INGENUITYwith

Combining ENGINEERING

POWER PLANT ENGINEERS

ENGENIUS ERECTORS PVT. LTD.

A humble beginning was made in 1978 by our founder, Mr. A.H.Mohajir, to cater to the growing need of power generation in India with the formation of a Partnership firm, "Engenius Enterprises", which was converted to a private limited company, “ENGENIUS ERECTORS Private Limited” (EEPL), in 1982.

Since then, EEPL has executed more than hundred projects in the field of Construction and Maintenance of Thermal, Nuclear and Gas based Power Plants in India. In the process, we have continually set new benchmarks in the Power Sector with our Quality and Safety standards. Besides our highly-experienced field personnel have executed a variety of jobs in the Construction and Maintenance of Turbine/Motor driven large capacity Axial Flow Blowers & Gas Compressors for Steel Plants. In addition we have also carried out the complex Life Extension Programme of Power Plants through our services to TPE, ABB-ABL & ABB Sae Sadelmi.

A BRIEF HISTORY

Compliance with applicable legislation and regulations of Health, Safety and EnvironmentMinimizing risks arising fromoccupational health and safety hazardsMinimizing / Controlling pollution and industrial wasteCreating awareness amongst our employees through communica-tions and training

EEPL is committed to provide safe, healthy and environment friendly working conditions and improving them through:

SAFETY POLICY

To continuously review and maintain an effective Quality Assurance ProgrammeTo standardise all our internal activitiesTo deploy highly qualified and well trained personnelTo inculcate Quality consciousness through the total involvement of all employees

"To offer services that fulfil the customer's requirements first time, on time, every time."Objectives toward quality policy

QUALITY POLICY

Erection and Commissioning of Steam Turbines, Generators and their Auxiliary Equipment such as Condensers (Water cooled / Air cooled), Boiler Feed Pumps (Motor / Turbine driven), Condensate Extraction Pumps, Circulating Water Pumps, ACW Pumps, DMCW Pumps, Oil Pumps, Vacuum Pumps etc. with their drive Motors, Deaerator with storage Tank, HP LP Heaters, Steam Water Separators, Piping systems involving Carbon Steel, Stainless Steel and Alloy Steel confirming to P11, P22, P91 material specification in Thermal & Nuclear Power Stations.

Erection and Commissioning of Gas Turbines, Generators and their Auxiliary Systems such as Inlet Air System, Exhaust Gas System, Fuel Injection system, Fire protection system, including Field inter connecting Piping.

Maintenance, Capital Repair and Renovation of all above equipment.

OUR STRENGTHS

Erection & Commissioning of First 6067 m3/min Axial flow Turbo-Blowers in Indiaat Visakhapatnam Steel Plant (1987-89).Erection & Commissioning of First Gas based Combined Cycle power station in India at Ahmedabad Electricity Co. (1989-91).First Life Extension Programme for Power plants in India at Neyveli Lignite Corporation, Neyveli (1992-95).Erection & Commissioning of First BHEL 600MW Turbo-Generator set in India atNorth Chennai (2011-12).

FIRST'S IN THE FIELD

1 Rewinding in-situ for 50 MW hydro-generator

•In association with ABB Sae Sadelmi, Italy2. At Karnafauli Hydro Station, Bangladesh

In-situ rewinding of 50 MW turbo-generator rotor,In-situ repair, replacement of stator core packetsfor 100 MW generator statorRepair of rotor discs and re-blading of 100 MW HP Turbine rotor in-situ.

••

In association with TPE, Russia1. At Neyveli Thermal Station- 1, India

SOME CHALLENGINGASSIGNMENTS

and many more...

CLIENT LIST

92 Units

20 Units

115 Units

17 Units

6 Units

4 Packages

3 Packages

2 Packages

1 Package

1 Package

3 Packages

15,400 MW

>

>

>

>

Erection & Commissioning of STG set and Auxiliaries

Erection & Commissioning of GTG set and Auxiliaries

Overhauls of STG & GTG sets

Steam Turbine / Motor-driven Axial Blowers / Compressors

Steam Condensers for 230/500 MW Nuclear Power Plant

Boiler External Piping with P11, P22 & P91 Material Spec.

Secondary Cycle Piping for 500/1000 MW Nuclear Plant

Renovation(LEP) of 50 MW Boiler & Aux.

Renovation(LEP) of 50 MW Steam Turbine, Generator & Aux.

Renovation(LEP) of 100 MW Steam Turbine, Generator & Aux.

Renovation & Relocation of 4 MW, 12 MW & 30 MW STG & Aux.

Our Contribution to the National Power Grid

Note: “>” Indicates that additional units are in progress

OUR ACHIEVEMENTS

KEY MEMBERS

K.RAMALINGAMGENERAL MANAGERAn Electrical Engineer with 37 years of experience in power plant Erection & Maintenance.

IMRAN MOHAJIRSR. EXECUTIVEA Systems Engineer experienced in Project Management.

G.BALASUBRAMANIANSR. DY. GENERAL MANAGERA Mechanical engineer with rich experience of power plant equipment Erection, specialising in Piping.

P.V.SAIDIRECTOR TECHNICALA Mechanical Engineer vastly experienced in Engineering, Design & Construction of power plants.

A.H.MOHAJIRMANAGING DIRECTORAn Electrical Engineer with 47 years of experience in Maintenance & Construction of power plant equipment.

JAVEED MEHKRIDIRECTOR COMMERCIAL A Commerce graduate with extensive experience in Marketing, Administration & Business Networking.

+91 80 [email protected]

DeskEmail

No.5, 2nd cross, Lalbagh RoadBangalore 560 027Karnataka, INDIA

+91 891 [email protected]

DeskEmail

QTR.NO: SFA-1/145, EEIE, Auto NagarVishakhapatnam 530 012Andhra Pradesh, INDIA

REGIONAL OFFICES

+91 44 [email protected]

DeskEmail

3rd Floor, Anand Building194, Poonamallee High RoadKilpauk, Chennai 600 010Tamil Nadu, INDIA

ADMIN OFFICE

+91 44 27259261 / 62 / [email protected]

DeskEmail

A.S. Horticultural Farms, No.1, Mottur RoadKattavakkam Village, WalajabadKancheepuram Dist 631 604Tamil Nadu, INDIA

CORPORATE OFFICE

CONTACT