Code Minimum Base Shear Requirements February 2007 Joe Maffei RUTHERFORD & CHEKENE

Upload: dangcong

Post on 05-Apr-2018

222 views

Category:

Documents


4 download

TRANSCRIPT

Code Minimum Base ShearRequirements

February 2007Joe Maffei

RUTHERFORD & CHEKENE

OUTLINE

UBC, ASCE 7-02, ASCE 7-05

Effect on design response spectrum,spectral displacement demand andrequired stiffness

Why we should have a minimum baseshear and drift limit

Conclusions & Recommendations

0.00

0.04

0.08

0.12

0.0 0.3 0.6 0.9 1.2

S1

Seattle SF Salt Lake

MINIMUM BASE SHEAR

1997 UBC

ASCE 7-02

ASCE 7-05

RUTHERFORD & CHEKENE

EFFECT OF EQ 30-7 ON SPECTRA SHAPE

0.0

0.4

0.8

1.2

1.6

0.0 1.0 2.0 3.0 4.0 5.0 6.0

Sa

T

EDA

UBC EQ. 30-7

0

20

40

60

80

100

0 1 2 3 4 5 6

T, sec

EFFECT ON SPECTRAL DISPLACEMENT DEMAND

Eq. 30-7

CODE SPECTRUM

S d, i

nche

s

RUTHERFORD & CHEKENE

0.00

0.04

0.08

0.12

0.0 0.3 0.6 0.9 1.2

S1

Seattle SF Salt Lake

MINIMUM BASE SHEAR

ASCE 7-05

DISPLACEMENT DEMAND VS. S1

0

20

40

60

80

100

120

140

160

180

0 0.2 0.4 0.6 0.8 1

ASCE 7-05Soil type B

Seattle SF Salt Lake

S d, i

nche

s

T=4

T=5

T=6

S1

Applying UBC eq 30-7 in effect reduces thedrift limit for actual ground motion hazard.

R=5, soil B

Eff. DBE drift limit

No 30-7 for drift 2%

30-7 for drift, T=4 1%

30-7 for drift, T=6 0.7%

30-7 for drift, T=8 0.3%

From Charlie K.

From Charlie K.

From WJE

P-Δ EFFECT ON LATERAL CAPACITY

P

Δ

hR

Vmin

Vmin

MR,min = Vmin hr

LIMIT P-Δ REDUCTION IN LATERAL CAPACITY

P-Δ

V

MCE drift

Vmin

RUTHERFORD & CHEKENE

CONCLUSIONS

There should be a minimum base shear forstrength, about 4% or 5% xW for a high-risewith typical flexibility.

The current limit on the drift produced by theactual ground motion hazard, 2% DBE, 3%MCE, are needed.

These two checks provide a “safety net”,without which we would be completely puttingour trust in NLRH analyses.

CONCLUSIONS

Eq 30-7 reflects >mean ground motions fromT=2 to T=4 seconds. If applied beyond T=4 itbecomes increasingly conservative.

Applying UBC Eq 30-7 to drift in effect reducesthe drift limit, severely for longer periods.

Applying UBC 30-6 and 30-7 for strength onlyprovides an adequate safety net.

ASCE 7-05 minimum base shear of 1%(applicable to S1 < 0.6g) is unconservative.

Minimum base shear should depend onthe building’s actual drift demand, which isonly indirectly tied to seismic hazard.

A minimum based on seismic hazard(safety net to the safety net) should bebased on the long period acceleration,including soil effect. i.e., SM1

PROPOSAL ON MINIMUM BASE SHEAR

PROPOSAL ON MINIMUM BASE SHEAR

Design for strength, but not drift, forCmin = (δmax, mce /0.02)(0.04) ≥ 0.05SM1

Δmax,mce = MCE story drift ratio, worst story,average of records

Cmin = (δmax/0.02)(0.07) ≥ 0.05SM1

Δmax = DBE story drift ratio, worst story

PROPOSAL ON MINIMUM BASE SHEARAND NEAR-FIELD DEMANDS

Consider extreme actual records, unscaled.[Tabas, Lucerne, 1979 El Centro, Sylmar]NRLH with P-Δ shows no collapse, and noindividual story drift > 4%

RUTHERFORD & CHEKENE