collaborative car parking design

44
Collaborative Car Parking Capability Brochure

Upload: hannan-associates

Post on 22-Jul-2016

224 views

Category:

Documents


7 download

DESCRIPTION

Collaborative Car Parking is an offer brought to you by Aedas RHWL, Hill Cannon and Hannan Associates; arising out of the design and delivery of two significant Multi-Storey Car Park (MSCP) schemes delivered by the respective consultants in quick succession in 2014. We are offering a collective consultant team with a proven and very recent track record for the delivery of MSCP of the highest quality on complex urban sites - backed up by a historic pedigree of delivering similar parking schemes.

TRANSCRIPT

Page 1: Collaborative Car Parking Design

Col

labo

rati

ve C

ar P

arki

ngC

ap

ab

ilit

y B

roc

hu

re

Page 2: Collaborative Car Parking Design

Aedas RHWL

HONG KONG

31/F, One Island East,

18 Westlands Road,

Quarry Bay,

Hong Kong

LONDON

Ivory House, St Katharine Docks

London, E1W 1AT

United Kingdom

tel +44 (0)20 7480 1500

fax +44 (0)20 7481 4840

[email protected]

BERLIN

Neue Schönhauser Straße 9

10178 Berlin

Germany

tel +49 (0)30 2576 160

fax +49 (0)30 2576 1616

[email protected]

DOHA

Aedas RHWL

7th Floor, IBQ Building

Airport Road, Doha, Qatar

Postal address:

PO Box 200441

Doha, Qatar

tel +974 4402 4777

fax +974 4402 4747

[email protected]

www.aedas.com/aedasrhwl

ISO 9001:2008 Approval

Certifi cate No. LRQ 4000557

Hannan Associates

MANCHESTER (Head Offi ce)

Beta House, Alphagate Drive

Manchester Road, Denton,

M34 3SH

tel +44 (0)16 1337 2200

fax +44 (0)16 1337 2201

[email protected]

EDINBURGH

Abbey House, 83 Princes Street,

EH2 2ER

tel +44 (0)13 1247 6770

fax +44 (0)13 1247 6710

[email protected]

www.hannan-uk.com

Hill Cannon Consulting LLP

HARROGATE

Business Centre

Hartwith Way

Harrogate

HG3 2XA

tel +44 (0)14 2381 3522

www.hillcannon.com

Page 3: Collaborative Car Parking Design

Contents

1. Introduction ................................................. 2

2. About Aedas RHWL ...................................... 4

3. About Hill Cannon ........................................ 6

4. About Hannan Associates ............................ 8

5. New Bailey Car Park Salford / UK ................10

6. Stockport Exchange Stockport / UK ...........12

7. St Paul’s Square Liverpool / UK...................14

8. Southwater Telford / UK .............................16

9. Millennium Point Birmingham / UK .............18

10. Doncaster Civic Quarter Doncaster / UK .... 20

11. Talbot Gateway Blackpool / UK ................. 22

12. Madeira Road Bournemouth / UK .............. 24

1Collaborative Car Parking |

Page 4: Collaborative Car Parking Design

Introduction

| Capability Statement2

Collaborative Car Parking is an offer brought to you

by Aedas RHWL, Hill Cannon and Hannan Associates;

arising out of the design and delivery of two

signifi cant Multi-Storey Car Park (MSCP) schemes

delivered by the respective consultants in quick

succession in 2014.

We believe that the old adage of; ‘it’s just a car park’,

no longer applies.

Today’s car parks are key components of the urban

design of an area; often being the fi rst building

constructed as part of an area’s regeneration or a

new scheme. The car park subsequently becomes

an advert for the quality of the coming development,

thus these structures need to be as innovative as

possible and of equal design quality to the buildings

of the wider scheme that will follow.

A modern car park needs to be user friendly,

adaptable, and able to react to both new technology

and the evolving ergonomics of vehicles.

We are offering a collective consultant team with a

proven and very recent track record for the delivery of

MSCP of the highest quality on complex urban sites -

backed up by a historic pedigree of delivering similar

parking schemes.

We aim to build on the excellent working relationships

that have been developed during the recent work

undertaken together, offering a more effi cient design

process, born out of the familiarity and knowledge of

the individual team members.

We welcome any opportunities to present our

collective approach to your organisation.

Alasdair MealeyAssociate

Aedas RHWL

Steve VollarPrincipal Partner

Hill Cannon

John WalkerDirector

Hannan Associates

Page 5: Collaborative Car Parking Design
Page 6: Collaborative Car Parking Design

| Capability Statement4

About Aedas RHWL

Aedas is one of the world’s leading global architecture

and design practices.

The company is built on the belief that great design

can only be delivered by people with a deep social and

cultural understanding of the communities they are

designing for.

Aedas global platform for creative excellence in

design enables some of the world’s most talented

designers to plug into the latest information and

delivery systems they need to produce truly world-

class design solutions.

The practice’s unique structure, global presence,

and commitment to cutting-edge R&D are testament

to our desire to deliver design excellence to clients

wherever they are in the world.

RHWL joined Aedas in January 2015 bringing 54 years

of experience of design and delivering buildings,

and urban regeneration projects in both the UK and

around the world, to the Aedas Global network.

Page 7: Collaborative Car Parking Design

5Collaborative Car Parking |

Page 8: Collaborative Car Parking Design

| Capability Statement6

About Hill Cannon

Hill Cannon have been designing car parks for over

forty fi ve years with the current partners, Glynn

Rhodes and Steve Vollar, overseeing some major

changes in car park design and are able to call on

the experience of a dedicated team of engineers and

parking technicians to develop a bespoke solution for

any proposed scheme.

From their background as structural engineers, they

have been able to evolve functional, effi cient and cost

effective design solutions for the operational aspects

of a car park. This involves developing a brief with

the Client and then optimising the use of the site to

achieve the required parking numbers, to adhere to an

agreed budget and to design a parking facility that is

well lit, has a clear layout and is user-friendly.

The design parameters include a service level

determination which can range from basic to

enhanced, to suit location, nature of use and, where

applicable, to scale of charging.

Hill Cannon developed and patented a unique vehicle

circulation system, VCM, now widely adopted as ideal

for small to medium sized car parks.

Advanced pre-cast concrete solutions have been

designed to cater for off-site construction techniques

and quality fi nishes. Recent developments include

the design of automated parking systems as a design

alternative.

Page 9: Collaborative Car Parking Design

7Collaborative Car Parking |

Page 10: Collaborative Car Parking Design

| Capability Statement8

About Hannan Associates

William E Hannan & Associates was formed in 1983 to

provide Building Services Consultancy.

The company today continues to focus exclusively

on Building Services Engineering and operates from

offi ces in Manchester, London & Edinburgh. They

work successfully throughout the UK and abroad and

the business has grown consistently.

A Commercial approach to design strategies, together

with the careful usage of the latest technologies

and sustainable design has ensured that 80% of

the practice turnover is achieved through repeat

business. The development of the company has been

aided by a strong and loyal work force through which

the company has developed long term relationships

with major end user clients.

Hannan Associates is committed to creating

successful buildings through attention to detail

utilising their breadth of experience, technical skills

and with levels of personal attention not provided by

our competitors. Our design solutions are renowned

for pushing beyond current thinking whilst controlling

risk and delivering on the key essentials of client and

end user satisfaction.

The company is led by Directors Ian Joyce, John

Walker and Jamie Hall. Ian has been with Hannans

since it began, John joined the company 18 years ago

and Jamie 20 years ago.

The core of their business plan is controlled growth

built upon a best practice approach to all aspects

of the running of the business. The company strives

for continuous improvement and supports this with

an ongoing investment plan. Business is deliberately

conducted in a number of sectors and projects are of

varying sizes in order to provide fi nancial resilience.

This long term philosophy has resulted in solid track

record in a number of sectors and the capability to

manage and deliver projects ranging from building

surveys to projects valued in excess of £300m with

international design teams.

Page 11: Collaborative Car Parking Design

9Collaborative Car Parking |

Image Source: One Angel Square

Page 12: Collaborative Car Parking Design

| Capability Statement10

New Bailey MSCP is the fi rst building of the commercial zone of the New Bailey

Masterplan to be delivered; replacing existing surface car parking and freeing up land

for future development plots.

It is a nine storey facility providing 620 car parking spaces, arranged around a two

way Vertical Circulation Module (VCM) system, including disabled spaces, an area

for motorcycle parking and 6 electric car charging points. The building sits next to a

grade II* listed railway viaduct and a major road intersection which was redeveloped in

tandem with the building.

The car park serves users of Salford Central station as well as the wider development.

The building attempts to do away with the preconceptions of ‘normal’ car park

architecture to provide something that is a precursor to the quality of the future

buildings of the masterplan. The building utilises perforated aluminium cladding, which

wraps round the building in a pattern infl uenced by both the circulation of the building

and the local industrial architecture and bridges.

Construction commenced in mid-February 2014 with practical completion achieved at

the beginning of December 2014.

The project was recently featured on the January 2015 edition of Parking Review as the

cover story.

Client

English Cities Fund

Operator

NCP

Involvement

Aedas RHWL, Hill Cannon & Hannan Associates

Completion Year

2014

Number of Spaces

620

New Bailey Car Park

Salford / UK

Page 13: Collaborative Car Parking Design
Page 14: Collaborative Car Parking Design

| Capability Statement12

As part of Phase 1 of the Stockport Exchange development, the MSCP

provides a new 1,000 space facility over six levels, with circulation

arranged around a one way Vertical Circulation Module (VCM)s system,

allowing for an effi cient footprint to the building. The car park includes

an area for motorcycle parking, electric car charging points and a secure

cycle storage facility with changing facilities and lockers.

The car park acts as the catalyst for the rest of the development, as

it allowed the disparate surface parking to be amalgamated into one

location, thereby clearing large areas of the site for future phases.

The façade uses Stockport’s signifi cant history as a major centre of the

textile industry as the thematic driver for its elevations. This takes the

form of a pattern across the façade, created by weaving expanded metal

mesh strips between horizontal bars; forming prefabricted cladding

panels, which are then arrayed in a specifi c pattern.

The aim was to provide a visual screen that is broken down into smaller

segments, which also allows fresh air and light to penetrate into the

car park. This is an environmentally friendly solution as it removes

mechanical ventilation requirements and reduces artifi cial lighting levels.

Awards

Nominated for ‘Best New Car Park’ - British Parking Awards 2015

Client

Muse Developments

Operator

NCP

Involvement

Aedas RHWL, Hill Cannon & Hannan Associates

Completion Year

2014

Number of Spaces

1,000

Stockport Exchange

Stockport / UK

Page 15: Collaborative Car Parking Design

13Collaborative Car Parking |

Page 16: Collaborative Car Parking Design

| Capability Statement14

Delivered as part of the fi rst phase of the St Paul’s Square

Central Business District development, the 400 space MSCP

provides parking for both the adjacent residential building and

the commercial offi ce buildings of the Square.

The effi cient two way circulation of the building allows the car

park to be accommodated on an extremely constrained site.

The design is in-keeping with the high design quality of the rest

of the development; with the building’s façade clad in timber

- a more sustainable material - thus following the “green”

aspirations of the rest of the Masterplan.

The timber elevations have a pattern of repeating open slots,

which enhance natural daylight into the building and negate the

need for the building to be mechanically ventilated.

Client

English Cities Fund

Operator

N/A (Estate Managed)

Involvement

Aedas RHWL

Completion Year

2008

Number of Spaces

400

St Paul’s Square

Liverpool / UK

Page 17: Collaborative Car Parking Design
Page 18: Collaborative Car Parking Design

| Capability Statement16

Client

Telford & Wrekin Council

Operator

Telford & Wrekin Council

Involvement

Hill Cannon

Completion Year

2014

Number of Spaces

600

Southwater

Telford / UK

Built into a seven metre high embankment, the

Southwater Car Park incorporates a one-way VCM

type circulation that equally addresses areas

of pedestrian public realm and main vehicular

thoroughfares on both sides of the building.

The MSCP houses an integral retail unit and provides

some 600 spaces to service the town centre and

Southwater development itself. The structure was

designed in a manner that means future expansion

is wholly possible yet with minimum disruption to the

concurrent operation of the Car Park.

The material palette of the building has three main

elements - a local and historically signifi cant blue /

black brick, an anodised aluminium mesh that varies

in transparency depending on the viewer’s vantage

point and brightly coloured horizontal banding.

Page 19: Collaborative Car Parking Design

17Collaborative Car Parking |

Image Source: Associated Architects

Page 20: Collaborative Car Parking Design

| Capability Statement18

Part of the wider Birmingham Millennium Centre

development, Millennium Point is a 980 space MSCP.

The building is situated on a sloping site and offers

6 levels of parking. The internal vehicular circulation

model incorporates the VCM (Vertical Circulation

Module) system, whilst externally multi-faceted and

punctured panels give a striking and varied aesthetic.

In 2013, the building was named as one of the top ten

“coolest car parks in the world” by bdonline.co.uk.

Awards

‘Best New Car Park’ - British Parking Awards 2012

Client

Birmingham City Council

Operator

Birmingham City Council

Involvement

Hill Cannon

Completion Year

2011

Number of Spaces

980

Millennium Point

Birmingham / UK

Page 21: Collaborative Car Parking Design

19Collaborative Car Parking |

Page 22: Collaborative Car Parking Design

| Capability Statement20

Phase 1 of the £330m Doncaster Civic Quarter regeneration

scheme included the construction of a new 157,500 sq ft civic

offi ce building, performance venue, public realm area and the

refurbishment of the multi storey car park. Hannan Associates

undertook the MEP Design for the refurbishment of the

850-space MSCP.

Awards

Nominated and Highly Commended for ‘Best Refurbishment’ -

British Parking Awards 2013

Client

Doncaster Metropolitan Borough Council & Muse Developments

Operator

APCOA

Involvement

Hannan Associates

Completion Year

2011

Number of Spaces

850

Doncaster Civic Quarter

Doncaster / UK

Page 23: Collaborative Car Parking Design

Before refurbishment

After refurbishment

Page 24: Collaborative Car Parking Design

| Capability Statement22

As part of Muse Development’s 1.1 million sq ft

Talbot Gateway Development in Blackpool, Hannan

Associates provided MEP design services for the

refurbishment of the 648 space, 5 level MSCP

originally built in the 1930s whilst incorporating new

ground fl oor retail units.

The car park was awarded the British Parking Award

for ‘Best Refurbishment’ during 2014. It beat strong

competition from fi ve other shortlisted car parks in

the Best Refurbishment category thanks to a creative

design that reveals the original 1930s frame through

the new elevations, to deliver a contemporary car

park that acknowledges its heritage.

Awards

‘Best Refurbishment’ - British Parking Awards 2014

Client

Muse Developments

Operator

Blackpool Borough Council

Involvement

Hannan Associates

Completion Year

2013

Number of Spaces

648

Talbot Gateway

Blackpool / UK

Page 25: Collaborative Car Parking Design

23Collaborative Car Parking |

Page 26: Collaborative Car Parking Design

| Capability Statement24

With distinctive coloured louvre fi ns in eight

graduating hues, the Madeira Road MSCP forms a

new landmark along the adjacent Wessex Way - a

vital local infrastructure link. It is a steel framed

382 space, 7 storey car park that combined previous

piecemeal surface car parking for local residents,

commuters and shoppers alike.

Client

Bournemouth Borough Council

Operator

Bournemouth Borough Council

Involvement

Hill Cannon

Completion Year

2014

Number of Spaces

382

Madeira Road

Bournemouth / UK

Page 27: Collaborative Car Parking Design

25Collaborative Car Parking |

Image Source: BrightSpace Architects

Page 28: Collaborative Car Parking Design

| Capability Statement26

Co

lla

bo

rati

ve

De

liv

ery

Te

am

an

d C

Vs

Page 29: Collaborative Car Parking Design
Page 30: Collaborative Car Parking Design

| Capability Statement28

Michael ClarkExecutive Director

B Arch(Hons) Dip Arch Edinburgh ARB, Registered Architect RIBA Member

Michael has been responsible for developing the urban regeneration and masterplanning sector within Aedas RHWL, undertaking large scale Regeneration, Masterplanning and Development Framework commissions across the UK, Europe and the Middle East. This work is underpinned by a track record for delivering a broad range of buildings typologies from large commercial schemes to residential developments via the occasional football stadium.

Michael joined Aedas RHWL in 1987, and was made Executive Director in 2003. He studied at Heriott Watt University Edinburgh and is a member of the Hong Kong Council for Academic Accreditation.

Page 31: Collaborative Car Parking Design

29Collaborative Car Parking |

Michael ClarkExecutive Director

B Arch(Hons) Dip Arch Edinburgh ARB, Registered ArchitectRIBA Member

Significant Projects

Phases I-III / Liverpool / UK

A mixed use, inner city regeneration schemein the heart of the New Commercial Quarter of Liverpool, consisting of 300,000 ft2 office in 3 separate buildings, 80 apartments, restaurants and a 400 space car park, allgrouped around a new public square. St Paul’s Square is the first phase of a much broader masterplan and regeneration scheme for thecities new central business district.Executive Director

New Bailey / Salford

Central Business District / UK

Appointed to produce an integrated andflexible masterplan for the commercial heartof new Salford, the schemes will include 2million square feet of commercial and retail development with two 450 space car parksand over 350 apartments in an landscaped buffer, the schemes will link the centre ofManchester to the historic Chapel Street and regenerate Salford with a dynamic newwaterfront development.Executive Director

Pall Mall Central Business District /

Liverpool / UK

Appointed to produce a new strategic masterplan for the new Commercial Quarter for Liverpool with English Cities Fund as theclient. This project will ultimately deliver over1,500,000 sq ft of development forming a newCentral Business District within the city, this regeneration scheme involves residential,retail, leisure and hotel uses as well as office space.Executive Director

Stoke-On-Trent Smithfield / UK

Led the successful international team thatwon for his client Gener8/Chelsfield, thedevelopment rights for delivering the keystonecomponent for North Staffs regenerationprogramme. This is a £200 million mixed use masterplan which draws on the world’s bestto deliver a commercially real solution for nowand in the future.Executive Director

The Atrium / Amsterdam

The first element of a Municipality based masterplan for a 10 million m2 BusinessDistrict on Amsterdam’s South Axis. Thissite will deliver over 100,000m2 of mixed use development and is key to unlocking the visionfor Amsterdam’s future.Executive Director

Chester Central / UK

This mixed use master plan was commissionby Cheshire West and Chester Renaissance. Ithas culminated in a development agreementforming between a private developer and localstake holders. This 500,000 sq ft master planwas commended by Places Matter, the Cabereview panel, for its sensitive response tocontemporary urban design in an outstandinghistoric context.Executive Director

Lusail / Doha / Qatar

Won in international competition, this10,000,000sqft masterplan comprises a newdistrict for the new city of Lusail. Locatedjust north of Doha, this masterplan is a keycomponent of the delivery of the 2022 WorldCup Legacy.Executive Director

Page 32: Collaborative Car Parking Design

| Capability Statement30

Alasdair MealeyAssociate

BSc Architecture & Architectural Engineering (Hons)Dip ArchARB, Registered Architect

Alasdair has been a key member of the team responsible for developing the urban regeneration and masterplanning sector within Aedas RHWL, which comprises large scale regeneration, Masterplanning and Development Framework commisions across the UK and in Europe.

His experience covers a wide range of sectors - offi ces, masterplanning, refurbishment, multi-storey car parks and recently; Europe's largest commercial art gallery as well as the new headquarters and venue for one of the world's most famous night clubs.

He is adept at developing concept designs in parallel with leading major co-ordination exercises with other consultants and suppliers pre-construction, in addition to working with contractors resolving construction details once projects are on site.

Alasdair joined Aedas RHWL in 2004, as part of the inaugural year of the practice's graduate recruitment programme, which now over 10 years later - he is responsible for organising and co-ordinating.

He is a regular guest critic at Westminster University and is on the Architectural Advisory Board at Coventry University.

Page 33: Collaborative Car Parking Design

31Collaborative Car Parking | 31Collaborative Car Parking |

Awards

Masterplan of the year

Salford Central, Salford Good Design Awards2010

New car park of the year

Stockport Exchange Multi Storey Car Park.Shortlisted, British Parking Awards.

Significant Projectsfi

Ministry of Sound / London

A purpose built venue fi tout and headquartersfifor the iconic nightclub. The 5,000 sq m scheme will increase the potential capacity bya third over the existing venue, and will allow for a greater flexibility of the space to allow itflto be used for a wider number of functions andevents. The design meets the Client's specificfispatial, specialist acoustic and technical requirements.Associate

New Bailey, Salford Central Business District

The scheme will include 2 million sq ft of commercial and retail development withtwo large multi-storey car parks and over 350 apartments in a landscaped buffer. Thescheme will link the centre of Manchesterto the historic Chapel Street and regenerate Salford with a dynamic new waterfront development.Associate

Stockport Exchange Masterplan

The Stockport Grand Central masterplan aimsto deliver over 37,000 sq m of commercial andmixed use development over the next 10-15years; creating a business quarter that willdramatically raise the standard of offi ce spacefiand public realm in central Stockport. It is also intended to address the existing infrastructure and so significantly improve the experiences fiof pedestrians and users of cars and public transport. The scheme comprises offices, afihotel and a large multi-storey car park. Associate

White Cube Art Gallery, Bermondsey / London

Executive Architect based on site during construction, dealing directly with the contractor and wider design team to resolve design and construction co-ordination issues,based on the Concept Architects design. At the time of opening this was the largest commercial art gallery in Europe. The building has been featured in numerous publications,and has won or been nominated for a number of awards. Executive Architect

The Atrium / Amsterdam

The fi rst element of a Municipality basedfimasterplan for a 10 million sq m Business District on Amsterdam’s South Axis. The site will deliver over 100,000 sq m of mixed use development and is key to unlocking the vision for Amsterdam’s future.Project Architect

Senator House / London

The refurbishment works at Senator House in the City of London comprised the complete overhaul of the common parts including the reception & atrium and the return of four floorsflback to Category ‘A’ office accommodation. fiThe refurbishment was designed to enhance the building for both existing and new tenants,on behalf of the client. Project Architect

Alasdair MealeyAssociate

BSc Architecture & Architectural Engineering (Hons)Dip ArchARB, Registered Architect

Page 34: Collaborative Car Parking Design

| Capability Statement32

Steve VollarPrincipal Partner

BSc Civil EngineeringFellow of Institution of Structural EngineersMember of Institution of Civil EngineersFellow of the Association of Consulting EngineersPast Chairman Yorkshire Branch of structural EngineersFEANI – Eur Ing

Steve has worked as team leader on over fifty car park structures at a variety of scales from 220 to 5,000+ spaces. They have been located in theUK and as well as overseas; with each design providing a bespoke solutionto suit the location, scale and brief.

As a co-author of the Car Park Designers Manual (ICE publications),ongoing research into parking trends and new technology is continual and, in addition to the development of modular car park structures, Steve has gained experience of APS (Automated Parking Systems) and can now offer consultancy services on these as a potential alternative.

Steve also had extensive experience in the maintenance and inspection of existing car parks; giving a better insight into designing for durability whichhas also given him the breadth of experience to be employed as an expert witness when required.

Parking controls, wayfinding, maintenance regimes and car parkoperational matters can all be undetaken by Hill Cannon in their role as Parking Consultants.

Page 35: Collaborative Car Parking Design

33Collaborative Car Parking | 33Collaborative Car Parking |

Employment Record

2011 to Date Hill Cannon Consulting LLP - Partner1996 – 2011 Hill Cannon (UK) LLP - Partner/Senior Partner1993 – 1996 AKS (Northern) - Principal1989 – 1993 Andrew Kent & Stone (Leeds) - Partner1982 – 1989 Andrew Kent & Stone (Oxford) - Associate1978 – 1982 Roughton & Partners, Southampton & Lesotho - Senior Engineer1973 – 1978 Kenchington Little & Partners, Winchester -Engineer

Experience

1996 to date - Hill Cannon

Responsible for the detailed planning and structural design of over 30 structural multi-storey and raised deck car parks from 50 spaces to 2000 spaces.

Structural inspections of multi-storey car parks, highway bridge and structures.

Current knowledge of Network Rail Documents – requirements for Construction Work on or near RailwayOperational Land, including guidelines for the design of supports for structures built over or close to railway lines.

Recent multi-storey and raised deck structured car park projects include Clarence Dock, Leeds; Princes Dock, Liverpool in reinforced concrete; Sunwin House, Bradford with elevated footbridge link; Victoria Mill, Shipley instructural steel; extension to Regent Centre Gosforthadjacent to Metro rail link and station; Westgate Station, Wakefield; Walton Street Car Park, Aylesbury; PiccadillyBasin, Manchester, together with refurbishments andExpert Witness cases on multi-storey car parks.

1993 – 1996 - AKS (Northern)

Practice Principal with projects including WYPTE MetroCar Park improvements at the following stations – Crossflatts; Sandal & Agbrigg; Micklefield and Brough hada valid access permit following Railtrack training course.

1982 – 1989 - Andrews Kent & Stone

Associate then Partner in charge of Leeds officewith a wide range of large developments including a retailcentre in Worcester with a multi-storey car park over a bus station designed to bridge code collision loading. MODstructures and bridge design on various sites.

1978 – 1982 - Roughton & Partners

Senior Engineer with projects including twobridges in United Arab Emirates to UK bridge codes andvarious bridge and highway structures for the Lesotho Mountain Road Project designed to UK bridge codes.

1973 – 1978 Kenchington Little & Partners

Civil and structural engineering projects includingsite investigation and highways structures for J Sainsburydepot and retail units.

Steve VollarPrincipal Partner

BSc Civil EngineeringFellow of Institution of Structural EngineersMember of Institution of Civil EngineersFellow of the Association of Consulting EngineersPast Chairman Yorkshire Branch of structural EngineersFEANI – Eur Ing

Page 36: Collaborative Car Parking Design

| Capability Statement34 | Capability Statement34

Stuart WrayPrincipal

IEng AMIStructE

Stuart is an office Principal with responsibility for drawing office management of all new-build car parking and Information Technologywithin the practice.

Stuart Wray joined the practice of Hill Cannon In 1973. Whilst gaining experience in the design and detailing of reinforced concrete, structural steelwork, load-bearing brickwork and structural timber, he qualified forthe Higher National Certificate in Civil Engineering in 1978. In 1985 he became an associate and in 2001 became a partner of the practice.

During the past 39 years he has been involved at all levels with the designand construction of 35 multi-storey car parks.

Recent duties include being Project Engineer for multi-storey car parks at for the Piccadilly Station at Manchester and Scottish Exhibition &Conference Centre, Glasgow, he has also developed a precast framesystem for use in multi-storey car parks.

Although recently specialising in parking structures, Stuart Wray has gainedexperience as a design engineer on a wide range of projects, including refurbishment work, schools, hospitals, brickworks, factories, housing, a community centre at RAF Cranwell and a mosque in Leeds.

He has served on the Committee of the Yorkshire & Humberside Region ofthe Concrete Society.

Page 37: Collaborative Car Parking Design

35Collaborative Car Parking |

Significant Projects

Stockport Exchange

Sheffield University

Leeds University

Grafton Street, Manchester

Grand Central, Stockport

Millennium Point, Birmingham

Gatwick MSCP, London

Media City, MSCP, Salford

John Lennon MSCP, Liverpool

Kings Waterfront MSCP, Liverpool

Manchester Royal Infirmary MSCP

Clarence Dock, Leeds MSCP

Ocean Terminal MSCPs, Edinburgh

Luton Airport Parkways MSCP

The Grand MSCP, Manchester

Stuart WrayPrincipal

IEng AMIStructE

2014

2014

2014

2013

2012

2011

2010

2008

2007

2006

2005

2002

2000

1999

1998

Page 38: Collaborative Car Parking Design

| Capability Statement36 | Capability Statement36

John WalkerCompany Director / Electrical Design Engineer

Chartered Engineer, MCIBSEB.A. (Hons), Open University IEE/CIBSE Module Profile Thesis onInformation Technology in BuildingsSCOTEC Higher Certificate in Electrical and Electronic Engineering

John has 36 years experience in building services consultancy with 18years at director level. He is a Chartered Engineer and Chartered Director.

He has strong project and management experience with an unblemished record of project success, client satisfaction and financial return.

John is committed to Continued Professional Development, is a CharteredEngineer, a Chartered Director and an active member of the British Councilfor Offices.

John is enthusiastic, committed, cheerful and calm under pressure. Capable of developing and maintaining good client and team relationships. John has an ability to understand and use technology whilst retaining aview of the wider issues and am capable of leading change within anorganisation.

Professional Memberships:

Chartered EngineerChartered DirectorMember of the Chartered Institution of Building Services EngineersAssociate of the Institution of Electrical EngineersMember of the Institute of DirectorsMember of the British Council for Offices

Employment History:

1996 – Current Date - Electrical Director - William Hannan & Associates1994 - 1996 Principal Consultant, Entec1991 - 1994 Senior Consultants, Wallace Whittle & Partners Limited1983 - 1991 Project Engineer, ACTS1978 - 1983 Design Engineer, Crouch and Hogg

Page 39: Collaborative Car Parking Design

37Collaborative Car Parking |

Significant Projects

Car ParksStockport Exchange Multi Storey Car Park - New BuildSalford New Bailey Multi Storey Car Park - New BuildDoncaster Civic Quarter MSCP - Refurbishment Talbot Gateway, Blackpool MSCP - RefurbishmentThe Piazza Hotel & Leisure Scheme Manchester Multi Storey Car Park - New BuildHarbour Exchange MSCP, London - New Build

Commercial Office Developments:No. 1 Bickerstaffe Square, Blackpool Council HQ, Talbot GatewayStockport Exchange, Grand Central RedevelopmentArena Central, BirminghamChester Central Business DistrictNo.1 First Street, ManchesterNo.1 First Street Fit Out for Manchester City CouncilMann Island CAT A WorksMann Island Fit Out for Mersey TravelShip Canal House Refurbishment, ManchesterODPM Fire and Control Centre, Lingley Mere, WarringtonODPM Fire and Control Centre, MertonKings Reach Business Park, StockportLingley Mere Business Park, WarringtonBritish Telecom, Call Centre, WarringtonScottish Friendly Assurance Headquarters, GlasgowBritish Telecom, Dial House, GlasgowKuwait Embassy, LondonHyde Park House, LondonBritannia Life, Head Office, GlasgowDelta House, GlasgowMeridian Court, GlasgowHighland Distilleries, GlasgowGeneral Accident Life, Headquarters, YorkBritish Telecom, New Headquarters, ManchesterVentura Customer Services Phase 1 Call Centre, RotherhamVentura Customer Services Phase 2 Call Centre, RotherhamHighbridge Developments Call Centres, Rotherham

Industrial:Omega Business Park, WarringtonLogic Leeds Business ParkCheshire Waste EFW Plant, Lostock GralamManchester Airport Expeditor HangorTrawsfynydd Decommissioning Site, Lighting DesignWalker Business Park, BlackburnLowfields Business Park, YorkshireHellerman Tyton Factory, ManchesterEurocentral Business Park, Glasgow – Building A&C Fit OutFerguson Ailsa Covered ShipyardMaintetti, Factory DevelopmentPoint Five, Walker Park, Blackburn, Industrial, PPG LandKings Park, Phase 500-80, ManchesterFerguson Ailsa Covered ShipyardMaintetti, Factory Development

Residential:Appleby Lodge Apartment Scheme, ManchesterSierra Blanca Villa, Marbella, SpainKersal Close Housing Scheme, Prestwich, Manchester – Manchester Methodist housing AssociationLeonard Cheshire Foundation, Disabled Residential Accommodation, HitchinOrchard Gate Luxury Residential Refurbishment, WentworthWatlington Country Estate Luxury Residential

Refurbishment

Leisure & Hotel:Exhibition Centre LiverpoolHoliday Inn Hotel, Heathrow AirportBishopsgate Premier Lodge Hotel, ManchesterThe Piazza Novotel & Ibis Hotel Scheme ManchesterSt George’s Hall Refurbishment, LiverpoolThe Sport City Stadium, ManchesterThe Eureka Museum, HalifaxBaniyas Hotel, United Arab EmiratesJJB Leisure Centers

Government:West Yorkshire Police Stations RefurbishmentPaisley Sheriff CourthouseOffer, Technical Scrutiny of Renewable Energy Power Generations proposalsBritish Airports Authority, Fire Station Control CentreScottish Development Agency, A9 & Kessock Bridge Road LightingLiverpool Vision, Assessment of the Electrical Infrastructure of the City of LiverpoolKuwait Embassy, LondonLoch Lomond Water Supply SchemePenwhirn Filter StationAncrum Sewage WorksJedburgh Sewage WorksAuchtermuchty Sewage Pumping and Treatment Scheme

Football Stadia:Celtic Park RedevelopmentThe Sport City Stadium, Manchester

Education:Newford and Blurton Primary School Refurbishments, StokeSalford and Wigan BSF ProjectsBuilding Schools for the Future Halton & Warrington MBC ProjectsBrunel University Framework AgreementManchester Mesivta High School, ManchesterLoreto CollegeSt Mary’s CollegeWest Cheshire CollegeUniversity of Manchester, Coupland 3 Building RefurbishmentRossall SchoolWigan & Leigh College, Image CentreNord Anglia, Cleveland School BoltonKilmarnock AcademyStonyhurst CollegeManchester Metropolitan UniversityTrafford College

Retail:The Core Shopping Centre, LeedsWestgate Wakefield, Retail DevelopmentMatalan Retail Units RefurbishmentThe Square Shopping Centre, SaleLord Square Shopping Centre, BlackburnThe Paisley Centre, PaisleySwinegate, York

Communications and Information Technology:Kuwait Embassy, LondonBritannia Life, GlasgowHighland Distilleries, GlasgowGeneral Accident Life, Computer Centre, YorkGeneral Accident, Branch Installations throughout the UK

John WalkerCompany Director / Electrical Design Engineer

Chartered Engineer, MCIBSEB.A. (Hons), Open University IEE/CIBSE Module Profile Thesis onInformation Technology in BuildingsSCOTEC Higher Certificate in Electrical and Electronic Engineering

Page 40: Collaborative Car Parking Design

| Capability Statement38 | Capability Statement38

Jamie HallDirector / Mechanical Design Engineer

CIBSE Low Carbon ConsultantCIBSE Low Carbon Energy Assessor

BTEC Higher National Certificate (Building Services Engineering)BTEC Ordinary National Certificate (Building Services Engineering)City & Guilds Parts I, II and Advanced Certificates (Plumbing and Heating)

Jamie has over 30 years experience of Building Services Design and theConstruction Industry. He has worked for Hannan Associates for over 20years now and has five years experience as a company Director.

During his career Jamie has gained valuable experience of a diverse range of projects including several town centre regeneration schemes incorporatingcar parks, retail, office buildings, residential, hotel and leisure.

Jamie is very experienced in projects featuring complex infrastructureappraisal, strategy and procurement and is a registered CIBSE Low CarbonConsultant and Energy Assessor. Jamie is a strong team player & managerwith excellent interpersonal skills.

Experience within Hannan Associates:

2010 – onwards: Director / Mechanical Design Engineer, Hannan Associates 1994 – 2010: Associate Mechanical Design Engineer, Hannan Associates

Page 41: Collaborative Car Parking Design

39Collaborative Car Parking |

Significant Projects

Car ParksStockport Exchange Multi Storey Car Park - New BuildSalford New Bailey Multi Storey Car Park - New BuildDoncaster Civic Quarter MSCP - Refurbishment Talbot Gateway, Blackpool MSCP - RefurbishmentThe Piazza Hotel & Leisure Scheme Manchester Multi Storey Car Park - New BuildHarbour Exchange MSCP, London - New Build

Commercial Sector Office DevelopmentsNo. 1 Bickerstaffe Square, Blackpool Council HQ, Talbot GatewayStockport Exchange, Grand Central RedevelopmentOne Arena Central, BirminghamChester Central Business DistrictDorset Council HQ Offices and Library, DorchesterBuilding 4 - St Paul’s Square Development, LiverpoolBuilding 5 - St Paul’s Square Development, LiverpoolNo.1 First Street, ManchesterNo.1 First Street Fit Out for Manchester City CouncilMann Island CAT A WorksMann Island Fit Out for Mersey TravelGMP Head Quarters Office Development, Ashton MossTwo Rivers Housing HQ Offices, GloucestershireRiverside Exchange, Sheffield80 Mosley Street, ManchesterShip Canal House Office Refurbishment, Manchester City CentreHellerman Tyton Office Development, ManchesterLingley Mere Business Park, WarringtonWalker Office Park – BlackburnKing’s Reach Business Park, StockportThe Parks Office Development – HaydockEmpress Business Centre – ManchesterMatrix Park, ChorleyDaresbury Business Park

IndustrialCheshire Waste EFW Plant, Lostock GralamManchester Airport Expeditor HangorTrawsfynydd Decommissioning Site, Lighting DesignWalker Business Park, BlackburnLowfields Business Park, YorkshireHellerman Tyton Factory, ManchesterEurocentral Business Park, Glasgow – Building A&C Fit OutParc Bryn Cegin Business Park, BangorHareshill Business Park, HeywoodKings Park, Phase 500-80, ManchesterJJB Sports, Distribution Warehouse – Martland Park, WiganWalker Park, Warehouse Developments - BlackburnClaremont Fabrics, New Warehouse and Offices - Glossop, Derbyshire

ResidentialCommunity Integrated Care Home, Thornlea Residential Care Home SchemeArena Housing Scheme Brookside, OrmskirkWulvern Housing Pickmere Court Scheme, CreweArena Housing Parkhaven Scheme, MaghullArena Housing Pennington Lodge Scheme, St HelensArena Housing Cantilever Gardens Scheme, Warrington

Arena Housing Heyescroft Scheme, LiverpoolAnfield and Breakfield Retirement VillageLingley Mere Hotel Project 2007Didsbury Residential Scheme, ManchesterNorthenden Residential Scheme, ManchesterBuckshaw Village, ChorleyPrivate Luxury Country Estate Refurbishment, Cheshire

Hotel and LeisureSalford Central Premier Inn HotelJJB Health Clubs & Soccer Domes in UK and IrelandStaybridge Suites, NewcastleWrightington Hotel Extension WiganSeafield Caravan Park & Leisure CentreDavy’s Wine Bar, LondonEureka Childrens MuseumBridgewater Hotel

InfrastructureDaresbury Park Development - WarringtonWalker Park - Guide, BlackburnTrinity Walk - Wakefield

Retail & Mixed DevelopmentSalford Central, Chapel Street Regeneration SchemeChester CBD Regeneration SchemeTrinity Walk – Wakefield Town CentreCharles Street – Dorchester Town Centre RedevelopmentPydar Street – Truro City Centre RedevelopmentNeath Town Centre RedevelopmentBargoed Town Centre RedevelopmentMaybrook Retail Park, CanterburyCastlecourt Shopping Development – BelfastAltrincham Retail Park - ManchesterToys R Us - Altrincham

StadiaBlackburn Rovers Football Club – New Training Academy, BrockhallLeeds United Football Club – New Training Academy, Thorpe Arch, WetherbyManchester United Football Club – Training AcademyRobin Park Stadium, WiganManchester United Football Club, Various ProjectsCity of Manchester Stadium - Commonwealth Games Stadium of 2002Manchester City Football Club, Kippax Stand

Sustainable DevelopmentsVulcan House, Riverside Exchange, SheffieldODPM Fire Control Centre, Lingley Mere, WarringtonSt Pauls Square - LiverpoolGMP Head Quarters Office Development, Ashton Moss, ManchesterMid Cheshire College – New Arts Block

GovernmentNorcross, New Offices for DSS – BlackpoolHalton Lea Library Refurbishment

EducationNew and refurbished institutions;Mid Cheshire College – New Arts Block

Jamie HallDirector / Mechanical Design Engineer

CIBSE Low Carbon ConsultantCIBSE Low Carbon Energy Assessor

BTEC Higher National Certificate (Building Services Engineering)BTEC Ordinary National Certificate (Building Services Engineering)City & Guilds Parts I, II and Advanced Certificates (Plumbing and Heating)

Page 42: Collaborative Car Parking Design
Page 43: Collaborative Car Parking Design

Aedas RHWL

HONG KONG

31/F, One Island East,

18 Westlands Road,

Quarry Bay,

Hong Kong

LONDON

Ivory House, St Katharine Docks

London, E1W 1AT

United Kingdom

tel +44 (0)20 7480 1500

fax +44 (0)20 7481 4840

[email protected]

BERLIN

Neue Schönhauser Straße 9

10178 Berlin

Germany

tel +49 (0)30 2576 160

fax +49 (0)30 2576 1616

[email protected]

DOHA

Aedas RHWL

7th Floor, IBQ Building

Airport Road, Doha, Qatar

Postal address:

PO Box 200441

Doha, Qatar

tel +974 4402 4777

fax +974 4402 4747

[email protected]

www.aedas.com/aedasrhwl

ISO 9001:2008 Approval

Certifi cate No. LRQ 4000557

Hannan Associates

MANCHESTER (Head Offi ce)

Beta House, Alphagate Drive

Manchester Road, Denton,

M34 3SH

tel +44 (0)16 1337 2200

fax +44 (0)16 1337 2201

[email protected]

EDINBURGH

Abbey House, 83 Princes Street,

EH2 2ER

tel +44 (0)13 1247 6770

fax +44 (0)13 1247 6710

[email protected]

www.hannan-uk.com

Hill Cannon Consulting LLP

HARROGATE

Business Centre

Hartwith Way

Harrogate

HG3 2XA

tel +44 (0)14 2381 3522

www.hillcannon.com

Page 44: Collaborative Car Parking Design

HONG KONG

31/F, One Island East,

18 Westlands Road,

Quarry Bay,

Hong Kong

LONDON

Ivory House, St Katharine Docks

London, E1W 1AT

United Kingdom

tel +44 (0)20 7480 1500

fax +44 (0)20 7481 4840

[email protected]

BERLIN

Neue Schönhauser Straße 9

10178 Berlin

Germany

tel +49 (0)30 2576 160

fax +49 (0)30 2576 1616

[email protected]

DOHA

Aedas RHWL

7th Floor, IBQ Building

Airport Road, Doha, Qatar

Postal address:

PO Box 200441

Doha, Qatar

tel +974 4402 4777

fax +974 4402 4747

[email protected]

www.aedas.com/aedasrhwl

ISO 9001:2008 Approval

Certifi cate No. LRQ 4000557