HOWERTON ENGINEERING & SURVEYING PLLC Southern Ohio Growth Partnership P.O. Box 509 Portsmouth, Ohio 45622 Richard L. Howerton, PE, PS Richard A. Howerton, PS Carl Kibbey Phillip Hammond $15,000 2008 Finished on Budget Finished on Time The Southern Ohio Growth Partnership retained Howerton Engineering to prepare a traffic impact study for the proposed development of the Coca Cola Distribution Site located along U.S Rt 23 in Clay Township, Scioto County, Ohio. The Southern Ohio Growth Partnership, is proposing to develop a new industrial center located on the west side of U.S. Route 23 in Clay Township, located approximately 4 ½ miles north of the City of Portsmouth, and 3 ½ miles south of Lucasville. The proposed development will be located between intersections of Maple Benner Road and Houston Hollow Road. The map to the right shows the location of the proposed development site (in blue). There proposed development will initially consist of a 14 acre site, ultimately enveloping 67 acres for future industrial sites. The first phase was completed in 2007. Completion of the entire development is undetermined at this time. For the purposes of this study, we will assume a ten year build-out. This report determines how the proposed development will affect travel service along U.S. Route 23 and the aforementioned intersections. This report also investigates improvements to the U.S. Route 23 to accommodate the increased traffic volumes generated by the development. The report analyzes the operation of the following intersections: t U.S. Route 23/Maple Benner t U.S. Route 23/Houston Hollow Coca-Cola Traffic Impact Study Portsmouth, OH Client Key Staff Project Completion Date Project Budget Project Schedule Project Cost

Upload: vuonghuong

Post on 30-Mar-2018

219 views

Category:

Documents


2 download

TRANSCRIPT

HOWERTON

ENGINEERING &

SURVEYING PLLC

Southern Ohio Growth PartnershipP.O. Box 509Portsmouth, Ohio 45622

Richard L. Howerton, PE, PSRichard A. Howerton, PSCarl KibbeyPhillip Hammond

$15,000

2008

Finished on Budget

Finished on Time

The Southern Ohio Growth Partnership retained Howerton Engineering to prepare a traffic impact study for the proposed development of the Coca Cola Distribution Site located along U.S Rt 23 in Clay Township, Scioto County, Ohio.

The Southern Ohio Growth Partnership, is proposing to develop a new industrial center located on the west side of U.S. Route 23 in Clay Township, located approximately 4 ½ miles north of the City of Portsmouth, and 3 ½ miles south of Lucasville. The proposed development will be located between intersections of Maple Benner Road and Houston Hollow Road. The map to the right shows the location of the proposed development site (in blue). There proposed development will initially consist of a 14 acre site, ultimately enveloping 67 acres for future industrial sites.The first phase was completed in 2007. Completion of the entire development is undetermined at this time. For the purposes of this study, we will assume a ten year build-out. This report determines how the proposed development will affect travel service along U.S. Route 23 and the aforementioned intersections. This report also investigates improvements to the U.S. Route 23 to accommodate the increased traffic volumes generated by the development. The report analyzes the operation of the following intersections:

t U.S. Route 23/Maple Benner

t U.S. Route 23/Houston Hollow

Coca-ColaTraffic Impact Study Portsmouth, OH

Client

Key Staff

Project Completion Date

Project Budget

Project Schedule

Project Cost