    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Collaborative Software Design & Development

    Coordination 4

    Laura NaymanJason VanFickell

    2008/04/01

  • 2

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    The Impact of Time Separation on Coordination in Global Software Teams: a Conceptual Foundation

    J. Espinosa and Erran Carmel

  • 3

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    OverviewDecreased efficiency from time separation results from:

    Time-zone differences

    Non-overlapping weekends, holidays, manufacturing shifts and work schedules

    Teams employ different tactics for dealing with this inefficiency:

    Synchronous

    Asynchronous

    Education

    Coordination between developers in teams consists of four main components:

    Communication

    Clarification

    Delay

    Rework

  • 4

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Overview Continued…Vulnerability costs which increase inefficiency and costs are incurred

    as a result of:Resolving misunderstandings

    Rework. (These increase with time separation.)

    Reasons for decreased/inefficient coordination in the presence of time

    separationInsufficient communication media

    Difficulties in resolving unclear messages

    Reduced opportunities for spontaneous interaction

  • 5

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Motivation

    Why are cost benefit trade-offs of higher coordination costs and lower

    productions costs important to understand?

    Time separation has a huge impact on coordination costs

    Team work is increasingly carried out globally for the following reasons:

    Transportations costs for digital products are low (software, documents)

    Delivery time for these products is effectively zero

    Production costs in many “offshore” locations is significantly lower

    Geographic dispersion enables firms to access software talent and technical resources

  • 6

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    BackgroundPractices used by developers to overcome difficulties resulting from time separation:

    Asynchronous: Teams compensate for non-overlapping work hours by using different methods

    Asynchronous tactics: email, voice mail, shared databases, wikis, code-versioning tools with

    comments sections.

    Teams also learn to structure their comments and information in such a way as to avoid

    clarification.

    Synchronous: Teams plan for the overlap times and enlarge the windows of overlap time

    Synchronous tactics: Teams expand overlap times by working longer or assigning certain

    people on the team to work longer or communicate with people in different time zones.

    Education: Individual developers become more efficient working with time differences, with better

    information.

    Education tactics: Make team members aware of time separation issue and give them

    resources to help them schedule meetings and make schedules taking into account the

    different time zones.

  • 7

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination Model: Mathematical Perspective

    Objective of Coordination Model:

    Models costs due to time differences in dispersed software teams

    Evaluate how total cost of carrying out a task is influenced by :

    cost and effectiveness of different communication

    mechanisms in various collaboration modes (i.e. co-located and separated

    by distance and/or time)

    delays caused by time separation

  • 8

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Distributed coordination assumptions within Mathematical Coordination model

    Assumption: No distinctions between complexities of a task request encapsulated in a message

    Problem with Assumption: Both, a large task which perhaps requiring several days of effort,

    or small such as yes or no answer are treated the same

    Assumption : Media choices for time separated team members are limited to email when work hours

    don’t overlap and phone calls otherwise

    Problem with Media Choice Assumption:

    Requests are often not clear, requiring additional clarification communication, further

    delaying the whole process.

    Working face-to-face, clarification may be nearly instantaneous.

    Even when members are distant, but in same-time zones, clarifications can be made very

    quickly through phone calls, instant messaging (IM), or videoconference.

    Time separated communication requires the need to clarify messages and will introduce

    further delay, unless this happens during work-overlapping hours.

  • 9

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination Model:Workflow dependency

    Costs calculated based on single collaboration between two developers:Task Requestor makes a request to another developer who is the task Producer

    because of a workflow dependency,

    i.e. the work of the Requestor cannot continue until the work of the Producer is finished

    Requestor must communicate the task requirements to the Producer, and the Producer must communicate an acknowledgement to the Requestor when the dependent task is completed

    Team members may be interacting in any of four possible collaboration

    modes:Time and/or Distance Separate – 4 possibilities

  • 10

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Major points

    of coordination theoryDevelopers should communicate a lot early in the development process !!!

    Communication is costly and time separation introduces asymmetries.

    Coordination between N developers separated by distance can be substantialThese issues compound further with time separation

    Overlap in work hours between any two members who collaborate can take

    place either at the beginning or at the end of one’s workday.

    The synchronous or asynchronous solutions to time separation will have to be

    worked out differently, depending on when the work-time overlap occurs in

    one’s workday

  • 11

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Argument for Coordination Model

    Effect of time separation on global software team coordination can be

    modeled by analyzing timing issues:

    When interaction between developers occur

    Frequency of interaction between developers

    Task duration times

    Amount of overlap in work hours

    Evaluating how these variables affect :

    production costs (i.e. the cost of carrying out individual tasks)

    coordination costs (i.e. the cost of managing the dependencies between

    individual tasks)

  • 12

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Breakdown of Coordination Costs:

    Coordination Costs mainly composed of production costs and communication costs.

    Coordination costs can be further decomposed into the following costs:

    communication costs – the cost of maintaining communication links and the cost of sending and receiving messages

    delay costs – the cost of delays caused by the dependency requiring communicationAffected by latency inherent in the communication media and working-time differences

    clarification costs – the cost of further communication required to repair miscommunication

    rework costs – the cost of further production necessary for work that was completed before the miscommunication was discovered

    Differences from Malone’s coordination model:

    some adjustments to take into account delays resulting from distance separation

    time zone differences

    Model time and distance separation between actors.

    Malone’s model analyzes different coordination structures for a set of developers

  • 13

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination Costs: Terminology

    Production Costs: Costs of carrying out task

    Coordination costs are essentially communication costs :Costs of maintaining communication links and sending and

    receiving messages.

    Delay costs: Incurred because one developer is waiting for

    another to complete the task.

    Clarification costs: additional cost of communication and delay

    because of miscommunication.

    Rework costs: additional production costs resulting from

    miscommunication.

  • 14

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination FormulasProduction Costs (Pc) is the cost of carrying out tasks

    Pc = λCpTt

    λ = Daily frequency of task arrivals (messages)

    Cp = Daily production cost rate for the Producer

    Tt = Time for Producer to complete task

    Cost component only involves individual production time

    and costs incurred by the Producer

    Unaffected by time or distance separation.

  • 15

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination FormulasCommunication Costs (Cc) = Cl + 2λCm (2)Cl = Daily cost of maintaining a communication link between two time-separated

    developers

    Cm = Daily cost of sending individual single messages.

    Cls = Cost of maintaining a synchronous communication link

    Cla = Cost of maintaining an asynchronous communication link

    Cms = Cost of sending a synchronous message

    Cma = Cost of sending an asynchronous message

    Several Permutations of Communication Costs Equation

    Both members communicate synchronously

    Cl + 2λCms

    One member communicates asynchronously and one synchronously

    Cl + Cla + λ(Cms + Cma)

  • 16

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination FormulasDelay Costs (Dc) = λTdCd

    Td = Delay experienced by task Requestor while Producer completes task

    Cd = Daily rate of cost delay for the task Requestor

    Measured from perspective of the task Requestor, because this is the developer who has a dependency, whose work is delayed while the Producer completes the task.

    If Producer carries out task during Requestor’s off hours, Td is zero, which is the motivator for software work organized in follow-the-sun arrangements

    if Producer does all work during overlapping work hours, Td is identical to the time it takes to carry out the task Tt

    Degree of time separation or work-time overlap has substantial effect on delay costs

  • 17

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination Formulas

    Clarification Costs (Cf ) = Cf = Pu(Cc + Dc)

    Pu = Probability that task-request message will be unclear

    Incurred when task request messages are not clear

    Task Requestor and task Producer need to communicate again to

    resolve misunderstanding,

    Further communication and delay costs are incurred

  • 18

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination Formulas

    Rework Costs (Rc) = PuPrRwPc

    Pr = Probability given unclear message will lead to rework

    Rw = Proportion of total task that needs rework

    Rc = Rework costs

    Incurred if need for clarification occurs after Producer has started to

    work on task and some software work needs to be redone.

  • 19

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Vulnerability CostsFollow-the-sun and round-the-clock programming arrangements ideal if:

    Cost of carrying out task = Pc + Cc + Dc

    Substantial delay costs savings by maximizing the amount of task production that takes place during the Requestor’s off hours

    Malone’s ‘vulnerability’ costs = clarification and rework costs

    Problem surfaces when vulnerabilities materialize, requiring

    further communication to clarify issues and possible rework

  • 20

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Vulnerability Costs EvaluatedVulnerability costs affected by quality of communication

    medium

    Pu is dependent on the particular medium used

    Pu for face-to-face communication is very low

    Pu increases as teams move to leaner communication media like video/voice conference and email

    Pu increases as global team members span more boundaries (e.g. cultural, functional, language) (Watson-Manheim et al. 2002, Espinosa et al. 2003)

  • 21

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Vulnerability Costs EvaluatedVulnerability costs affected by time separation

    Longer delays are introduced

    Team forced to use asynchronous communication tools at times

    when such communication media may not be the most effective

    Lean communication media (e.g. electronic mail) may not be the

    most appropriate form of communication for equivocal tasks

    that contain more uncertainties (Dennis and Kinney 1998)

  • 22

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Summary of Coordination ModelCoordination Model involves the following costs:

    Individual production costs (Pc) necessary to carry out individual software development task activities

    Coordination costs (Co) necessary to manage the dependencies among different task activities. These costs are composed of:

    communication costs (Cc)delay costs (Dc)Clarification costs (Cf)Rework Costs (Rc)

    Application of these formulas will vary substantially in complexity depending on:Timing of team members interaction (when request and response occur relative to each other)

    Coordination costs are sensitive to time at which a request is initiated and the time at which that request is responded to.

  • 23

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Practical Applications for ModelCoordination model decomposes total cost of collaboration between developers with time

    and/or distance separation.

    Model can be helpful to project managers when creating budgets and schedules for

    software projects.

    Model is practical because it gives users the ability to change parameters and

    relax/tighten assumptions

    Possible practical expansions to the model:

    Include the presence of multiple synchronous and asynchronous communication

    tools

    Would reduce communication costs by reducing the delay in exchanging

    information

    Different types of tasks (longer, more complicated) can be modeled by

    increasing the task duration variable (Tt) and/or the frequency of task requests

    (gamma) and/or increase the clarification variable (Pu).

    Possible to add delays and assign priorities to tasks and then recalculate costs

  • 24

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Coordination Model LimitationsMajor Limitations of model which affect its use in practical applications:

    No distinction between task complexity:

    Complex tasks need to be modeled as sequence of communication events which would increase the

    communications costs on many levels.

    Production cost estimate for a software project is way off without some knowledge about

    complexity of task

    Assumption made on mode of communication

    Assumption that face-to-face communication occurs instantaneously

    E.g. People in the same building have different schedules and meetings and other priorities

    Coordination model needs to be adjusted to change communication delays based on task priority.

    Higher priority tasks will involve multiple modes of communication to resolve the problem quickly

    Less rework might be required as a result

    Important issues get dealt with quickly and with quality because peoples jobs are on the line

  • 25

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Issues in Global Software Development affecting Coordination Model

    Time separation is reduced overlap in work hours and not necessary time zone differences

    Reduction in overlap reduces the time during which synchronous communication can occur

    Work schedules, holidays, weekends, and other scenarios increase overlap in work hours.

    The model focuses more on time separation rather than time zone differences because it

    many scenarios software development projects create overlapping work hours in spite of

    different schedules to increase efficiency and decrease development costs due to

    communication delay costs.

    Time separation leads most teams to change their work norms

    Components of Coordination model can be decreased

  • 26

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    ConclusionModel contains five cost components:

    production, communication, delay, clarification, and rework costs.

    If a given time-separation configuration is not cost-effective,

    developers will make decisions:

    Change work schedules of some or all of its members to either

    increase time overlaps to reduce clarification and rework costs

    Reduce time overlap to reduce delay costs (e.g. shift work, follow-the-sun)

    • All decisions made provided that the timing of task requests can

    be programmed optimally.

  • 27

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Global Software Development in Practice Lessons Learned

    Rafael Prikladnicki,Jorge Luis Nicolas Audy, and

    Roberto Evaristo

  • 28

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Motivations for GSD

    Global Software Development is lucrative to commercial endeavours, not just for open source projects

    What are some of the benefits to GSD that have motivated corporate organizations to start using it

  • 29

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Motivations for GSD

    Proximity to more customers

    Software products easily delivered globally

    Reducing time to marketUsually by employing 'follow-the-sun' development

    Ability to select resources from a larger pool

    Improve efficiency using resources where they are available

  • 30

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    What makes GSD so unique?

    Time-zone differencesReal-time communication is limited to small windows

    Physical distanceOnline coordination tools inefficientNo face-to-face meetings

    Cultural differencesLanguageTraditionsNorms of behavior

  • 31

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Challenges of GSD

    Strategy decisionsHow do you divide up the project?Which site has the resources to do each part?Which sites have the necessary experience and infrastructure?

    Cultural DifferencesMiscommunication most often caused by cultural differences

    What are some ways that these risks can be mitigated?

    What are the major challenges of GSD?

  • 32

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Challenges of GSD (contd.)

    Knowledge managementBecause communication during GSD is so expensive, missing documentation results in lost productivityCompared to co-located projects, documentation provides a much higher return on investment due to the decrease in risk

    What types of methods or tools could be used to improve knowledge management?

  • 33

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Challenges of GSD (contd.)

    Technical issuesProject management requires more effort, because synchronization of milestones is more difficultData network performance can impede project work

    Intranet mechanisms that are fast on a single site may be painfully slow for a remote site due to latencyLarge project artifacts can take on the order of hours for remote sites to download, leading to lost productivity

  • 34

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Related Work

    GSD significantly affects how software is produced, so new mechanisms are needed to support it (Herbsleb and Moitra 2001)

    (Karolak 1998) discussed a software life cycle tailored to GSD

    Centripetal and centrifugal forces that affect GSD teams (Carmel 1999)

  • 35

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Related Work (contd.)

    Centripetal forces:Coordination breakdownLoss of communication richnessGeographic dispersionCultural differencesLoss of 'teamness'

    What types of activities are needed to help hold teams together?

  • 36

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Related Work (contd.)

    Centrifugal forcesTelecommunications infrastructureStrong product architectureTeam buildingManagerial techniquesCollaborative technologyDevelopment methodology

  • 37

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Related Work (contd.)

    (Evaristo 2003) describes several dimensions to any distributed project where management should watch out for problems

    TrustLevels of dispersionSynchronicityComplexityTypes of stakeholdersSystems methodologyType of projectsPolicies and standardsPerceived distanceCulture

  • 38

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Studies

    2 international corporations, both SW-CMM level 2

    2 projects at each organization were interviewed

    Data sources:1 manager and 5 developers in each project interviewedOrganizational and project surveys used separatelyDocumentation reviewsMission analysisBusiness processMeeting minutesSoftware process descriptions

  • 39

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Study: Organization 1

    Headquarters in Brazil with branches in Latin America, USA and Europe

    9 units were responsible for consulting, training, and software development

    80 people

    RUP & PMI processes used in ISO 9001 organization

    GSD chosen because of cost reduction/competitiveness, creating units of specialization

  • 40

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Study: Organization 1 (contd.)

    Project AApplication for a large US companyManaged on both the client and company side

    Project BBanking application for company in BrazilSubcontracted to the group from another subcontractorFirst subcontractor represented the customer and sometimes the project team

  • 41

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Study: Organization 2

    Company headquarters in the US

    180 people from 3 groups in 2 different continents

    Responsible for worldwide internal computer demand

    Microsoft Solutions Framework, RUP, PMI used

    Applications used by international organization

    GSD done for cost reduction, global strategy, and international trademark consolidation

  • 42

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Study: Organization 2 (contd.)

    Project CHuman Resources applicationCustomers in the US officeDevelopers in US and Brazil

    Project DManufacturing applicationUsers and customers in USDevelopers in multiple branches but based in Brazil

  • 43

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Studies: Results

    What factors do you think would have affected the level of success of each of these projects

    Table 2. GSD difficulties found

    GSD difficulties Dimension Organization

    Requirements engineering Technical 1, 2Software development process Technical 1, 2Software configuration Technical 1Knowledge management Technical 1Communication and language Nontechnical 1, 2Culture and context sharing Nontechnical 2Trust Nontechnical 1, 2

  • 44

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Studies: Results

    Problem areasLack of standards or processDifficulty in sharing information without a knowledge management systemRequirements phase consistently more difficult

    More detailed requirements had to compensate for lack of information sharing

    Software configuration managementEach site was working with different versions

    Trust issues developedMiscommunication was common

  • 45

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Studies: Results

    SolutionsWork standardizationPlanningImproved formal software process

    Especially requirements engineering

    Risk management process (only used by Organization 1)

    Process was specialized for distributed projects

    Increasing trust through training on several topics

    Leadership, Communication, Culture, Context Sharing,

  • 46

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Case Studies: Results

    Determining success factorsFormal processTrainingPlanning appropriate sites for each projectFirst interteam contactActivities to improve trust, communication, and feedback

  • 47

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Lessons Learned : 1 & 2Project and risk management need more attention

    GSD causes these tasks to take more timeProblems are able to go unnoticed for a longer timeThese problems will become serious threats to success

    More detailed processes are needed

    All projects without good processes sufferedAt the start of the project agree on the following:

    Coding standardsCode ownershipToolsActivities

  • 48

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Lessons Learned : 3 & 4Knowledge management causes information sharing and learning from experience

    Co-located teams do this naturallyGlobally distributed teams must encourage this process

    Requirements phase is the biggest challenge in GSDOften are unclear or have errorsWasted time results in increased project costsMitigation strategy

    Spend much more time in requirements meetingEnsure all stakeholders are present in these meetingsFully document the results for all to see

  • 49

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Lessons Learned: 5 & 6

    Planning is the key to distributed projectsMatching the right project to the right teamIdentifying the associated risks before starting

    Recruiting and training global teams minimized non-technical problems

    Training before starting the project minimizes the chance of miscommunication

  • 50

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Lessons Learned : 7

    Tools help distributed interaction, particularly communication tools

    Seek out the best collaboration tools you can findTeach everyone how and when to use themTeach the team when communication escalation is appropriate

  • 51

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Lessons Learned : 8

    Distributed Software Development is a maturity process

    It takes organizations time to mature (much like with CMM) Most organizations are experiencing basic problems now, because they are at a lower maturity level

    They could learn a lot from more the more mature

    organizations, possibly preventing the same mistakes

  • 52

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Analysis & Critique

    High level of detail in case studies

    Time zone differences not prevalent in all projects

    Validated theory

    Only observational

    Other comments?

  • 53

    Collaborative Software Design and Development Coordination 4

    EE 382V – Spring 08

    Conclusion & Discussion

    GSD will become the normImproved facilitating technologyContinued cost pressuresSmaller independent groups can specialize their process

    Challenges will persistManaging non co-located teams is a continued challengeLargest challenge is reducing the problems that asynchronous communication create

    Future work could focus on specific aspects

    Requirements, Risk Management, or Project Allocation