code calculations, construction drawings and elevation/section graphics…
TRANSCRIPT
![Page 1: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/1.jpg)
code calculations,construction drawings
and elevation/section graphics…
![Page 2: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/2.jpg)
RENDERED ELEVATIONS AND BUILDING SECTIONS
![Page 3: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/3.jpg)
![Page 4: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/4.jpg)
![Page 5: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/5.jpg)
![Page 6: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/6.jpg)
![Page 7: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/7.jpg)
![Page 8: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/8.jpg)
![Page 9: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/9.jpg)
![Page 10: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/10.jpg)
![Page 11: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/11.jpg)
CODE CALCULATIONS
cap energy usagevary by statevary by project type
![Page 12: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/12.jpg)
Energy Consumption
– Lighting consumes ~23% of the electricity used in all buildings
– ~20% of electricity required for air-conditioning results from heat generated by lamps
– ~ ½ electricity used in commercial buildings is for lighting systems
– ~10% of electricity consumed in residences is used for lighting
![Page 13: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/13.jpg)
life cycle consumption standards
• ASHRAE, LEED, etc.• Cradle to cradle, energy star, etc.• hazardous material disposal• planning: HVAC and daylighting
integration
![Page 14: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/14.jpg)
Light Pollution and Trespass
• Light pollution: – Excessive glow of light in night sky– excess lighting; sources aimed in inappropriate
directions– dark sky society
• Light trespass:– Glare onto an adjacent property
![Page 15: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/15.jpg)
THE MASSACHUSETTS ENERGY CODE
![Page 16: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/16.jpg)
Lighting Power Density (LPD) Maximum Power Usage
• Code specifies numeric maximum• By Occupancy type• Watts/sq. ft.• Use formula from Code• Use Room finish schedule• Add up totals from RCP, total watts per
luminaire• Adjust fixture total or lamping
appropriately if you’re over
![Page 17: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/17.jpg)
From CMR 780
![Page 18: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/18.jpg)
![Page 19: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/19.jpg)
![Page 20: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/20.jpg)
![Page 21: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/21.jpg)
calculations using schedule
![Page 22: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/22.jpg)
CONSTRUCTION DRAWINGS
![Page 23: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/23.jpg)
lighting equipment schedule
![Page 24: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/24.jpg)
![Page 25: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/25.jpg)
![Page 26: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/26.jpg)
most typical fields:
• Letter• Symbol (from RCP)• Type (mounting + lamp +
distribution)• Lamp (col’s for number and wattage)• Manufacturer• Catalog number• Finish• Mounting• Notes
![Page 27: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/27.jpg)
DETAIL DRAWINGS
draw dimensional relationshipsdraw mounting systemnote materials (construction and finish)note lampingnote mounting
![Page 28: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/28.jpg)
Stretched ceiling
![Page 29: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/29.jpg)
![Page 30: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/30.jpg)
![Page 31: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/31.jpg)
![Page 32: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/32.jpg)
Special conditions
![Page 33: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/33.jpg)
Special conditions
![Page 34: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/34.jpg)
Special conditions
![Page 35: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/35.jpg)
![Page 36: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/36.jpg)
![Page 37: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/37.jpg)
ACT meeting GWB wall
![Page 38: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/38.jpg)
ACT hung off structure
![Page 39: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/39.jpg)
DIMMING/SWITCHING PLANS
indicate location of controls and groupings of fixtures onto circuits
![Page 40: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/40.jpg)
Switching:Considerations
• Consider location and appearance of controls• Consider fixture grouping• Consider operation
– Switched, dimmed, remote controls, PDA controls– Pre-set scenes at control– Pre-set scenes at central dimming station, computer interface, or
telephone activation• Consider operators
![Page 41: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/41.jpg)
![Page 42: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/42.jpg)
![Page 43: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/43.jpg)
SYSTEMS COORDINATION
structural system limitationHVAC system implications
![Page 44: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/44.jpg)
![Page 45: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/45.jpg)
![Page 46: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/46.jpg)
Steel yourselves
![Page 47: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/47.jpg)
Concrete systems
![Page 48: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/48.jpg)
Most restrictive
![Page 49: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/49.jpg)
Heating and A/C symbols
![Page 50: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/50.jpg)
Air systems: how they work
![Page 51: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/51.jpg)
Mechanical Plans from the Engineer
![Page 52: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/52.jpg)
You need the duct sizing and register locations
![Page 53: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/53.jpg)
Diffusers
![Page 54: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/54.jpg)
Supply air diffusers
![Page 55: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/55.jpg)
Linear diffusers and return grilles
![Page 56: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/56.jpg)
average dimensions
![Page 57: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/57.jpg)
![Page 58: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/58.jpg)
![Page 59: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/59.jpg)
![Page 60: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/60.jpg)
![Page 61: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/61.jpg)
![Page 62: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/62.jpg)
![Page 63: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/63.jpg)
7’5’ maximum from side walls15’ OC maximum
Sprinkler spacing Rule of Thumb
![Page 64: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/64.jpg)
Alarms: NFPA 72 indicates where needed
![Page 65: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/65.jpg)
Other rules of thumb
![Page 66: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/66.jpg)
Wireless
• Wireless repeaters – Every 150’ within direct line of sight– 50’ through interior partitions– Not at all through masonry/exterior walls– Library stacks are worst
![Page 67: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/67.jpg)
A/V equipment
• TV’s, projectors, etc• Sight lines are critical (for viewer and
projector)• Speakers: – Coverage varies greatly by system– One in a room– Wall or ceiling mtd– Stereos, CD’s, etc: within the room
![Page 68: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/68.jpg)
Smoke and/or fire detectors
• One in every enclosed space• One every 50’• Heat and/or optical sensitivity• Hard-wired• Fire detectors required in some specific
occupancies (hazardous)
![Page 69: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/69.jpg)
Exit signage and lighting
• Wall or ceiling mtd; can be lit internally• At every exit door• Every 100’• Battery-powered lights• Strobe lights with audible alarms in bathrooms
and egress corridors
![Page 70: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/70.jpg)
![Page 71: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/71.jpg)
![Page 72: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/72.jpg)
Smoke detectors
• Hard wired• At least 1 in all occupied spaces• Every 30’/900sf• Inside ductwork
![Page 73: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/73.jpg)
Manual fire alarms
• Within 5’ of all exits• Specific height• Must not project into space more than 4”
![Page 74: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/74.jpg)
Visible/audible alarm signals
• Within 5’ of all exits• Along path of travel
![Page 75: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/75.jpg)
Fire extinguishers
• Within 30’ of cooking equipment• Buildings under construction• Open flames• Labs, computer rooms, generator
rooms
![Page 76: code calculations, construction drawings and elevation/section graphics…](https://reader037.vdocument.in/reader037/viewer/2022103022/56649f505503460f94c738be/html5/thumbnails/76.jpg)
so for this project…
• generate the schedule–manufacturer’s data for decorative only– all lighting equipment included– include exit signs (find a product)