Month Year Columbus Avenue Bicycle Path and Mobility Enhancements Community Board 7 Commissioner Janette Sadik-Khan, New York City Department of Transportation December 11, 2012

Upload: others

Post on 25-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

MonthYear

Columbus AvenueBicycle Path and Mobility Enhancements

Community Board 7

Commissioner Janette Sadik-Khan, New York City Department of TransportationDecember 11, 2012

Page 2: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Background

2

− 2010: Protected bicycle path installed on Columbus Avenue− W 96th St to W 77th St− Worked with the Columbus

Avenue Working Group

− 2012: Protected bicycle path installed on 9th Avenue − W 59th St to W 31st St

Page 3: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Columbus Avenue Issues

3

− Lack of continuity in the bicycle network− Resulting in lower bicycle volumes on existing Columbus Avenue bike path

− Long pedestrian crossings− 60 foot wide roadway

− Desire for beautification of commercial corridor− Street trees and plantings

− Corridor with variable traffic conditions− Motor vehicle congestion approaching Broadway intersection− Water main construction near Lincoln Center

Page 4: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Project Proposal

4

− Extend design on Columbus Avenue− W 110 to W 96 Streets− W 77 to W 59th Streets

− Provide connections to existing bicycle facilities− 106th St− 9th Avenue− Columbus Avenue

− Tailor design to improve traffic flow in congested areas

− Provide loading zones for businesses with need

Page 5: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

5

Existing Conditions

Columbus Avenue at W 70th St

Page 6: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

6

Existing Conditions

Wide Parking Lanes

Wide Parking Lanes

Wide Roadway, Long Pedestrian Crossing Distances

Wide Roadway, Long Pedestrian Crossing Distances

3 Travel Lanes + 1 Curbside Rush Hour Travel Lane2 Parking Lanes, No Dedicated Cycling Space

3 Travel Lanes + 1 Curbside Rush Hour Travel Lane2 Parking Lanes, No Dedicated Cycling Space

60 Feet60 Feet

Rush Hour Travel LaneRush Hour Travel Lane

Page 7: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Proposal Summary

7

Bicycle Path Enhanced Shared Lane

Existing Bicycle Facilities

ConstructionColumbus Av

Page 8: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Design Treatments

Mixing Zone

Pedestrian Island

8

Enhanced Shared Lane

Shortens pedestrian crossings

Shortens pedestrian crossings

Safely accommodates

vehicle/bike turning conflict

Safely accommodates

vehicle/bike turning conflict

Additional bike symbols, over head

no passing sign, solid lane line

Additional bike symbols, over head

no passing sign, solid lane line

Page 9: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Proposal Summary

9

Bicycle Path

Existing Bicycle Facilities

ConstructionColumbus Av

Page 10: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

10

Segment Planned # of Travel Lanes Volume**

W. 110th to W. 96th 3+ 868(8:00a – 9:00a)

Peak Hour Volume Compared to Proposed Number of Travel Lanes

Peak Hour Vehicle Volumes: Average of three consecutive weekdays (Monday-Thursday) taken the week of 10/1/12

Proposed Roadway Configuration110th St to 96th St & 77th St to 70th St

Page 11: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Proposed Roadway Configuration

11Columbus Avenue, Manhattan

Page 12: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Parking Impact

12

East Side Repurposed Parking Space (west side not affected by islands & turn lanes)

Parking Space Equivalents (Approx.)

110th to 96th

77th to 65th

Total

Turn Lanes/ Mixing Zones 23 22 45

Pedestrian Islands 9 7 16

Total Spaces Repurposed 32 29 61

Total Existing Parking Spaces 149 108 257

Percent of Spaces Repurposed 21% 27% 24%

Mixing Zone Pedestrian Island

Note: Upper Section, 17 islands, 4 mixing zones, 1 turn lane; Lower 12 islands, 3 mixing zone, 1 turn lane

Page 13: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

13

Existing Conditions: Lincoln Center

Columbus Avenue at Broadway

Page 14: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

1414

Short Curbside Turn Lane

Short Curbside Turn Lane

Complex Intersection, Wide Roadway, 

Long Pedestrian Crossing Distances

Complex Intersection, Wide Roadway, 

Long Pedestrian Crossing Distances

3 Travel Lanes1 Turn Lane

1 Bus Stop Lane

3 Travel Lanes1 Turn Lane

1 Bus Stop Lane

60 Feet60 Feet

Existing Conditions: Lincoln Center

Page 15: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

15

Existing Conditions: Columbus Ave

Columbus Avenue at W 68th St Facing South

Page 16: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Proposal Summary

16

Shared Lane

Existing Bicycle Facilities

ConstructionColumbus Av

Page 17: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

17

Segment Planned # of Travel Lanes Volume**

W. 66th to W. 65th 4 1,255(8:00p – 9:00p)

Peak Hour Volume Compared to Proposed Number of Travel Lanes

Peak Hour Vehicle Volumes: Average of three consecutive weekdays (Monday-Thursday) taken the week of 10/1/12

Proposed Roadway Configuration

• Add 1 travel lane

Page 18: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Proposed Roadway Configuration

18Second Avenue, Manhattan

Page 19: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Intersection Treatment/Transition

19• Transition from bicycle path to shared lane through intersection

Page 20: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Proposal Summary

20

Bicycle Path Shared Lane

Existing Bicycle Facilities

ConstructionColumbus Av

Page 21: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Turn Treatments

21Existing Bicycle Facilities

Construction

Location of Split Phase Location of Mixing Zone

Potential Bike PathPotential Shared Lane

Columbus Av W 1

08 S

T

W 1

04 S

T

W 7

6 S

T

W 7

4 S

T

W 7

2 S

T

W 7

0 S

T

W 1

00 S

T

Page 22: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Construction

22

• DEP water main project: Late 2013 Completion• Columbus Ave: Broadway to W 60th St• W 60th St: West End Ave to Columbus Ave• W 63rd St: Broadway to Columbus• W 62nd St: Amsterdam and Columbus

• Fordham University Construction• Columbus Ave: W 62nd to W 60th Streets

• Install bicycle path upon completion of construction on Columbus Ave• Columbus Ave: W 63rd to W 59th St

Page 23: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Bike Path Construction Detour

23Ninth Avenue, Manhattan: Water Main Construction Temporary Design (52-48)

• Install temporary path through work zone

Page 24: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Business Outreach

24

• Working with businesses to review their needs for potential loading regulations

− 107-108: WS Movers− 106-105: NY Plumbing Supply− 105-104: Klausner Plumbing− 100-99: PETCO, Home Goods− 99-98: Modell’s− 98-97: Duane Reade− 97-96: Rite Aid, Sleepy’s− 76-75: Duane Reade− 74-73: Pioneer Supermarket− 67-68: 67th St Wine and Spirit− 67-68: Reebok Sports Club− 67-66: ABC Studio

• Business outreach completed between W 110 St and W 96 St

Location of major business

Page 25: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

Proposal Benefits

25

• Increased safety for all roadway users• Better continuity of the Bicycle Network,

promotes healthy activity• Reduces traffic congestion approaching

Broadway by adding a travel lane• Shorter Pedestrian Crossings – Helps seniors

and children• Greener Streets – Planting beds on pedestrian

islands provide more green space• Convenient delivery zones for businesses

Page 26: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected

26

nyc.gov/dot ThankYou