  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    1/22

    COAL HANDLING PLANT

    Introduction

    Coal Handling Plant (CHP) is a plant which handles the coal from its receipt to

    transferring or conveying it to Boiler House and storing in Raw Coal Bunkers

    (R.C.Bunkers). Average size of Coal received in CHP is 300-400 mm, which is called

    Received off Mine (ROM) size.

    Functional Work in Coal Handling Plant (CHP):

    In brief it can be stated that Coal Handling Plant performs the following main

    functional work sequentially:

    Receipt of coal in CHP from coal mines Different ways of Coal

    Transportation from mines

    Weighing of coal by Electronic Weighing Machine

    Unloading of coal form wagon or truck by Wagon Tipplers

    Controlling coal flow on conveyor belt by Vibrating Feeder

    Transferring or conveying of coal to different points by Conveyor

    Belts

    Storing & Stacking of uncrushed coal in coal yard by Stacker cum

    Reclaimer

    Coal Screening for separating sized coal and by passing thecrusher by Vibrating Screen

    Crushing it to required size Coal Crushers

    Transferring & distributing the quanta of crushed coal to various

    coal mill bunkers by Travelling Trippers

    Major Equipments of CHP:-

    1. Wagon Tipplers

    2. Vibrating Feeders3. Conveyor Belts

    4. Vibrating Screen

    5. Coal Crushers

    6. Travelling Trippers

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    2/22

    Auxiliaries in Coal Handling Plant

    1. Electromagnetic Separators, Cross Belt Magnetic Separator

    (CBMS) & Magnetic Pulley

    2. Metal Detector

    3. Dust extraction systems

    4. Gas Extractor

    5. Pull Cord

    BASIC FUNCTIONAL LAYOUT OF CHP:

    http://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspxhttp://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspx
  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    3/22

    BASIC FUNCTIONAL LAYOUT OF CHP:

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    4/22

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    5/22

    COAL HANDLING PLANT

    1000 TPH Coal Handling Plant at Durgapur Projects Power Station, Extn. Unit #7 (1 x 300

    MW) including Track Hopper with Paddle feeder, Crushing & Screening, Stacker cum Reclaimerand Belt Conveying System with associated Electrical, Civil & Structural and Utility work for

    Durgapur Projects Limited.

    1 X 300 MW Durgapur Project Power Station

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    6/22

    Wagon Tipplers:-These are the giant machines having gear boxes and motor assembly and are used

    to unload the coal wagons into coal hoppers in very less time (e.g. 20 wagons/hr.

    or more).

    http://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspxhttp://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspx
  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    7/22

    Vibrating Feeders:-These are electromagnetic vibrating feeders or sometimes in the form of dragging

    chains (Apron Type) Vibrating Feeder which are provided below the coal hoppers.

    This equipment is used for controlled removal of coal from coal hoppers.

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    8/22

    Electromagnetic Vibrating feeding system

    A vibratory feeding system includes a hopper, a tray and an electromagnetic vibrator. The hopper isdisposed above the tray so that components can flow from the hopper to the tray. The vibrator is

    mounted to the tray. During operation, an electromagnet is rapidly energized and de-energized causing an armature of the drive assembly to be pulled in and released upto 7,200 times per minute, in turn imparting a vertical reciprocating vibration to the

    support platform so that the tray can be vibrated to move components along the tray. The tray can

    have a v-groove along which the plurality of components can flow.

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    9/22

    http://www.freepatentsonline.com/6631799-0-large.jpg
  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    10/22

    Belt Conveyor System:-

    Belt conveyor System is a kind of machine that to transfer the material

    continuously. It has the synthetic rubber belts which move on metallic rollers

    called idlers with the help of belt drive (pulleys). It is used in Coal Handling Plant

    for shifting of coal from one place to other places The belt works under the effect

    of frictional force. It is not only the components to transfer the material, but also

    the components to transfer the force.

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    11/22

    Conveyor Belt system consists of the following components:

    1. Conveyor Belt- internal Cotton canvas or Synthetic canvas or metal wire

    canvas impregnated with rubber covers on both face and back.

    2. Pulley drive system having Drive or Head pulley with Motor, Tail Pulley, Bend

    Pulleys & Snub Pulley

    3. Idlers

    4. Gravity Take up system or Belt tensioning system

    5. Belt cleaning or wiping system

    6. Gear Box

    7. Fluid Coupling

    CONVEYOR IDLERS

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    12/22

    TROUGHING IDLER

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    13/22

    TROUGHING TRAINING IDLERS

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    14/22

    IPMACT IDLER & ITS POLLAR

    RETUTN IDLER

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    15/22

    Vibrating Screen

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    16/22

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    17/22

    Coal Crushers:-

    We receive the coal in the form of odd shaped lumps. These lumps are to be

    crushed to required size. These lumps are crushed by coal crushers.

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    18/22

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    19/22

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    20/22

  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    21/22

    Trippers:-

    These are the motorized or manually operated machines and are used for feeding

    the coal to different coal bunkers as per their requirement.

    Electromagnetic Separators:-

    Electromagnets are used for removing of Iron and magnetic impurities from the

    coal.

    Dust Extraction System:-

    This system is provided in CHP for suppression of coal dust in coal handling plant.

    Gas Extractors:-

    Gas extractors are provided at the bunker level to remove all types of poisonous

    and non poisonous gases from the working area.

    Operational Cycles:-

    1. Normal Bunkering cycle.

    2. Stacking cycle.

    3. Reclaiming Cycle.

    Normal Bunkering Cycle:-

    Shifting of coal received from coal wagons directly to coal bunkers is normal

    bunkering cycle.

    Stacking Cycle:-

    When there is no coal requirement at coal bunkers even then CHP has to unload

    the received coal which is stacked at open ground called yard. This is stacking

    cycle.

    Reclaiming Cycle:-As and when coal wagons are not available the requirement of coal bunkers is

    fulfilled from the stacked coal this is reclaiming cycle.

    Weighing of Coal:-

    Weighing of coal is carried out at wagon tippler. Weight of loaded wagon is taken;

    after unloading the coal, weight of empty wagon is taken the difference of the two

    will give the weight of the coal (normally 55-60 metric ton of coal come in each

    wagon).

    Payment of Coal:-Payment of coal is made to the coalmines as per the weighing of coal carried out

    at their premises. However, if any dispute arises regarding weighing of coal same

    is to be settled by the committee of both the parties.

    Stone shells:-

    Sometimes stone shells are received along with coal same has to be removed from

    the coal before bunkering and is done sometimes manually or by different type of

    machines.

    If quantum of stone shells is beyond minimum limit the cost of the coal is

    recovered from the coal mines against the quantity of stone shells received from

    them.

    http://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspxhttp://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspxhttp://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspxhttp://www.indiastudychannel.com/resources/84033-INFORMATION-OF-COAL-HANDLING-PLANT.aspx
  • 8/3/2019 COAL HANDLING Tech. Information Auto Saved)

    22/22

    Chemical Analysis of Coal:-

    Sample of coal is randomly collected from each rake by concerned MSEB staff and

    detailed chemical analysis, calculation of calorific value is carried out and is

    confirmed whether it is as per agreement with the coal mines or not.