Zone S3
Alimentation S3B01
SDX 55Cde CR
Cde CP
26/09/2007 [email protected] 7
Emergency (AUG) stops systems in CMS underground areas
→Actions to take to be ready for a general test on 15/02/2008:→Issue a document synthesising the position of AUGs in USC55
and UXC55 (R Lassausaie)→Review of document by Safety coordinator (M Arnaud), and
GLIMOS (C Schaefer)→Execute work (INEO)→Organise reception & tests (G Cumer)