Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202 P 303.894.2007 | F 303.869.2065 www.dora.state.co.us/puc

Upload: baka

Post on 15-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

Colorado Renewable Requirements, Policies, and Projects. James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202 P 303.894.2007 | F 303.869.2065 www.dora.state.co.us/puc. Falling Growth in Demand. Public Service Company. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Colorado Renewable Requirements, Policies, and Projects

Colorado Renewable Requirements, Policies, and Projects

James Tarpey, Esq.CommissionerColorado Public Utilities Commission1560 Broadway, Suite 250Denver, CO 80202P 303.894.2007 | F 303.869.2065www.dora.state.co.us/puc

Page 2: Colorado Renewable Requirements, Policies, and Projects

2

Falling Growth in Demand

6,000

6,200

6,400

6,600

6,800

7,000

7,200

7,400

7,600

7,800

8,000

2009 2010 2011 2012 2013 2014 2015

Apr-04

Mar-09

Note: 2007-2009 Forecasts Includes DSM /Demand Response Goals

Public Service Company

Su

mm

er

Pe

ak

D

em

an

d (

MW

)

Page 3: Colorado Renewable Requirements, Policies, and Projects

3

And Falling Growth in Sales

25,000

27,000

29,000

31,000

33,000

35,000

37,000

39,000

41,000

2009 2010 2011 2012 2013 2014 2015

Apr-04

Oct-09

Public Service Company

An

nu

al

Sa

les

(M

Wh

)

Note: 2007-2009 Forecasts Includes

DSM /Demand Response Goals

Page 4: Colorado Renewable Requirements, Policies, and Projects

4

Changes in Colorado’s RPS

2004RPS Goal: 10% by 2015

2007RPS Goal: 20% by

2020

2010RPS Goal: 30% by

2020

0%

5%

10%

15%

20%

25%

30%

35%

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

A37 (2004)

1281 (2007)

1001 (2010)

1001 (DG)

Page 5: Colorado Renewable Requirements, Policies, and Projects

5

Public Service Wind Development

5

• 1024 MW of wind generation in service by 2008

• 875 MW of new wind generation selected as part of the Electric Resource Plan– 173 MW in service in 2009– 252 MW in service by 2010– 450 MW in service by 2015

Page 6: Colorado Renewable Requirements, Policies, and Projects

6

Public Service Solar Thermal and PV Development

• 24 MW of utility scale PV generation in service by 2010

• 100 MW of new utility scale PV generation selected as part of the Electric Resource Plan

• 250 MW of Solar Thermal generation with storage selected as part of the Electric Resource Plan

• Projected three 250 MW solar thermal facilities in 2016, 2017 and 2018, totaling 750 MW

6

Page 7: Colorado Renewable Requirements, Policies, and Projects

7

Distributed Generation Development

• HB 10-1001:– Absolute 3% DG requirement in 2020 (contrast to 4%

solar calculation)– Defines DG as a renewable resource not requiring any

additional substation or transmission facilities:o Retail – interconnected on the customer side of the

meter (may not supply more than 120% of customer’s average annual consumption)

o Wholesale – interconnected directly to distribution at normal distribution voltages (nameplate rating must be 30 MW or less)

7

Page 8: Colorado Renewable Requirements, Policies, and Projects

8

Clean Air – Clean Jobs: HB10-1365

8

• Goals: – Meet reasonably foreseeable requirements of federal

Clean Air Act– Protect public health and the environment at a lower

cost than a piecemeal approach

• Impetus: IOUs’ compliance with expected federal environmental requirements, especially for regional haze and ozone

• Mercury reductions and potential federal greenhouse gas reductions also considered

Page 9: Colorado Renewable Requirements, Policies, and Projects

9

Clean Air – Clean Jobs: HB10-1365

• Means: Retrofit, Retire, Replace

• Preferred replacement: – natural gas– Long term natural gas contracts are encouraged

• Public Service expected to address at least 900 MW of generation in the Front Range of Colorado

Page 10: Colorado Renewable Requirements, Policies, and Projects

10

Clean Air – Clean Jobs: HB10-1365

• Key Dates:– August 15, 2010: Public Service plan due– December 15, 2010: PUC decision due– Early 2011: Legislative approval– December 31, 2017: Plan to be fully implemented

Page 11: Colorado Renewable Requirements, Policies, and Projects

1111

ERZs and Senate Bill 07-100• SB 07-100:

– Identify zones in Colorado rich in energy resources and transmission investments

– 180 day deadline for final Commission decisions on CPCNs for projects identified in bi-annual SB-100 reports

– Current cost recovery through a rider for transmission projects for which a CPCN has been granted

Page 12: Colorado Renewable Requirements, Policies, and Projects

12

Page 13: Colorado Renewable Requirements, Policies, and Projects

1313

Transmission and Senate Bill 07-100

http://www.sb100transmission.com/