collecting & reporting waste bvpis through wastedataflow
DESCRIPTION
Collecting & reporting waste BVPIs through WasteDataFlow. User Group (England) 5 th June 2006. Outline. Background System changes New questions New reports New guidance Overview of calculation method Timing Points for discussion. Background. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/1.jpg)
Collecting & reporting waste BVPIs through WasteDataFlow
User Group (England)
5th June 2006
![Page 2: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/2.jpg)
Outline
• Background• System changes
– New questions– New reports– New guidance
• Overview of calculation method• Timing• Points for discussion
![Page 3: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/3.jpg)
Background
• Defra, DCLG & the Audit Commission discussed & agreed to the principle of WDF being used for BVPIs 2006/7 onwards
• BVPIs 82a-d, 84, 86, 87, 91a,b in scope
• Calculation to be done within system; methodology being finalised with UG. Discussions on-going with AC.
• Aim: minimum system changes, maximum benefit to all =>WDF as ‘one-stop-shop’.
![Page 4: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/4.jpg)
Proposed question changes
• Refined Question 18 to enable voluntary separate reporting of hh and non-hh recycled tonnages (for 82a and 82b).
• New optional question 69 for reporting hh tonnages to landfill and energy recovery (for 82c and 82d)
![Page 5: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/5.jpg)
![Page 6: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/6.jpg)
![Page 7: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/7.jpg)
New BVPI report• Excel based; can be run for each quarterly return.
Will include all BVPIs, and show WCAs for WDAs.• An example…
![Page 8: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/8.jpg)
New Guidance
• Will explain which questions (or parts of) are used in BVPI calculations, the calculation methodology, the new questions and reporting.
![Page 9: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/9.jpg)
Overview of calculation method
• 84: total hh waste = collected for recycling (10, 12, 16, 17, 18hh, 33, 34), excl. rubble & reuse, plus residual from households in Q23. For WDAs includes WCAs recycling, and Q14 WDA recycling. Also forms denominator for 82.
• 82a,b; tonnages sent for recycling/composting (net of rejects) from Q10, 12, 16, 17, 18 (hh only), 33, 34, excludes rubble & reuse. Minus MRF rejects (% due to hh). Minus Q19 rejects (% due to hh).
![Page 10: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/10.jpg)
Overview of calculation method…
• 82c; [inputs to Q54 and Q57 plus RDF produced in Q56 plus diverted for energy recovery from other routes (59, 64, 65) minus diverted for recycling from Q57]* %hh waste for energy recovery (69) plus recycling rejects to energy recovery.
• 82d; [inputs to landfill, 51, 52, 53, plus diverted for landfill from other routes (56, 59, 60, 64, 65)]*%hh waste for landfill (69) plus recycling rejects to landfill.
![Page 11: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/11.jpg)
Overview of calculation method…
• 84a – total hh waste/population from Q1, (to be updated)
• 86; net total collection cost Q31. No. hh in Q2.
• 87; net total disposal cost Q32. Total MSW=all Q23 plus all recycling tonnages (including WCAs for WDAs)
• 91a; at least one recyclable – total of Q7
• 91b; at least two recyclables – from Q7 (sum of 2, 3, 4+).
![Page 12: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/12.jpg)
Timing
• Question changes for 2006/7, plan disseminated soon, implemented from July 2006.
• New guidance; early July 2006.
• BVPI excel report; from July 2006
• Annual submission to Audit Commission next year – probably through upload to EDC. Work on-going with AC. Auditing & WDF validation will be complementary. Auditors will have access to WDF.
![Page 13: Collecting & reporting waste BVPIs through WasteDataFlow](https://reader035.vdocument.in/reader035/viewer/2022062500/568151f1550346895dc02a02/html5/thumbnails/13.jpg)
Discussion Points
• Comments on calculation methodology or report?
• How does PI reporting currently work within your
authority and how will WDF fit within this process?
• Any other points?