common intranet system v-sat in nepal annex 9. establishment process
TRANSCRIPT
![Page 1: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/1.jpg)
Common intranet Common intranet system system V-SATV-SAT
In NepalIn Nepal
Annex 9
![Page 2: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/2.jpg)
ESTABLISHMENT ESTABLISHMENT PROCESS PROCESS
![Page 3: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/3.jpg)
V-SAT V-SAT ““VERY SMALL APERTURE TERMINAL” VERY SMALL APERTURE TERMINAL”
Allows high speed data and voice transmission
Cost effective Telecommunication Facility
Operated through a Satellite System It is generally used in countries with
difficult access to internet or with low bandwidth hindering data transmission, and as such, productivity
![Page 4: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/4.jpg)
BACKGROUND/RATIONAL FOR BACKGROUND/RATIONAL FOR IMPLEMENTATION IN NEPALIMPLEMENTATION IN NEPAL
Earthquakes vs. terrestrial communication system damage
Country in conflict, crisis vs infrastructure
![Page 5: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/5.jpg)
![Page 6: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/6.jpg)
Initial stepsInitial steps
UNICEF and UNDP contracted Telenor - Norway for installationUNDP Technical recommendation for Nepal Co: a minimum of 64k bandwidthUNICEF HQS recommended to opt for the VSAT WAN (to improve and secure their connectivity)
![Page 7: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/7.jpg)
UNDP, UNICEF, UNFPA, UNDP/SURFThese agencies share the OUTDOOR
EQUIPMENTUNDP, UNFPA, and UNDP/SURF share
the bandwidthUNICEF has its own separate bandwidth
and has a separate indoor equipment (like routers and switches)
Participating agencies:Participating agencies:
![Page 8: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/8.jpg)
V-SAT SERVICESV-SAT SERVICES Better internet connectivity Voice over IP (internet protocol) services Free In-net telephone calls to other
Telenor VSAT country offices Cost effective off net tel. Calls
(originating from Norway) (8 voice cards available for
UNDP/UNFPA/SURF 4 voice cards available for UNICEF alone)
![Page 9: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/9.jpg)
LESSONS LEARNEDLESSONS LEARNED
![Page 10: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/10.jpg)
Obtainment of V-SAT license from the Government
HMG’s request to go through the local service provider
Struggle for the telecom authority’s fees exemption (approx USD 3300) every 5 years.
Exemption of the yearly frequency license fee payment
Lack of appropriate scale (1 OHM) for grounding
PROBLEMPROBLEMSS
![Page 11: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/11.jpg)
Coordination with PABX and VSAT consultants (to integrate PABX with VSAT)
Initial failure in identifying proper lightening system for the V-SAT
Government may not permit the use of VOIP (voice over internet protocol, this is country specific issue)
PROBLEMSPROBLEMS
![Page 12: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/12.jpg)
Establishment of V-SAT committee, preparation of MOU
Good cooperation from the partners from the beginning
Required support from the management and IAAG Savings on telecommunication cost: Telephone
and Fax Possible connectivity to other agencies in case of
natural disaster Provide information sharing support to the
government in case of natural disaster ( incase government telecom infrastructure collapses)
POSITIVE ASPECTSPOSITIVE ASPECTS
![Page 13: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/13.jpg)
IMPROVEMENT FOR THE IMPROVEMENT FOR THE FUTUREFUTURE
Other UN agencies inclusion in the existing V-SAT pool
Video conference facility to UN agencies outside the pool
Bandwidth enhancement in an on-going process
Provision of backup V-SAT link with UNICEF ROSA
![Page 14: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/14.jpg)
IMMIDIATE PRIORITIES AND CURRENT IMMIDIATE PRIORITIES AND CURRENT DEVELOPMENT DEVELOPMENT
Enhancement of V-SAT connectivity service to be provided to UNDP regional center
![Page 15: Common intranet system V-SAT In Nepal Annex 9. ESTABLISHMENT PROCESS](https://reader035.vdocument.in/reader035/viewer/2022062404/5514ca3b55034640138b5d3a/html5/thumbnails/15.jpg)
CONSTRAINTSCONSTRAINTS Maintenance in case of breakdowns of
major parts Parts cost as high as USD 18,000
(transreceiver) Identification of the problem and
replacement of the parts may take up to 1-2 weeks.
Telenor requested to open a warehouse in the region for speedy maintenance of V-SAT
Participating agencies agreed to create flexible budget for maintenance purpose