Code Administration Code of Practice. KPIs Q2 2011. Tim Davis. Critical Friend. Number and percentage of survey respondents who stated they were ‘ satisfied ’ or better with the assistance offered by the JO 38 responses, 97% satisfied or better. Quality of assessment. - PowerPoint PPT PresentationTRANSCRIPT
Code AdministrationCode of Practice
Tim Davis
KPIs Q2 2011
Critical Friend• Number and percentage of survey respondents who stated they
were ‘satisfied’ or better with the assistance offered by the JO– 38 responses, 97% satisfied or better
Quality of assessmentQuarter 1 Ofgem
Implement Reject
PanelImplement 9 1
Reject 0 1
4 Self-Governance Modifications have also been implemented)
No Reports “sent back” by Ofgem18 Ofgem 2011 Decisions accord with Panel (75%)
Quarter 2 Ofgem
Implement Reject
PanelImplement 5 3
Reject 2 3
Effective communication
• Glossary and plain English summary to be provided with reports– Part of standard documentation
Quarter 1 Quarter 2 YTD
Number of Consultations 16 8 24
Average number of respondents
9.1 9.6 9.4
Efficient administration (1)Percentage of papers published outside of modification rules requirements
Quarter 1 Quarter 2 YTD
% UNC Modification Papers (Mods, DMRs, FMRs)
0% 0% 0%
Quarter 1 Quarter 2 YTD
Meetings 71 91 162
Papers 366 419 785
% Late 23% 16% 20%
Efficient Administration (2)
Quarter 1 Quarter 2 YTD
Number and percentage of reports submitted to the authority in line with original timetable
1 1 2
Quarter 1 Quarter 2 YTD
Number of extensions to timetable requested
14 21 35
Efficient Administration (3)Average time between:
Quarter 1 Days
Quarter 2Days
YTDDays
Proposal being raised and submitted for decision
137 145 141
Proposal being submitted for decision and decision being published
112 78 95
Decision and implementation (separately identifying systems and non-system changes)
3 (no central systems changes)
2 (with one central
systems change)
5 (one central systems change)
Implementation costsQuarter 1 Quarter 2 YTD
Number and percentage of reports for which implementation cost estimates were available for consultation
100% 100% 100%
Accuracy percentage difference (whether higher or lower) between estimated and actual implementation costs
n/a n/a n/a