Presented By: Amit Grover – Manager Admin
R.K.Verma – Manager Facility
© 2018 Cognizant
Cognizant Technology Solutions India Pvt Ltd, Gurgaon SEZ-6, August 2018
© 2018 Cognizant2
Cognizant is a global leader in providing solution for IT , consulting, digital, technology and business process outsourcing services, dedicated to helping the world's leading companies build stronger businesses.
Headquartered in Teaneck, New Jersey, United States. Cognizant is included in the NASDAQ-100, S&P 500 indices, Forbes Global 2000 and became Fortune 200 company in year 2017. Cognizant is ranked among the top performing and fastest growing companies in the world.
The company has more than 260,000 employees globally, of which over 180,000 are in India across 10 locations with a plurality in Chennai.
US$ 14.81 billion in revenues for FY 2017.
Cognizant Overview
Cognizant Overview
© 2018 Cognizant3
• 75+ delivery and operations centers globally and spread across 38 countries
• Occupy 24 million+ built up area and 13.6 million Sqft of Own Facility
• Majority of these operations are in hot and humid climate and significant percentage
support 24X7 operations
• More than 80% of the space is air-conditioned
• Our data centers alone constitute more than 15% of the total energy consumption
CTS Gurgaon SEZ-6 Overview
© 2018 Cognizant4
Details
No of buildings & Sqft 1 no. building (5th & 6th Floor) & 42384 Sqft
Seating Capacity 444 nos.
No. of associates as on date 487 nos.
Details
Utilities Details
Self Power generation (Builder)
UPS Capacity: 2 x 60 KVA
Transformer details : 5 x 2000 KVA (Builder)
Lifts : 5 nos. Passenger lifts + 1 no. Service lift
Comprehensive Building Management system
Dual Rising Main.
ISO 27001:2013 1st July'2018
Energy Consumption Trend in last 3 years
© 2018 Cognizant5
Description 2014 2015 2016 2017
% Reduction in 2015 Vs
2014
% Reduction in 2016 Vs
2015
% Reduction in 2017 Vs
2016
EPI: KWH/Sq. ft. /Month1.05 1.03 0.97 0.91 1.9% 5.8% 6.2%
Average Headcount 388 364 395 346 6.2% -7.9% 12.4%
KWH/Person/Month114 119 104 111 -4.3% 12.6% -6.7%
Energy Consumption in KWH
532515 522269 494412 463536 1.9% 5.3% 6.2%
Energy Savings in KWH10246 27857 30876
Energy Savings Cost in INR133096 361862 401079
Unit Cost in INR 12.99 12.99 12.99
Reduction in EPI in last 3 years is 13.9%
Reduction in KWH/Person/Month in last 3 years is 1.6%
© 2018 Cognizant6
Comparison with Benchmark Data- BEE
Benchmark Data- BEE for Buildings where Air-Conditioned area is more than 50% of Carpet area
Bandwidth for Office Buildings for 3 climate zones
EPI in Kwhr./Sq. M. / Year
Star RatingWarm and
HumidComposite Hot and Dry
1 Star 200-175 190-165 180-155
2 Star 175-150 165-140 155-130
3 Star 150-125 140-115 130-105
4 Star 125-100 115-90 105-80
5 Star Below 100 Below 90 Below 80
Gurgaon SEZ-6 Facility EPI
Description 2014 2015 2016 2017
EPI: Kwh/Sq.M. / Annum 135 133 126 118
© 2018 Cognizant7
Road Map for SEZ-6 Facility as 3 Star Rated Building Reference to
BEE Benchmark
Zero investment Initiatives
Gurgaon SEZ-6 is defined under composite Climate zone as per BEE- Energy Conservation
Building Code. Facility is 10 years old with minimal automation but it presently matches to
BEE standards of Three-Star rated building with more than 80% of the space is air-
conditioned.
Objective
• Achieve SEC equivalent to 4 Star rated Building by Year 2019
Road map to 4 Star Rated Building
To achieve set objective in coming years, we have planned various Energy Conservation projects
like retrofit of old conventional AC units, Retrofit of CFL/T5 light fittings to LED, Retrofit of UPS to
Modular UPS in year 2018 to year 2019
Energy Saving project FY 2015
© 2018 Cognizant8
UPS consolidation/Optimization – Zero Investment Initiative
Consolidation/Optimization of UPS Load by removing
60 KVA UPS – One 60 KVA UPS disconnected from
the circuit as running load on all UPS(60KVAX3) was
only 25-30%. Along with Energy saving we are saving
AMC cost too
Unit Savings:
10368 kWh/yr
Cost Saving:
134680 INR/yr
AMC Cost
Saving: 47496
INR/yr
Energy Saving project FY 2016
© 2018 Cognizant9
HVAC optimization- Zero Investment Initiative
Earlier Ductable AC dedicated for Cafeteria was being running 9 hrs. in a
day ,subsequently we had patched cafeteria duct with builder central AHU
consequently now we need to run the same ductable AC only for peak
hrs. (11:00-16:00) i.e. 4 to 5 hrs. instead 9hrs
Unit Savings:
27684 kWh/yr
Cost saving :
359625 INR/yr
Energy Saving projects in FY 2017
© 2018 Cognizant10
Pull cord switch Installation
Earlier 30 no's lights (14*4) near by façade area was operational for 12 hrs.
even without presence of associates & more lux level available than required.
subsequently we have installed pull cord switches on all lights near façade
glass & educated associates to use the same as & when required. Resulting
found reduction in energy consumption
Unit Savings:
2439 kWh/yr
Pull cord
Cost Savings:
31687 INR/yr
Energy Saving projects in FY 2017
© 2018 Cognizant11
Migration of all warm white light to cool white light
We have migrated all lights (14watt *4) from warm white to cool white, and
by doing this we succeed to achieve the expected lux level in less count of
the lights consequently now only we are managing expected lux level with
1500 lights(14watts*4) as earlier this count was 1600.
Unit Savings:
4066 kWh/yr
Cost Savings:
52812 INR/yr
Energy Saving projects in FY 2017
© 2018 Cognizant12
Migration of Halogen lights to Recessed down lights
Replaced all 50watts halogen lights(30No’s) with 11 watts Recessed CFL
downlights
Unit Savings:
3397 kWh/yr
Cost Savings:
44135 INR/yr
Energy Saving projects in FY 2017
© 2018 Cognizant13
10 KVA UPS disconnected from the circuit as running load on said UPS
was less so we transferred load on another Existing 60KVA UPS which
was running with 40% load
Unit Savings:
1900 kWh/yr
Cost Savings:
24691 kWh/yr
AMC Cost
Savings:7916
INR/yr
Optimization of UPS Load - Zero Investment Initiative
Optimization of AHU running - Zero Investment Initiative
In weekends AHU was running from 8:00 Hrs to 14:00Hrs even after
non-availability of associates, we had stopped to run AHU during
weekend about 6 hrs every week and save much more energy
consumptionUnit Savings:
8064 kWh/yr
Cost Savings:
104751 INR/yr
Energy Saving projects in FY 2017
© 2018 Cognizant14
Optimization of AHU & Lights operation - Zero Investment Initiative
Optimization of Lights by Switching ON/OFF lights as and when
required
Unit Savings:
5040 kWh/yr
Cost Savings:
65470 INR/yr
During weekdays AHU running from 8:00 Hrs. to 20:00 Hrs as per
business model
Optimization of AHU units by control of AHU operations during & post
Business hours
Unit Savings:
2772 kWh/yr
Cost Savings:
36008 INR/yr
Innovative Projects in FY 2017
© 2018 Cognizant15
The revealed area where the pull cord has been installed was having sun light
access through façade. Lux level on those seats were more than 400lumens
during day time.
During Training session of E&M team this problem statement was raised &
afterward we came up with solution of pull cord switch Therefore we had
installed pull cord switch so that it can be operated as & when required.
Investment:
1050 INR/yr
Cost Savings:
31687 INR/yr
Pull cord switch Installation
Installation of Pull cord switch on 2x2 light fittings near façade glass
Payback
Months: 0.40
Innovative Projects in FY 2017
© 2018 Cognizant16
During review of site Energy consumption Trend, it has been observed that
lighting is one of top three major consumption equipment & in this we were
using halogen lights(50w) which was of high wattage compare to other lights.
So we replaced this with Recessed down light(11w) which reduces the energy
consumption.
Investment:
5250 INR/yrCost Savings:
44135 INR/yr
Migration of Halogen lights to Recessed down lights
Payback
Months : 1.43
Innovative Projects in FY 2017
© 2018 Cognizant17
During walkthrough this has been observed that warm light was giving dull
look inside the ODC & also we received multiple low lux level feedback from
our associates. So We migrated all lights (14watt *4) from warm white to cool
white, and by doing this we succeed to achieve the expected lux level in less
count of the lights consequently now only we are managing expected lux level
with 1500 lights(14watts*4) as earlier this count was 1600.
Investment:
71250 INR/yr
Cost Savings:
52812 INR/yr
Migration of all warm light to cool white light
Payback
Months: 17.8
GHG Inventorisation
© 2018 Cognizant18
Carbon Foot Print Activities
S.No. YearDG KWH
Units
DLF self power
generation station
KWH
Scope 1 emissions
kgCO2 / Ton of Final
Products
Tons / Turn of final
Product
Scope 2 emissions
kgCO2 / Ton of Final
Products
Tons / Turn of final
Product
Total
kgCO2 / Ton of Final
Products
Tons / Turn of final
Product*
1 2014 0 532515 0.000 315.515 315
2 2015 0 522269 0.000 309.444 309
3 2016 0 494412 0.000 292.939 292
4 2017 0 463536 0.000 274.645 274
Scope 1 emissions DG Sets Not applicable
Scope 2 emissions Electricity
Consumption Applicable
Green Supply Chain
© 2018 Cognizant19
1. Performance of the vendors has been evaluated for
efficiency improvement and resource conservation in carbon,
material, water and toxicity
2. Supplier audits in place for optimization of resources and for
leading efficiency improvement and resource conservation
Supplier Evaluation
Benefits Achieved
1.keeping employees informed about their environmental roles and
responsibilities
2.Improving cost control
3. Reducing incidents that result in liability
4. conserving raw materials and energy
5.Improve our monitoring of environmental impacts
6.Improve the efficiency of our processes
Green Supply Chain
© 2018 Cognizant20
1. Segregation of plastic, food , paper waste & disposing accordingly
2. Hazardous waste management & segregation awareness to team
created for managing safe keeping Hazardous waste generated at
location
3. Celebrating Earth Hour every year
4. GO GREEN celebration - Tree plantation
5.Swach Bharat is conducted twice a year
6.No C fold day - at Washroom - We have stopped using C- Fold on
weekends to save paper in our washrooms.
7.Installation of Aerator in water Taps for saving water consumption
Day Time Transport optimization
Projects implemented
Energy Monitoring
© 2018 Cognizant21
Weekly
Weekly energy call
Working on Energy consumption trend
Daily
Energy consumption updating in FMS Portal
Top 3 energy profile review (HVAC,UPS ,Lighting)
MONTHLY
MMR
EPI Review
ECM Validation
Energy Profile analyze
Energy consumption updating in FMS
© 2018 Cognizant22
Effective Monitoring and Control Methodology
Activity Frequency Responsible Accountable Consulted Informed
Daily Energy
DashboardDaily Facilities Team
CWS Location
ManagerCWS Energy POC CWS Ops lead
Facility Management
System (FMS
System)
Daily Facilities TeamCWS Location
ManagerCWS Energy POC CWS Ops lead
Energy Review Monthly Facilities Team Energy LocationCWS Energy city
lead
CWS Location
Manager
City review QuarterlyCWS Energy City
lead
CWS India Energy
Manager
CWS Energy India
lead
Sustainability
Team
Update to CWS
Operation LeadQuarterly
CWS Location
Head
Energy India lead
/Sustainability
Team
CWS Ops lead
Update to Energy
CommitteeQuarterly
Sustainability
Team
Head-
Sustainability
Energy India lead
/ Energy Manager
Dashboard on
Equipment’s &
AMC
YearlyCWS Energy
City lead
CWS India
Energy
Manager
Energy India
leadCWS Ops lead
© 2018 Cognizant23
Strategic Path
EMP
•Site specific tailor
made Energy
Management Plan
rolled out for the
period of year
2011-2019
Energy Team
• As per EMP – Energy
Team is formed under
Corporate Workplace
Service Head which
includes different
department members.
EHS lead and BEE
certified Energy Auditor
Account
Management
• Yearly Energy
Conservation Plan
• Identifying
opportunities
• Process
improvements
• Implementation
• Periodic Review
Strategic Path
Awareness &Training Program
© 2018 Cognizant24
“The First Step towards change is awareness”
Employees Awareness through Signage and Posters
Campaigns
Innovations AwarenessCampaigns
Message through Dashboard
Energy and Environment Awareness Mailers
Awareness &Training Program
© 2018 Cognizant25
Training conducted on basic OHSAS & EMS Knowledge for new joiner.
Let nature shine - “Small Things can make a big difference”
Vendor & OEM training are based on job requirement
Team Work in Energy Conservation & Monitoring
© 2018 Cognizant26
Description Project - 1 Project - 2 Project - 3 Project - 4
Idea Originated in the
Year :2015 2017 2017 2017
Name of the project
Power savings through
prompt operational
schedules of AC's, lighting,
Planned annual preventive
maintenance schedules and
prompt execution of
maintenance as per planned
schedule
At 5th & 6th floor both cafeteria
for LED TV we have make
arrangement for network
connectivity so that during any
event or if any presentation
need to be present then we
can use this with existing LED
rather Putting additional
projectors.
Replacement of
1500 No's warm
light to Cool day
light in all ODC's
workstation area
Installation of Pull
cord switch on all
the 2x2 light fittings
which are near
façade glass.
Details of Members in
the Implementation
Team / Core Group
(Nos, & Designation):
(E&M) team-Engineers,
Technicians
(E&M) team-Engineers,
Technicians, IT
(E&M) team-
Engineers,
Technicians
(E&M) team-
Engineers,
Technicians
Expected or Actual
Date of Implementation
:
February-15 July-17 August - 17 May-17
Methodology adopted
to overcome the
constraints
Trainings and Brainstorming BrainstormingTrainings and
BrainstormingBrainstorming
Environment
© 2018 Cognizant27
List of major environmental improvements made during
2015 – 2016
Name of the Environment ProjectYear of
Implementation
Celebrating Earth Hour every year 2015
GO GREEN group of employees at Cognizant Gurgaon DLF SEZ volunteers to carry out various environment
activities which helps societies & Nature. The various activities is completed as well as ongoing in terms Tree
plantations, etc. at Hills surrounding Gurgaon City and try to maintain it through watering the plants on weekly
basis voluntarily.
2015
Motivational Events is scheduled time to time to aware employees about the benefit of planting trees plants at
their locations as being part of maintaining environment clean and green.2015
Hazardous waste management & segregation awareness to team created for managing safe keeping Hazardous
waste generated at location2015
Swach Bharat is conducted twice a year 2015
Green day celebrated - Tree plantation 2017
No C fold day - at Washroom - We have stopped using C- Fold on weekends to save paper in our washrooms. 2016
Environment
© 2018 Cognizant28
Swach Bharat
Abhiyan
No c-Fold day
Celebrating World Green DaySwach Bharat
Abhiyan
Few Snaps on environmental improvements
List of Certifications
© 2018 Cognizant29
Awards
Name of the Award Year of Receipt Given by
Fire & Safety week award2015 DLF
Fire & Safety week award2016 DLF
Fire & Safety week award2017 DLF
Certification Valid Up to Given by
ISO 27001:201301st July'18 DNV GL
Way Forward (2018 - 2019)
© 2018 Cognizant30
Migration of
CFL/T5 with LED
light
Old Ductable AC
unit replacement
with VRF
Lux level/Weather
sensor near façade
glass
1. Conventional AC’s replacement with VRF system – Planned to complete till Dec’18
Estimated Annual Electrical Savings(Kwh/Year) is 35147
2. Replacement of existing CFL/T5 light fitting with LED lights – Planned to complete till
May’19
Estimated Annual Electrical Savings(Kwh/Year) is 35027
3. CFL/LED Down lighters near facade(day light available) will be operated with lux
level/weather sensor – Planned to complete Oct’18
Estimated Annual Electrical Savings(Kwh/Year) is 753
Replacement of conventional UPS with Modular UPS
UPS Retrofit