1 Columbia River Benefits Columbia River Benefits and Costs and Costs Jim Fredericks Jim Fredericks June 8, 2009 June 8, 2009 Northwestern Division Northwestern Division

Upload: barton

Post on 09-Feb-2016

22 views

Category:

Documents


1 download

DESCRIPTION

Columbia River Benefits and Costs Jim Fredericks June 8, 2009 Northwestern Division. Columbia River Treaty Benefits. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

1

Columbia River Benefits and Costs Columbia River Benefits and Costs

Jim FredericksJim FredericksJune 8, 2009June 8, 2009

Northwestern DivisionNorthwestern Division

Page 2: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

Columbia River TreatyColumbia River TreatyBenefitsBenefits

““Being desirous of achieving the development of Being desirous of achieving the development of those resources in a manner that will make the largest those resources in a manner that will make the largest

contribution to the economic program of both contribution to the economic program of both countries and to the welfare of their peoples of which countries and to the welfare of their peoples of which

those resources are capable…”those resources are capable…”

Page 3: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

3

Flooding IssuesFlooding Issues• 1948 Memorial Day Flood 1948 Memorial Day Flood

– 50 deaths; > $100 Million damages in US and Canada.50 deaths; > $100 Million damages in US and Canada.

Page 4: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

4

Storage BenefitsStorage Benefits

0

50

100

150

200

250

300

350

400

450

500

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul

Unregulated

Flood Control &Power Regulation

Avg.=182 kcfs

Comparison of 50-year Average Monthly Comparison of 50-year Average Monthly Unregulated Flow to a Regulated Flow for Unregulated Flow to a Regulated Flow for Power/Flood Control at The Dalles in KcfsPower/Flood Control at The Dalles in Kcfs

• Flood Damage Flood Damage ReductionReduction

• Hydropower BenefitsHydropower Benefits– Increased Energy Increased Energy

(aMW)(aMW)– Increased Increased

Dependable Capacity Dependable Capacity (MW)(MW)

• Other Benefits as wellOther Benefits as well– Irrigation, M &I, Irrigation, M &I,

Recreation, ect..Recreation, ect..

Page 5: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

5

Projects ConstructedProjects Constructed

• Mica – completed 1973Mica – completed 1973• Duncan completed 1973Duncan completed 1973• Arrow (Keenelyside) – Arrow (Keenelyside) –

completed 1968completed 1968• Libby completed 1973 Libby completed 1973

(U.S.)(U.S.)

Page 6: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

6

DuncanDuncan

• 1.4 MAF (1.73 km1.4 MAF (1.73 km33))• No hydropowerNo hydropower• Fluctuates 30m Fluctuates 30m

Page 7: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

7

MicaMica

• 5.0 MAF (6.14 km5.0 MAF (6.14 km33) Non-Treaty Storage ) Non-Treaty Storage • 7.0 MAF (8.63 km7.0 MAF (8.63 km33))• 1740 MW Capacity1740 MW Capacity• One of the largestOne of the largestearth fill dams in theearth fill dams in theWorld.World.

Page 8: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

8

Arrow (Kennleyside)Arrow (Kennleyside)

• 7.1 MAF (8.76 km7.1 MAF (8.76 km33))• 185 MW Capacity185 MW Capacity• Navigation lockNavigation lock

Page 9: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

9

US Project - LibbyUS Project - Libby

• 5.0 MAF (6.14 km5.0 MAF (6.14 km33))• 604 MW Capacity604 MW Capacity• Construction CostConstruction Cost $585M (1981$)$585M (1981$)• Benefit to cost ratio Benefit to cost ratio for power 3.4 to 1.for power 3.4 to 1.• Benefit to cost ratio Benefit to cost ratio for flood damage reduction 1.3 to 1.for flood damage reduction 1.3 to 1.

Page 10: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

10

What the U.S. PaidWhat the U.S. Paid

• For Flood ControlFor Flood Control - $64.5 Million- $64.5 Million This This amount was based on one-half of the estimated amount was based on one-half of the estimated present worth value of flood damages prevented present worth value of flood damages prevented over a period of sixty years.over a period of sixty years.

• Hydropower Hydropower – – Canada was entitled to one-half Canada was entitled to one-half the downstream benefits. Estimated at 1,200 to the downstream benefits. Estimated at 1,200 to 1,500 MW of capacity and 520 to 560 average 1,500 MW of capacity and 520 to 560 average megawatts of energy. Canada subsequently sold megawatts of energy. Canada subsequently sold this to the US for 30 years for this to the US for 30 years for $254.4 Million.$254.4 Million.

Page 11: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

11

Other Costs of Upstream StorageOther Costs of Upstream Storage

• Fish and Wildlife Mitigation Fish and Wildlife Mitigation – hatcheries, spill, and other actionshatcheries, spill, and other actions

• Lost cultural resourcesLost cultural resources– inundation of historical and sacred sites inundation of historical and sacred sites

• Social impactsSocial impacts– Dislocation of residentsDislocation of residents

Page 12: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

12

Economic Benefits and CostsEconomic Benefits and Costsof the Columbia and its Tributariesof the Columbia and its Tributaries

• Benefits – Benefits – Hydropower, Hydropower, flood damage flood damage reduction, reduction, irrigation, irrigation, water supply, water supply, navigation, navigation, and and recreation.recreation.

Page 13: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

13

Page 14: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

14

Columbia River Basin Columbia River Basin Benefits and CostsBenefits and Costs

• Hydropower ProjectsHydropower Projects– 75% of Corps National installed capacity (15,600 MW)75% of Corps National installed capacity (15,600 MW)– 52% of Northwest hydropower output 52% of Northwest hydropower output

• Flood Damage ReductionFlood Damage Reduction– System Development Cost $5BSystem Development Cost $5B

– Cumulative flood damages prevented $14BCumulative flood damages prevented $14B

– Damages prevented as a result of reservoirs $6BDamages prevented as a result of reservoirs $6B• NavigationNavigation

– 992 miles of navigable waterways992 miles of navigable waterways– 10 Locks10 Locks

Page 15: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

15

Federal ObjectiveFederal Objective• The Federal objective of water and related The Federal objective of water and related

land resources planning is to contribute to land resources planning is to contribute to national economic development consistent national economic development consistent with protecting the Nation’s environment with protecting the Nation’s environment statutes, applicable executive orders, and statutes, applicable executive orders, and other Federal planning requirements.other Federal planning requirements.

Page 16: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

16

Evaluation Criteria – 4 AccountsEvaluation Criteria – 4 Accounts

• National Economic DevelopmentNational Economic Development (NED) (NED)– Changes in the economic value of the national output of Changes in the economic value of the national output of

goods and services.goods and services.• Regional Economic Development (RED)Regional Economic Development (RED)

– Changes in the distribution of regional economic Changes in the distribution of regional economic activity.activity.

• Environmental Quality (EQ)Environmental Quality (EQ)– Non-monetary effects on significant natural and Non-monetary effects on significant natural and

cultural resources.cultural resources.• Other Social Effects (OSE)Other Social Effects (OSE)

– Not reflected in other three accounts.Not reflected in other three accounts.

Page 17: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

17

NED Account has been the focusNED Account has been the focus

• NED Benefits NED Benefits – HydropowerHydropower

• Costs of the most likely alternativeCosts of the most likely alternative– Other thermal (Coal, Combustion-Turbine, Combined Other thermal (Coal, Combustion-Turbine, Combined

cycle combustion turbine)cycle combustion turbine)

– Flood Damage ReductionFlood Damage Reduction• Actual or simulated market priceActual or simulated market price

– Damages with and without the storageDamages with and without the storage

Page 18: Columbia River Benefits and Costs  Jim Fredericks June 8, 2009 Northwestern Division

18

BPA Fish & Wildlife ExpendituresBPA Fish & Wildlife Expenditures

• $8.6B expenditures through 2006$8.6B expenditures through 2006– $2.9B power purchases$2.9B power purchases– $1.78B foregone revenues $1.78B foregone revenues – $1.71B for Council’s direct program$1.71B for Council’s direct program– $1.38 B for dam fish passage$1.38 B for dam fish passage– $862.2M for mitigation costs associated with $862.2M for mitigation costs associated with

Federal projects.Federal projects.