SITE PLAN
pEG pOl.10
czo
C.)
'7,5b
‹<-
pEG pl_ACE.A)
T TOTAL -8,#ffLTR
60
Designology 212 Amelia Lane, Newbury
VICTORIA - AUSTRALIA DESIGN & BUILDING CONSULTANTS.
MOBILE - 0416 056 651 EMAIL -
kevingdesignology.com.au
w - www.designology.com.au
, •64.7 •64.71
,91O (10
o /1/ tOk• /1/ Q / 0
57.4a- - -
/ 61.
57 80
/ ,:"., , (5' / ,31.. , 0 , /
, , „ / „ / , , / / , , 1 , , / , / , CFA FIRE FIGHTING / / / 10,000IUR WATER TANK! 0'
/ refer foiMS ( June202 i
„ e, , Re7,3374,, , „ „ ///
/ /
1,1 / /
/ 4:7/
/ /
NTGACTOR SH L RIFY ALL LEVELS, D SIZES PRIOR TO I MENCEMENT OF AN
DRAWINGS.
ALL WORKS' ' 'RIED OUT ARE TO C CODE OF A RALIA, STANDARDS
RELEVANT AUTHORITIES, R REQUIREMENTS AND BY-LA
ENSIONS AND WORK OR SHOP
PLY WITH THE BUILDING USTRALIA, LOCAL AND ALL
ULATIONS, STATUTORY
, WHICH HAVE JURISDICTION
OVER THE BUILDING WORKS.
tets .00
• NEW LEVEL
o EXISTING GROUND LEVEL
ISSUE REVISIONS
EXISTING TREE REMOVED
EXISTING TREE RETAINED
DATE DRAWN sp
DATE -
REF
F I R E F I G H T I N G NOTES
Standard bushfire requirements to also be satisfied are as
o 10,000Itr. above ground water tank conc. or metal - A minimum o f 10,000 litres effective water supply f o r fire fighting purposes must be established and maintained on the site that is stored in an above ground water tank constructed o f concrete or metal. All fixed above-ground water pipes and fittings required f o r fire fighting purposes must be made of corrosive resistant metal.
o The water supply must meet the following requirements:
- The outlet/s of the water tank must be within 4m of the accessway and be unobstructed.
o Accessway needs 3.5m trafficable width + 0.5m each side for firefighter access.
o The water supply system must be designed such that it will be hydraulically possible for a CFA appliance to draw water from the outlet, when taking into account site conditions.
o Be readily identifiable from the building or appropriate identification signage t o the satisfaction of CFA must be provided.
o Include a riser up to the road level with a coupling (64mm CFA 3 thread per inch male fitting).
o Incorporate a ball or gate valve (British Standard Pipe (BSP) 65mm)
o All pipework and fittings must be a minimum of 65mm (excluding the CFA coupling).
o If the elevation from the base of the water supply to the outlet point is greater than 6m a pump will need to be installed at the supply to boost the water up to the outlet point. Installation would be to AS 2419.1 2005 - Fire Hydrant Installations standard e.g. use of 100 ml pipe etc.
o If a pump is installed i t is preferable that the pump is diesel operated. The pump should be installed in a ventilated non-combustible enclosure to protect it from radiant heat. Weatherproof signage indicating the placement o f the pump and the pumps operating instructions shall be placed both at the pump and at the outlet point.
CFA FIRE FIGHTING 10,000LTR WATER TANK refer to BMS ( june2021) Ref =3374/1
RAINWATER TANKS TOTAL = 8,000LTR
MARCH 2021
CHECKED
PROPOSED NEW DWELLING
FOR
AT
EDWARD HUTCHINSON
No.6. ILUKA AVE. WYE RIVER
DRAWING SITE PLAN
PDF FILE SAVE - 20 SEPT 2021
VER -2
SCALE 1 / 200
JOB No.
SHEET 0 2 0F14
D21/199862
Des1gnology p/I 212 Amelia Lane, Newbury VICTORIA - AUSTRALIA
DESIGN & BUILDING CONSULTANTS.
MOBILE - 0416 056 651 EMAIL -
kevingdesignology.com.au
W - www.designology.com.au
CFA FIRE FIGHTING 10,000LTR WATER TA
S ( june2 4/1
0 EXISTING GROUND LEVEL
PDF FILE SAVE -20 SEPT 2021
CONTRACTOR SHALL VERIFY ALL LEVELS, DIMENSIONS AND SIZES PRIOR TO COMMENCEMENT OF ANY WORK OR SHOP
DRAWINGS.
ALL WORKS CARRIED OUT ARE TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA, STANDARDS AUSTRALIA, LOCAL AND ALL
RELEVANT AUTHORITIES, REGULATIONS, STATUTORY REQUIREMENTS AND BY-LAWS, WHICH HAVE JURISDICTION
OVER THE BUILDING WORKS.
ISSUE REVISIONS DATE DRAWN VER -2 sp PROPOSED NEW DWELLING
DATE - APRIL 2021 FOR EDWARD HUTCHINSON
SCALE 1 /200
REF AT No.6. ILUKA AVE. WYE RIVER
JOB No.
CHECKED DRAWING SATELLITE VIEW - PLAN SHEET 0 3 OF 14
D21/199862