Raghid Gabrial
Strategic ConsultantAlpin Limited
Commissioning Your Way to
High Performance BuildingsPhoto
1st Annual KGBC Green Building Conference
“Sustainable Housing and Green Living”
![Page 2: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/2.jpg)
2
Table of Contents
1. What is Building Cx?
2. The Cx Scope and Process
3. Hiring an Independent Third-
Party CxA
4. Design & Construction Phases
Cx issues
Introduction
01The Importance of Cx
and Cx Benefits02
Conclusions04
1. The importance of BECx in the
GCC region
2. Cx Benefits
LEED Commissioning031. LEED Cx
2. LEED Cx and IAQ
3. LEED Cx and Airtightness Test
Major References:
![Page 3: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/3.jpg)
3
What is Building Cx?
ASHRAE Definition
Building Cx reveals the hidden issues involved in design, construction and operational phases.
Apparent Project Issues
Actual Project Issues
CxA,Designer
andContractor
Designer and
Contractor
![Page 4: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/4.jpg)
4
What is Building Cx?
Phases of Work
Pre-Design Design
Construction
Post-Construction
(warranty)
Operations“Commissioning is NOT the final 3 months of aproject. It starts from pre-design to operations”
![Page 5: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/5.jpg)
5
The Cx Scope
Possible Scope of Work
01 Space Heating and Cooling
02 Refrigeration
03 Ventilation Systems and Controls
04 Lighting and Daylight Harvesting
05 Domestic Cold & Hot Water Systems
06 Renewable Energy Systems
07Building Envelope, Fire Life-Safety Systems,
Security Systems, and Electrical Power
Distribution
08Building Automation System (BAS) and
Energy Management System (EMS)
...and any additional system requested by the client or as required by Green Building Standards.
![Page 6: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/6.jpg)
6
The Cx Process
Pre-Design▪ CxA updates the Cx plan
▪ CxA review contractors’ MEPF submittals
▪ CxA chair the Cx Meetings
▪ CxA veirify Pre-functional checklists
▪ CxA verify Functional testing plan
▪ CxA Witness pre-functional and functional tests
▪ CxA review O&M manual
▪ CxA develop system manual (LEED only)
▪ CxA Supervise training of owner’s staff.
▪ CxA Development of final Cx plan
▪ CxA witness Cx and integration activities
▪ CxA develop final Cx report
Construction▪ The owner selects the design team, which
includes the CxA
▪ The CxA consists of the Cx team leader and a
multi-disciplinary team of specialists
▪ Together they will work with the owner to develop
OPR in this phase
Design▪ ReCx
▪ Building fine-tuning
▪ Seasonal testing on all MEP systems
▪ Review of deficiencies from previous Cx reports,
operation logs and concerns as noted by the
building operators
▪ Integration with BIM (Building Information
Modelling) via COBie (Construction Operations
Building Information Exchange)
Post-Construction
▪ CxA create the Cx Requirements & Specifications
▪ CxA review BoD; developed by the designer
▪ CxA update OPR
▪ CxA develops Cx Plan; draft copy
▪ CxA review of the design documents.
Post-Construction PhaseConstruction PhaseDesign PhasePre-Design Phase
![Page 7: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/7.jpg)
7
Hiring an Independent Third-Party CxA
TrustedAdviser
Cx Review
Project’sSuccess
Proper Certification
![Page 8: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/8.jpg)
Design Phase issue
• The drawing shows 2 fans in Parallel and 2 is Series
• Ducting arrangement; before and after fans, is not acceptable
• What about SMACNA & AMCA
![Page 9: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/9.jpg)
Construction Phase issue
• Poor workmanship/housekeeping; dusty duct and IAQ requirement
![Page 10: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/10.jpg)
Construction Phase issue
Poor workmanship:• Loose nut support• Support end not filed• Support ends not painted• Flexible duct connections ends kept lose
![Page 11: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/11.jpg)
11
The Importance of BECx in the GCC Region
A properly commissionedbuilding envelope maylead to significant energysavings in HVAC systems.
HVAC Failures
Building envelope failuremay also allow watervapour inside what maylead to mold growth.
Mold Growth
Corrosion of façade andsuperstructure is anotherissue that may be causedby intrusion of salty airdue to building envelopefailure.
Corrosion
Sand storms in theregions also contributeto infiltration.
Infiltration
![Page 12: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/12.jpg)
12
The Cx Benefits
General Benefits
01 Avoided premature equipment failures
02 Avoided construction-defects litigation
03 Improved end user comfort
04 Mitigated indoor air quality problems
05 Increased staff competence
06 Reduced change orders
![Page 13: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/13.jpg)
13
Cx Benefits
Benefits & Value add to construction projects
Financial Savings
Enhanced Quality
Sustainability▪ Lower energy costs▪ Lower operational costs▪ Lower maintenance
costs▪ Shorter building
turnover period▪ Fewer project delays▪ Minimized impact on
late design changes
▪ Lower maintenance▪ Lower change of orders▪ Added value
construction quality▪ Improved air quality▪ Improved occupant
productivity▪ More knowledgeable
O&M staff▪ Improved future design
▪ Reduced energy waste ▪ Reduced water waste▪ Better air quality▪ Reduced condensation
issues▪ Higher MEPF and
Building Enclosure systems operation efficiency
CxA
References:
1) The Lawrence Berkeley National Laboratory Study - Cx data were collected for
643 commercial buildings, commissioned by 37 different Cx providers.
2) U.S. Department for Energy – Cx data were collected for federal buildings in the
U.S.
![Page 14: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/14.jpg)
14
Costs and Benefits
Non-energy benefits
• Improved equipment performance
• Worker comfort
• Higher staff engagement
• Improved Indoor Environmental Quality (IEQ)
Benefits of Building Cx
Increased profitability for tenants and building
owners
Increased net operating income and
quicker return on investment
![Page 15: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/15.jpg)
15
Costs and Benefits
Energy Savings Through Cx
How does Building Cx help to achieve energy savings?
Adequate MEP
System
Good Building
Enclosure
Energy Bills
reduced
Greenhouse Gas Emissions
reduced
Adequate
BMS
![Page 16: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/16.jpg)
16
LEED Cx
EA Prerequisite - Fundamental Cx and Verification Required
▪ Credit support design, construction, and eventual operation
▪ Goal: meet the owner’s project requirements for energy, water, indoor environmental quality,and durability.
▪ This optional credit intends to further support the design, construction, and eventual operation ofa project
▪ This credit is divided into the two following parts:
Part 1 – Enhanced Commissioning Guidelines (3 points).Part 2 – Enhanced and Monitoring-Based Commissioning Guidelines (4 points).
EA Credit – Enhanced Cx (2 to 6 points)
![Page 17: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/17.jpg)
17
LEED Cx and Indoor Air Quality
▪ LEED V4 establishes minimum and enhanced requirements for IAQ.
▪ To prevent air infiltration and to ensure moisture control are two of the requirements thatcan be achieved through an effective BECx process.
Develop and implement a moisture control planto protect stored on-site and installedabsorptive materials from moisture damage.Also include strategies for protecting thebuilding from moisture intrusion andpreventing occupants’ exposure to moldspores.
“LEED:Moisture Control
Develop a plan to manage fumes and avoidinfiltration to occupied spaces.“LEED:
Outdoor Emissions
![Page 18: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/18.jpg)
18
LEED Cx and Air Tightness Testing
▪ An effective way to ensure low external air infiltrationis through airtightness testing.
▪ ASTM E1827 standard establishes procedures forairtightness testing of buildings using an orifice blowerdoor (figure 1).
▪ This technique uses an orifice blower door to inducepressure differences across the building envelope and tomeasure those pressure differences and the resultingairflows (figure 2).
Figure 1 - Airtightness Testing: Orifice Blower Door
Figure 2 - Air Pressure Components on the Building Envelope
![Page 19: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/19.jpg)
19
Conclusion
01 High Benefit-Cost Ratio
02 CxA is most effective when implemented at
the pre-design phase
03 CxA leads to more superior buildings with
minimum maintenance required
04 CxA should report directly to
owner/developer to avoid bias
05Long-term savings with energy bills and
lower maintenance exceed up-front costs
with CxA
06 BECx can significantly reduce energy
consumption in buildings
“Cx is the single most cost-effective strategy for reducing energy, costs and greenhouse gas emissions in buildings today” (Lawrence Berkeley National Laboratory, 2009).
Reasons...
![Page 20: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/20.jpg)
20
Video: “Cx Process Explained by Alpin Limited”
![Page 21: Commissioning Your Way to High Performance Buildings · 2019. 4. 25. · 5 The Cx Scope Possible Scope of Work 01 Space Heating and Cooling 02 Refrigeration 03 Ventilation Systems](https://reader036.vdocument.in/reader036/viewer/2022071108/5fe2b939a4a7af14aa6d8f63/html5/thumbnails/21.jpg)