commonwealth of kentucky department of highways · department of highways layout map lin. ft. miles...
TRANSCRIPT
NUMBER:
LETTING DATE:
INDEX OF SHEETS
SHEETS NOT INCLUDED IN TOTAL SHEETS
SHEET NO. DESCRIPTION
STANDARD DRAWINGSNUMBER
DEPARTMENT OF HIGHWAYS
LAYOUT MAP
LIN. FT. MILES
FOR EQUALITIES
RAILROAD CROSSINGS NO.
BRIDGES
NOT INCLUDED
LIN. FT.
LIN. FT.
DEDUCTED
ADDED
PLANS OF
PROPOSED PROJECT
STATE HIGHWAY ENGINEER
PROJECT
LIN. FT.
COUNTY OF
ITEM NO.
LENGTH LIN. FT. MILES
FOR EQUALITIES
RAILROAD CROSSINGS NO.
BRIDGES
NOT INCLUDED
LIN. FT.
LIN. FT.
DEDUCTED
ADDEDLIN. FT.
LENGTH LIN. FT. MILES
FOR EQUALITIES
RAILROAD CROSSINGS NO.
BRIDGES
NOT INCLUDED
LIN. FT.
LIN. FT.
DEDUCTED
ADDEDLIN. FT.
LENGTH LIN. FT. MILES
FOR EQUALITIES
RAILROAD CROSSINGS NO.
BRIDGES
NOT INCLUDED
LIN. FT.
LIN. FT.
DEDUCTED
ADDEDLIN. FT.
LENGTH
PROJECT MANAGER
RECOMMENDED BY:
PLAN APPROVED BY:
DATE:
Commonwealth of KentuckyDEPARTMENT OF HIGHWAYS
Commonwealth of Kentucky
JEFFERSON
05-9008.00
FD52 1550 CO56 E143
9037001 D
1453.32 0.28
1314.43 0.25
CROSS SECTION SHEETS
TRAFFIC PLANS
PIPE DRAINAGE SHEETS
COORDINATE CONTROL SHEETS
EROSION CONTROL SHEETS
TRAFFIC CONTROL NOTES
DETAIL SHEETS
PLAN AND PROFILE SHEETS
TYPICAL SECTIONS-SUMMARY OF QUANTITIES
LAYOUT SHEET
E-S
HE
ET
NA
ME:
R0010
0LS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R1
DESIGN CRITERIA
DESIGNED
CLASS OF HIGHWAY
TYPE OF TERRAIN
DESIGN SPEED
REQUIRED NPSD
REQUIRED PSD
LEVEL OF SERVICE
DHV
D %
T %
% RESTRICTED SD
LEVEL OF SERVICE
MAX. DISTANCE W/O PASSING
LATITUDE DEGREES
LONGITUDE SECONDS WEST
SECONDS NORTH
DEGREES
ADT PRESENT ( )
ADT FUTURE ( )
GEOGRAPHIC COORDINATES
URBAN ARTERIAL
LEVEL
45 MPH
360’
1625’
2015 49,600
MINUTES
MINUTES
12
35
56
28 85
38
DATE:
9037001D JEFFERSON COUNTY
KY 1747 (HURSTBOURNE PARKWAY)
TTS-115-02
TTD-125-02
TTC-160-02
TTC-115-03
TPM-145-03
TPM-110-03
TPM-100-03
RPM-170-09
RPM-120-07
RPM-110-07
RPM-100-01
RPM-010-06
RGX-200-01
RGX-040-03
RGX-001-06
RGS-002-06
RGS-001-07
RDX-215-01
RDX-210-03
RDX-160-06
RDI-041-01
RDI-035-02
RDI-026-01
RDI-025-05
RDI-020-09
RDI-001-10
RDD-030-08
RDB-420-05
RDB-410-06
RDB-400-05
RDB-283-04
RDB-282-04
RBD-281-03
RDB-280-06
RDB-101-05
RDB-100-05
RDB-019-04
RDB-018-04
RDB-017-03
RDB-016-03
RDB-015-04
RDB-014-06
RDB-013-07
RDB-006-08
RDB-003-08
RBR-016-05
RBR-015-05
RBR-010-06
RBR-005-11
RBR-001-12
RBI-002-07
RBI-001-11
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R0010
0LS.
DG
NFIL
E
NA
ME:
KY 155 (TAYLORSVILLE ROAD) AT
2000 ’ 4000 ’ 8000 ’0’
KY 1747 STA. 50+00.00
KY 155 STA. 303+12.25 =
X1-X8
T1-T14
R29-R30
R27-R28
R21-R26
R20
R13-R19
R3-R12
R2-R2F
R1
R2A-R2F
TOTAL SHEETS: 52
THESE PLANS ARE FOR GRADE, DRAIN, AND SURFACING
THE CONTROL OF ACCESS ON THIS
PROJECT SHALL BE BY PERMIT
THIS PROJECT IS ON THE NH SYSTEM
KY 155 KY 1747
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
STA. 295+05.18
BEGIN CONSTRUCTION
STA. 309+58.50
END CONSTRUCTION
1
1
11’ TO 12’ 11’ TO 12’ 0’ TO 22’ 0’ TO 12’
2
3
VARIES
DETAIL "C"
AND GUTTER
STANDARD CURB
SAWCUT LINE
TYPICAL SECTIONS
VARIES VARIESVA
RIES
VARIESVARIES 2’
SIDEWALK OR SHOULDER.
SEE CROSS SECTIONS FOR CONSTRUCTION OUTSIDE THE
2’ 3’ 5’ 2’
11’
MATCH EXISTING
1
2’
VARIES
2’ 4’ 2’ 11’
MATCH EXISTING
11’11’11’11’2’11’ 11’
MATCH EXISTING
MATCH EXISTING
6’3’
VARIES
VARIES
MIN.4" DGA
ROADWAY, MEDIAN, AND ISLAND TRANSITIONS.
SEE DETAIL SHEETS AND CROSS SECTIONS FOR PROPOSED
DETAIL "A"
MEDIAN
REMOVE
DETAIL "B"
MEDIAN
REMOVE
DETAIL "B"
DETAIL "B"
DETAIL "C"
2.00%
4.00%8.00%
4.00" CL3 AB 1.00D PG64-22 (WIDENING)
4.00" CL3 AB 1.00D PG64-22 (WIDENING)
4.00" CL3 AB 1.00D PG64-22 (WIDENING)
4.00" DGA BASE (WIDENING)
DETAIL "A"
1.50" CL3 AS 0.38A PG64-22 (OVERALL)
12"
4.00" DGA BASE
GUARDRAIL
WIDENED TO 3’ FOR
TYPICAL 2’ SHOULDER
DAYLIGHT DGA BASE
1.50" CL3 AS 0.38A PG64-22 (OVERALL)
REMOVE MEDIAN AND REPLACE FULL DEPTH
11’11’
MEDIAN AND ISLAND TRANSITIONS.
SEE DETAIL SHEETS AND CROSS SECTIONS FOR PROPOSED
4" CONC. SIDEWALK
BARRIER MEDIAN
OR
MEDIAN DETAIL)
(SEE RAISED ASPHALT
AND GUTTER
STANDARD CURB
KY 155 (TAYLORSVILLE ROAD) STA. 299+10 TO STA. 302+95
4
4
IS TO BE INSTALLED.
SHOULDER SHALL BE WIDENED 1 FOOT WHERE GUARDRAIL
5
5
KY 155 (TAYLORSVILLE ROAD) STA. 295+05.18 TO STA. 299+10
SAWCUT LINE
3:1 MAX.
3:1
SHOULDERS
MAINLINE PAVEMENT
16.00" BASE
1.50" SURFACE
1.50" SURFACE
1.50" CL3 ASPH. SURF. 0.38A PG64-22
(2 COURSES)
ASPHALT CURING SEAL
1.50" CL2 ASPH. SURF. 0.38A PG64-22
SIZE NO. 8 OR 9M
20 lb/s.y. ASPHALT SEAL AGGREGATE (EACH COURSE)
2.4 lb/s.y. ASPHALT SEAL COAT (EACH COURSE)
- USING -
GRADE, DRAIN & SURFACING
NEW CONSTRUCTION
SIZE NO.8 OR 9M
ASPHALT SEAL AGGREGATE @ 20 lb/sy
ASPHALT CURING SEAL @ 2.4 lb/sy
FILL SLOPE. TWO APPLICATIONS OF THE FOLLOWING:
SHOULDERS TO A POINT TWO FEET DOWN THE DITCH OR
ASPHALT SEAL REQUIRED FROM OUTSIDE EDGE OF PAVED
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" DGA
16.00" BASE
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" DGA
(MAX.)
2.00% (MAX.)
AS SHOWN ON PLANS
EXISTING PAVEMENT
MILL AND OVERLAY
AS SHOWN ON PLANS
EXISTING PAVEMENT
MILL AND OVERLAY
EXIST. ASPH. SURFACE
MILL AND OVERLAY
EXIST. ASPH SURFACE
MILL AND OVERLAY
2’ MIN
6
6
6
6
6
6
EXPECTED TO BE 31 FEET FROM CENTERLINE OF KY 155.
AS APPLICABLE. LIMITS OF JPC PAVEMENT ARE
TO 2 INCHES DOWN TO EXISTING JPC PAVEMENT
MILL EXISTING SURFACE APPROXIMATELY 1.5
FOR VERTICAL FACE
SAWCUT AS NEEDED
FOR VERTICAL FACE
SAWCUT AS NEEDED
WHERE APPLICABLE
LONGITUDINAL EDGE KEY
EX. JPC
EX. JPC
4.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" DGA BASE
EARTHWORK QUANTITIES)
MATERIAL (INCLUDED IN
AND BACKFILL WITH SUITABLE
REMOVE EXISITNG PAVEMENT
SHOWN IN PLANS
WITH CL3 AS 0.38A PG64-22 AS
MILL AND OVERLAY EX. PVMT .
4
2’ MIN
EX. JPC
ASPHALT PVMT.
EX. FULL DEPTH
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R00200
TS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 5-9008.00 R2
TYPICAL SECTIONS
SCALE: NTS
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00200
TS.
DG
NFIL
E
NA
ME:
1
2
3
TYPICAL SECTIONS
11’11’11’11’11’2’2’
1 MATCH EXISTING8.00%
VARIES
0’ TO 22’
DETAIL "D"
4.00" CL3 AB 1.00D PG64-22 (WIDENING)
4.00" CL3 AB 1.00D PG64-22 (WIDENING)
4.00" CL3 AB 1.00D PG64-22 (WIDENING)
4.00" DGA BASE (WIDENING)
DETAIL "D"
DAYLIGHT DGA BASE
1.50" CL3 AS 0.38A PG64-22 (WIDENING)
11’11’11’ 12’
OR
VA
RIES
VA
RIES
12’12’ 12’
VARIES VARIESVARIES
VARIES
12’ TO 24’
DETAIL "E" DETAIL "F"
ROADWAY, MEDIAN, AND ISLAND TRANSITIONS.
SEE DETAIL SHEETS AND CROSS SECTIONS FOR PROPOSED
MEDIAN AND ISLAND DETAILS.
SEE DETAIL SHEETS AND CROSS SECTIONS FOR PROPOSED
VARIES
VARIES
VARIES
DETAIL "E"
VARIES
MIN.4" DGA
DETAIL "F"
CURB OR SHOULDER.
SEE CROSS SECTIONS FOR CONSTRUCTION OUTSIDE THE
BARRIER MEDIAN TYPE 5
BARRIER MEDIAN TYPE 5
2’ 2’ 2’ 2’
KY 155 (TAYLORSVILLE ROAD) STA. 304+00 TO STA. 309+58
KY 1747 (HURSTBOURNE PARKWAY) STA. 56+34 TO STA. 59+50
4
3:1 MAX.
3:1
SAWCUT LINE
MAINLINE PAVEMENT
- USING -
GRADE, DRAIN & SURFACING
NEW CONSTRUCTION
SIZE NO.8 OR 9M
ASPHALT SEAL AGGREGATE @ 20 lb/sy
ASPHALT CURING SEAL @ 2.4 lb/sy
FILL SLOPE. TWO APPLICATIONS OF THE FOLLOWING:
SHOULDERS TO A POINT TWO FEET DOWN THE DITCH OR
ASPHALT SEAL REQUIRED FROM OUTSIDE EDGE OF PAVED4
SHOULDERS
16.00" BASE
1.50" SURFACE
1.50" SURFACE
1.50" CL3 ASPH. SURF. 0.38A PG64-22
(2 COURSES)
ASPHALT CURING SEAL
1.50" CL2 ASPH. SURF. 0.38A PG64-22
SIZE NO. 8 OR 9M
20 lb/s.y. ASPHALT SEAL AGGREGATE (EACH COURSE)
2.4 lb/s.y. ASPHALT SEAL COAT (EACH COURSE)
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" DGA
16.00" BASE
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" CL3 ASPH. BASE 1.00D PG64-22
4.00" DGA
VERTICAL FACE
AS NEEDED FOR
SAWCUT LINE
2’ MIN
2’ MIN
EX. JPC
VARIES
PVMT.
ASPH.
EX.
PVMT.
ASPH.
EX.
VERTICAL FACE
AS NEEDED FOR
SAWCUT LINE
2’ MIN
WHERE APPLICABLE
LONGITUDINAL EDGE KEY
1.50" CL3 AS 0.38A PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" DGA BASE
1.50" CL3 AS 0.38A PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
4.00" DGA BASE
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R002
A0
TS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 5-9008.00 R2A
TYPICAL SECTIONS
SCALE: NTS
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R0020
AT
S.
DG
NFIL
E
NA
ME:
DETAIL "H"
4.00" DGA BASE
12"
DETAIL "I"
DETAIL "G"
SECTION A-A ASPHALT ENTRANCE
2’ PAVED SHOULDER2’ PAVED SHOULDER
DRIVING LANE
SE
E
X-S
EC
TIO
NS
MA
TC
H
EXIS
T
EN
T.
FULL DEPTH ASPHALT PAVEMENT
TYPICAL COMMERCIAL ENTRANCE
A
A
(SEE PLANS)
RADIUS VARIES
IN PLANS
WIDTH AS SHOWNPAVEMENT
MATCH EXIST.
PAVEMENT
EXIST. ENTRANCE
DGA --------------------------------------
CL 3 ASPH BASE 1.00D PG64-22-------------
CL 3 ASPH SURF 0.38A PG64-22-------------
VARIES
GRADE
PAVEMENT 12% MAX.
ASPHALT ENTRANCE
2’ TRAFFIC LANES
PAVEMENT
MAINLINE
4.00 INCHES
3.00 INCHES
1.25 INCHES
TYPICAL SECTIONS
APPROACH LT. 307+60
DISCOUNT TIRE ACCESS
LT. 297+50
HURSTBOURNE LANE
VARIES VARIES
DETAIL "I"
4.00" DGA BASE
12"
8.00%
2’ 17’ RADIAL 2’VARIES VARIES
MATCH EXISTINGMATCH EXISTING 2% CROWN
DETAIL "H"DETAIL "G"
2’6’
2.00%
AND GUTTER
STANDARD CURB
SIDEWALK
4" CONC.
DAYLIGHT DGA
STANDARD CURB AND GUTTER
1.25" CL3 AS 0.38A PG64-22
3.00" CL3 AB 1.00D PG64-22
1.25" CL3 AS 0.38A PG64-22
3.00" CL3 AB 1.00D PG64-22
(6" GUTTER)
AND GUTTER MOD
STANDARD CURB
(6" GUTTER)
AND GUTTER MOD
STANDARD CURB
(6" GUTTER)
AND GUTTER MOD
STANDARD CURB
ISLAND
RAISED ASPHALT ISLAND
12" 12"
2" CL3 AS 0.38A PG64-22
COMPACTED EARTH
DGA BASE (4" MIN.)
AND GUTTER
STANDARD CURB
AND GUTTER
STANDARD CURB
4" DGA BASE
MILL AND OVERLAY
EXISTING PAVEMENT CONSTRUCTION
FULL DEPTH
1
V
V
V
V
V
VV
V
V V
V
V
V
V
V
V
VV V
V
VV
V
V
V
V
VV
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V
VV
V
V
V
V
VV
VV
V
V
V
VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V
V
V
V
V
VV
V
VV
V
V
V
V
VV
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V
V
VV
V
V
V VV
V
V
V
VV
V
V
V
V
V
VV
V
V
V
V
V
V
V
V
VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V V
V VV
V
V
V
VV
V
V
V
V
V
VV
V V
V
V
V
V
V V
V
V
V
V
V
VV V
V
V
V
V
V
VV
V
V V
V
V
V
V
V
V
V
VV
V
VV
V
V
V
VV
V VV
V
V
V
VV
V
V
V
V
V
VV
V V
V
V
V
V
2
2
3:1 MAX
4" CONC. SIDEWALK
3:1 MAX3:1
MAX3:1 MAX
SEE PLAN SHEETS FOR PROPOSED ISLAND DETAILS.
1
SIZE NO.8 OR 9M
ASPHALT SEAL AGGREGATE @ 20 lb/sy
ASPHALT CURING SEAL @ 2.4 lb/sy
FILL SLOPE. TWO APPLICATIONS OF THE FOLLOWING:
SHOULDERS TO A POINT TWO FEET DOWN THE DITCH OR
ASPHALT SEAL REQUIRED FROM OUTSIDE EDGE OF PAVED
4.00" DGA BASE
4.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
RESIDENTIAL ASPHALT ENTRANCE PAVEMENT
DGA --------------------------------------
CL 3 ASPH BASE 1.00D PG64-22-------------
CL 3 ASPH BASE 1.00D PG64-22-------------
CL 3 ASPH SURF 0.38A PG64-22-------------
4.00 INCHES
4.00 INCHES
3.00 INCHES
1.25 INCHES
RAISED CONCRETE MEDIAN
DGA BASE (4" MIN.)
AND GUTTER
STANDARD CURB
AND GUTTER
STANDARD CURB
MILL AND OVERLAY
EXISTING PAVEMENT CONSTRUCTION
FULL DEPTHV
V
V
V
V
VV
V
V V
V
V
V
V
V
V
VV V
V
VV
V
V
V
V
VV
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V
VV
V
V
V
V
VV
VV
V
V
V
VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V
V
V
V
V
VV
V
VV
V
V
V
V
VV
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V
V
VV
V
V
V VV
V
V
V
VV
V
V
V
V
V
VV
V
V
V
V
V
V
V
V
VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V
VV
V V
V VV
V
V
V
VV
V
V
V
V
V
VV
V V
V
V
V
V
V V
V
V
V
V
V
VV V
V
V
V
V
V
VV
V
V V
V
V
V
V
V
V
V
VV
V
VV
V
V
V
VV
V VV
V
V
V
VV
V
V
V
V
V
VV
V V
V
V
V
V
6" CLASS A CONCRETE
V
V
V
V
V
VV
V
V V
V
V
V
V
V
VV
V
V V
V
V
V
V
V
V
VV V
V V
V
V
V
V
V
VV V
V
V
V
V
V
V
V
V
VV
V
NEW PAVEMENT
12 INCHES
LONGITUDINAL EDGE KEY DETAIL
4 INCHES
NEW ASPHALT SURFACE
NEW SURFACE
MIN. 18 INCHES
EXISTING BITUMINOUS PAVEMENT
1.25" CL3 AS 0.38A PG64-22
3.00" CL3 AB 1.00D PG64-22
4.00" CL3 AB 1.00D PG64-22
(4" MIN)
DGA BASE
COMMERCIAL ASPHALT ENTRANCE PAVEMENT
HURSTBOURNE LANE AND
(SEE BELOW)
ASPH. ENTRANCE PVMT.
FULL DEPTH COMMERCIAL
TRANSVERSE EDGE KEYS WHICH SHALL ALSO BE BID AS LOGITUDINAL EDGE KEY.
BITUMINOUS MATERIAL REMOVED. THIS DETAIL SHALL ALSO APPLY TO
EQUIPMENT, ETC. TO PERFORM THE WORK AND DISPOSE OF THE
EDGE KEY" SHALL INCLUDE ALL NECESSARY MATERIALS, LABOR,
THE CONTRACT UNIT PRICE BID PER LINEAR FOOT FOR "LONGITUDINAL
SO THE TOP ASPHALT BASE LAYER MAY HEEL INTO THE EXISTING PAVEMENT.
INCLUDE MILLING THE EXISTING BITUMINOUS BASE 4" DEEP BY 12" WIDE,
LIMITS OF EXISITING JPC PAVEMENT. WORK UNDER THIS ITEM SHALL
BE REQUIRED. IF LESS THAN 2 FEET, REMOVE EXISTING ASPHALT TO
OF BITUMINOUS PAVEMENT FROM EXISTING JPC PAVEMENT SHALL
EXISTING BITUMINOUS PAVEMENT. A MINIMUM WIDTH OF 2 FEET
CONTRACTOR SHALL USE LONGITUDINAL EDGE KEY ADJACENT TO
FOR VERTICAL FACE
SAWCUT 6" AS NEEDED
SURFACE
CONSTRUCT NEW ASPH.
MILL EX. SURFACE AND
August 17, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
E-S
HE
ET
NA
ME:
R002
B0
TS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 5-9008.00 R2B
TYPICAL SECTIONS
SCALE: NTS
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R0020
BT
S.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R2C
R0020
CS
UV:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R0020
CS
U.
DG
NFIL
E
NA
ME:
GENERAL SUMMARY
UNITDESCRIPTIONITEM
01810 LF
01811 LF
01923 SY
02015 SY
02091 SY
02200 CY
02351 LF
02360
02381 LF
02568 LS
STANDARD CURB AND GUTTER
STANDARD CURB AND GUTTER MOD
STANDARD BARRIER MEDIAN TYPE 5
CEMENT CONCRETE ISLAND
REMOVE PAVEMENT
GUARDRAIL-STEEL W BEAM-S FACE
GUARDRAIL TERMINAL SECTION NO 1 EACH
REMOVE GUARDRAIL
MOBILIZATION
02650 LS
02677
02720 SY
MAINTAIN AND CONTROL TRAFFIC
ASPHALT PAVE MILLING & TEXTURING
02721 SYREMOVE CONCRETE SIDEWALK
SIDEWALK - 4 IN CONCRETE
02160 LF
02159 LFTEMP DITCH
CLEAN TEMP DITCH
02704
02705
02706
02707
02708
SILT TRAP TYPE A
SILT TRAP TYPE B
SILT TRAP TYPE C
CLEAN SILT TRAP TYPE A
CLEAN SILT TRAP TYPE B
CLEAN SILT TRAP TYPE C
02703
LFTEMP SILT FENCE02701
EACH
EACH
EACH
EACH
EACH
EACH
05950 SY
05952 SY
EROSION CONTROL BLANKET
TEMP MULCH
05953 SY
05963
TEMP SEED AND PROTECT
INITIAL FERTILIZER TON
02726 LSSTAKING
0
31
-
-
0
0.03
-
740
287.5
287.5
1
TON 242
202
3
3
3
3
3
3
266
315
138
76
49
0
-
-
50
0.04
-
235
0
162
2
2
2
2
2
2
197
0
0
0
-
-
0
0.01
-
0
329
3
3
3
3
3
3
409
156
0
49
31
1
1
50
0.08
1
975
287.5
287.5
1
306
1,384
693
1,384
8
8
8
8
8
8
342
1,251
724
491
76
(WES
T)
KY 15
5
(EA
ST)
KY 15
5
KY 17
47
0
0
404 323 657
0 0
0 0
43 21
404 323 657
76 0
457 644 150
343 483 113 939
TO
TA
L
PR
OJE
CT
02671 PORTABLE CHANGEABLE MESSAGE SIGN EACH - -
02775 EACH - -ARROW PANEL
- 4
- 2
942 569
UNITDESCRIPTIONITEM
06574
06514 LF
06516 LF
06530 LF
06568 LF
PAVE STRIPING REMOVAL-4 IN
PAVE STRIPING THERMO-STOP BAR-24 IN
06576
06589
06591
06592
SF
PAVE MARKING-THERMO CURV ARROW EACH
PAVE MARKING-THERMO ONLY EACH
PAVE MARKER TYPE V-MW
PAVE MARKER TYPE V-BY
PAVE MARKER TYPE V-B W/R
06590 PAVE MARKER TYPE V-MY
EACH
EACH
EACH
EACH
59
42
LF 0
DETECTABLE WARNINGS23158ES505
PAVE STRIPING-PERM PAINT-4 IN
PAVE STRIPING-PERM PAINT-8 IN
12
0
220782NS714
2
EACH
EACHPAVE MARKING THERMO-BIKE LANE ARROW24386EC
PAVE MARKING THERMO-BIKE
LF 16PAVE MARKING-THERMO YIELD BAR-36 IN22520EN
06565 LFPAVE MARKING-THERMO X-WALK-6 IN 167
06542 LF 66
67
0
0
39
4,650
64
40
4
0
0
0
14
198
0
12
0
0
2
1,282
0
0
12
5
0
0
0
0
615
0
49
0
3,036
82
28
5
2
2
30
822
66
615
79
49
41
8,968
2,163
(WES
T)
KY 15
5
(EA
ST)
KY 15
5
KY 17
47
963 0
00
150150
PAVE STRIPING-THERMO-6 IN W
TO
TA
L
PR
OJE
CT
2 0EACH 0 2
20550ND LF 2,334 1,311 4,732
10EACH24631EC 10 7 27BARCODE SIGN INVENTORY
24768EC
21134ND REMOVE-STORE AND REINSTALL SIGN
LANE SEPARATOR CURB
06546 PAVE STRIPING-THERMO-12 IN W LF 0 0 211 211
457
122 245
06600 EACH 20 0 46 66REMOVE PAVE MARKER TYPE V
10030NS DOLL
DOLLFUEL ADJUSTMENT
ASPHALT ADJUSTMENT
10020NS
21289ED
0
55 00 55
LONGITUDINAL EDGE KEY
23131ER701 PIPELINE VIDEO INSPECTION
21417ES717 PAVE MARK THERMO CONE CAP-SOLID YELLOW
LF
LF
SF05964
05985 SY
20-10-10 FERTILIZER
SEEDING AND PROTECTION
TON
06406 SFSBM ALUM SHEET SIGNS .080 IN
06410 LFSTEEL POST TYPE 1
0.05
104
0.06 0.02 0.13
1,876
260
163
685 966 225
65
58 55 50
91
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
GENERAL SUMMARY SHEET
1,200
06598 0PAVEMENT MARKING REMOVAL SF 130 100 230
105 105
254 670 1,087 2,011
1,087SAWCUT PAVEMENT
169 252 421
2,7251,214ROADWAY EXCAVATION *
* REMOVAL OF CURB AND GUTTER, MEDIANS, AND ISLANDS WHERE SHOWN IS INCLUDED IN ROADWAY EXCAVATION
4,839
12,155
SH
EET
NO.
SKEW
UNIT TO BID
ITEM CODE
REMARKS
TOTAL PROJECT
R3 297+53 36
440 462 521 1433 1480 1559 1568
18 IN
OU
TLET T
Y 1
SL
OPE
D
BO
X
INLET T
Y
B
CU
RB
BO
X
INLET T
Y 6E
DR
OP
BO
X
INLET 13-75
DR
OP
BO
X
522
112
240
16
95
41
22
12
13
2
1
2
1
1
1
1
1
1
1298+40
R7
R9
58+20R11
299+97.16
299+75.26
299+34.35
56+41.62
R11 60+60
H=3.80’
H=3.95’
H=4.30’
H=4.62’
H=3.20’
H=5.45’
H=5.73’
298+74
51+87.43
1496
(OMIT
AP
RO
N)
INLET T
Y 3
DR
OP
BO
X
51+68.97 1° LT 8 1 H=2.81’
R5 72 1304+71.60
307+55
PIPE DRAINAGE SUMMARY
RE
MO
VE PIP
E
EACH EACH EACH EACH EACHEACHLF LF LF LF LF
1705
EACH
1709
EACH
1310
BO
X IN
LET
&
GU
TTE
R
RE
MO
VE
CU
RB
CA
TC
H
BA
SIN
ADJ
US
T
1
1
1298+23 290
31
1 1
28
78
88
20
238
TAYLORSVILLE (WEST)
TAYLORSVILLE (EAST)
HURSTBOURNE PKWY
36 112 170 0 427 2 3 0 0 1 0 02
36 6 3 1 1 2109112 410 774
0 0 0 0 1 1240 2390 13
0 4 0 1 0 01080 0 96 0 0 0
1 3 1
1 1 1
R3
R3
R3
R3
R3
R3
R5
R5
INLET 13-3
DR
OP
BO
X
15 IN
PIP
E
EN
TR
AN
CE
18 IN
PIP
E
CU
LV
ER
T
PIP
E 15 IN
SE
WE
R
ST
OR
M
PIP
E 18 IN
SE
WE
R
ST
OR
M
NOTES
ESTIMATED AT 110 LBS. PER SQ. YD.
1
PER INCH OF DEPTH, UNLESS NOTED
OTHERWISE.
ITEM UNIT
PAVING SUMMARY
ITEM
PAVING AREAS
S Q U A R E Y A R D S
CODE
ITEM
ALL ASPHALT MIXTURES SHALL BE
PA
RK
WA
Y
HU
RS
TB
OU
RN
E
KY 17
47
PA
RK
WA
Y
HU
RS
TB
OU
RN
E
KY 17
47
28TON
TON
TON00001
00100
DGA BASE
4" DGA BASE
1
YD. PER INCH OF DEPTH.
ESTIMATED AT 1 15 LBS. PER SQ.
3,547 2,336
2,282
193
2.77
449 667
293
RO
AD (W
ES
T)
TA
YL
ORS
VIL
LE
KY 15
5
214
1,215
RO
AD (E
AS
T)
TA
YL
ORS
VIL
LE
KY 15
5
547
6.86
124
RO
AD (W
ES
T)
TA
YL
ORS
VIL
LE
KY 15
5
RO
AD (E
AS
T)
TA
YL
ORS
VIL
LE
KY 15
5
& E
NT
RA
NC
ES
SID
E S
TR
EETS
KY 15
5 (E
AS
T)
& E
NT
RA
NC
ES
SID
E S
TR
EETS
KY 15
5 (W
ES
T)
PR
OJE
CT
TO
TA
L
7
& E
NT
RA
NC
ES
SID
E S
TR
EETS
KY 15
5 (W
ES
T)
& E
NT
RA
NC
ES
SID
E S
TR
EETS
KY 15
5 (E
AS
T)
90
521 100
645
13.92
1,85023
22906ES403 CL3 ASPH. SURF. 0.38A PG64-223" CL3 ASPH. BASE 1.00D PG64-22
1.50" CL3 ASPH. SURF. 0.38A PG64-22
2" CL3 ASPH. SURF. 0.38A PG64-22 (ISLAND)
4" CL3 ASPH. BASE 1.00D PG64-22 1,912 2,170 6,256
00103
00214 CL3 ASPH. BASE 1.00D PG64-22
08100
ASPHALT SEAL AGGREGATE
ASPHALT SEAL COAT TON
TON
CONCRETE - CLASS A CY
6" CONCRETE (MEDIAN)
10" DGA (AVERAGE FULL DEPTH SHOULDER)
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON R2D
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R0020
DS
U.
DG
NFIL
E
NA
ME:
05-9008.00
R0020
DG
N
August 17, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
207 75 511 244
0.34 0.83
1.03 3.26
0.13 0.39
14.9 14.9
1.69
89
441
88
LF
0
88
18 IN
PIP
E
EN
TR
AN
CE
0
88
407 901.25" CL3 ASPH. SURF. 0.38A PG64-22
410
386 90
1,0991,427
164
421 478 35153 1,377 2,464
AND PAVING AREA AND SUMMARY
PIPE DRAINAGE SUMMARY
22767ES710
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON R2E
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R0020
EG
N.
DG
NFIL
E
NA
ME:
05-9008.00
R0020
EG
N
THE CONTROL OF ACCESS ON THIS
PROJECT SHALL BE BY PERMIT
GENERAL AND SPECIAL NOTES
EACH CONTRACTOR SUBMITTING A BID FOR THIS WORK WILL MAKE A THOROUGH INSPECTION OF THE SITE PRIOR TO SUBMITTING
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
STANDARD DRAWINGS
STANDARD DRAWINGS ARE NOT ATTACHED TO THESE PLANS. A STANDARD DRAWING BOOK AND THE HEADWALL SUPPLEMENTAL
BOOK MAY BE OBTAINED FROM THE SUPPORT BRANCH OF THE DEPARTMENT OF ADMINISTRATIVE SERVICES IN FRANKFORT, KY, AT (502) 564-4610.
N.G.S. (U.S.G.S.) BENCHMARKS
DO NOT DISTURB N.G.S. (U.S.G.S.) BENCHMARKS IN ANY MANNER UNLESS DIRECTED BY THE ENGINEER.
CLEARING AND GRUBBING
CONTRARY TO SECTION 202 OF THE STANDARD SPECIFICATIONS, NO DIRECT PAYMENT WILL BE ALLOWED FOR CLEARING AND
GRUBBING ON THIS PROJECT.
DEPARTMENT OF THE ARMY AND WATER QUALITY CERTIFICATION APPROVALS
A DEPARTMENT OF THE ARMY (DA) PERMIT, WHICH MAY REQUIRE APPROVAL OF A STATE WATER QUALITY CERTIFICATION FROM THE KENTUCKY
DIVISION OF WATER, REGULATES THIS PROJECT AT ONE OR MORE LOCATION. PERFORM ALL APPLICABLE WORK IN COMPLIANCE WITH THE
CONDITIONS STATED IN THE DA PERMIT AND APPROVED WATER QUALITY CERTIFICATION. POST A COPY OF THE DA PERMIT AND THE WATER
QUALITY CERTIFICATION IN A CONSPICUOUS PLACE AT THE PROJECT SITE. IF A DA PERMIT OR WATER QUALITY CERTIFICATION APPROVAL IS PENDING,
DO NOT WORK IN OR DISTURB THE DESIGNATED AREA(S) UNTIL OBTAINING THE APPROPRIATE APPROVAL(S). REFER TO NOTICE(S) CONTAINED IN THE
CONTRACT BID PROPOSAL FOR DESIGNATED AREA(S) WHERE WORK IS PROHIBITED BY THE ABSENCE OF APPROVAL.
LIQUIDATED DAMAGES
SHOULD THE CONTRACTOR FAIL TO MEET THE SPECIFIED COMPLETION DATE, LIQUIDATED DAMAGES SHALL BE ASSESSED IN ACCORDANCE WITH SECTION 108.09
OF THE CURRENT EDITION OF THE KYTC STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
BEFORE YOU DIG
ALL UTILITIES ON THESE PLANS ARE APPROXIMATE. INDIVIDUAL SERVICE LINES ARE NOT SHOWN. THE CONTRACTOR OR
SUBCONTRACTOR SHALL NOTIFY "KENTUCKY 811" UTILITY PROTECTION CENTER BY DIALING 811 OR (TOLL FREE PHONE
NO. 1-800-752-6007) A MINIMUM OF TWO (2) AND NO MORE THAN TEN (10) BUSINESS DAYS PRIOR TO EXCAVATION. THIS NUMBER
IS ESTABLISHED TO PROVIDE ACCURATE LOCATION OF EXISTING BELOW GROUND UTILITIES (I.E. CABLES, ELECTRIC WIRES,
GAS, AND WATERLINES). THE CONTRACTOR SHALL BE RESPONSIBLE FOR BECOMING FAMILIAR WITH ALL UTILITY REQUIREMENTS
SET FORTH ON THE PLANS. IF ANY UTILITY LINES ARE ENCOUNTERED DURING CONSTRUCTION, EXTREME CAUTION SHOULD BE
EXERCISED AND THE UTILITY COMPANY NOTIFIED IMMEDIATELY. ANY DAMAGES SHALL BE REPAIRED IMMEDIATELY AT THE
DIRECTION OF THE UTILITY COMPANY, INCLUDING TEMPORARY AND PERMANENT WORK. IT WILL BE THE CONTRACTOR’S
RESPONSIBILITY TO COVER ANY COSTS ASSOCIATED WITH THE REPAIRS.
CAUTION - EXISTING UTILITIES LOCATIONS
ON-SITE INSPECTION
A BID AND WILL THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS SO THAT THE WORK CAN BE EXPEDITIOUSLY
PERFORMED AFTER A CONTRACT IS AWARDED. SUBMISSION OF A BID WILL BE CONSIDERED EVIDENCE OF THIS INSPECTION HAVING
BEEN MADE. ANY CLAIMS RESULTING FROM SITE CONDITIONS WILL NOT BE HONORED.
CAUTION
INFORMATION SHOWN ON THE DRAWINGS INCLUDING THE TYPES AND QUANTITIES OF WORK LISTED ARE NOT TO BE TAKEN AS AN
ACCURATE OR COMPLETE EVALUATION OF THE MATERIAL AND CONDITIONS TO BE ENCOUNTERED DURING CONSTRUCTION. THE
CONTRACTOR MUST DRAW HIS OWN CONCLUSIONS AS TO THE CONDITIONS ENCOUNTERED. KYTC DOES NOT GIVE ANY GUARANTEE
AS TO THE ACCURACY OF THE DATA AND NO CLAIM WILL BE CONSIDERED FOR ADDITIONAL COMPENSATION IF THE CONDITIONS
ENCOUNTERED ARE NOT IN ACCORDANCE WITH THE INFORMATION ABOVE.
CONSTRUCTION TO AVOID DAMAGES TO THEM.
THE UTILITIES PROPERLY LOCATED BEFORE BEGINNING CONSTRUCTION AND TAKING THE PROPER MEASURES DURING
THE EXISTING UTILITY LOCATIONS WITHIN THESE PLANS ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR HAVING
COMPACTION OF ALL OTHER ASPHALT MIXTURES BY OPTION B.
SUBSECTIONS 402 AND 403 OF THE CURRENT STANDARD SPECIFICATIONS. USE JOINT CORES AS DESCRIBED IN SUBSECTION 402.03.02 FOR SURFACE MIXTURES ONLY. WILL ACCEPT THE
WILL ACCEPT THE COMPACTION OF ASPHALT MIXTURES FURNISHED FOR DRIVING LANES AND RAMPS AT ONE INCH (25 MM) OR GREATER ON THIS PROJECT BY OPTION A ACCORDING TO
COMPACTION OF ASPHALT MIXTURES
PERFORM THE WORK AND DISPOSE OF THE REMOVED ASPHALT MATERIAL.
INTO THE EXISTING SURFACE. THE CONTRACT UNIT PRICE BID LINEAR FOOT (PER METER) FOR "EDGE KEY" INCLUDES ALL NECESSARY MATERIALS, LABOR AND EQUIPMENT NECESSARY TO
THIS WORK INCLUDES CUTTING OUT THE EXISTING ASPHALT SURFACE TO A MINIMUM DEPTH AND WIDTH AS DETAILED ELSEWHERE IN THE PLANS SO THAT THE NEW SURFACE MAY HEEL
EDGE KEY
GENERAL AND SPECIAL NOTES
SPECIAL NOTE 11M - BARCODES ON PERMANENT SIGNS
SPECIAL NOTE 1I - PORTABLE CHANGEABLE MESSAGE SIGNS
SPECIAL NOTES FOR
AND/OR AS DIRECTED BY THE ENGINEER.
INCIDENTALS NECESSARY TO PROPERLY INSTALL THE LANE SEPARATOR CURB ACCORDING TO THE MANUFACTURER’S INSTALLATION INSTRUCTIONS, THESE NOTES,
THE CONTRACT UNIT PRICE PER LINEAR FOOT SHALL BE FULL COMPENSATION FOR FURNISHING ALL MATERIALS, EQUIPMENT, TOOLS, HARDWARE, LABOR, AND
LANE SEPARATOR CURB. THE DEPARTMENT WILL MAKE PAYMENT FOR THE COMPLETED AND ACCEPTED QUANTITIES OF LANE SEPARATOR CURB. PAYMENT AT B.
MAINTAIN AND CONTROL TRAFFIC. SEE TRAFFIC CONTROL PLAN.A.
BASIS OF PAYMENTV.
LANE SEPARATOR CURB. THE DEPARTMENT WILL MEASURE LANE SEPARATOR CURB IN LINEAR FEET.C.
INCIDENTAL TO THE PROJECT BID ITEMS.
SITE PREPARATION. OTHER THAN THE BID ITEMS LISTED, THE DEPARTMENT WILL NOT MEASURE SITE PREPARATION FOR PAYMENT, BUT SHALL BE B.
MAINTAIN AND CONTROL TRAFFIC. SEE TRAFFIC CONTROL PLAN.A.
METHOD OF MEASUREMENTIV.
WILL BE CONSIDERED IF THE CONDITIONS ENCOUNTERED ARE NOT IN ACCORDANCE WITH THE INFORMATION SHOWN.
OWN CONCLUSIONS. THE DEPARTMENT DOES NOT GIVE ANY GUARANTEE AS TO THE ACCURACY OF THE DATA AND NO CLAIM FOR MONEY OR TIME EXTENSION
TO BE TAKEN AS AN ACCURATE EVALUATION OF THE MATERIALS AND CONDITIONS TO BE ENCOUNTERED DURING CONSTRUCTION; THE BIDDER MUST DRAW THEIR
CAUTION. THE INFORMATION IN THIS PROPOSAL AND SHOWN ON THE PLANS AND THE TYPE OF WORK LISTED HEREIN ARE APPROXIMATE ONLY AND ARE NOT F.
THE OWNER AND THE ENGINEER AT NO ADDITIONAL COST TO THE DEPARTMENT.
ADDITIONAL COST TO THE DEPARTMENT. REPAIR OR REPLACE DAMAGED PRIVATE PROPERTY IN LIKE KIND MATERIALS AND DESIGN TO THE SATISFACTION OF
CONTRACTOR’S ACTIVITIES. REPAIR OR REPLACE DAMAGED ROADWAY FEATURES IN LIKE KIND MATERIALS AND DESIGN AS DIRECTED BY THE ENGINEER AT NO
PROPERTY DAMAGE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO PUBLIC AND/OR PRIVATE PROPERTY RESULTING FROM THE E.
RETURN TO A COMPLETE UPRIGHT POSITION WITH MINIMAL MAINTENANCE.
EASILY REPLACED UNDER TRAFFIC CONDITIONS. THE POSTS AND THE SYSTEM SHALL BE DESIGNED AND FABRICATED TO WITHSTAND REPEATED IMPACTS AND
THE COLOR OF THE POST, LONGITUDINAL SYSTEM, AND ADJACENT PAVEMENT MARKING. THE SYSTEM SHALL BE OF SUCH DESIGN TO ALLOW POSTS TO BE
MINIMUM OF 26 INCHES IN HEIGHT, AND A MINIMUM OF 2 INCHES IN WIDTH. THE COLOR OF THE RETROREFLECTIVE SHEETING USED ON THE POST SHALL MATCH
INCHES ALONG THE SYSTEM. THE POST COLOR SHALL MATCH THE COLOR OF THE MODULAR CURB UNIT AND ADJACENT PAVEMENT MARKING. POSTS SHALL BE A
UPRIGHT POST. EACH MODULAR CURB UNIT SHALL HAVE AT LEAST ONE UPRIGHT POST. POSTS SHALL BE UNIFORMLY SPACED AT NO GREATER THAN 44 D.
MAXIMUM HEIGHT OF 4 INCHES, A MAXIMUM WIDTH OF 12 INCHES, AND INCLUDE A RETROREFLECTIVE MARKER.
DESIGNED TO ALLOW FOR CROSS DRAINAGE UNDER THE MODULAR CURB UNITS. EACH MODULAR CURB UNIT WILL HAVE A MINIMUM LENGTH OF 40 INCHES, A
MANUFACTURER’S RECOMMENDATIONS. THE SYSTEM SHALL HAVE A MOUNTABLE DESIGN TO ALLOW FOR EMERGENCY VEHICLE CROSSOVERS. THE SYSTEM SHALL BE
LANE SEPARATOR CURB. THE LANE SEPARATOR CURB SYSTEM MUST BE FASTENED TO THE UNDERLYING PAVEMENT OR BRIDGE DECK ACCORDING TO THE C.
OR DIRECTED, BY THE ENGINEER.
BACKFILL, AND REMOVAL OF OBSTRUCTIONS OR ANY OTHER MATERIAL NOT COVERED BY OTHER ITEMS. PERFORM ALL SITE PREPARATION ONLY AS APPROVED,
SITE PREPARATION. BE RESPONSIBLE FOR ALL SITE PREPARATION INCLUDING, BUT NOT LIMITED TO: CLEARING AND GRUBBING, STAKING, EXCAVATION, B.
MAINTAIN AND CONTROL TRAFFIC. SEE TRAFFIC CONTROL PLAN.A.
CONSTRUCTION METHODSIII.
ENGINEER PRIOR TO INSTALLATION. SYSTEM COLOR SHALL MATCH THE ADJACENT PAVEMENT MARKING COLOR.
SYSTEM SHALL BE COMPLIANT WITH NCHRP 350 OR MASH. MANUFACTURER’S DOCUMENTATION VALIDATING THIS COMPLIANCE SHALL BE PROVIDED TO THE
LONGITUDINAL CHANNELIZING SYSTEM. THE DESIGN OF THE SYSTEM SHALL ALLOW A RADIUS OR CURVE AS NEEDED BY ROADWAY GEOMETRY. THE COMPLETE
LANE SEPARATOR CURB. THE MODULAR UNITS OF THE LANE SEPARATOR CURB SYSTEM ARE TO INTERFACE WITH EACH OTHER TO FORM A CONTINUOUS B.
MAINTAIN AND CONTROL TRAFFIC. SEE TRAFFIC CONTROL PLAN.A.
POSTS/PANELS.
FURNISH AND INSTALL RAISED TRAFFIC SEPARATOR CURB GUIDANCE SYSTEM WHICH INCLUDES CURB SECTIONS, TRANSITIONS END SECTIONS, DELINEATOR
IN THESE NOTES.
SAMPLING A SUFFICIENT TIME IN ADVANCE OF THE USE OF THE MATERIALS TO ALLOW FOR THE NECESSARY TIME FOR TESTING UNLESS OTHERWISE SPECIFIED
ALL MATERIALS SHALL BE SAMPLED AND TESTED IN ACCORDANCE WITH THE DEPARTMENT’S SAMPLING MANUAL AND THE MATERIALS SHALL BE AVAILABLE FOR
MATERIALSII.
(1) MAINTAINING AND CONTROLLING TRAFFIC; (2) INSTALLING LANE SEPARATOR CURB; AND (3) ALL OTHER WORK SPECIFIED IN THE CONTRACT.
STANDARD SPECIFICATIONS. THIS PROJECT SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, MATERIALS, AND INCIDENTALS FOR THE FOLLOWING:
SPECIFICATIONS, STANDARD AND SEPIA DRAWINGS, AND SPECIAL NOTES AND SPECIAL PROVISIONS, CURRENT EDITIONS. ARTICLE REFERENCES ARE TO THE
EXCEPT AS PROVIDED HEREIN, PERFORM ALL WORK IN ACCORDANCE WITH THE DEPARTMENT’S STANDARD SPECIFICATIONS, INTERIM SUPPLEMENTAL
DESCRIPTIONI.
SPECIAL NOTE FOR LANE SEPARATOR CURB
Anthony Lewis
Digitally signed by Anthony Lewis DN: cn=Anthony Lewis, o=Stantec Consulting, ou, [email protected], c=US Date: 2017.08.17 14:29:07 -04'00'
0’ 40’ 80’20’
298
+00
297
+00
296
+00
295
+00
+40.00 7.00’ RT
BEGIN TAPER MA
TC
HLIN
E S
TA. 300
+00
+05.18 7.38’ LT
BEGIN TAPER
TO LOUISVILLE
KY 155 (TAYLORSVILLE ROAD)
15" PIPE
STA. TO STA. SIZE/TYPECHANNEL LINING
TYPE QUANTITYDEPTH
296+00 TO 297+35.18 SPCL. "V" ECB 1.0’
DITCH CONSTRUCTION LT !
SPCL. "V" ECB 1.0’
+53.74 31.47’ LT
BEGIN TAPER
+40.14 0.46’ LT
R= 5.46’
MEDIAN
PVMT. TAPER
+16.05 36.21’ LT
END TAPER
+09.08 13.85’ LT
END TAPER
11’11’
11’
11’
11’
12’
12’
12’
12’
12’
CONST. LIMITS
TANGENT PVMT. TAPER
TANGENT PVMT. TAPER
+45.37 2.88’ LT
END TAPER
S86°
58’37"
ES33°54’33"E
299
+00
300
+00
SPCL. "V" ECB 1.0’
297+70.78 TO 298+19.26
REMOVE EXISTING
+53.35 10.96’ LT
R= 1.00’
MEDIAN
+99.13 9.96’ LT
R= 1.00’
MEDIAN
+63.49 43.73’ LT
R= 2.00’
ISLAND
+86.00 43.25’ LT
R= 2.00’
ISLAND
+98.94 92.05’ LT
R= 2.00’
ISLAND
+91.26 137.34’ LT
R= 100.00’
+45.90 72.90’ LT
R= 35.00’
’0
01=
R
’5
3=
R
11’11’
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
15" PIPE
18" PIPESPCL. "V" DT.SPCL. "V" DT.
SPCL. "V" DT.
HU
RS
TB
OU
RN
E
LA
NE
(REMOVE)
15" PIPE15" PIPE
EX. R/W
EX. R/W
EX. R/W
EX. R/W
PIPE)(REMOVE
x
x
x
xx
x
xx
’499=R NOITISNART LAIDAR
’0001=R NOITISNART LAIDAR
AS
PH.
ASP
H.
DNR
e= see x-secE= 613.22’R= 5208.71’L= 4824.34’T= 2600.81’ = 53°04’04" RTPI STA 296+52.01D
299+47.16 TO 299+67.87
91 SY
33 SY
14 SY
103.00’ LT
+18.96
111.70’ LT
+86.95
AT END OF SIDEWALK
GRADE TO EXISTING
+00.42 37.15’ LT
BEGIN TRANSITION
+91.72 36.82’ LT
END TRANSITION
+91.72 10.82’ LT
END TRANSITION+99.92 15.16’ LT
BEGIN TRANSITION
PVMT. TRANSITION
PVMT. TRANISITION
PVMT TRANSITION
+91.72 4.82’ LT
END TRANSITION
+99.79 9.16’ LT
BEGIN TRANSITION
4.37’ RT
+13.53
5.63’ RT
+67.13
18.60’ RT
+20.00
18.82’ RT
+30.46
15.40’ RT
+30.84
15.75’ RT
+50.11
41.34’ LT
+20.00
I.E. 636.06O.E. 635.70
O.E. 633.50I.E. 635.10
TG. 638.05 FL. 637.25
FL. 637.20 637.27
FL.
OF PIPE
INCIDENTAL TO REMOVAL
REPAIR OF CB WALL
(REMOVE)
’2201=R NOITISNART LAIDAR
x x
+33.16 59.87’ LT
R= 15.00’ +72.70 60.47’ LT
R= 15.00’
8.06’ RT
+46.51
1.84’ RT
+99.54
REMOVE EXISTING MEDIAN AND CURB
MEDIAN AND CURB
CONSTRUCT RAISED CONC MEDIAN
ISLAND
CONCRETE
CEMENT
CONSTRUCT
KY 155 (TAYLORSVILLE RD)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R00300
PL
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R3
PLAN SHEET
STA. 295+05.18 TO STA. 300+00 SCALE: 1"=40
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00300
PL.
DG
NFIL
E
NA
ME:
15"
SE
WE
R
PE
R
RE
CO
RD
DR
AWIN
G 08010-11
IE-633.38
TG-636.38
CB
12" VCP
12"
VC
P
8" PVC
8" PVC
TELE/JB
TELE/JB
IE-633.97
TG-637.22
CB
IE-627.12
IE-634.24
2" TRENCH DRAIN
CB
TG-637.95
IE-SIL
TE
D
CB
TG-641.70
IE-634.70
18"
RC
PIE-637.40
8’X
4’
RC
BC
18" RCP
15" RCP
18" RCP
12"
RCP
15"
RC
P
IE-629.41
15" RCP
15" RCP
15" RCP
18"
RC
P
SP
ELEV=
638.
00
TBM1
ELEV=
636.
99
TBM2
SAN
MH
SAN
MH
SAN
MH
SAN
MH
SAN
MH
IE-62
7.08
TL-63
6.08
SAN
MH
IE-63
0.45
TL-63
9.16
SAN
MHIE
-63
5.76
TL-64
1.04
SAN
MH
IE-63
7.92
TL-64
3.22
SAN
MH
WV
WV
WV
WV
IE-625.68
IE-636.02
IE-635.66
5"
DID N
OT
FIN
D
SAN
MH P
ER R
ECOR
D D
RA
WIN
G 0
8010-11
IE-635.04
STA. 295+05.18
BEGIN CONSTRUCTION
GAS LINECAUTION
WIDTH PIPESTA.
SID
ESIZE (IN) LENGTH (FT)(LF) TYPE AREA (SQYD)
SURFACE
EACH
HDWL TYPE
ENTRANCES
ASPH -SID
E
STA. STA.
STANDARD
C&G
(LF)
-
-LT
HDR
(LF)
-
TO
CURB
297+09.28
-299+14.43 300+00.00
295+34.68 357
115
AREA
(SQYD)SID
E
STA. TO STA.
-LT 300+00.00
SID
E
STA. TO STA.
-LT -
TYPE 1
-
(SQYD) (EACH) (SQFT)
SIDEWALK
4 INCH CONC WARNINGSDETECTABLERAMPS
300+00.00299+14.99 73
SIDEWALK
SEEDING AND PROTECTION
LT 297+53 27 15 3610
MED
AREA
(SQYD)SID
E
STA. TO STA.
- 76LT 299+00.91298+61.50
AREA
(SQYD)SID
E
STA. TO STA.
- 97298+56.35297+09.08
BARRIER MEDIAN TYPE 5
MED
- 58300+00.00298+96.13MED
508295+05.18
CONCRETE ISLAND
DEPTH NEW PAVEMENT
ESTIMATED LIMITS OF FULL
SID
E
TO
-LT
SID
E
TO
-LT
LONGITUDINAL EDGE KEY
LENGTH LENGTH
(LF) (LF)
295+20 295+20
300+00295+20 482
- 672
- 224
295+32.68 298+56.34
298+96.14
STA.APPROX.
STA.APPROX.
STA.APPROX.
STA.APPROX.
MED
LT 298+86.95 - 299+18.96
300+00
34
MED
SAWCUT PAVEMENT
-LT 295+20295+20 10
-LT 297+47.74 297+57.87 10
LT -
LT 297+60 - 299+60 200
LT -
10
297+47.74 297+57.87 10
298+86.95 299+18.96 34
294+00 294+20 294+40 294+60 294+80 295+00 295+20 295+40 295+60 295+80 296+00 296+20 296+40 296+60 296+80 297+00 297+20 297+40 297+60 297+80 298+00 298+20 298+40 298+60 298+80 299+00
299+20 299+40 299+60 299+80 300+00
641.
9
641.
5
641.
3
641.
0
640.7
640.6
640.5
640.2
639.9
639.6
639.4
639.2
638.9
638.6
638.4
638.2
638.0
637.8
637.7
637.6
637.6
637.4
637.4
637.4
637.4
638
640
642
644
646
648
650
652652
654
656
658
634
636
632
630
628
626
624
622
620
634
636
638
640
642
644
646
648
650
652652
632
630
628
626
624
656
654
622
SPCL. "V" DT. LT.
SPCL. "V" DT. LT.
DT. LT.
SPCL. "V"
+00
+00
O.E. 633.50
TG. 638.05 FL. 637.20
I.E. 632.90
I.E. 634.25
I.E. 635.10
EX. 18" RCP
FL. 634.30
O.E. 635.70
I.E. 636.06
+35.18
+19.26
+67.87
+47.16
S=1.91%
+70.78
S=0.99%
S=4.68%
638.87
637.12
635.23
632.40
633.37
@ S=1.00%
15" ENT PIPE
18"
SL
OP
ED
BO
X
OU
TL
ET
TY
PE 1
ST
A. 298
+27.91
LT.
FL. 637.25 FL. 637.27
I.E. 633.30
I.E. 632.65
15" STORM PIPE @ S=1.00%
@ S=0.98%
15" STORM PIPE
@ S=1.14%
15" STORM PIPE
@ S=24.58%
15" STORM PIPE
ABOVE EXISTING DATUM FOR CLARITY
LEFT SIDE DRAINAGE SHOWN 10’
EXISTING GROUND LINE
ST
A. 295
+05.18
BE
GIN
CO
NS
TR
UC
TIO
N
DBI T
YP
E 13-3
ST
A. 298
+40
LT.
CBI T
YP
E
B-3-2
ST
A. 299
+34.35
LT.
CBI T
YP
E
B-3-6
ST
A. 299
+75.27
LT.
CBI T
YP
E
B-4-2
ST
A. 299
+97.16
LT.
EX. E
LE
C. LIN
E
18" CULVERT PIPE @ S=1.43%
S=3.01%
MA
TC
HLIN
E S
TA. 300
+00
18"
SL
OP
ED
BO
X
OU
TL
ET
TY
PE 1
ST
A. 299
+38.35
LT.
DATUM
DATUM
KY 155 (TAYLORSVILLE RD)
HORIZONTAL 40’SCALE: 1" =
VERTICAL4’ 1" =
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R4
PROFILE SHEET
STA. 295+05.18 TO 300+00
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00400
PF.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
CA
BL
E
&
CO
ND
UIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. T
EL
EP
HO
NE
EX. S
AN. S
EW
ER
EX. E
LE
C. LIN
E
0’ 40’ 80’20’
304
+00
300
+00
301+
00
302
+00
303
+00
52+00
51+00
50+00 POB 50+00.00
+41.72 7.82’ LT
R= 1.00’
MEDIAN
+90.47 37.54’ LT
R= 3.00’
ISLAND
11’11’
11’11’
11’
11’
11’
KY 155 (TAYLORSVILLE ROAD)
MA
TC
HLIN
E S
TA. 306
+00
MATCHLINE STA. 52+00
KY 1747 STA. 50+00.00
KY 155 STA. 303+12.25 =
KY 17
47 (H
UR
ST
BO
UR
NE P
AR
KW
AY)
N54°2
6’3
8"E
S.F. W/1 TERM. SECT. NO 1
287.5 LF OF STEEL ’W’ BEAM GUARDRAIL
LT. STA. 300+14.14 TO STA 302+79.63 CONST.
+34.62 86.82’ LT
R= 50’
MA
TC
HLIN
E S
TA. 300
+00
35.97’ LT
+50.05
STA. TO STA. SIZE/TYPECHANNEL LINING
TYPE QUANTITYDEPTH
SPCL. "V" ECB 1.0’
DITCH CONSTRUCTION LT !
305+60 TO 306+00
305
+00
306
+00
18" P
IPE
+49.74 40.96’ LT
R= 3.00’
ISLAND
+01.85 108.05’ LT
R= 3.00’
ISLAND
(HU
RS
TB
OU
RN
E P
AR
KW
AY)
KY 17
47
27 SY
15" PIPE
CONST. LIMITS
CONST. LIMITS
CONST. LIMITS
(REM
OVE)
REMOVE 50 SY OF EXISTING SIDEWALK
287.5 LF OF EXISITNG GUARDRAIL
LT. STA. 300+09.78 TO STA 302+79.63 REMOVE
REMOVE 31 SY EXISTING PAVEMENT
LT. STA. 302+57.02 TO STA 302+84.73
SPCL. "V" DT.
64.58’ LT
+78.76
64.58’ LT
+95.61
6.18’ RT
+95.61
109.66’ LT
+91.76
43.18’ LT
+17.34
R=118
’
R=10
0’
11’
18’
+16.95 143.18’ LT
R= 100’
51.33’ RT
(HURST)
+60.00
68.03’ RT
(HURST)
+67.15
GR
AD
E
TO
DR
AIN
6’
PA
VE
D S
HDR
25:1 SHDR TAPER
+00.00 50.78’ LT
BEGIN TAPER
+00.00 46.18’ LT
END TAPER
18" PIPE 18"
PIP
E
EX. R/W
EX. R/W
EX. R/W
EX. R/W
x
x
309+05.48 158.84’ LT
R= 500’ (TAYLORSVILLE)
x
x
x
ASPH. ISLANDCONST. RAISED
’05=R
e= see x-secE= 613.22’R= 5208.71’L= 4824.34’T= 2600.81’ = 53°04’04" RTPI STA 296+52.01D
x
32.35’ LT
+50.00
108.85’ LT
+97.02
65.50’ RT
(HURST)
+60.00
SEPARATOR CURB
CONSTRUCT 67 LF LANE
RT. STA. 51+33 TO STA 52+00
I.E. 640.09
I.E. 639.25
TG. 641.00
ISLAND AND CURBREMOVE EXISTING
AND CURBISLAND
EXISTINGREMOVE
KY 155 (TAYLORSVILLE RD)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R00500
PL
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R5
PLAN SHEET
STA. 300+00 TO STA. 306+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00500
PL.
DG
NFIL
E
NA
ME:
15"
RC
P
IE-638.37
TG-641.52
CB
IE-639.49
TG-641.79
CB
IE-632.12
TG-638.02
CB
IE-632.45
TG-636.40
CB
ELEC/JB
ELEC/JB
ELEC/JB
TELE/JB
TELE/JB
TELE/JB
TELE/JB
WATER/
HATC
H
IE-637.91
TG-641.46
CB
IE-637.46
TG-642.76
CB
IE-638.01
TG-641.99
CB
ELEC/JB
ELEC/JB
ELEC/JB
18" RCP
IE-637.96
IE-628.11
IE-629.01
4"P
VC 12
"PV
C
X 2
8’X
4’
RC
BC
30" RCP
18"
RCP
18" RCP
18" RCP
36" RCP
12"
RC
P
12"
RCP
IE-638.26
TG-641.69
CB
12"
RCP
15" RCP
18" RCP
12"
RC
P
IE-633.11
12"
RC
P
LP
LP
MH
ELEC.
ELE
V.=
540.5
1
TBM3
ELE
V.=
643.3
4
TBM5
IE-631.69
TG-638.79
CB
SS
MH
SS
MH
IE-630.90
TL-638.66
SS
MH
SA
NM
H
IE-628.0
2
TL-635.7
8
SA
NM
H
IE-635.75
TL-642.45
SS
MH
EM
H
ELEC/JB
WV
WV
WV
GV
GV
GV
12"
PV
C
24"
CO
NC.
WA
TE
R
MAIN
24" CONC. WATER MAIN
16" CLD WATER MAIN
24"R
CP
ELEC/SIG
N C
ONTR
OL B
OX
15"
RC
P
15"
RC
P
C
GAS LINECAUTION
SID
E
STA. STA.
STANDARD
C&G
(LF)
-
-LT
HDR
(LF)
-
TO
CURB
302+63.11
-303+85.51 304+54.70
300+00.00 268
235
AREA
(SQYD)SID
E
STA. TO STA.
-LT 302+59.18
SEEDING AND PROTECTION
177300+00.00
SID
E
STA. TO STA.
-LT -
TYPE 1
22
(SQYD) (EACH) (SQFT)
SIDEWALK
4 INCH CONC WARNINGSDETECTABLERAMPS
302+57.02300+00.00
SIDEWALK
AREA
(SQYD)SID
E
STA. TO STA.
- 302+44.72300+00.00
BARRIER MEDIAN TYPE 5
MED 160
LT
177 1
(EACH)
TYPE 3
- 2 20302+74.18302+59.91 -
-LT 3 30304+44.60303+88.35 -
-LT 1 10305+13.81304+56.56 -
RT 16
35
41
GAS LINECAUTION
DEPTH NEW PAVEMENT
ESTIMATED LIMITS OF FULL
SID
E
TO
-
SID
E
TO
-LT
LONGITUDINAL EDGE KEY
LENGTH
LENGTH
(LF)
(LF)
306+00 277
300+00 494
- 320
- 255
302+84.73
303+85.45
STA.APPROX.
STA.APPROX.
STA.APPROX.
STA.APPROX.
LT 304+17.94 -
304+17.94
306+00 277
300+00
302+44.72
304+58.70LT
LT
SAWCUT PAVEMENT
MED
-302+59.92 302+89.29LT 88
LT 304+25.47 - 306+00.00 473
300+00 300+20 300+40 300+60 300+80 301+00 301+20 301+40 301+60 301+80 302+00 302+20 302+40 302+60 302+80 303+00 303+20 303+40 303+60 303+80 304+00 304+20 304+40 304+60 304+80 305+00
305+20 305+40 305+60 305+80 306+00
637.4
637.6
637.6
637.7
637.8
638.0
638.1
638.3
638.4
638.6
638.9
639.2
639.5
639.7
639.9
640.1
640.3
640.6
640.8
640.9
641.
1
641.
3
641.
6
641.
8
642.0
642.1
642.4
642.6
642.8
643.0
643.3
638
640
642
644
646
648
650
652652
654
656
658
634
636
632
630
628
626
624
622
620
634
636
638
640
642
644
646
648
650
652652
632
630
628
626
624
656
654
622
FL. 627.61
I.E. 630.00
I.E. 640.09SPCL. "V" DT. LT.
641.35 641.65
+60 +00
S=0.75%
18"
SL
OP
ED
BO
X
OU
TL
ET
TY
PE 1
ST
A. 304
+71.
60
LT.
EX. 8’x4’ RCBC
@ S=2.64%18" CULVERT PIPE
ABOVE EXISTING DATUM
LEFT SIDE DRAINAGE SHOWN 10’
EXISTING GROUND LINE
KY 17
47 S
TA. 50
+00.00
KY 15
5 S
TA. 303
+12.25
=
MA
TC
HLIN
E S
TA. 306
+00
MA
TC
HLIN
E S
TA. 300
+00
@ S=24.58%15" STORM PIPE
DATUM
DATUM
KY 155 (TAYLORSVILLE RD)
HORIZONTAL 40’SCALE: 1" =
VERTICAL4’ 1" =
E-S
HE
ET
NA
ME:
R00600
PF
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R6
PROFILE SHEET
STA. 300+00 TO STA. 306+00
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00600
PF.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
EX.
GA
S
LIN
E
EX.
GA
S
LIN
E
EX.
WA
TE
R
LIN
E
EX. E
LE
C. LIN
E
EX. E
LE
C. LIN
E
EX. E
LE
C. LIN
E
0’ 40’ 80’20’
310
+00
309
+00
308
+00
306
+00
307
+00
STA. TO STA. SIZE/TYPECHANNEL LINING
TYPE QUANTITYDEPTH
306+00 TO 307+01.78 SPCL. "V" ECB 1.0’ 68 SY
DITCH CONSTRUCTION LT !
SPCL. "V" ECB 1.0’ 102 SY
KY 155 (TAYLORSVILLE ROAD)
R=3
0’
R=3
0’
18" PIPE
+58.50 30.18’ LT
END TAPER
+58.50 42.71’ LT
BEGIN TAPER
100’ TAPER
R=5000’
+13.15 74.78’ LT
R= 30’
+03.56 73.52’ LT
R= 30’
45.55’ LT
+54.23
+54.32 34.55’ LT
(MATCH EXISTING DEFLECTION)
MA
TC
HLIN
E S
TA. 306
+00
11’
308+06.17 TO 309+58.50
TO TAYLORSVILLE
(REMOVE)
SPCL. "V" DT.
SPCL. "V" DT.
CONST. LIMITS
CONST. LIMITS
EX. R/W
EX. R/W
EX. R/W
EX. R/W
x
x
e= see x-secE= 613.22’R= 5208.71’L= 4824.34’T= 2600.81’ = 53°04’04" RTPI STA 296+52.01D
ASPH.
O.E. 642.50
I.E. 643.40
KY 155 (TAYLORSVILLE RD)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R00700
PL
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R7
PLAN SHEET
STA. 306+00 TO STA. 309+58.50 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00700
PL.
DG
NFIL
E
NA
ME:
IE-638.9
3
TL-
643.5
7
SS
MH
TELE/JB
GW
X3
IE-643.11
30"X19" RCP IE-645.88
18" RCP
IE-644.11
IE-644.68
TG-648.08
CB
12" RCP
12"
CM
P
24"X36" RCP
24"X36" RCP
24"X36" RCP30" RCP
IE-638.26
TG-641.69
CB
ELE
V=649.0
6
TB
M6
SS
MH
SS
MH
SS
MH
SS
MH
SS
MH
IE-642.50
TL-647.47
SS
MH
IE-C
AN’T
OPE
N
TL-647.95
SS
MH
IE-C
AN’T
OPE
N
TL-648.15
SS
MH
IE-644.02
TL-647.87
SS
MH
WV
WM
IE-645.69
GV
STA. 309+58.50
END CONSTRUCTION
GAS LINECAUTION
SID
E
STA. STA.
(LF)
-
-LT
HDR
(LF)
-
TO
CURB
307+40.24
-307+76.75 307+92.71
307+23.26
AREA
(SQYD)SID
E
STA. TO STA.
-LT 309+58.50
SEEDING AND PROTECTION
402306+00.00
WIDTH PIPESTA.
SID
E
SIZE (IN) LENGTH (FT)(LF) TYPE AREA (SQYD)
SURFACE
EACH
ENTRANCES
ASPHLT 90 18 8836307+58.50 2
LT 25
24
MODIFIED
6" C&G
OUTLET TY 1
SLOPED BOX
TELEPHONE LINECAUTION UNDERGROUND
DEPTH NEW PAVEMENT
ESTIMATED LIMITS OF FULL
SID
E
TO
-LT
SID
E
TO
-LT
LONGITUDINAL EDGE KEY
LENGTH
LENGTH
(LF)
(LF)
306+00 308+00 202
306+00 362
-307+39.77 307+77.21
STA.APPROX.
STA.APPROX.
STA.APPROX.
STA.APPROX.
LT
309+58.50
38
SAWCUT PAVEMENT
-LT 307+40.71 307+76.30 36
-LT 309+58.50 309+58.50 10
-309+58.50 309+58.50LT 10
306+00 306+20 306+40 306+60 306+80 307+00 307+20 307+40 307+60 307+80 308+00 308+20 308+40 308+60 308+80 309+00 309+20 309+40 309+60 309+80 310+00 310+20 310+40 310+60 310+80 311+00
311+20 311+40 311+60 311+80 312+00
643.3
643.5
643.7
644.0
644.1
644.4
644.9
645.4
645.1
645.7
645.9
646.1
646.2
646.4
646.6
646.7
646.9
647.2
647.4
647.4
647.7
647.9
648.2
648.5
634
636
638
640
642
644
646
648
650
652652
632
630
628
626
624
656
654
622
638
640
642
644
646
648
650
652652
654
656
658
634
636
632
630
628
626
624
622
620
I.E. 643.40
O.E. 642.50
644.90
+06.17
643.50
641.65
642.41
+00
+00
+01.78
SPCL. "V" DT. LT.
SPCL. "V" DT. LT.
S=1.49%
S=0.75%
18"
SL
OP
ED
BO
X
OU
TL
ET
TY
PE 1
ST
A. 307
+10.44
LT.
18"
SL
OP
ED
BO
X
OU
TL
ET
TY
PE 1
ST
A. 307
+97.51
LT.
645.60
+58.50
ABOVE EXISTING DATUM
LEFT SIDE DRAINAGE SHOWN 10’
EXISTING GROUND LINE
309
+58.50
EN
D
CO
NS
TR
UC
TIO
N
MA
TC
HLIN
E S
TA. 306
+00
S=1.20%
18" ENTRANCE PIPE @ S=1.02%
DATUM
DATUM
KY 155 (TAYLORSVILLE RD)
HORIZONTAL 40’SCALE: 1" =
VERTICAL4’ 1" =
E-S
HE
ET
NA
ME:
R00800
PF
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 5-9008.00 R8
PROFILE SHEET
STA. 306+00 TO STA. 309+58.50
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00800
PF.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
EX. E
LE
C. LIN
E
0’ 40’ 80’20’
52
+00
58
+00
+33.62 6.00’ LT
END TAPER
+90.00 18.00’ RT
BEGIN TAPER
8:1 TAPER
8:1 TAPER
+07.50 3.00’ LT
R= 1.00’
MEDIAN
+97.50 15.00’ RT
R= 1.00’
MEDIAN
+51.25 11.00’ RT
R= 5.00’
MEDIAN
+98.17 15.00’ RT
R= 1.00’
MEDIAN
+53.68 1.00’ RT
R= 5.00’
MEDIAN
18.00’ RT
+84.68
+33.17 6.41’ RT
BEGIN TAPER
+34.00 0.00
END TAPER R=62’
R=62’
MA
TC
HLIN
E S
TA. 52
+00
MA
TC
HLIN
E S
TA. 58
+00
12’
12’
12’
12’
PI STA 57+51.02
TL
E
= 9°36’39" RT
= 3819.72’
s
cs
L
LTST
s
= 421.15’= 200.00’= 440.72’
= 133.34’
R= 13.91’
= 66.67’
= 1°30’00"
e = see x-sec
18.00’ LT
+84.68
(REMOVE)
+98.17 62.00’ RT
R= 62.00’
MEDIAN
+07.50 50.00’ LT
R= 62.00’
MEDIAN
KY 1747
HURSTBOURNE PARKWAY
+00.00 67.44’ RT
BEGIN TAPER
+44.63 54.62’ RT
END TAPER
54.41’ RT
+83.04
25:1 SHDR TAPER
R=500’
CONST. LIMITS
EX. R/W
EX. R/W
EX. R/WEX. R/W
X
X
X X
X
X
X
EX. RAISED ASPH. MEDIAN
6.41’ RT
+84.67
SEPARATOR CURB
CONSTRUCT 83 LF LANE
RT. STA. 52+00 TO STA 52+83
TG. 644.23
KY 1747 (HURSTBOURNE PARKWAY)
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
E-S
HE
ET
NA
ME:
R00900
PL
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R9
PLAN SHEET
STA. 52+00 TO STA. 58+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R00900
PL.
DG
NFIL
E
NA
ME:
15"
SE
WE
R
PE
R
RE
CO
RD
DR
AWIN
G 08010-11
IE-638.51
TG-642.55
CBIE-637.50
TG-642.85
CB
IE-634.14
TL-640.77
SSMH
IE-637.46
TG-642.76
CB
IE-637.96
30"
RC
P
IE-633.21
18"
RCP
IE-639.07
48" RCP
IE-638.06
18"
RC
P
12" RCP
15"
RC
P
15" RCP15" RCP
SSMH
SAN
MH
SAN
MH
DID NOT FIN
D
SAN
MH PER RECO
RD DRAWIN
G 08010-11
IE-CA
N’T O
PEN
TL-642.97
SAN
MH
AS
PH
AL
T
PA
RKIN
G
52
+00
53
+00
54
+00
55
+00
56
+00
57
+00
58
+00
TS 53
+29.87
SC 55
+29.87
PI 57
+51.
02
CC
AREA
(SQYD)SID
E
STA. TO STA.
-
BARRIER MEDIAN TYPE 5
MED
-MED
MED - 3
54+84.68
56+94.50
57+95.17
57+10.50
58+00.00
58+00.00
168
131
DEPTH NEW PAVEMENT
ESTIMATED LIMITS OF FULL
SID
E
TO
-LT
SID
E
TO
-LT
LONGITUDINAL EDGE KEY
LENGTH LENGTH
(LF) (LF)
31858+00 318
- 326
STA.APPROX.
STA.APPROX.
STA.APPROX.
STA.APPROX.
54+84.67
RT
54+84.67
54+84.68 58+00
SAWCUT PAVEMENT
AREA
(SQYD)SID
E
STA. TO STA.
-
SEEDING AND PROTECTION
53+44.6352+00RT 91 - 145RT 52+00 53+44.63 - 14553+44.63
- 20756+97.50
-57+54.03 57+98.17
RT
58+00
52+00
RT
RT
54+90
44
DATUM
DATUM
KY 1747 (HURSTBOURNE PARKWAY)
HORIZONTAL 40’SCALE: 1" =
VERTICAL’4 1" =
E-S
HE
ET
NA
ME:
R010
00
PF
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R10
PROFILE SHEET
STA. 51+00 TO STA. 58+00
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R010
00
PF.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
52+00 52+20 52+40 52+60 52+80 53+00 53+20 53+40 53+60 53+80 54+00 54+20 54+40 54+60 54+80 55+00 55+20 55+40 55+60 55+80 56+00 56+20 56+40 56+60 56+80 57+00
57+20 57+40 57+60 57+80 58+00
642.2
642.4
642.5
642.6
642.6
642.7
642.8
642.9
643.1
643.1
643.2
643.4
643.4
643.5
643.6
643.7
643.7
643.9
644.2
644.4
643.9
643.8
643.1
643.9
644.5
644.8
644.9
645.3
645.4
645.5
645.2
632
630
628
634
636
638
640
642
644
646
648
650
652 652
654
656
658
660
638
640
642
644
646
648
650
652652
654
656
658
634
636
632
630
FL. 633.63
EX. 30" RCP
FL. 639.83
EX. 18" RCP
EX. 15" RCP
DBI T
YP
E 13-3
ST
A. 56
+41.
62
LT.
TG. 644.23
I.E. 638.50
634
636
638
640
642
644
646
634
636
638
640
642
644
646
641.
7
51+00 51+20
641.
6
642.0
51+40 51+60
642.1
642.2
51+80 52+00
642.2
652
664
662
660
662
664
EX. 18" RCP
FL. 635.25
TG. 641.00
I.E. 639.25
HDWL KY 155 STA. 304+71.60)
@ S=2.64% (FROM
18" STORM PIPE
@ S=6.63%
18" STORM PIPET
YP
E 1
SL
OP
ED
BO
X
OU
TL
ET
ST
A. 51+
87.43
RT.
(OMIT
AP
RO
N)
DBI T
YP
E 3 S
ST
A. 51+
70.40
RT.
I.E. 638.19
18" PIPE
EXISTING GROUND LINE
MA
TC
HLIN
E S
TA. 58
+00
+96.01
639.84
642.36
EX. S
AN. S
EW
ER
EX. E
LE
C. LIN
E
EX. ELEC. LINE
LINE
EX. WATER
0’ 40’ 80’20’
MA
TC
HLIN
E S
TA. 58
+00 +08.17 3.00’ LT
R= 1.00’
MEDIAN
+48.17 15.00’ RT
R= 1.00’
MEDIAN
+48.17 12.00’ RT
BEGIN TAPER
+92.17 6.00 LT
END TAPER
+10.00 18.00 LT
END TAPER
+10.00 6.00 LT
BEGIN TAPER
8:1 TAPER
100’ TAPER
15" PIPE
PIP
E
18"
STA. TO STA. SIZE/TYPECHANNEL LINING
TYPE QUANTITYDEPTH
SPCL. "V" ECB 1.0’
DITCH CONSTRUCTION MEDIAN
60+66.17 TO 63+00
12’
12’
6’
12’
PI STA 57+51.02
TL
E
= 9°36’39" RT
= 3819.72’
s
cs
L
LTST
s
= 421.15’= 200.00’= 440.72’
= 133.34’
R= 13.91’
= 66.67’
= 1°30’00"
e = see x-sec
58
+00
156 SY
SPCL. "V" DT.
CONST. LIMITS
(CAP)
(REMOVE)
KY 1747
HURSTBOURNE PARKWAY
EX. R/W EX. R/W
EX. R/W
EX. R/W
X
X
TG. 645.05
TG. 644.50
KY 1747 (HURSTBOURNE PARKWAY)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R01100
PL
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R11
PLAN SHEET
STA. 58+00 TO STA. 63+14.4340’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R01100
PL.
DG
NFIL
E
NA
ME:
IE-645.26
TG-650.26
CB
IE-643.39
TG-647.47
CB
IE-641.90
TG-645.15
CB
IE-6.40.45
TG-644.60
CB
IE-645.99
TG-649.62
CB
IE-643.86
IE-649.11
15" RCP
15"
RC
P
IE-638.99
15" RCP
18"
RCP
18" RCP 18" RCP18" RCP
ELEV.=644.64
TBM7
IE-645.73
IE-639.47
TG-644.95
CB
58
+00
59
+00
60
+00
61+
00
62
+00
63
+00
64
+00
CS 59
+70.60
ST 61+
70.60
TS 63
+67.25
C CC
STA. 63+14.43
END CONSTRUCTION
AREA
(SQYD)SID
E
STA. TO STA.
- 7
BARRIER MEDIAN TYPE 5
MED
-MED
AREA
(SQYD)SID
E
STA. TO STA.
-
SEEDING AND PROTECTION
225
100
59+48.17 63+14.43MED58+00.00
58+00.00
58+11.16
59+51.18
DEPTH NEW PAVEMENT
ESTIMATED LIMITS OF FULLSID
E
TO
-LT
SID
E
TO
-LT
LONGITUDINAL EDGE KEY
LENGTH LENGTH
(LF) (LF)
58+00 51858+00 518
- 149
STA.APPROX.
STA.APPROX.
STA.APPROX.
STA.APPROX.
RT 58+00
63+14.43
59+48.17
63+14.43
SAWCUT PAVEMENT
634
636
638
640
642
644
646
648
650
652652
58+00 58+20 58+40 58+60 58+80 59+00 59+20 59+40 59+60 59+80 60+00 60+20 60+40 60+60 60+80 61+00 61+20 61+40 61+60 61+80 62+00 62+20 62+40 62+60 62+80 63+00
63+20 63+40 63+60 63+80 64+00
645.2
644.9
645.1
645.2
645.4
645.5
645.6
645.8
646.0
646.1
646.1
646.0
645.8
644.0
644.3
644.6
644.8
645.4
646.0
646.7
647.3
647.8
648.3
648.8
649.4
649.8
650.2
650.5
654
656
658
632
630
628
626
624
634
636
638
640
642
644
646
648
632
630
628
626
624
650
652652
654
656
658
660
622
I.E. 639.47
CAP EX. CBI
EL. 641.30
I.E. 639.60
I.E. 641.30
TG. 644.50
644.90
+00
+00
647.27
+00
649.07SPCL. "V" MEDIAN DT.
S=1.80%
S=1.00%
S=2.37%
15" STORM PIPE @ S=0.71%
DBI T
YP
E 13-75
ST
A. 58
+20
RT.
DBI T
YP
E 6
E
ST
A. 60
+60
RT.
EXISTING GROUND LINE
63
+14.43
EN
D
CO
NS
TR
UC
TIO
N
644.56
+66.17
TG. 645.05
MA
TC
HLIN
E S
TA. 58
+00
DATUM
DATUM
KY 1747 (HURSTBOURNE PARKWAY)
HORIZONTAL 40’SCALE: 1" =
VERTICAL4’ 1" =
E-S
HE
ET
NA
ME:
R012
00
PF
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R12
PROFILE SHEET
STA. 58+00 TO STA. 63+14.43
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R012
00
PF.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
EX. E
LE
C. LIN
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
110
STATION OFFSETPOINT
55+00
ELEV.
644.101
55+00 6.40 RT 643.502
55+20 644.153
55+20 6.41 RT 643.554
55+20 14.16 RT 644.225
55+20 644.126
55+40 644.227
55+40 5.58 RT 633.668
55+40 11.63 RT 644.359
55+40 644.1510
55+60 644.4511
55+60 3.15 RT 643.7812
55+60 9.20 RT 644.4813
55+60 644.2514
55+80 644.5715
55+80 0.70 RT 644.0416
55+80 6.74 RT 644.7417
55+80 644.4418
56+00 644.5819
56+00 644.1020
STATION OFFSETPOINT
56+00 4.26 RT
ELEV.
644.8221
56+00 644.5422
56+20 644.5823
56+20 4.28 LT 644.1724
56+20 1.76 RT 645.0125
56+20 644.6926
56+40 644.5727
56+40 644.2128
56+40 645.0529
56+40 644.6630
56+60 644.7931
644.4332
645.0433
56+60 644.8234
56+80 644.9735
56+80 644.6136
56+80 645.0737
56+80 644.9038
57+00 645.1339
57+00 644.7740
STATION OFFSETPOINT
57+00
ELEV.
645.0941
57+00 645.0342
57+00 645.0143
57+20 645.2644
57+20 644.9045
57+20 644.9746
57+20 645.1047
645.0548
57+40 645.5049
57+40 645.1450
57+40 645.1751
57+40 645.1552
57+60 645.5253
57+60 645.1954
57+60 645.1555
57+60 645.1256
57+80 645.5257
57+80 645.2458
57+80 645.2259
57+80 645.1760
STATION OFFSETPOINT
58+00
ELEV.
645.5961
58+00 645.2962
58+00 645.2963
58+00 645.1764
58+00 645.1965
58+20 645.5966
58+20 645.2367
58+20 645.0568
58+20 645.4369
58+40 645.7170
58+40 645.3571
58+40 645.1772
58+40 645.6673
58+60 645.8674
58+60 645.5075
58+60 645.3276
58+60 645.7777
58+80 645.9378
58+80 645.5779
58+80 645.3980
STATION OFFSETPOINT
58+80
ELEV.
645.9081
59+00 646.0382
59+00 645.6783
59+00 645.4984
59+00 645.9985
59+20 646.2086
59+20 645.8387
59+20 645.6588
59+20 646.0689
59+40 646.2890
59+40 645.9191
59+40 645.7392
59+40 646.1493
59+60 646.3894
59+60 646.0095
59+60 645.8496
59+8097
59+80 646.1298
59+80 645.9899
60+00 646.43
STATION OFFSETPOINT
60+00
ELEV.
646.08
60+00 645.97
60+20 646.58
60+20 646.32
60+20 646.23
60+40 646.64
60+40 646.12
646.79
60+60 646.46
100
101
102
103
104
105
106
107
108
109
56+60
56+60
57+20
42 108
60+60
18 RT
18 RT
18 RT
18 RT
2 LT
18 RT
18 RT
6 LT
0
18 RT
18 LT
6 LT
0
18 RT
18 LT
6 LT
0
18 RT
18 LT
6 LT
18 LT
18 LT
18 LT
18 LT
18 LT
18 LT
18 LT
18 LT
18 LT
18 RT
18 LT
18 RT
18 LT
18 RT
18 RT
18 LT
18 RT
18 LT
12 RT
18 LT
18 LT
12 RT
18 LT
18 RT
18 LT
18 LT
18 LT
18 RT
18 LT
12 RT
18 RT
18 LT
0
6 LT
0
10.71 RT
6 LT
2.67 RT
6 LT
12.85 RT
6 LT
2.68 RT
6 LT
0
18 LT
6 LT
12 RT
18 RT
12 RT
18 RT
18 LT
6 LT
12 RT
18 RT
18 LT
6 LT
12 RT
18 LT
6 LT
6 LT
12 RT
18 RT
18 LT
6 LT
12 RT
18 RT
6 LT
6 LT
10.57 RT
6 LT
8.08 RT
6 LT
5.55 RT
6 LT
3.01 RT
1.98 LT
0.51 RT
109
6 LT 646.2560+40
110
646.44
55
+00
56
+00
57
+00
58
+00
59
+00
60
+00
SC 55
+29.87
CS 59
+70.60
C C
0’ 40’ 80’20’
2.50
%{
3.08
%{
3.17
%{
2.88
%{
3.00
%{
2.50
%{
3.00
%{
3.00
%{
3.00
%{
3.00
%{
3.00
%{
3.00
%{
2.75
%{
2.33
%{
2.50
%{
3.00
%{
3.00
%{
3.00
%{
3.00
%{
3.00
%{
2.67
%{
3.17
%{
3.08
%{
3.08
%{
3.00
%{
2.92
%{
2.17
%{
3.25
%{
2.06
%{
1.00
%{
1.00
%{
1.00
%{
2.00
%{
2.75
%{
2.50
%{
2.58
%{
2.67
%{ 2.40
%{
2.00
%{
2.00
%{
1.33
%{
1.67
%{
1.00
%{
1.21%
}
0.35
%}
0.58
%{
0.33
%{
1.00
%{
1.00
%{
1.00
%{
1.00
%{
1.00
%{
1.00
%{
1.00
%{
1.00
%{
1.00
%{
MAKE FIELD ADJUSTMENTS AS REQUIRED TO MAINTAIN DRAINAGE FLOW IF DIFFERENT ELEVATIONS ARE ENCOUNTERED DURING CONSTRUCTION.
NOTE: ALL ELEVATIONS AT 18 FOOT OFFSETS (LT AND RT) SHOULD MATCH EXISTING ELEVATIONS.
KY 1747 (HURSTBOURNE PARKWAY)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R013
00
DS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R13
PAVEMENT DEVELOPMENT SHEET
SCALE: 1"=40’
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R013
00
DS.
DG
NFIL
E
NA
ME:
0’ 40’ 80’20’
298
+00
297
+00
296
+00
295
+00
MA
TC
HLIN
E S
TA. 300
+00
299
+00
300
+00
4" SOLID YELLOW
4" SOLID WHITE
4" SOLID YELLOW
4" SOLID WHITE
4" SOLID WHITE
4" SOLID WHITE
4" SOLID YELLOW
4" DASHED WHITE
4" DASHED WHITE
LEGEND
BIKE LANE
THERMO LEFT TURN ARROWS
THERMO RIGHT TURN ARROWS
TYPE V MONO-DIRECTIONAL (WHITE) TAYLORSVILLE
TYPE V BI-DIRECTIONAL (YELLOW) TAYLORSVILLE
(3’ x 9’)4" DOTTED WHITE
24" STOP BAR
MEDIAN NOSE AREAFACE OF CURB AND TOP OFSOLID THERMO YELLOW ON
THERMO BIKE
THERMO BIKE LANE ARROW
80’ SPACING
KY 155 (TAYLORSVILLE RD)
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R014
00
DS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R14
STRIPING PLAN SHEET
STA. 295+05.18 TO STA. 300+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R014
00
DS.
DG
NFIL
E
NA
ME:
40’
80’
MARKERS INSTALLED ALONG LANE LINES SHALL BE PLACED BETWEEN AND IN LINE WITH THE SKIPS.
LEFT TURN LANESEDGE OF ROADWAY
NORMAL DASH LINES DOTTED LINES
24’
STA. 295+05.18
BEGIN CONSTRUCTION
0’ 40’ 80’20’
304
+00
300
+00
301+
00
302
+00
52+00
51+00
MA
TC
HLIN
E S
TA. 306
+00
MATCHLINE STA. 52+00
MA
TC
HLIN
E S
TA. 300
+00
305
+00
306
+00
4" SOLID WHITE
4" SOLID YELLOW
4" DASHED WHITE
4" SOLID WHITE
4" SOLID WHITE4" DASHED WHITE
24" STOP BAR
4" SOLID YELLOW
4" SOLID WHITE
24" STOP BAR
6" THERMO SOLID WHITE
4" SOLID WHITE
8" SOLID WHITE
6" THERMO SOLID WHITE
LEGEND
BIKE LANE
THERMO LEFT TURN ARROWS
THERMO RIGHT TURN ARROWS
TYPE V MONO-DIRECTIONAL (WHITE) TAYLORSVILLE
TYPE V BI-DIRECTIONAL (YELLOW) TAYLORSVILLE40’
40’
THERMO BIKE
THERMO BIKE LANE ARROW
THERMO YIELD BAR
THERMO YIELD BAR
(2’ x 6’)WHITE 6" THERMO DOTTED
24" STOP BAR
24" STOP BAR
6" THERMO SOLID WHITE
6" THERMO SOLID WHITE
93’
SP
ACIN
G
80’ SPACING
40’
KY 155 (TAYLORSVILLE RD)
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R015
00
DS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R15
STRIPING PLAN SHEET
STA. 300+00 TO STA. 306+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R015
00
DS.
DG
NFIL
E
NA
ME:
40’
80’
MARKERS INSTALLED ALONG LANE LINES SHALL BE PLACED BETWEEN AND IN LINE WITH THE SKIPS.
LEFT TURN LANESEDGE OF ROADWAY
NORMAL DASH LINES DOTTED LINES
24’
ONLY
0’ 40’ 80’20’
310
+00
309
+00
308
+00
306
+00
307
+00
MA
TC
HLIN
E S
TA. 306
+00
4" SOLID WHITE
LEGEND
BIKE LANE
THERMO LEFT TURN ARROWS
THERMO RIGHT TURN ARROWS
TYPE V MONO-DIRECTIONAL (WHITE) TAYLORSVILLE
TYPE V BI-DIRECTIONAL (YELLOW) TAYLORSVILLE
24" STOP BAR
100’
140’
KY 155 (TAYLORSVILLE RD)
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R016
00
DS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R16
STRIPING PLAN SHEET
STA. 306+00 TO STA. 309+58.50 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R016
00
DS.
DG
NFIL
E
NA
ME:
40’
80’
MARKERS INSTALLED ALONG LANE LINES SHALL BE PLACED BETWEEN AND IN LINE WITH THE SKIPS.
LEFT TURN LANESEDGE OF ROADWAY
NORMAL DASH LINES DOTTED LINES
24’
STA. 309+58.50
END CONSTRUCTION
0’ 40’ 80’20’
52
+00
MA
TC
HLIN
E S
TA. 52
+00
MA
TC
HLIN
E S
TA. 58
+00
4" SOLID WHITE
8" SOLID WHITE
4" SOLID YELLOW
4" SOLID WHITE
4" SOLID WHITE
ONLY LABEL
THERMO
LEGEND
BIKE LANE
THERMO LEFT TURN ARROWS
THERMO RIGHT TURN ARROWS
TYPE V MONO-DIRECTIONAL (YELLOW) HURSTBOURNE
TYPE V BI-DIRECTIONAL (WHITE/RED) HURSTBOURNE
(3’ x 9’)
8" DOTTED WHITE
4" SOLID WHITE
(3’ x 9’)
4" DOTTED WHITE
4" SOLID YELLOW
53
+00
54
+00
55
+00
56
+00
57
+00
58
+00
80’
CHEVRONS
12" THERMO WHITE
(2’ x 6’)4" DOTTED YELLOW
93’ SPACING
100’
40’
80’
MARKERS INSTALLED ALONG LANE LINES SHALL BE PLACED BETWEEN AND IN LINE WITH THE SKIPS.
LEFT TURN LANESEDGE OF ROADWAY
NORMAL DASH LINES DOTTED LINES
24’
KY 1747 (HURSTBOURNE PARKWAY)
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R017
00
DS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R17
STRIPING PLAN SHEET
STA. 52+00 TO STA. 58+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R017
00
DS.
DG
NFIL
E
NA
ME:
ONLY ONLY
ONLY
0’ 40’ 80’20’
MA
TC
HLIN
E S
TA. 58
+00
58
+00
4" SOLID YELLOW
4" SOLID YELLOW
4" SOLID YELLOW
4" SOLID WHITE
LEGEND
BIKE LANE
THERMO LEFT TURN ARROWS
THERMO RIGHT TURN ARROWS
40’
80’
MARKERS INSTALLED ALONG LANE LINES SHALL BE PLACED BETWEEN AND IN LINE WITH THE SKIPS.
LEFT TURN LANESEDGE OF ROADWAY
TYPE V MONO-DIRECTIONAL (YELLOW) HURSTBOURNE
TYPE V BI-DIRECTIONAL (WHITE/RED) HURSTBOURNE
59
+00
60
+00
61+
00
62
+00
63
+00
64
+00
ONLY LABEL
THERMO
(3’ x 9’)
4" DOTTED WHITE
(3’ x 9’)
8" DOTTED WHITE
CHEVRONS
12" THERMO WHITE
125’
93’ SPACING
NORMAL DASH LINES DOTTED LINES
24’
KY 1747 HURSTBOURNE PARKWAY)
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R018
00
DS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R18
STRIPING PLAN SHEET
STA. 58+00 TO STA. 63+14.4340’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R018
00
DS.
DG
NFIL
E
NA
ME:
ONLY
STA. 63+14.43
END CONSTRUCTION
0’ 40’ 80’20’
LEGEND
BIKE LANE
THERMO LEFT TURN ARROWS
THERMO RIGHT TURN ARROWS
TYPE V MONO-DIRECTIONAL (YELLOW) HURSTBOURNE
TYPE V BI-DIRECTIONAL (WHITE/RED) HURSTBOURNE
KY 1747
HURSTBOURNE PARKWAY
4" SOLID YELLOW
4" DASHED WHITE
4" DOTTED WHITE (3’ x 9’)
OFF R
AMP
LO
CAL
AC
CESS
I 64 E
AST
BO
UN
D
ON
RA
MP
I 64 E
AS
TB
OU
ND
EXISTING MEDIAN ENDAND CURVE INTO OPPOSITE END
EXTEND AS TANGENT SOUTHBOUND
LANE LINES WITHIN RESTRIPING AREA
RAISED PAVEMENT MARKERS ALONG EXISTING
REMOVE EXISTING LANE MARKINGS AND
40’
80’
MARKERS INSTALLED ALONG LANE LINES SHALL BE PLACED BETWEEN AND IN LINE WITH THE SKIPS.
LEFT TURN LANESEDGE OF ROADWAY
NORMAL DASH LINES DOTTED LINES
24’
KY 1747 (HURSTBOURNE PARKWAY)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R019
00
DS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R19
STRIPING PLAN SHEET
40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R019
00
DS.
DG
NFIL
E
NA
ME:
TRAFFIC CONTROL PLAN NOTES
GENERAL TRAFFIC CONTROL NOTES
EMERGENCIES OR ACCIDENTS.
COORDINATOR SHALL HAVE ACCESS ON THE PROJECT TO A RADIO OR TELEPHONE TO BE USED IN CASE OF
TELEPHONE NUMBER WHERE THE TRAFFIC COORDINATOR CAN BE CONTACTED AT ANY TIME. THE TRAFFIC
THE PROJECT PER HOUR AT ALL TIMES LANES ARE CLOSED. THE CONTRACTOR SHALL FURNISH THE NAME AND
RESPONSIBLE FOR TRAFFIC CONTROL MAINTENANCE AND SHALL MAKE AT LEAST ONE PASS-THROUGH INSPECTION ON
CALL 24 HOURS A DAY, 7 DAYS A WEEK FOR THE PROJECT DURATION. THE TRAFFIC COORDINATOR SHALL BE
VARIABLE MESSAGE BOARDS AS NEEDED OR AS DIRECTED BY THE ENGINEER. A TRAFFIC COORDINATOR SHALL BE ON
CLOSURES ARE IN USE TO INSPECT THE TRAFFIC CONTROL, MAINTAIN THE SIGNING AND DEVICES AND RELOCATE
ENGINEER ON THE PROJECT. A TRAFFIC COORDINATOR SHALL BE ON THE PROJECT AT ALL TIMES WHEN LANE
ADDITIONALLY, THE TRAFFIC COORDINATOR SHALL REPORT ALL INCIDENTS THROUGHOUT THE WORK ZONE TO THE
FRIDAY, AND TWICE A DAY (MORNING AND EVENING) SATURDAY AND SUNDAY, FOR THE LIFE OF THE PROJECT.
COORDINATOR SHALL INSPECT THE PROJECT MAINTENANCE OF TRAFFIC AT LEAST ONCE A DAY, MONDAY THROUGH
THE CONTRACTOR SHALL DESIGNATE AN EMPLOYEE OR EMPLOYEES TO BE TRAFFIC COORDINATOR(S). THE TRAFFIC
TRAFFIC COORDINATOR
PAVEMENT DROP-OFF NOTES
PAYMENT WILL BE ALLOWED FOR DGA MATERIAL USED FOR WEDGING.
LESSER TREATMENTS THAN THOSE DESCRIBED ABOVE MAY BE CONSIDERED FOR LOW-VOLUME LOCAL STREETS.
THE DROP-OFF AREA.
VERTICAL PANELS OR BARRICADES FOR SHORT DISTANCES DURING DAYLIGHT HOURS WHILE WORK IS BEING DONE IN
FOR TEMPORARY CONDITIONS, DROP-OFFS GREATER THAN FOUR INCHES MAY BE PROTECTED WITH PLASTIC DRUMS,
LIGHTS SHOULD BE USED FOR OVERNIGHT INSTALLATIONS.
STRONGLY ENCOURAGED. IF CONCRETE BARRIERS ARE USED, SPECIAL REFLECTIVE DEVICES OR STEADY BURN
OR BARRICADES MAY BE USED. IF THE DROP-OFF IS GREATER THAN 12 INCHES, POSITIVE SEPARATION IS
IS FIVE FEET OR MORE DISTANCE BETWEEN THE EDGE OF THE PAVEMENT AND THE DROP-OFF, THEN DRUMS, PANELS
GREATER THAN FOUR INCHES POSITIVE SEPARATION OR WEDGE WITH 3:1 OR FLATTER SLOPE NEEDED. IF THERE
THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION.
SHOULD BE PLACED EVERY 50 FEET. SPACING OF DEVICES ON TAPERED SECTIONS SHOULD BE IN ACCORDANCE WITH
DURING DAYLIGHT HOURS. FOR TANGENT SECTIONS WITH SPEED LESS THAN 50 MPH AND FOR CURVES, DEVICES
FOR SPEEDS OF 50 MPH OR GREATER. CONES MAY BE USED IN PLACE OF PLASTIC DRUMS, PANELS AND BARRICADES
TWO TO FOUR INCHES PLASTIC DRUMS, VERTICAL PANELS OR BARRICADES EVERY 100 FEET ON TANGENT SECTIONS
DROP-OFF AREA.
LESS THAN TWO INCHES NO PROTECTION REQUIRED. WARNING SIGNS PLACED IN ADVANCE AND THROUGHOUT THE
FOLLOWS:
A PAVEMENT EDGE THAT TRAFFIC IS NOT EXPECTED TO CROSS, EXCEPT ACCIDENTALLY, SHOULD BE TREATED AS
DROP-OFFS ARE GREATER THAN 1/2 INCH. MODIFICATIONS WILL BE AS DIRECTED BY THE ENGINEER.
SITUATIONS. WARNING SIGNS SHALL BE PLACED IN ADVANCE AND THROUGHOUT THE DROP-OFF AREA WHEN
INCHES. THIS MAY BE INCREASED TO 2 INCHES FOR LOW SPEED 2-1ELEVATION DIFFERENCE GREATER THAN 1
A PAVEMENT EDGE THAT TRAFFIC IS EXPECTED TO CROSS IN A LANE CHANGE SITUATION SHALL NOT HAVE AN
JULY 4, 2018
MAY 26-28, 2018
MAY 4-6, 2018
MARCH 30, 2018
JANUARY 15, 2018
DECEMBER 23, 2017 TO JANUARY 1, 2018
NOVEMBER 23-26, 2017
NOVEMBER 11, 2017
SEPTEMBER 2-4, 2017
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
SHALL BE ASSESSED IN ACCORDANCE WITH SECTION 108.09 OF THE CURRENT EDITION OF THE KYTC STANDARD
SHOULD THE CONTRACTOR FAIL TO OPEN LANES TO TRAFFIC AT THE SPECIFIED TIMES, LIQUIDATED DAMAGES
UPON COMPLETION OF THE PROJECT.
ALL ARROW PANELS AND PORTABLE CHANGEABLE MESSAGE SIGNS SHALL BECOME THE PROPERTY OF THE CONTRACTOR
ALL MAINTENANCE OF TRAFFIC PLANS ARE SUBJECT TO THE JUDGMENT OF THE ENGINEER.
INDEPENDENCE DAY WEEKEND
MEMORIAL DAY WEEKEND
KENTUCKY DERBY WEEKEND
GOOD FRIDAY
MARTIN LUTHER KING, JR. DAY
CHRISTMAS EVE THROUGH NEW YEAR’S HOLIDAY
THANKSGIVING WEEKEND
VETERAN’S DAY
LABOR DAY WEEKEND
THESE SPECIFIED TIMES:
STANDARD SPECIFICATIONS. MORE SPECIFICALLY, THERE SHALL BE NO LANE OR SHOULDER CLOSURES DURING
LANE OR SHOULDER CLOSURES WILL NOT BE PERMITTED ON THE HOLIDAYS SET FOR IN SECTION 101.03 OF THE
PRIVATE ENTRANCES.
CONTRACTOR SHALL PHASE CONSTRUCTION TO MAINTAIN ACCESS TO SIDE STREETS, COMMERCIAL ENTRANCES, AND
11’ MINIMUM LANE WIDTHS SHALL BE MAINTAINED AT ALL TIMES.
CONSTRUCTION SHALL BE LIMITED TO ONE ROUTE AT A TIME.
LIMITED TO ONE LANE PER DIRECTION AT A TIME.
LANE CLOSURES SHALL ONLY BE ALLOWED BETWEEN THE HOURS OF 7:00 PM TO 6:00 AM. LANE CLOSURES SHALL BE
CONSTRUCTION SHALL BE PERFORMED BEHIND LANE OR SHOULDER CLOSURES AS DIRECTED BY THE ENGINEER.
ENGINEER.
SHALL BE DELIVERED TO THE DISTRICT 5 TRAFFIC FACILITY AT 1517 DURRETT LANE, AS DIRECTED BY THE
ALL EXISTING SIGNALIZATION EQUIPMENT REMOVED REMAINS THE PROPERTY OF THE KYTC AND THE EQUIPMENT
BE GIVEN 48 HOURS NOTICE BEFORE ANY SIGNALS ARE CHANGED OR RELOCATED.
DURING HOURS OF LOW TRAFFIC FLOW UTILIZING FLAGGERS AS NEEDED DURING THESE OPERATIONS. KYTC SHALL
OR ANY EXISTING SIGNAL POLE IS REMOVED. RELOCATION OF SIGNAL HEADS IF REQUIRED SHOULD BE PERFORMED
OF CONSTRUCTION WILL HAVE TEMPORARY POLES OR NEW POLES CONSTRUCTED BEFORE GRADING ACTIVITIES BEGIN
HOURS MAY BE EXTENDED BY THE ENGINEER IF SPECIAL EVENTS WARRANT. SIGNAL POLES AFFECTED BY ANY PHASE
THE SIGNALS MAY BE OPERATED MANUALLY FOR BRIEF PERIODS OF TIME IF APPROVED BY THE ENGINEER. THESE
SIGNALIZATION EQUIPMENT MUST BE APPROVED BY THE ENGINEER. EXCEPT FOR THE HOURS OF 7 A.M. TO 9 P.M.,
TEMPORARY AND/OR PERMANENT SIGNALIZATION EQUIPMENT. THE LOCATION AND TYPE OF TEMPORARY
APPROVED OR MANDATED BY THE ENGINEER SHALL BE MAINTAINED AT THE INTERSECTION WITH A COMBINATION OF
BOTH PEDESTRIAN AND VEHICULAR SIGNALIZATION SCHEMES SHALL BE MAINTAINED. SIGNAL TIMING PLANS
THE SIGNALIZATION OF THE INTERSECTION WITHIN THE PROJECT LIMITS SHALL BE MAINTAINED AT ALL TIMES.
VEHICLE AS QUICKLY AS POSSIBLE.
EMERGENCY RUN ARRIVES AT THE SCENE, THE CONTRACTOR SHALL MAKE PROVISIONS FOR THE PASSAGE OF THAT
IF TRAFFIC SHOULD BE STOPPED DUE TO CONSTRUCTION OPERATIONS AND AN EMERGENCY VEHICLE ON AN OFFICIAL
BY THE ENGINEER BEFORE WORK CAN BE STARTED BY THE CONTRACTOR.
TRAFFIC IS ALLOWED TO USE ANY LANE CLOSURES, CROSSOVERS OR DETOURS. ALL SIGNING SHALL BE APPROVED
THE ENGINEER AND CONTRACTOR, OR THEIR AUTHORIZED REPRESENTATIVES, SHALL REVIEW THE SIGNING BEFORE
ALL OPERATIONS DURING WORKING HOURS.
GREATEST LANE WIDTH ALLOWABLE FOR ALL TRAVEL LANES. THE DEVICES WILL NEED TO BE MOVED THROUGHOUT
TRAFFIC. TRAFFIC CONTROL DEVICES SHALL BE MOVED DURING CONSTRUCTION ACTIVITIES TO ACCOMMODATE THE
THE FLOW OF TRAFFIC AND REMOVED STARTING AND PROCEEDING IN THE DIRECTION OPPOSITE THE FLOW OF
IN GENERAL, ALL TRAFFIC CONTROL DEVICES SHALL BE PLACED STARTING AND PROCEEDING IN THE DIRECTION OF
THE ENGINEER.
CONSTRUCTION WHICH REMAINS APPLICABLE WHILE CONSTRUCTION IS OCCURRING TO A LOCATION AS APPROVED BY
ARE APPLICABLE OR ARE REMOVED. THE CONTRACTOR MAY RELOCATE ANY EXISTING SIGN DISTURBED BY ACTIVE
NOT PROPERLY APPLY TO THE CURRENT TRAFFIC PHASING, AND SHALL MAINTAIN THE COVERING UNTIL THE SIGNS
THE CONTRACTOR SHALL COMPLETELY COVER ANY SIGNS, EITHER EXISTING, PERMANENT OR TEMPORARY, WHICH DO
OF THE CONTRACTOR WHEN NO LONGER REQUIRED.
ANY TEMPORARY TRAFFIC CONTROL ITEMS, DEVICES, MATERIALS AND INCIDENTALS SHALL REMAIN THE PROPERTY
PLANS, THE MUTCD OR THE ENGINEER.
FOR THE CONTROL AND PROTECTION OF VEHICULAR AND PEDESTRIAN TRAFFIC AS SPECIFIED IN THESE NOTES, THE
BARRICADES, VERTICAL PANELS, PLASTIC DRUMS (STEEL DRUMS WILL NOT BE PERMITTED) AND CONES NECESSARY
B. ALL FLAGPERSONS AND TRAFFIC CONTROL DEVICES SUCH AS, BUT NOT LIMITED TO, FLASHERS, SIGNS,
AND MARKINGS.
A. ALL LABOR AND MATERIALS NECESSARY FOR CONSTRUCTION AND MAINTENANCE OF TRAFFIC CONTROL DEVICES
OTHERWISE PROVIDED FOR IN THESE NOTES. BUT IS NOT LIMITED TO THE FOLLOWING ITEMS AND OPERATIONS:
AS SET FORTH IN THE CURRENT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION UNLESS
MAINTAIN AND CONTROL TRAFFIC WILL BE PAID FOR AT THE LUMP SUM PRICE TO MAINTAIN AND CONTROL TRAFFIC
EXCEPT FOR THE ROADWAY AND TRAFFIC CONTROL BID ITEMS LISTED. ALL ITEMS OF WORK NECESSARY TO
PROGRAM (NCHRP) 350 REPORT.
ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL COMPLY WITH THE NATIONAL COOPERATIVE HIGHWAY RESEARCH
CURRENT EDITIONS.
(MUTCD), THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE STANDARD DRAWINGS,
TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
EXPECTED CONSTRUCTION PHASING
PAVEMENT MARKING
MILL AND RESURFACE
CONSTRUCT NEW MEDIAN
REMOVE EXISTING MEDIAN AND ISLANDS AND REPLACE OR FILL VOID
WIDEN WESTBOUND
KY 155
PAVEMENT MARKING
CONSTRUCT NEW MEDIAN OPENING
REMOVE EXISTING MEDIAN OPENING
KY 1747
CONSTRUCT NEW TRAFFIC SIGNAL
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
E-S
HE
ET
NA
ME:
R02000
MT
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R20
TRAFFIC CONTROL PLAN NOTES
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02000
MT.
DG
NFIL
E
NA
ME:
A
EROSION CONTROL LEGEND
SILT FENCE SF
SILT TRAP TYPE B
AALTERNATE 2
SILT TRAP TYPE A
ALTERNATE 1
SILT TRAP TYPE A
TEMPORARY SILT DITCH
OVERLAND SHEET FLOW
DISTURBED DRAINAGE AREA
PROPOSED R/W
PROPOSED EASEMENT
SILT TRAP TYPE C
EROSION CONTROL NOTES
OF THE BMP, KEPT ON SITE, AND AVAILABLE FOR PUBLIC INSPECTION.
THE DEVELOPMENT AND UTILIZATION OF THESE MEASURES WILL BE RECORDED AS PART
PROJECT AND WORK CONDITIONS AND SHALL BE APPROVED BY THE SECTION ENGINEER.
EROSION CONTROL MEASURES EMPLOYED BY THE CONTRACTOR WILL BE UNIQUE TO THE
MATERIAL AT SITES APPROVED BY THE SECTION ENGINEER.
AND SILT FENCES WHENEVER THEY BECOME ONE- HALF FULL AND PROPERLY DISPOSE OF THE
THE CONTRACTOR SHALL BE REQUIRED TO CLEAN OUT (REMOVE SEDIMENT FROM) SILT TRAPS
EXCAVATION OR DISTURBANCE WITHIN A DRAINAGE AREA.
EROSION CONTROL MEASURES SHALL BE IN PLACE AND FUNCTIONING PRIOR TO ANY
WITH THE JUNE, 2012 LETTING.
FOR ROAD AND BRIDGE CONSTRUCTION, AND THE SUPPLEMENTAL SPECS EFFECTIVE
DEVELOP THE BMP ACCORDING TO SECTION 213.03.01 OF THE STANDARD SPECIFICATIONS
PROVIDE A STARTING POINT FOR THE CONTRACTOR AND SECTION ENGINEER TO
THE EROSION CONTROL PLANS DO NOT CONSTITUTE A BMP BY THEMSELVES. THEY
OF THE AFOREMENTED SILT BASIN OR TRAPS.
FILTER DEVICES MAY BE USED OR THE OVERLAND FLOW MAY BE DIVERTED TO ONE
ADJACENT PROPERTY OWNER. WHERE OVERLAND FLOW EXIST, A SILT FENCE OR OTHER
COLLECTION POINT PRIOR TO DISCHARGING INTO A BLUE LINE STREAM OR ONTO AN
OR SILT TRAP TYPE B SHALL ALWAYS BE PLACED AT THE MOST REMOTE DOWNSTREAM
IF A SILT BASIN IS NOT USED THEN ONE SILT TRAP TYPE A, ALTERNATE NUMBER 2
DOCUMENTATION PROCEDURES ESTABLISHED BY THE DIVISION OF CONSTRUCTION.
USED AND THE VOLUME PROVIDED BY EACH SILT TRAP IN ACCORDANCE WITH THE
BY THE CONTRACTOR TO DETAIL THE SELECTION OF EACH EROSION CONTROL DEVICE
THE EROSION CONTROL PLAN SHALL BE ANNOTATED AS THE WORK PROCEEDS
UP GRADIENT AREAS THAT HAVE BEEN PROTECTED BY SILT TRAPS (ACRES). -
OF 100 SQUARE FOOT PER LINEAR FOOT OF SILT FENCE.
AREAS PROTECTED BY SILT FENCE SHALL BE COMPUTED AT A MAXIMUM RATE
UP GRADIENT AREAS THAT HAVE BEEN PROTECTED BY SILT FENCE (ACRES). -
THE USE OF TEMPORARY MULCH IS ENCOURAGED. -
TEMPORARY MULCH.(ACRES).
CONTROL BLANKET OR OTHER GROUND PROTECTION MATERIAL SUCH AS
UP GRADIENT AREAS THAT HAVE BEEN RECLAIMED AND PROTECTED BY EROSION -
UP GRADIENT AREAS NOT DISTURBED (ACRES). -
AMOUNTS:
THE REQUIRED VOLUME AT EACH SILT TRAP MAY BE REDUCED BY THE FOLLOWING
SHALL BE DETERMINED BY THE CONTRACTOR AND VERIFIED BY THE ENGINEER.
OF THE ENGINEER. THE REQUIRED VOLUME CALCULATION FOR EACH SILT TRAP
CONTRIBUTING AREAS ARE DISTURBED OR ARE STABILIZED TO THE SATISFACTION
VOLUME AT EACH ADDED SILT TRAP SHALL BE COMPUTED AS UP GRADIENT
REMOVED IN ORDER TO ACHIEVE THE BEST MANAGEMENT PLAN. THE REQUIRED
PHASE OF CONSTRUCTION. AS WORK PROCEEDS, SILT TRAPS MAY BE ADDED OR
SHALL COMPUTE THE VOLUME NECESSARY TO CONTROL SEDIMENT DURING EACH
OF DISTURBED GROUND DURING EACH PHASE OF CONSTRUCTION. THE CONTRACTOR
THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS TO MINIMIZE THE AMOUNT
PER DISTURBED CONTRIBUTING ACRE.
ALL SILT CONTROL DEVICES SHALL BE SIZED TO RETAIN A VOLUME OF 3,600 CUBIC FEET
EROSION CONTROL LEGEND
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R0210
0E
CMicro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R21
AND NOTES
SCALE: NTS
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R0210
0E
C.
DG
NFIL
E
NA
ME:
0’ 40’ 80’20’
298
+00
297
+00
296
+00
295
+00
MA
TC
HLIN
E S
TA. 300
+00
TO LOUISVILLE
KY 155 (TAYLORSVILLE ROAD)
CONST. LIMITS
299
+00
300
+00
HU
RS
TB
OU
RN
E
LA
NE
DISTURBED DRAINAGE AREAS
SECTION
DDA 1 0.01 36
DDA 2 0.47 1,692
DDA 3 2.53 9,108
POINT DISCHARGE DDA 1
POINT DISCHARGE DDA 3
DDA 3
DDA 2
DDA 1
CONST. LIMITS
(ACRES)AREA
DISTURBED
(CU FT)SEDIMENT VOLUME
MAXIMUM
KY 155 (TAYLORSVILLE RD)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R02200
EC
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R22
EROSION CONTROL PLAN SHEET
STA. 295+05.18 TO STA. 300+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02200
EC.
DG
NFIL
E
NA
ME:
IE-634.24
2" TRENCH DRAIN
CB
TG-637.95
IE-SIL
TE
D
CB
TG-641.70
IE-634.70
18"
RC
PIE-637.40
18" RCP
15" RCP
18" RCP
15" RCP
15" RCP
18"
RC
P
IE-625.68
IE-636.02
IE-635.66
IE-635.04
638638
638
638
638
637
639
636636
636
637
637
637
637
637
637
632
633
633
633
634634
634
634
635635
635
635
635
636
636
636
636
636 636
637637
637
637
637
637
637637
637
637
637
638
638
638638
638
638
638
638
638
638
638
638 638638
638
638
638
638
638
638
639
639
639
639
639639
639639
639639639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
640640
640
640
640
640
640
640640640640
640
640640
640
640
640
640
640
640
640
640
640
640
641
641
641
641
641
641
641
641
641
641641641
641
641
641
641
641
641
641
641
642
642
642
642
642
642
642642642
643
643
0’ 40’ 80’20’
CONST. LIMIT
S
300
+00
DDA 2 0.47 1,692
DDA 3 2.53 9,108
DDA 4 0.18 648
DDA 5 1.05 3,780
301+
00
302
+00
303
+00
304
+00
305
+00
306
+00
MA
TC
HLIN
E S
TA. 306
+00
MATCHLINE STA. 52+00
52+00
MA
TC
HLIN
E S
TA. 300
+00
51+00
50+00
KY 155 (TAYLORSVILLE ROAD)
(HU
RS
TB
OU
RN
E P
AR
KW
AY)
KY 17
47
CONST. LIMITS
DDA 3
DDA 3
DDA 4
DDA 5
DDA 2
POINT DISCHARGE DDA 2
POINT DISCHARGE DDA 5
CONST. LIMITS
DISTURBED DRAINAGE AREAS
SECTION(ACRES)
AREADISTURBED
(CU FT)SEDIMENT VOLUME
MAXIMUM
KY 155 (TAYLORSVILLE RD)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R02300
EC
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R23
EROSION CONTROL PLAN SHEET
STA. 300+00 TO STA. 306+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02300
EC.
DG
NFIL
E
NA
ME:
ELEC/JB
ELEC/JB
ELEC/JB
ELEC/JB
ELEC/JB
ELEC/JB
30" RCP
MH
ELEC.
EM
H
ELEC/JBE
LEC/SIG
N C
ONTR
OL B
OX
640
640
640
640
640
640
640
646
646
646
646
641
641
641
641
641
641
641
639
631
631
632
632
632
629
629
632632
632
632632
632
632
632
632
632
632
632
632
632630
630
630
630630
631
631631
631631
631
631
631
631
631
633
633
633
633633
633633633
6336
33
633
633
633
633 633
633
633
633
633
633
633
634
634
634
634634
63463463463
4
634
634
634
634
634
634
634
634 634
634
634
635
635
635
635
635
635635
635
635
635
635
635
635635
635 635
635
635
635
635
636
636
636636
636636
636
636
636
636
636
636
636
636636 636
636
636
636
636
637
637
637
637
637
637637
637
637
637
637
637
637
637
637
637
637
637
637
637
637
637
637
638
638
638
638
638
63863
8
638638
638
638
638
638
638638638
638
638
638
638
638
638
638
638
638
638
638
639
639
639 639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
639
640
640
640
640
640640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
641
641
641
641641
641
641
641
641
641
641
641
641
641
641
641
641
641
641
641
641
642
642
642
642
642
642
642
642
642 642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
642
643
643
643
643
643643
643
643
643
643
643
643
643
643
643
643
644
644
644
644644
644
644
644
645
645
645
645
645
645
645
645
646
646
646
646
646
0’ 40’ 80’20’
DDA 3 2.53 9,108
DDA 5 1.05 3,780
306
+00
CONST. LIMITS
MA
TC
HLIN
E S
TA. 306
+00
307
+00
308
+00
309
+00
310
+00
TO TAYLORSVILLEKY 155 (TAYLORSVILLE ROAD)
CONST. LIMITS
DDA 5
DDA 3
DISTURBED DRAINAGE AREAS
SECTION(ACRES)
AREADISTURBED
(CU FT)SEDIMENT VOLUME
MAXIMUM
KY 155 (TAYLORSVILLE RD)
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
E-S
HE
ET
NA
ME:
R02400
EC
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R24
EROSION CONTROL PLAN SHEET
STA. 306+00 TO STA. 309+58.50 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02400
EC.
DG
NFIL
E
NA
ME:
645
645
645
645645
645
645
645 646
646
646
646
646646
646
646
646
643
643
643
643643643
644
644
644
644
644
644
644
644 644
644
644
644
644
645
645
645
645
645
645
645
645
645
646
646
646
646
646
646
646
646
646
646
646
646
646
646
647
647647
647
647
647
647
647
647
647
647
647
647
647
647647
647
647
647
647
647
647
647
647
647
647
648
648
648
648
648
648
648
648
648
648
648
648
648
648
649
649
649
649
649
649
649
649
649
649
649
0’ 40’ 80’20’
DDA 5 1.05 3,780
DDA 6 1.43 5,148
DDA 7 0.55 1,980
52
+00
(HURSTBOURNE PARKWAY)KY 1747
MA
TC
HLIN
E S
TA. 58
+00
58
+00
MA
TC
HLIN
E S
TA. 52
+00
53
+00
54
+00
55
+00
56
+00
57
+00
DDA 6
DDA 7
POINT DISCHARGE DDA 6POINT DISCHARGE DDA 7
POINT DISCHARGE DDA 8
DDA 5
DISTURBED DRAINAGE AREAS
SECTION(ACRES)
AREADISTURBED
(CU FT)SEDIMENT VOLUME
MAXIMUM
KY 1747 (HURSTBOURNE PARKWAY)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R02500
EC
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R25
EROSION CONTROL PLAN SHEET
STA. 52+00 TO STA. 58+00 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02500
EC.
DG
NFIL
E
NA
ME:
644
644
644
644
643
643
643
643
643
643 643
643
643 643
643643
643
643
643
643
643
643
643
643
644
644
644
644
644
644
644
644
644644
644
644644 644
644
644
644
644
644
644
644
644
645
645
645
645
645
645
645
645
645
645
645
645
645
645
645
645
645
645
646
646
646
646
0’ 40’ 80’20’
DDA 6 1.43 5,148
DDA 7 0.55 1,980
DDA 8 0.76 2,736
DDA 9 0.06 216
58
+00
MA
TC
HLIN
E S
TA. 58
+00
DDA 8
DDA 7
DDA 9DDA 6
POINT DISCHARGE DDA 9
59
+00
60
+00
61+
00
62
+00
63
+00
64
+00
DISTURBED DRAINAGE AREAS
SECTION(ACRES)
AREADISTURBED
(CU FT)SEDIMENT VOLUME
MAXIMUM
KY 1747 (HURSTBOURNE PARKWAY)
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R02600
EC
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R26
EROSION CONTROL PLAN SHEET
STA. 58+00 TO STA. 63+14.43 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02600
EC.
DG
NFIL
E
NA
ME: 645645
646
646
645
645
645
645
645
646
646
646
646
646
646
646
646
645
645
645
645
645645
645645
646
646
646
646
646
646
646
646
646
646
646
646
646
646
647647
647
647
647 647
647
647
647
647
647
647
647
647
647
647
647
647
648
648
648
648
648
648
648
648
648
648648
649
649
649
649
649
649
649
649
650
650
650
650
650
650
650
650
651
651
651
651
651
651
652
652
0’ 400’ 800’200’
PI STA 57+51.02
TL
E
= 9°36’39" RT
= 3819.72’
s
cs
L
LTST
s
= 421.15’= 200.00’= 440.72’
= 133.34’
C
C
R= 13.91’
= 66.67’
= 1°30’00"
PI STA 67+27.49
TL
E
= 7°47’39" lT
= 3819.72’
s
cs
L
LTST
s
= 360.23’= 200.00’= 319.61’
= 133.34’
R= 9.29’
= 66.67’
= 1°30’00"
e = see x-sec
e = see x-sec
275
+00
280
+00
285+00
290
+00
295+00
300+00
305+00
310
+00
315+
00
PT 318+
75.5
4
PC 270
+51.
20
POE 82+44.85
80+00
75+00
70+00
65+00
60+00
55+00
50+00
TS 53+29.87
SC 55+29.87
ST 61+
70.60
CS 59+70.60
TS 63+67.25
SC 65+67.25
CS 68+86.87
ST 70+86.87
PI 67+27.49
PI 5
7+51.
02
PI 296+52.01
TBM-1
TBM-2
TBM-3
TBM-4
TBM-5
TBM-6
TBM-7
MON-1
MON-2
TRAV-3
TRAV-4
TRAV-9
TRAV-5
TRAV-8
TRAV-7
TRAV-6
NAVD88 Vertical Datum. Geoid model used was Geoid12A.
Elevations were derived from GPS methods and are adjusted to the
BASIS OF ELEVATIONS
area.
average Grid Factors from the Primary Survey Control over the project
The project Grid Factor is 0.999941 and was obtained by using the
.U.S. Survey Feetin
Coordinates are based on State Plane Coordinate System Single Zone and
and adjusted to the National NAD83/FBN System.
Coordinates for horizontal control were obtained from GPS methods
COORDINATE SYSTEMST
A 295+05.18
BE
GIN
CO
NST
RU
CTIO
N
STA 309+58.5
0
END CONSTRUCTIO
N
ST
A 63+14.43
EN
D
CO
NS
TR
UC
TIO
N
e= see x-secE= 613.22’R= 5208.71’L= 4824.34’T= 2600.81’ = 53°04’04" RTPI STA 296+52.01D
S86°58’37"E
S33°54’3
3"E
N54°
26’38"
E
N64°
03’17
"E
N56°
15’38"
E
PO
B 50+00.00
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R02700
CC
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R27
COORDINATE CONTROL SHEET
SCALE: 1"=400’
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02700
CC.
DG
NFIL
E
NA
ME:
EAST (X)NORTH (Y)
COORDINATE CONTROL POINTS
POINT
ELEV. (Z)
DESCRIPTION
State Plane Coordinates
STATION OFFSET
MON-1 AZI 068-2006 3966909.735 644.16
MON-2 STA 068-2006 3966633.817 641.34
TRAV-3 IPC 3966266.714 639.00
TRAV-4 IPC 3965899.422 639.71
TRAV-5 IPC 3966234.374 644.56
TRAV-6 IPC 3966547.663 645.69
TRAV-7 IPC 3966964.918 649.28
TRAV-8 IPC 3966711.086 644.50
TRAV-9 IPC 3966396.578 642.22
TBM-1 SQUARE CUT 638.00
TBM-2 SQUARE CUT 636.99
TBM-3 BOLT 640.51
TBM-4 SQUARE CUT 646.12
TBM-5 RR SPIKE IN PP 643.34
TBM-6 SQUARE CUT 649.06
TBM-7 RR SPIKE IN PP 644.64
4965663.385
4966203.824
4966728.992
4966719.155
4967095.316
4967531.020
4967881.061
4967420.540
4966927.332
289+02.10
295+015.02
301+63.22
303+93.66
51+75.30
57+20.02
62+27.26
57+10.43
51+32.95
298+42.77
299+69.56
302+59.31
304+53.51
51+60.58
309+70.96
58+45.91
47.55 RT
50.65 RT
64.82 RT
358.37 RT
115.49 RT
102.83 RT
103.15 LT
94.20 LT
114.15 LT
52.09 LT
71.68 RT
57.52 RT
305.08 RT
80.30 RT
45.15 LT
79.18 RT
EAST (X)NORTH (Y)
COORDINATE CONTROL POINTS
POINT
ELEV. (Z)
DESCRIPTION
State Plane Coordinates
STATION OFFSET
PC TAYLORSVILLE RD 3967373.908 4963889.744 270+51.20
POC TAYLORSVILLE RD 3966734.253 4966129.130 294+00
PI TAYLORSVILLE RD 3967236.750 4966486.937 296+52.01
POC TAYLORSVILLE RD 3965778.619 4967373.536 309+75
PT TAYLORSVILLE RD 3965078.280 4967937.877 318+75.54
POB 3966226.401 4966885.546 50+00
TS 3966418.222 4967153.913 53+29.87
SC 3966533.094 4967317.626 55+29.87
PI 3966663.120 4967496.538 57+51.02
CS 3966758.312 4967696.173 59+70.60
ST 3966847.377 4967875.240 61+70.60
TS 3966933.418 4968052.079 63+67.25
SC 3967022.484 4968231.145 65+67.25
PI 3967091.025 4968376.006 67+27.49
CS 3967181.481 4968508.295 68+86.87
ST 3967291.105 4968675.567 70+86.87
POE 3967934.271 4969638.517 82+44.85
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
S HURSTBOURNE PKWY
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
R02800
CC
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 R28
COORDINATE CONTROL SHEET
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02800
CC.
DG
NFIL
E
NA
ME:
630
640
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
299+75.26
630
640
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
298+40
630
640
}
TG = 638.05
I.E. 634.25
H=3.80’, 13.67’ LT.
CONST. DBI TYPE 13-3
FL = 637.20
I.E. 632.90
15"
LE
VE
L
PH
DESIG
N
HEIG
HT
CO
VE
R
MA
XI
MU
M
EACH EACH
M 3.4
22 M 3.8
1
1
3:1
TY
PE 13 - 3
DR
OP
BO
X IN
LE
T
CONST. 95 L.F. 15" STORM PIPE @ S=1.00%
640
630
640
630
3:1
299+34.35
630
640
0-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 20 30 40 50 60 70 80 90 100 110 120 130 140 15010
0-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 20 30 40 50 60 70 80 90 100 110 120 130 140 15010
299+97.16
I.E. 632.65
I.E. 633.30
FL = 637.25
FL = 637.27
}
CONST. 41 L.F. 15" STORM PIPE @ S=0.98%
}
CONST. 22 L.F. 15" STORM PIPE @ S=1.14%
}
TY
PE
B
CU
RB
BO
X IN
LE
T
M 2.9195
41
12 M 4.01
3:1
TO EX 8’x4’ RCBC
CONST. 12 L.F. 15" STORM PIPE @ S=24.58%
H=4.62’, 10.32’ LT.
CONST. CBI TYPE B 4-2
H=4.30’, 10.68’ LT.
CONST. CBI TYPE B 3-6
H=3.95’, 11.66’ LT.
CONST. CBI TYPE B 3-2
REMOVE EXISTING DBI
630
640
STORM SEWER PIPE
LINEAR FEET
KY 155 (TAYLORSVILLE RD)
PIPE DRAINAGE SHEET 1 of 2
SCALE: 1"= 20’
PIPE SECTIONS
STA. 298+40 TO STA. 299+97.16
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.7.443
JEFFERSON 05-9008.00 R29
SHEET NO.ITEM NO.COUNTY OF
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R02900
PD.
DG
NFIL
E
NA
ME:
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
58+20
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
60+60
640
650
CONSTRUCT LID TO CAP BOX
REMOVE TOP PHASE OF EX CBI.
}
TG = 645.05
I.E. 639.60
I.E. 639.47CONST. 13 L.F. 18" STORM PIPE @ S=1.00%
EX. 18" STORM PIPE
TG = 644.50
I.E. 641.30
H=3.20’, 7.30’ RT.
CONST. DBI TYPE 6E
56+41.62
TG = 644.23
I.E. 638.50
H=5.73’, 5.33’ LT.
CONST. DBI TYPE 13-3
EX. 15" STORM PIPE
LE
VE
L
PH
DESIG
N
HEIG
HT
CO
VE
R
MA
XI
MU
M
EACH EACH EACH
TY
PE 13 - 3
DR
OP
BO
X IN
LE
T
TY
PE 13 - 75
DR
OP
BO
X IN
LE
T
TY
PE 6
E
DR
OP
BO
X IN
LE
T
15" 18"
M 5.6
M 4.0
M 2.2
240
1
1
113
REMOVE EXISTING DBI
3:13:1
630
640
650
0 10 20 30 40 50 60 70 80 90
100 110 120 130 140 150
-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
630
640
650
51+68.97 @ 0°40’30" SKEW LT.
TG = 641.00
I.E. 638.19I.E. 637.90
CONST. 8 L.F. 18" STORM PIPE @ S=3.63%
EX. 18" STORM PIPE
EX. 18" STORM PIPE
EX. JUNCTION BOX
}
}
M 2.1
FROM SLOPED BOX OUTLET TYPE 1 STA. 304+71.60
CONST. 72 L.F. 18" STORM PIPE @ S=2.64%
EACH
TY
PE 3
DR
OP
BO
X IN
LE
T
196
TO SLOPED BOX OUTLET TYPE 1 STA. 51+87.43
CONST. 16 L.F. 18" STORM PIPE @ S=6.63%
CONST. 240 L.F. 15" STORM PIPE @ S=0.71%
H=2.81’, CL Box = STA. 51+70.40, 83.42’ RT.
CONST. DBI TYPE 3 S (OMIT APRON)
H=5.45’, 12.67’ RT.
CONST. DBI TYPE 13-75
STORM SEWER PIPE
LINEAR FEET
KY 1747 (HURSTBOURNE PKWY)
PIPE DRAINAGE SHEET 2 of 2
SCALE: 1"= 20’
PIPE SECTIONS
STA. 51+68.97 TO STA. 60+60
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.7.443
JEFFERSON 05-9008.00 R30
SHEET NO.ITEM NO.COUNTY OF
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
R03000
PD.
DG
NFIL
E
NA
ME:
0
E-S
HE
ET
NA
ME:
X0010
0X
SMicro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X1
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
NUMBERS:
PROJECT
COUNTY OF
Commonwealth of KentuckyDEPARTMENT OF HIGHWAYS
JEFFERSON
FD52 1550 C056 E143
9037001 D
DESIGNED BY:
DATE SUBMITTED:
STANTEC
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X0010
0X
S.
DG
NFIL
E
NA
ME:
COM EMB DT MED DT LT DT RT
630
640
650
0 10 20 30 40 50 60 70 80 90-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
295+40
630
640
650
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-120-130-140-150
296+00
630
640
650
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
297+00
630
640
650
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
297+53
630
640
650
STA.295+40 TO STA.297+53
EX.
GA
S
LIN
E
EX. GAS LINE
EX.
GA
S
LIN
E
EX.
WA
TE
R
LIN
E
EX. TELEPHONE
CABLE & CONDUIT
PIPE
15" ENTRANCE
3:1
3:1
3:1
MATCH EXISTING}MATCH EXISTING}
MATCH EXISTING} MATCH EXISTING}
MATCH EXISTING}MATCH EXISTING}
MATCH EXISTING}
{6.14%
641.
5639.0
639.6
640.7
641.
89
641.
84
641.
61
641.
39
640.61
640.72
640.83
641.
00
641.
07
639.87
639.93
639.70
639.64
639.53
639.00
639.28
639.11
639.29
639.21
638.72
637.12
638.87
FL. 636.06
END SPCL. "V" DT.
LT. STA. 297+35.18
FL. 638.87
BEGIN SPCL. "V" DT.
LT. STA. 296+00
10’ V.C.
CONST. ENTRANCE
LT. STA. 297+53 64 6 0 7 0
63 4 0 6 0
8 0 12 0
72 0 0 0 0
DT LT
EMB
COM
0 SF
0 SF
AREAS
DT LT
EMB
COM
0 SF
0 SF
AREAS
DT LT
EMB
COM
4 SF
6 SF
AREAS
DT LT
EMB
COM
0 SF
0 SF
AREAS
-110
WESTBOUND THRU LANES
TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 295+05.18, 7.38’ LT. BEGIN
WESTBOUND THRU LANES
TAPER FOR RIGHT EDGE OF PAVEMENT FOR
STA. 295+53.74, 31.47’ LT. BEGIN
WESTBOUND THRU LANES
TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 297+09.08, 13.85’ LT. END
WESTBOUND THRU LANES
TAPER FOR RIGHT EDGE OF PAVEMENT FOR
STA. 297+16.05, 36.21’ LT. END
EASTBOUND LEFT TURN LANES
TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 295+40, 7.00’ RT. BEGIN
EASTBOUND LEFT TURN LANES
TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 296+45.37, 2.88’ LT. END
31 SF
23 SF
41 SF
22 0 0 0 0
11’6’22’8’14.8’
9.3’
11’6’22.1’8’9.8’
7.3’
7’7.9’23.6’9.1’
11.1’
1.6’
9.4’22.9’8’
33 SF
KY 155 SECTIONS
MATCH EXISTING}
11’
641.
24
EX. WATER LINE
EX. WATER LINE
EX. WATER LINE
100
0
E-S
HE
ET
NA
ME:
X00200
XS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X2
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X0010
0X
S.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
COM EMB DT MED DT LT DT RT
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
298+00
630
640
650
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
298+80
630
640
650
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
299+00
630
640
650
630
640
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
299+40
630
640
STA.298+00 TO STA.299+40
EX. GAS LINE
EX. GAS LINE
EX. GAS LINE
EX. GAS LINE
EX.
WA
TE
R
LIN
E
EX.
WA
TE
R
LIN
E
EX.
WA
TE
R
LIN
E
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. TELEPHONE
CABLE & CONDUIT
EX. TELEPHONE
CABLE & CONDUIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
3:13:1
MATCH EXISTING}
MATCH EXISTING} MATCH EXISTING}
MATCH EXISTING}
MATCH EXISTING} MATCH EXISTING}
638.4
637.7
637.6
637.4
PIPE
18" CULVERT
PIPE
18" CULVERT
638.33
638.48
638.30
638.54
638.48
637.99
638.67
637.85
637.69
637.75
637.65
637.59
638.73
638.35
638.17
637.61
637.53
637.44
637.21
635.40
FL. 635.23
END SPCL. "V" DT.
LT. STA. 298+19.26
FL. 635.70
BEGIN SPCL. "V" DT.
LT. STA. 297+70.78
FL. 632.40
END SPCL. "V" DT.
LT. STA. 299+68
FL. 633.37
BEGIN SPCL. "V" DT.
LT. STA. 299+47.16
9 0 12 0
60 0 0 0 0
22 0 0 0
76 64 0 0 0
DT LT
EMB
COM
6 SF
8 SF
AREAS
DT LT
EMB
COM
0 SF
0 SF
AREAS
DT LT
EMB
COM
0 SF
0 SF
AREAS
DT LT
EMB
COM
0 SF
AREAS
32 SF
51 SF
29 SF
21.6’6’26.4’
6’
1.06%}
11’6’24’51.4’
5.4’
14.4’
6.9’
3.6’
41.4’22.1’31.8’
11’6’22’8’10.8’
9.2’
WESTBOUND THRU LANES
TRANSITION FOR LEFT EDGE OF PAVEMENT FOR
STA. 297+99.92, 15.16’ LT. BEGIN
EASTBOUND LEFT TURN LANES
TRANSITION FOR LEFT EDGE OF PAVEMENT FOR
STA. 297+99.79, 9.16’ LT. BEGIN
WESTBOUND THRU LANES
TRANSITION FOR RIGHT EDGE OF PAVEMENT FOR
STA. 298+00.42, 37.15’ LT. BEGIN
WESTBOUND THRU LANES
TRANSITION FOR RIGHT EDGE OF PAVEMENT FOR
STA. 299+91.72, 36.28’ LT. END
WESTBOUND THRU LANES
TRANSITION FOR LEFT EDGE OF PAVEMENT FOR
STA. 299+91.72, 10.82’ LT. END
EASTBOUND LEFT TURN LANES
TRANSITION FOR LEFT EDGE OF PAVEMENT FOR
STA. 299+91.72, 4.82’ LT. END
73 SF
89 SF
156
104
KY 155 SECTIONS
3:1
EX. WATER LINE
EX. WATER LINE
EX. WATER LINE EX. WATER LINE
0
E-S
HE
ET
NA
ME:
X00300
XS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X3
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X0010
0X
S.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
COM EMB DT MED DT LT DT RT
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
300+00
630
640
650
620
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
301+00
620
630
640
650
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
302+00
630
640
650
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
303+00
630
640
650
STA.300+00 TO STA.303+00
EX.
GA
S
LIN
E
EX.
GA
S
LIN
E
EX.
GA
S
LIN
E
EX.
WA
TE
R
LIN
E
EX.
WA
TE
R
LIN
E
EX.
WA
TE
R
LIN
EE
X.
WA
TE
R
LIN
E
EX. TELEPHONE
CABLE & CONDUIT
EX. TELEPHONE
CABLE & CONDUIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. TELEPHONE
CABLE & CONDUIT
3:1
3:1
3:1MATCH EXISTING} MATCH EXISTING}
MATCH EXISTING}MATCH EXISTING}
MATCH EXISTING} MATCH EXISTING}
637.4
638.0
640.1
638.9
639.39
639.05
638.97
638.82
637.89
638.06
638.16
638.58
638.01
637.62
637.53
637.31
73 58 0 0 0
78 12 0 0 0
37 6 0 0 0
0 0 0 0 0
DT LT
EMB
COM
0 SF
AREAS
DT LT
EMB
COM
3 SF
0 SF
AREAS
DT LT
EMB
COM
3 SF
0 SF
AREAS
DT LT
EMB
COM 0 SF
0 SF
0 SF
AREAS
17 SF
28 SF
11’6’26’
4.8’
11’6’26’
11’6’26’
4.8’
4.8’
22 SF
20 SF
KY 155 SECTIONS
EX. WATER LINE
Dt. Lt.
Emb
Com
=
=
=
Sta. 295+05.18 to 303+12
Earthwork Quantities
37
189
905
0
E-S
HE
ET
NA
ME:
X00400
XS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X4
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X0010
0X
S.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
COM EMB DT MED DT LT DT RT
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
304+00
630
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
305+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
306+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-120-130-140-150
307+00
640
650
EX.
GA
S
LIN
E
EX.
GA
S
LIN
E
EX.
GA
S
LIN
E
EX.
WA
TE
R
LIN
E
EX. TELEPHONE
CABLE & CONDUIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
3:1
3:1
3:1
3:1
MATCH EXISTING}
MATCH EXISTING}
MATCH EXISTING}
641.
1643.3
642.1
644.4
644.74
644.87
644.90
643.89
643.86
643.71
642.36
642.38
642.44
642.40
641.
65
FL. 641.35
BEGIN SPCL. "V" DT.
LT. STA. 305+60
FL. 642.41
END SPCL. "V" DT.
LT. STA. 307+01.78
2 0 0 0
37 2 0 4 0
39 6 0 25 0
54 3 0 13 0
DT LT
EMB
COM
1 SF
0 SF
AREAS
DT LT
EMB
COM
2 SF
AREAS
DT LT
EMB
COM
1 SF
AREAS
DT LT
EMB
COM
0 SF
0 SF
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
13 SF
-110
34’13’
33.2’13’
32.1’13.5’5.2’
8.2’
9’
25:1 TAPER FOR PAVED SHOULDER WIDTH
STA. 305+00.00, 50.78’ LT. BEGIN
25:1 TAPER FOR PAVED SHOULDER WIDTH
STA. 306+00.00, 46.18’ LT. END
2 SF
14 SF
11 SF
STA.304+00 TO STA.307+00KY 155 SECTIONS
EX. E
LE
C. LIN
E
AREAS
EX.
WA
TE
R
LIN
E
EX. TELEPHONE
CABLE & CONDUITS
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
S
14.9’ 79.6’ 33’
641.
59
642.13
642.04
49 SF
7 SF
91 2 0 0 0
115
0
E-S
HE
ET
NA
ME:
X00500
XS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X5
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X0010
0X
S.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
COM EMB DT MED DT LT DT RT
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
307+60
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
308+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
309+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
309+40
640
650
EX.
GA
S
LIN
EE
X.
GA
S
LIN
E
EX.
GA
S
LIN
EE
X.
GA
S
LIN
E
EX.
WA
TE
R
LIN
E
EX.
WA
TE
R
LIN
E
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. TELEPHONE
CABLE & CONDUIT
EX. TELEPHONE
CABLE & CONDUIT
EX. TELEPHONE
CABLE & CONDUIT
EX. TELEPHONE
CABLE & CONDUIT
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
EX. TELEPHONE
CABLE & CONDUIT
3:1
3:1
3:1
3:1
MATCH EXISTING}
MATCH EXISTING}
MATCH EXISTING}
645.1
645.9
646.7
647.2
646.47
645.92
645.72
646.13
646.11
645.96
647.09
647.14
647.15
647.43
647.50
647.48
645.38
644.90
FL. 645.60
END SPCL. "V" DT.
LT. STA. 309+58.50
FL. 643.50
BEGIN SPCL. "V" DT.
LT. STA. 308+06.17
46 1 0 7 0
82 4 0 19 0
26 2 0 3 0
7 1 0 1 0
DT LT
EMB
COM
0 SF
0 SF
AREAS
DT LT
EMB
COM
1 SF
9 SF
AREAS
DT LT
EMB
COM
1 SF
1 SF
AREAS
DT LT
EMB
COM
1 SF
2 SF
AREAS
34 SF
28 SF
16 SF
19 SF30.5’
2’
7.5’
31’8.5’
31’14.6’
33.1’13’16.6’CONST. ENTRANCE
LT. STA. 307+58.50
WESTBOUND RIGHT TURN LANE
100’ TAPER FOR RIGHT EDGE OF PAVEMENT FOR
STA. 308+58.50, 42.71’ LT. BEGIN
WESTBOUND RIGHT TURN LANE
100’ TAPER FOR RIGHT EDGE OF PAVEMENT FOR
STA. 309+58.50, 30.18’ LT. END
3:1
STA.307+60 TO STA.309+40KY 155 SECTIONS
EX. WATER LINE
EX. WATER LINEPIPE
18" ENTRANCE
Dt. Lt.
Emb
Com
=
=
=
Sta. 303+12 to 309+58.50
Earthwork Quantities
72
23
497
0
E-S
HE
ET
NA
ME:
X00600
XS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X6
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X00600
XS.
DG
NFIL
E
NA
ME:
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
COM EMB MED DT DT LT DT RT
630
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
51+00
630
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
52+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
53+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
54+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
55+00
640
650
STA.51+00 TO STA.55+00
EX. E
LE
C. LIN
E
EX.
GA
S
LIN
E
EX.
WA
TE
R
LIN
E
641.
7642.2
642.7
643.2
643.7
644.07
643.57
642.19
641.
94
642.54
642.50
643.50
3:1
642.24
MATCH EXISTING}
4.08%}
2.00%}
1.40%}
15" RCP
15" RCP
41 0 0 0 0
0 0 0 0
28 0 0 0 0
0 0 0 0
COM
EMB
AREAS
0 SF
0 SFDT MED
COM
EMB
AREAS
0 SF
0 SFDT MED
COM
EMB
AREAS
0 SF
0 SF
0 SFDT MED
COM
EMB
AREAS
0 SF
0 SFDT MED
20 SF
15 SF
22 SF
50 0 0 0 0COM
EMB
AREAS
0 SF
0 SFDT MED
7 SF
1.3’
10.3’
6.4’
18’
57.8’
3.6’
6.1’
2’
54.4’
25:1 TAPER FOR PAVED SHOULDER WIDTH
STA. 52+00.00, 67.44’ RT. BEGIN
25:1 TAPER FOR PAVED SHOULDER WIDTH
STA. 53+44.63, 54.62’ RT. END
SOUTHBOUND LEFT TURN LANE
8:1 TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 55+33.17, 6.41’ RT. BEGIN
NORTHBOUND LEFT TURN LANE
8:1 TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 54+90.00, 18.00’ RT. BEGIN
KY 1747 SECTIONS
EX. T
EL
EP
HO
NE
CA
BL
E
&
CO
ND
UIT
S
16.5’33.4’32.4’56.9’
644.10
2.50%}
FO
R
KY 17
47
QU
AN
TITIES
LI
MIT
OF
AR
EA
65
108
0
E-S
HE
ET
NA
ME:
X00700
XS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X7
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X00600
XS.
DG
NFIL
E
NA
ME:
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
COM EMB MED DT DT LT DT RT
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
56+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
57+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
57+20
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
57+60
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
58+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
59+00
640
650
STA.56+00 TO STA.59+00
3.00%} 1.00%}
643.9
644.8
644.9
645.4
645.2
645.5
644.58
644.10
644.82
644.54
645.13
644.77
645.09
645.03
645.01
645.26
644.90
645.10
645.05
645.52
645.19
645.15
645.12
645.59
645.29
645.29
645.17
645.19
646.03
645.67
645.49
645.99
2.40%}3.00%}
3.00%} { 1.21% MATCH EXISTING}
2.75%} 0.58%}
MATCH EXISTING}2.50%} 1.00%}
1.00%}
PIPE
15" STORM
15" RCP
18" RCP
18" RCP
48" RCP
18" RCP48" RCP
48" RCP18" RCP
18" RCP
18" RCP
0 0 0 0
39 0 0 0 0
83 0 0 0 0
84 2 0 0 0
2 3 0 0
COM
EMB
AREAS
0 SF
0 SFDT MED
COM
EMB
AREAS
0 SF
0 SFDT MED
COM
EMB
AREAS
0 SF
0 SFDT MED
COM
EMB
AREAS
2 SF
0 SFDT MED
COM
EMB
AREAS
1 SF
0 SFDT MED
36 SF
50 SF
55 SF
COM
EMB
AREAS
0 SF
0 SFDT MED
58 SF
52 SF
56 SF
160
SOUTHBOUND LEFT TURN LANE
8:1 TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 56+33.62, 6.00’ LT. END
NORTHBOUND LEFT TURN LANE
8:1 TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 56+34.00, 0.00’ RT. END
MATCH EXISTING}
SOUTHBOUND LEFT TURN LANE
8:1 TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 59+48.17, 12.00’ RT. BEGIN
3.00%}
KY 1747 SECTIONS
6 0 0 0200
13.7’
4.3’1.8’
16.2’
7.3’10.7’6’12’
5.2’
12.9’6’12’
6’12’6’12’
6’12’6’12’
116
6’12’6’12’
0
E-S
HE
ET
NA
ME:
X00800
XS
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 X8
SCALE: 1" =
1" =
20’ HORIZONTAL
20’ VERTICAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
X00600
XS.
DG
NFIL
E
NA
ME:
August 17, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
COM EMB MED DT DT LT DT RT
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
59+60
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
60+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
61+00
640
650
640
650
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
62+00
640
650
640
650
660
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
63+00
640
650
660
STA.59+60 TO STA.63+00
646.0
646.1
644.6
647.3
649.8
646.38
646.00
645.84
646.43
646.08
645.40
648.80
648.76
648.75
647.14
646.87
646.83
644.90
647.27
649.07
651.
02
651.
02
645.66
3:1
3:13:1
3:1
3:1
645.97
1.00%}
1.00%}
2.20%}
0.30%}
FL. 649.07
END SPCL. "V" DT.
MEDIAN STA. 63+00
DBI TYPE 6E
GRADE TO
DBI TYPE 6E
GRADE TO
PIPE
15" STORM
PIPE
15" STORM
18" RCP
18" RCP
18" RCP
18" RCP
68 0 4 0 0
93 10 8 0 0
28 15 4 0 0
28 6 2 0 0
COM
EMB
AREAS
0 SF
2 SFDT MED
COM
EMB
AREAS
0 SF
3 SFDT MED
COM
EMB
AREAS
5 SF
1 SFDT MED
COM
EMB
AREAS
8 SF
3 SF
1 SFDT MED
COM
EMB
AREAS
7 SF
0 SF
0 SFDT MED
48 SF
Sta. 51+00 to 63+14.43
Earthwork Quantities
Dt. Med.
Emb
Com
21
41
1193
=
=
=
2 0 0 0 014.8’3.2’
Project Totals
Earthwork Quantities
Dt. Lt.
Dt. Med.
Emb
Com
=
=
=
=
SOUTHBOUND LEFT TURN LANE
8:1 TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 60+92.17, 6.00’ LT. END
SOUTHBOUND THRU LANE
100’ TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 62+10.00, 6.00’ LT. BEGIN
SOUTHBOUND THRU LANE
100’ TAPER FOR LEFT EDGE OF PAVEMENT FOR
STA. 63+10.00, 18.00’ LT. END
FL. 644.56
BEGIN SPCL. "V" DT.
MEDIAN STA. 60+66.17
3.17%}
2.92%}
KY 1747 SECTIONS
109
21
253
2595
43 SF
3:1
3:1
3:1
645.82
2’2’
10.6’6’12’
3.9’2’5.6’
6’12’
645.95
3.3’4’2’
12’
2’
4’
2’
12’
7 SF
TRAFFIC SIGNAL ESTIMATE OF QUANTITIES
TOTAL UNITS CODE ITEM DESCRIPTION
LIN FT
LIN FT
EACH
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
EACH
EACH
EACH
EACH
CU YD
EACH
EACH
4811
4820
4830
4844
4845
4850
4886
4895
4931
4932
4950
6472
20093NS835
20188NS835
20189NS835
20390NS835
21743NN
23157EN
23222EC
23235EC
ELECTRICAL JUNCTION BOX TYPE B
TRENCHING AND BACKFILLING
LOOP WIRE
CABLE-NO. 14/5C
CABLE-NO. 14/7C
CABLE-NO. 14/1 PAIR
MESSENGER-15400 LB
LOOP SAW SLOT AND FILL
INSTALL SIG CONTROLLER-TYPE 170
INSTALL STEEL STRAIN POLE
REMOVE SIGNAL EQUIPMENT
INSTALL SPAN MOUNTED SIGN
INSTALL PEDESTRIAN HEAD LED
INSTALL SIGNAL-3 SECTION LED
INSTALL SIGNAL-5 SECTION LED
INSTALL COORDINATING UNIT
INSTALL PEDESTRIAN DETECTOR
TRAFFIC SIGNAL POLE BASE
INSTALL SIGNAL PEDESTAL
INSTALL PEDESTAL POST
0501".
JACKET THAT STATES : " PROPERTY OF KENTUCKY TRANSPORTATION CABINET 502 564
ADD SENTENCE TO SECTION 835.15: ALL WIRE SHALL HAVE WORDING ADDED TO THE OUTER
REFUSAL TO DISTRIBUTE EQUIPMENT UPON ARRIVAL.
SIGNAL SYSTEM BRANCH THIS ADVANCE NOTICE COULD RESULT IN LONG DELAYS OR
WORKING DAYS PRIOR TO ARRIVAL. FAILURE TO PROVIDE POLE YARD PERSONNEL/
ROUTER USED FOR COMMUNCATION IN THE TRAFFIC SIGNAL A MINIMUM OF TWO (2)
[email protected]/ [email protected]) TO ARRANGE PROGRAMMING OF THE
CONTACT THE SIGNAL SYSTEM BRANCH (502-782-5543/502-782-5547 OR EMAIL
A MINIMUM OF TWO (2) WORKING DAYS PRIOR TO ARRIVAL. THE CONTRACTOR SHALL ALSO
502-330-8153 OR EMAIL [email protected]) AND ARRANGE TO PICK UP INSTALL ITEMS
CONTRACTOR SHALL CONTACT FRANKFORT POLE YARD PERSONNEL (502-782-8994/
FRANKFORT POLE YARD AND DELIVERING THESE ITEMS TO THE SITE. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PICKING UP INSTALL ITEMS FROM THE
INSPECTION HAVING BEEN COMPLETED.
CONDITIONS. SUBMISSIONS OF A BID WILL BE CONSIDERED AN AFFIRMATION OF THIS
SUBMITTING A BID AND SHALL BE THOROUGHLY FAMILIARIZED WITH EXISTING
THE CONTRACTOR SHALL MAKE AN INSPECTION OF THE PROJECT SITE PRIOR TO
SEE SECTION 602 FOR SPRIAL REINFORCEMENT SPLICING.
PROJECT. SEE SECTION 706, 723, AND 112 FOR MEASUREMENT AND OTHER DETAILS.
EDITION, AND OTHER SPECIAL NOTES AND SPECIFICATIONS WILL APPLY ON THIS
THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, CURRENT
6-5-2017
4
1
4
1
7
8
16
1
1
8
2
2
EACH
555
LIN FT 4792 CONDUIT 1 INCH40
1,530
4,250
3,002
207
3,664
INCIDENTAL TO THIS ITEM OF WORK.
BOXES, CABINETS, AND WOOD POLES FOR PAYMENT AND WILL CONSIDER THEM
SIGNAL SYSTEM INCLUDING, BUT NOT LIMITED TO POLE BASES, POLES, JUNCTION
ASSOCIATED WITH ANY STRUCTURAL OR ELECTRICAL COMPONENT OF THE MATERIALS
NOT MEASURE BACKFILLING AND THE DISPOSAL OR TRANSPORTATION OF EQUIPMENT AND
THE DEPARTMENT WILL MEASURE THE QUANTITY BY EACH. THE DEPARTMENT WILL
REPLACE THE PARAGRAPH WITH THE FOLLOWING: REVISION:
04.22 REMOVE SIGNAL EQUIPMENT. (CONSTRUCTION ONLY)SUBSECTION:
CONSTRUCTION AND MEASUREMENT NOTES THAT ARE CONTRARY TO SECTION 723
90
LIN FT75 OPEN CUT ROADWAY4821
21.2
EACH
24900EC
24901EC
PVC CONDUIT-1 1/4 IN-SCHEDULE 80
PVC CONDUIT-2 IN-SCHEDULE 80
20
215
34 EACH 4953 TEMP RELOCATION OF SIGNAL HEAD
NUMBERS:
PROJECT
COUNTY OF
Commonwealth of KentuckyDEPARTMENT OF HIGHWAYS
JEFFERSON
FD52 1550 C056 E143
9037001D
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
T0010
0S
UMicro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 5-9008.00 T1
TRAFFIC SIGNAL
ESTIMATE OF QUANTITIES
MEASUREMENT, CONST, AND MISC NOTES
DESIGNED BY:
DATE SUBMITTED:
STANTEC
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T0010
0S
U.
DG
NFIL
E
NA
ME:
EACH
(TYP.) 48" O.C.
CONDUIT STRAP
36"
(BOTH SIDES)
LOCKNUT (TYP)
POLE WALL
6"
1"
4" MIN.
24"18"
36"
AWAY FROM ENCLOSURE
FINISH GRADE TO DRAIN
1" CHAMFER
ANCHOR BOLT (TYP.)
BRIDGE CONSTRUCTION)
SPECIFICATIONS FOR ROAD AND
SECTION 835 OF THE STANDARD
AND SERVICE DISCONNECT (SEE
SERVICE POLE WITH METER BASE
FOR SERVICE
3-#6 STRANDED
(TYP.)
MOUNTING BRACKET
(TYP.)
MOUNTING STRAP
AND LUG
BUSHING
R S CONDUIT
GROUNDING BUSHING
(BOTH SIDES)
LOCKNUT (TYP)
CABINET HOUSING
LB CONDULET
STEEL POLE MOUNT ENCLOSURE
36"
CONDUCTOR
GROUNDING
DOOR (TYP.)
78"
A
ENCLOSURE BASE
CONCRETE PAD
ANCHOR BOLT (TYP.)
GROUND ROD
A
PAD MOUNT ENCLOSURE
TOP VIEW
SECTION A-A
R S CONDUIT
ELECTRICAL INSPECTION)
(LEAVE TOPS EXPOSED FOR
INSTALLED BELOW GROUND
GROUND ROD FOR CABINET
24"
10�"26�"
(IF NECESSARY)
1" R S CONDUIT FOR TELEPHONE
1" R S CONDUIT FOR SERVICE
5/30/2017
FOR GROUNDING DETAILS.
SEE POLE BASE DETAIL SHEET
LOOP WIRES.
BUSHINGS FOR SIGNAL AND
CONDUITS WITH END BELL
4 - 2" SCHEDULE 80 PVCAND CAPPED AT BOTH ENDS.
WITH END BELL BUSHING,
PVC CONDUIT STUBBED
SPARE 1�" SCHEDULE 80
NEC REQUIREMENTS
SPARE CONDUIT AND COMPLY WITH
OF CONDUITS IN ORDER TO PROVIDE 1
CONTRACTOR SHALL MODIFY QUANTITY
TO POLE BASE WITH END BELL BUSHING.
4- 2" (MIN.) SCHEDULE 80 PVC CONDUITS
TELEPHONE CONDUITS
1" RIGID STEEL (R S) SERVICE AND
CONDUCTOR(S)
BUSHING FOR GROUNDING
CONDUIT WITH END BELL
�" SCHEDULE 80 PVC
DIRECTION OF THE SPARE CONDUIT.
TO SHOW THE LOCATION/
IN THE TOP OF THE CABINET BASE
AN ARROW SHALL BE ETCHED
AND CAPPED AT BOTH ENDS.
STUBBED WITH END BELL BUSHING,
1�" SPARE SCHEDULE 80 PVC CONDUIT
WITH END BELL BUSHING.
GROUNDING CONDUIT
�" SCHEDULE 80 PVC
SERVICE CONDUCTORS
1" R S CONDUIT FOR
CONDUCTOR
BUSHING FOR GROUNDING
CONDUIT WITH END BELL
�" SCHEDULE 80 PVC
(IF NECESSARY)
SERVICE/SERVICE
CONDUIT FOR TELEPHONE
1" RIGID STEEL (R S)
OF POLE
TO METER BASE ON EXTERIOR
FEEDS, USE 1" R S CONDUIT
FOR UNDERGROUND SERVICE
USE �" SCHEDULE 80 PVC
GROUNDING (OPTIONAL),
FOR EXTERIOR SERVICE
THE FOLLOWING CONDITIONS:
USED FOR EITHER OR BOTH OF
EXTERIOR CONDUIT MAY BE
NEC REQUIREMENTS
SPARE CONDUIT AND COMPLY WITH
OF CONDUITS IN ORDER TO PROVIDE 1
SHALL MODIFY SIZE/QUANTITY
SIGNAL WIRES. CONTRACTOR
2- 2" (MIN.) R S CONDUITS FOR
POLE MOUNTED CABINETS:
THE GROUNDING SYSTEM.
CONDUIT SHALL NOT BLOCK THE HAND HOLE OR THE ABILITY TO ACCESS
TRANSITION FROM FLEXIBLE CONDUIT TO R S CONDUIT. FLEXIBLE
CONDUIT INSIDE THE POLE BASE. USE THE PROPER CONNECTIONS FOR
IN FLEXIBLE CONDUIT FROM THE DISCONNECT TO THE 1" RIGID STEEL
SERVICE WIRES FOR BASE MOUNTED CABINETS MAY BE INSTALLED
CONCRETE PAD, AND THEY CANNOT EXCEED THE 6 INCH HEIGHT.
ALL CONDUITS SHALL BE INSTALLED BETWEEN 4 TO 6 INCHES ABOVE THE
OF CONDUIT PAST THE EDGE OF THE CONCRETE PAD.
TO BID ITEM "4931". THIS INCLUDES PROVIDING A MINIMUM OF 24 INCHES
INSTALLED ON THE POLE AND/OR IN THE CABINET BASE ARE INCIDENTAL
(INCLUDING FLEX CONDUIT IF IT IS RUN INSIDE THE POLE) THAT ARE
ALL CONDUITS USED FOR THE TELEPHONE, GROUNDING, SPARES, AND SERVICE
NOTES:
THE PVC CONDUIT, CONNECTING TO THE CABINET GROUND BUS.
CABINET GROUND - GROUND WIRE SHALL COME FROM THE GROUND ROD THROUGH
THEY SHALL BE INCIDENTAL TO BID ITEM "4931".
POLE, RUBBER GROMMETS SHALL BE PROVIDED AT DISCONNECT AND POLE CUT OUTS.
STEEL (R S) GROUNDING BUSHING. IF GROUND WIRE IS RUN ON THE INSIDE OF THE
THE PVC CONDUIT, CONNECTING TO THE DISCONNECT AND THEN TO EACH RIGID
SERVICE GROUND - GROUND WIRE SHALL COME FROM THE GROUND ROD THROUGH
LEAVE TOP OF GROUND RODS EXPOSED FOR ELECTRICAL INSPECTION.
TESTING PRIOR TO CONNECTING THE WIRE TO ANY DISCONNECT, CABINET OR POLE.
CONTRACTOR SHALL PROVIDE A MINIMUM OF 6 INCHES OF GROUND WIRE FOR
GROUNDING REQUIREMENTS:
ADHESIVE OR APPROVED EQUAL.
MATERIAL, AND WITH MC778 PRESSURE SENSITIVE
WITH .007 THICKNESS, WITH UV WHITE POLYCARBONATE
PLY425 PREM STYLEMARK LABEL (OR APPROVED EQUAL)
SHALL BE 4" LONG AND 4" WIDE AND BE METALCRAFT
THIS FAULT CURRENT IS CALCULATED. THE STICKER
SYMMETRICAL RMS AMPERES AND THE DATE THAT
BE INSTALLED IN THE DISCONNECT WITH THE
CONTRACTOR SHALL SUPPLY A STICKER THAT WILL
SERVICE EQUIPMENT THAT IS INSTALLED. THE
MAXIMUM AVAILABLE FAULT CURRENT FOR THE
SHALL BE RESPONSIBLE TO CALCULATED THE
SHALL BE ALUMINUM ENCLOSURE. THE CONTRACTOR
DISCONNECTS (SAFETY SWITCH) AND METER BASE
SHALL BE UL RATED FOR COMMERCIAL USE.
DISCONNECTS (SAFETY SWITCH) AND METER BASE
SPECIAL NOTE:
SUPPLY
POWER
ROUTER
ETHERNET (ATC)
ATC OR 170 CONTROLLER
SHELF/DRAWER
SERIAL CABLEC2 (170)
ETHERNET CABLE
THE CABINET.
INSTALLED ON THE PROVIDE SHELF IN THE BACK OF
SIDE OF THE THE 19TH RACK. THE ROUTER SHALL BE
THE CABINET. ALL WIRING SHALL BE RAN DOWN THE
BE WATER TIGHT AND BE FLUSH WITH THE TOP OF
CONNECTION TO THE TOP OF THE CABINET SHALL
OPPOSITE THE MAIN POWER INSTALLATION. THE
INSTALL ON THE THE BACKSIDE OF THE CABINET
BLADE STYLE ANTENNA AND ROUTER INSTALLATION-
THE CABINET.
INSTALLED ON THE PROVIDE SHELF IN THE BACK OF
SIDE OF THE THE 19TH RACK. THE ROUTER SHALL BE
THE CABINET. ALL WIRING SHALL BE RAN DOWN THE
BE WATER TIGHT AND BE FLUSH WITH THE TOP OF
CONNECTION TO THE TOP OF THE CABINET SHALL
OPPOSITE THE MAIN POWER INSTALLATION. THE
INSTALL ON THE THE BACKSIDE OF THE CABINET
BLADE STYLE ANTENNA AND ROUTER INSTALLATION:
(REAR OF CABINET)
ROUTER INSTALLATION
SECURE TO RACK
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00200
CA.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
T00200
CA
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 5-9008.00 T2
CONTROLLER CABINET
AND ANTENNA/ROUTER DETAIL
PROPOSED FINISHED SURFACE.
NON-SHRINK GROUT IN �" SAW SLOT.
1 " BACKER ROD IN �" SAW SLOT.
PREFORMED LOOP IN �" SAW SLOT.
LOOP WIRE PLAN
SHEET
LAYOUT DETAIL
SPECIFIED ON
NUMBER OF TURNS
SHEET
LAYOUT DETAIL
SPECIFIED ON
NUMBER OF TURNS
PUT UNDER PAVEMENT
TEE
TEE
ASPHALT SAW SLOT DETAIL FOR PREFORMED
LOOP LEAD-IN
PREFORMED
SHEET
LAYOUT DETAIL
SPECIFIED ON
NUMBER OF TURNS
SHEET
LAYOUT DETAIL
SPECIFIED ON
NUMBER OF TURNS
�"
2"
CROSS SECTION
PREFORMED LOOP
TURNS
�"
LOOP WIRES IN SAW SLOT
1" RS ELBOW
18" MIN. DEPTH
OR CABINET
TO JUNCTION BOX
1" R S CONDUIT
6" MIN.
SECTION A-A (SAW SLOT DETAIL)
PROPOSED FINISHED SURFACE
IN A SINGLE SAW SLOT IS 6
MAXIMUM NUMBER OF WIRES
NON-SHRINK GROUT IN �" SAW SLOT
�" BACKER ROD IN �" SAW SLOT
PAVED SURFACE
9"-12"
FACE OF CURB
SURFACE OR
EDGE OF PAVED
CONTROL BOX
TO PULL BOX OR
CONTROL BOX
TO PULL BOX OR
SAW CUT PLAN
CONTROL BOX
TO PULL BOX OR
6’X6’ LOOP
SAW CUT PLAN
6’X30’ QUADRAPOLE LOOP
WIRING PLAN
TO ELIMINATE SHARP EDGES
CHISEL CORNERS TO SLOT DEPTH
CORE DRILL 1 �" HOLE AND/OR
�" SAW SLOT
A
A
A
A
(TYP.)
FULL DEPTH
TO ACHIEVE
BEYOND CORNER
EXTEND CUT
LOOP SEALANT IN �" SAW SLOT
LOOP WIRES ENCAPSULATED IN
SAW SLOT EDGE OF PAVEMENT TRANSITION
PREFORMED LOOP DIAGRAM
6" MIN.
6’x6’ PREFORMED LOOP
6’x30’ QUADRAPOLE PREFORMED LOOP
CONTROL BOX
TO PULL BOX OR
TO ACHIEVE FULL DEPTH
EXTEND CUT BEYOND CORNER
�" SAW SLOT
ELIMINATE SHARP EDGES
TO SLOT DEPTH TO
AND/OR CHISEL CORNER
CORE DRILL 1 �" HOLE
AND INSTALL 1" RIGID STEEL CONDUIT.
OR FACE OF CURB) TO CONDUIT
SAW SLOT (9"-12" FROM SHOULDER
DRILL 1�" DIAMETER HOLE FROM
LOOP LEAD-IN
PREFORMED
CONTROL BOX
TO PULL BOX OR
CONTROL BOX
TO PULL BOX OR
UNDER PAVEMENT
PLACE TUBE
SHIELDED CABLE.
CONNECTIONS IN THE CABINET OR CONNECTED TO
TO FIVE TURNS PER FOOT UNTIL TERMINATED AT FIELD
PREFORMED LOOP LEAD-IN SHALL BE TWISTED WITH THREE
2/13/2016
PREFORMED LOOP DIAGRAM LOOP WIRE PLAN
LOOP TO TRAFFIC. CURING TIME VARIES WITH TEMPERATURE AND HUMIDITY.
ENSURE THAT THE GROUT HAS COMPLETELY CURED PRIOR TO SUBJECTING THE *
CLEAN UP THE SITE AND DISPOSE OF ALL WASTE OFF THE PROJECT.*
GROUT SHALL BE CLEANED FROM THE ROADWAY TO ALLEVIATE TRACKING.
SHALL BE NO CONCAVE PORTION TO THE GROUT IN THE SAW SLOT. ANY EXCESS
INSTRUCTIONS. ALLEVIATE ALL AIR POCKETS AND REFILL LOW SPACES. THERE
FINISH FILLING THE SAW CUT WITH NON-SHRINKABLE GROUT PER MANUFACTURER’S *
ARE PRESENT BETWEEN THE LOOP SEALANT AND BACKER ROD.
ROD ALONG THE ENTIRE LOOP AND HOME RUN SAW SLOTS SUCH THAT NO VOIDS
COVER THE ENCAPSULATED LOOP WIRE WITH A CONTINUOUS LAYER OF BACKER *
SEALANT HAS SET.
WIRES IN THE SAW SLOT. THE WIRE SHOULD NOT BE ABLE TO MOVE WHEN THE
APPLY LOOP SEALANT FROM THE BOTTOM UP AND FULLY ENCAPSULATE THE LOOP *
HOLE.
INSTALL DUCT SEALANT TO A MINIMUM OF 1 INCH DEEP INTO THE CORED 1 � INCH *
SAW SLOT. SCREWDRIVERS SHALL NOT BE USED.
STICK. MAKE SURE THAT THE LOOP WIRE IS PUSHED FULLY TO THE BOTTOM OF THE
PUSH THE WIRE INTO THE SAW SLOT WITH A BLUNT OBJECT SUCH AS A WOODEN *
.PLACE THE LOOP WIRE SPLICE-FREE FROM THE TERMINATION POINT*
TO 1" RIGID STEEL CONDUIT ADJACENT TO THE ROADWAY WITH RIGID STEEL ELBOW.
INSTALL 1" RIGID STEEL CONDUIT IN 45 DEGREE DRILLED SLOT. CONNECT CONDUIT*
PROTRUSIONS SHALL BE GROUND OR RE-CUT AND CLEANED AGAIN.
PROTRUSIONS PRIOR TO THE PLACEMENT OF THE WIRE. ALL JAGGED EDGES AND
CLOSELY INSPECT ALL CUTS, CORES, AND SLOTS FOR JAGGED EDGES OR *
CONDUIT ADJACENT TO THE ROADWAY.
OR FACE OF CURB) AND DRILL A 1 � INCH HOLE ON A 45 DEGREE ANGLE TO THE
MEASURE 9-12 INCHES FROM THE EDGE OF THE PAVED SURFACE (SHOULDER BREAK *
SIDES OF THE SLOTS.
COMPLETELY DRY THE SLOTS, DRILLED CORES, AND WITHIN 1 FOOT ON ALL *
AND WITHIN 1 FOOT ON ALL SIDES OF THE SLOTS USING A HIGH PRESSURE WASHER.
CLEAN ALL FOREIGN AND LOOSE MATTER OUT OF THE SLOTS, DRILLED CORES, *
CORNERS TO PREVENT SHARP BENDS IN THE WIRE.
DRILL A 1 � INCH CORE HOLE AT EACH CORNER AND USE A CHISEL TO SMOOTHE *
PAVEMENT.
BACKER ROD IS A MINIMUM OF 4 INCHES BELOW THE SURFACE OF ASPHALT
MAKE EACH SAW-CUT � INCH WIDE AND AT A DEPTH SUCH THAT THE TOP OF THE *
TRAFFIC AND CENTERED IN THE LANE.
CAREFULLY MARK THE SLOT TO BE CUT, PERPENDICULAR TO THE FLOW OF *
INSTALLATION OF A LOOP.
THE FOLLOWING IS A TYPICAL STEP BY STEP PROCEDURE FOR THE
: CONSTRUCTION DETAILS FOR LOOP SAW SLOT AND FILL BID ITEM
LOOP WIRE PLAN
Use detail for concrete application if concrete is 4" or less
MAXIMUM NUMBER OF TUBES PER SLOT IS 1.
MAXIMUM NUMBER OF WIRES IN A TUBE PER SLOT IS 4.
BE WATER RATED #16 THWN OR TFFN.
TEMPERATURE SYNTHETIC RUBBER. STANDARD WIRE SHALL
THE TEE SHALL BE CONSTRUCTED OF HEAVY DUTY HIGH
HEAVY DUTY REINFORCED RUBBER HOSE (CLASS A OIL RESISANT).
PREFORMED LOOPS SHALL BE CONSTRUCTED WITH 11/16" OR SMALLER
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00300
LP.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
T00300
LP
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T3
LOOP DETAILS
3’
START CROSSING
VEHICLES
WATCH FOR
FLASHING
DON’T START
IF STARTED
FINISH CROSSING
STEADY
DON’T CROSS
PUSH BUTTON
TO CROSS
START CROSSING
VEHICLES
WATCH FOR
FLASHING
DON’T START
IF STARTED
FINISH CROSSING
STEADY
DON’T CROSS
PUSH BUTTON
TO CROSS
TIMER
TO FINISH CROSSING
TIME REMAINING
�" RIGID STEEL CONDUIT
7’7’
WOOD POST
4" X 4" X 10’
ALUMINUM PEDESTAL
2" MIN
2" MIN
POLE CAP BE INSTALLED DIAGONALLY.
OF 2 SCREWS FOR EACH BOX. SCREWS SHALL
SCREWS TO SECURE BOX TO POST. MINIMUM
#9 X 1�" PAN HEAD OR ROUND HEAD WOOD
PED DETECTOR
TYPE FS BOX AND
�" GALVANIZED PLUG
PED DETECTOR
TYPE FS BOX AND
FINISHED GRADE
WITH �" GALVANIZED PLUG FOR BOX
TYPE FS BOX AND PED DETECTOR
DIRECTION
SHALL POINT IN PROPER
SIGNS R10-3e ARROWS
(CENTERED)
SIGN R10-3e
DIRECTION (CENTERED)
SHALL POINT IN PROPER
SIGNS R10-3e ARROWS
6/22/2012
MIN. 1�
2" MIN
2" MIN
4�"3�" 2�"
6 -32 TAP
4"
1�"
2�"
2�"
1�"
�"
�"
BASE DETAIL
DETAIL SHEET FOR PEDESTAL POLE
SEE PEDESTRIAN SIGNAL COUNTDOWN
3’
3’
18" MIN.
GALVANIZED LAG BOLTS
STRAP WITH �" X 2�"
DOUBLE HOLE CONDUIT
SHALL BE USED FOR THE GROUND WIRE.
BOTH PED DETECTORS. THE GREEN WIRE
CABLE INSIDE CONDUIT TO CONNECT
WOOD POST
4" x 4" x 10’
EXIT HUB.
ACCOMMODATE
DRILL HOLE TO
DETECTOR.
CONNECTING OTHER PED
RACEWAY FOR WIRES
DRILL HOLES TO MAKE
1�"
2�"
4�" MAX.
PED DETECTOR ON WOOD POST DETAILPEDESTAL POST DETAIL FOR PED DETECTORS & SIGNS
PED DETECTOR
STRAIN POLE, WOOD POST, PEDESTAL, AND WOOD POLE
TYPE FS BOX FOR PED DETECTOR FOR USE WITH STEEL
FOR COUNTDOWN ONLY
R10-3e SIGN (9" X 15")
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00400
PO.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
T00400
PO
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T4
PEDESTRIAN DETECTOR DETAIL
LAP
1’-3"
18" MIN.
2’
PED SIGNALS
ALUMINUM PIPE
2" MIN.
2" MIN.
2" MIN.
2" MIN.2" MIN.
2" MIN.
PED SIGNALS
WOOD POLE
�" RIGID STEEL CONDUIT
8’
3’
8’
3’
8’
3’
(2 REQUIRED)
�" X .03"
BANDING TAPE
STAINLESS STEEL
AND PED SIGNALS
FOR PED DETECTORS
PEDESTAL POLE DETAIL
PLUG FOR BOX
WITH �" GALV.
PED DETECTOR
TYPE FS BOX &
PEDESTAL
ALUMINUM
PLUG FOR BOX
WITH �" GALV.
PED DETECTOR
TYPE FS BOX &
STEEL CONDUIT
1�" RIGID
FROM VEHICLES
TO AVOID DAMAGE
POSITIONED IN ORDER
BRACKET SHALL BE
EXCEED 4’.
SPACING SHALL NOT
BOLTS. MAXIMUM
�" X 2�" GALV. LAG
CONDUIT STRAP WITH
INSTALL DOUBLE HOLE
1’-6"
3" CLR
3" CLR
CONCRETE
3" CLR
4’
VINYL TAPE WHERE THEY PASS THROUGH THE HOLES.
SHALL BE PROTECTED WITH HEAT SHRINK TUBING OR
BURRS AND SHARP EDGES FROM THE HOLES. WIRES
CONTRACTOR SHALL USE A ROUND FILE TO REMOVE ALL
TYPE FS BOX NOT EXCEEDING �" IN DIAMETER.
CONTRACTOR SHALL DRILL HOLES IN THE PIPE AND THE
AND PED SIGNALS
FOR PED DETECTORS
STEEL STRAIN POLE DETAIL
AND PED SIGNALS
FOR PED DETECTORS
WOOD POLE DETAIL
FOR #3 TIE BARS
BENDING DETAIL
PEDESTAL POLE BASE DETAIL
DIRECTION (CENTERED)
SHALL POINT IN PROPER
SIGNS R10-3e ARROWS
1" CHAMFER
STEEL GROUNDING BUSHING.
GROUND LUG ON THE TRANSFORMER BASE AND THEN TO EACH RIGID
GROUND ROD THROUGH THE PVC CONDUIT, CONNECTING TO A
PEDESTAL POLE GROUND - GROUND WIRE SHALL COME FROM THE
LEAVE TOP OF GROUND RODS EXPOSED FOR ELECTRICAL INSPECTION.
TRANSFORMER BASE.
WIRE FOR TESTING PRIOR TO CONNECTING THE WIRE TO THE
CONTRACTOR SHALL PROVIDE A MINIMUM OF 6 INCHES OF GROUND
GROUNDING REQUIREMENTS:
SPACED
BARS EQUALLY
REINFORCING
(6) #6 VERTICAL
ON CENTER
BARS TO BE 12"
#3 TIE OR SPIRAL
POLE
FOR PEDESTAL
GROUND ROD
ON BOTH ENDS.
THREADED, AND CAPPED
CONDUIT; STUBBED OUT,
1 �" SPARE RIGID STEEL
CONDUCTOR
GROUNDING
OR VINYL TAPE WHERE THEY PASS THROUGH THE HOLES.
WIRES SHALL BE PROTECTED WITH HEAT SHRINK TUBING
REMOVE ALL BURRS AND SHARP EDGES FORM THE HOLES.
DIAMETER. CONTRACTOR SHALL USE A ROUND FILE TO
POLE AND THE TYPE FS BOX NOT EXCEEDING �" IN
CONTRACTOR SHALL DRILL HOLES IN THE STEEL STRAIN
AND GROUNDING DETAILS
FOR CONCRETE BASE DETAIL
SEE PEDESTAL POLE BASE DETAIL
BREAKAWAY SUPPORT STUB HEIGHT MEASUREMENT
4" MAX.
GROUND LINE
60"
STUB OF TRANSFORMER BASE
3/20/2017
BETWEEN THE STRADDLING WHEELS OF A VEHICLE.
PROJECTED MORE 4 INCHES ABOVE A GROUND LINE
THE ANCHOR BOLTS AND CONDUITS SHALL NOT BE
MAX.10"
SIDEWALK/SHOULDER
FINAL GRADE
FINAL GRADE
MAX.10"
SIDEWALK/SHOULDER
10"MAX.
SIDEWALK/SHOULDER
OR SHOULDER.
10" MAXIMUM DISTANCE FROM THE SIDEWALK
THE FARTHEST BUTTON SHALL BE WITHIN THE
FROM THE PAVED SIDEWALK OR SHOULDER.
THAT EACH BUTTON IS NO MORE THAN 10"
THE PEDESTAL SHALL BE INSTALLED SO
OR SHOULDER.
10" MAXIMUM DISTANCE FROM THE SIDEWALK
THE FARTHEST BUTTON SHALL BE WITHIN THE
FROM THE PAVED SIDEWALK OR SHOULDER.
THAT EACH BUTTON IS NO MORE THAN 10"
THE WOOD POLE SHALL BE INSTALLED SO
FINAL GRADE
(2 REQUIRED)
�" X .03"
BANDING TAPE
STAINLESS STEEL
PEDESTRIAN SIGN.
STEEL SCREWS FOR EACH
INSTALL TWO STAINLESS
DIRECTION (CENTERED).
SHALL POINT IN PROPER
SIGNS R10-3e ARROWS
PLUG FOR BOX.
WITH �" GALV.
PED DETECTOR
TYPE FS BOX &
PEDESTRIAN SIGN.
STEEL SCREWS FOR EACH
INSTALL TWO STAINLESS
DIRECTION (CENTERED).
SHALL POINT IN PROPER
SIGNS R10-3e ARROWS
AND GROUNDING DETAILS
FOR CONCRETE BASE DETAIL
SEE POLE BASE DETAIL SHEET
(2 REQUIRED)
3#4" X .03"
BANDING TAPE
& STAINLESS STEEL
LAG BOLTS (2 REQUIRED)
�" X 4" STAINLESS STEEL
(2 REQUIRED)
3#4" X .03"
BANDING TAPE
& STAINLESS STEEL
LAG BOLTS (2 REQUIRED)
�" X 4" STAINLESS STEEL
INSTALLED DIAGONALLY, SHALL BE USED.
BOX TO POLE. A MINIMUM OF 2 SCREWS PER BOX,
WOOD SCREWS SHALL BE USED TO SECURE TYPE FS
#9 X 1�" STAINLESS STEEL PAN HEAD OR ROUND HEAD
OR SHOULDER.
10" MAXIMUM DISTANCE FROM THE SIDEWALK
THE FARTHEST BUTTON SHALL BE WITHIN THE
FROM THE PAVED SIDEWALK OR SHOULDER.
THAT EACH BUTTON IS NO MORE THAN 10"
THE POLE SHALL BE INSTALLED SO
MOUNTING SIGN TO POLE.
THROUGH CONDUITS FOR
ROUND HEAD WOOD SCREWS
FOUR #14 X 3" STAINLESS STEEL
FOR SIGN MOUNTING. USE
�" RIGID STEEL CONDUIT
INSTALL 10" SECTIONS OF
CONDUIT.
OF THE PEDESTAL BASE TO SHOW LOCATION AND DIRECTION OF THE SPARE
EDGE OF THE CONCRETE BASE. AN ARROW SHALL BE ETCHED INTO THE TOP
THIS INCLUDES PROVIDING A MINIMUM OF 24 INCHES OF CONDUIT PAST THE
CONCRETE PEDESTAL POLE BASE ARE INCIDENTAL TO BID ITEM "23222EC".
ALL GROUNDING AND SPARE CONDUITS THAT ARE INSTALLED IN THE
NOTE:
OF THE FS BOX.
THE ATTACHMENT
SCREWS FOR
STAINLESS STEEL
INSTALL TWO
OF THE FS BOX.
THE ATTACHMENT
SCREWS FOR
STAINLESS STEEL
INSTALL TWO
OF THE FS BOX.
THE ATTACHMENT
SCREWS FOR
STAINLESS STEEL
INSTALL TWO
IN SIDEWALK.
SHALL BE INSTALLED FLUSH WITH THE GRADE IF
INSTALLED IN THE SIDEWALK. THE POLE BASE
SIDEWALK IF A PORTION OF THE POLE BASE IS
THERE SHALL BE AT LEAST 3 FOOT OF USABLE
INCIDENTAL TO THE PROJECT.
OR APPROVAL EQUAL. THIS SHALL BE
MC53FL PRESSURE SENSITIVE ADHESIVE
POLYCARBONATE MATERIAL, AND WITH
.007 THICKNESS, WITH UV WHITE
PLY695 PREM STYLEMARK LABEL WITH
THE STICKER SHALL BE METALCRAFT
INSTALL 3" FROM THE TOP OF THE DOOR.
A 4" BY 6" ARC FLASH WARNING STICKER
THE PEDESTAL BASE DOOR SHALL HAVE
NOTE:
SHALL BE INSTALLED FLUSH WITH THE GRADE.
BASE INTO THE SIDEWALK. THE PEDESTAL BASE
BE APPROXIMATELY ABOUT 2 INCH OF THE PEDESTAL
BASE IS INSTALLED IN THE SIDEWALK. THIS WILL
SIDEWALK IF A PORTION OF THE PEDESTAL
THERE SHALL BE AT LEAST 3 FOOT OF USABLE
CONDUCTOR
POLE GROUNDING
BUSHING (BOTH ENDS) FOR
CONDUIT WITH END BELL
�" SCHEDULE 80 PVC
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00500
PO.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
T00500
PO
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T5
PEDESTRIAN SIGNAL COUNTDOWN DETAIL
DIAMETER
OF ONE BOLT
CLEARANCE
MAXIMUM
CURB SIDE
3’-0"
FOUNDATION
OUTSIDE OF
BOLT CIRCLE
24�" MAX. DIAMETER
(MIN. OF 4)
POLE MANUFACTURER
RECOMMENDED BY
QUANTITY AS
ANCHOR BOLTS,
POLE
STRAIN
STEEL
1" CHAMFER
3" CLR
FINISHED GRADE
3’
4" - 6"
3" CLR
SHALL BE 2�"
OF ANCHOR BOLTS
MAXIMUM DIAMETER
3" CLR
LAP
1’-8"
2’-6"
BY MFR
REQUIRED
AS
LATEST EDITION
TO FIGURE 4D-1 MUTCD
17’ - 19’ & CONFORM
STRAND VISE (TYP.)
RING
BULL
BE LEVEL
TOP OF FOUNDATION MUST
COLLAR
POLE
SIDE.
BOLTS TOWARD CURB
NOTE: INSTALL TWO
(TYP.)
MESSENGER CABLE
SPAN DETAIL
CONCRETE
CONCRETE
FOR TIE BARS
BENDING DETAIL
WEATHERHEAD
TO PREVENT WATER IN
PROVIDE SAG IN WIRES
POLE
STRAND VISE
CABLE
MESSENGER
PLATE (TYPICAL)
LOCK WASHER ABOVE BASE
HEX NUT, WASHER, AND
RED
12"
YELLOW
12"
GREEN
12"
5"
5"
5"
5"
BACKPLATE DETAIL
NOTED
OR OTHERWISE
FOR ALL SPANS
5% MIN. SAG
USED FOR EACH SPAN.
THERE SHALL BE A SEPARATE COLLAR
BEYOND THE STRAND VISE YOKE.
MESSENGER SHALL EXTEND 8" TO 10"
AND BEND MESSENGER AT EXIT POINT.
INSTALL MESSENGER THROUGH STRAND VISE
OF THE SPAN WIRE TO THE POLE.
SHALL NOT BE USED ON THE ATTACHMENT
JOHNNYBALLS OR STRAIN ISOLATORS
GROUND ROD
CABINET
GROUND ROD
POLE
POLE
STRAIN
STEEL
1" CHAMFER
FINISHED GRADE4" - 6"
3" CLR
SERVICE LOCATION ONLY)
GROUND (REQUIRED AT
CONDUIT FOR SERVICE
�" SCHEDULE 80 PVC
SPAN WIRE DETAIL
WITH POLE GROUND DETAIL
STEEL STRAIN POLE BASE
AND POLE MOUNTED CABINET GROUNDING DETAILS
STEEL STRAIN POLE BASE WITH SERVICE, POLE,
18"
CONDUCTOR
GROUNDING
GROUND RODS
SERVICE
CONCRETE
18"
RAKING POLE (TYP)
FOR PLUMBING OR
UNDER BASE PLATE
HEX NUT AND WASHER
NUT
EXTEND ABOVE THE
BOLT THREADS SHALL
A MINIMUM OF TWO
(SIZE AND NUMBER VARY)
BARS EQUALLY SPACED
VERTICAL REINFORCING
TO BE 12" ON CENTER
#4 TIE OR SPIRAL BARS
10" BEYOND THE STRAND VISE YOKE.
MESSENGER SHALL EXTEND 8" TO
AT EXIT POINT.
STRAND VISE AND BEND MESSENGER
INSTALL MESSENGER THROUGH
BULL RING AT AERIAL CORNER.
CONNECT EACH STRAND VISE TO
AERIAL CORNER DETAIL
DROP BOX
(TYP.)
LOUVERS
BUSHING.
THEN TO EACH RIGID STEEL GROUNDING
CONDUIT, CONNECTING TO THE POLE AND
FROM THE GROUND ROD THROUGH THE PVC
POLE GROUND - GROUND WIRE SHALL COME
ELECTRICAL INSPECTION.
LEAVE TOP OF GROUND RODS EXPOSED FOR
CABINET OR POLE.
TO CONNECTING THE WIRE TO ANY DISCONNECT,
INCHES OF GROUND WIRE FOR TESTING PRIOR
CONTRACTOR SHALL PROVIDE A MINIMUM OF 6
GROUNDING REQUIREMENTS:
FOR POLE
GROUND ROD
SEE SECTION 723.03.02
DEPTH VARIES
(IF SPECIFIED).
TAPE
2" REFLECTIVE
Threaded Bolt
Cotter Pin
Nut
Lock Washer
Washer
Detail 1
Washer
Lock Washer
Nut
Cotter Pin
Threaded Bolt
Clamp Assembly Alt. 3
Clamp Assembly Alt. 1
Clamp Assembly Alt. 2
Detail 2
Detail 2 Detail 3
(Typical)
Detail 3
Washer
Lock Washer
Nut
Cotter Pin
Threaded Bolt
(Typical)
Detail 1
(Typical)
Detail 1
3/20/2017
ClAMP ASSEMBLY SPECIFCATIONS
GALVANIZING- ASTM A153
U- BOLTS- MINIMUM ASTM A36
ASTM A449, OR ASTM A490
A325,
BOLTS (EXCEPT U- BOLTS)- HIGH STRENGTH ASTM
(GRADE 50)
CLAMP/CLEVIS- ASTM A36 (GRADE 36)/ASTM A572
MATERIALS:
THIS STANDARD.
TO SECTION 835.07.01 AND THE DRAWINGS SHOWN ON
BRIDGES (2002). CLAMP ASSEMBLIES SHALL CONFORM
AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY
AFOREMENTIONED CODE SHALL BE OBTAINED FROM THE
ADDITIONAL DESIGN PROVISIONS NOT ADDRESSED IN THE
AND TRAFFIC SIGNALS, SIXTH EDITION 2013.
STRUCTURAL SUPPORTS FOR HIGHWAY SIGNS, LUMINAIRES
TO THE AASHTO STANDARD SPECIFICATIONS FOR
CLAMP ASSEMBLIES MUST BE DESIGNED IN ACCORDANCE
CONDUIT.
/DIRECTION OF SPARE
CARVED LOCATION
INTEGRITY.
BE INSTALLED FOR STRUCTURAL
BEND, THE METAL TEMPLATE SHALL
IF ANCHOR BOLTS ARE HEADED NOT
WHOLE LENGTH OF THE SPAN.
INSTALLED ACROSS THE
THE CABLE RINGS SHALL BE
RINGS - 18" MAX. SPACING.
3" GALVANIZED CABLE
INCIDENTAL TO THE PROJECT.
OR APPROVAL EQUAL. THIS SHALL BE
MC53FL PRESSURE SENSTIVE ADHESIVE
POLYCARBONATE MATERIAL, AND WITH
.007 THICKNESS, WITH UV WHITE
PLY695 PREM STYLEMARK LABEL WITH
THE STICKER SHALL BE METALCRAFT
INSTALL 3" FROM THE TOP OF THE DOOR.
A 4" BY 6" ARC FLASH WARNING STICKER
THE STEEL STRAIN DOOR SHALL HAVE
NOTE:
FOR EACH SIGNAL HEAD.
TO PREVENT WATER ACCESS TO WEATHERHEADS
PROVIDE 2 FOOT COIL IN SIGNAL CABLES
CONDUIT.
/DIRECTION OF THE SPARE
TO SHOW THE LOCATION
ON THE TOP OF THE BASE
ARROW SHALL BE ETCHED
CAPPED AT BOTH ENDS. AN
END BELL BUSHING AND
CONDUIT; STUBBED OUT WITH
1�" SPARE SCHEDULE 80 PVC
AT BOTH ENDS.
END BELL BUSHING AND CAPPED
CONDUIT; STUBBED OUT WITH
1�" SPARE SHEDULE 80 PVC
SHOWN ON THE CONTROLLER CABINET DETAIL SHEET.
UNDERGROUND SERVICE WIRES SHALL BE INSTALLED IN 1" RIGID STEEL CONDUIT AS
FLEXIBLE CONDUIT.
RIGID STEEL CONDUIT WITH WEATHERHEAD, OR ON THE INSIDE THE STEEL STRAIN POLE IN
OVERHEAD SERVICE WIRES SHALL BE INSTALLED ON THE EXTERIOR OF THE POLE IN A 1"
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, CURRENT EDITION.
FOR POLE BASE DEPTH SEE CHART IN SECTION 723 OF THE KENTUCKY STANDARD
CONCRETE PAD, AND THEY CANNOT EXCEED THE 6 INCH HEIGHT.
ALL CONDUITS SHALL BE INSTALLED BETWEEN 4 TO 6 INCHES ABOVE THE
BASE.
PROVIDING A MINIMUM OF 24 INCHES OF CONDUIT PAST THE EDGE OF THE CONCRETE POLE
INSTALLED IN THE POLE BASE ARE INCIDENTAL TO BID ITEM "23157EN". THIS INCLUDES
ALL CONDUITS USED FOR THE TELEPHONE, GROUNDING, SPARE, AND SERVICE THAT ARE
NOTES:
OF POLE
TO METER BASE ON EXTERIOR
FEEDS, USE 1" RIGID STEEL CONDUIT
FOR UNDERGROUND SERVICE
USE �" SCHEDULE 80 PVC
GROUNDING (OPTIONAL),
FOR EXTERIOR SERVICE
THE FOLLOWING CONDITIONS:
USED FOR EITHER OR BOTH OF
EXTERIOR CONDUIT MAY BE
GROUNDING CONDUCTOR
BUSHING FOR POLE
CONDUIT WITH END BELL
�" SCHEDULE 80 PVC
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00600
PO.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
T00600
PO
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T6
POLE BASE/SIGNAL HEAD DETAILS
MARKING
24"
CKT #1
LIGHTING
AB
C
E
F
DTYPE A
TYPE B
TYPE C
A B C D E F
2"
3"
23"
18"
36"
11"
14"
24"
12"
27"
30"
20"
25"
38"
13"
15"
26"
JUNCTION BOX DIMENSIONS (NOMINAL)
CONCRETE CABLE MARKERS
FINISHED GRADE
WARNING TAPE
DUCTED CABLE
18"
6"-10"
6" 4"
8"
#2#6
CKT
LIGHTING
#2#6
MINIMUM
FOUR (4) SCREWS
GASKET
WEATHER RESISTANT
COVER PLATE WITH
AND WARNING TAPE TRENCH
CONDUIT, DUCTED CABLE,
1�" *
NOTE: STACKABLE BOXES ARE PERMITTED
* MINIMUM
BACKFILL
TO THE SATISFACTION OF THE ENGINEER,
LIFTS AND RETORE DISTURBED AREA
COMPACT BACKFILL IN 9" MAXIMUM
CONTRACTOR SHALL PLACE AND
DUCTED CABLE ARE MINIMUMS.
DEPTHS SHOWN FOR CONDUIT AND
CONDUIT
24"
24"
4"
SUB-BASE SUB-BASE24" MIN.
24" MIN. 24" MIN.
CONDUIT INSTALLATION UNDER EXISTING PAVEMENT DETAIL
RIGID STEEL CONDUIT
4"
COPPER CONDUCTOR
4 AWG SOLID BARE
(TYP.)
BUSHING
GROUNDING
CAPPED ON BOTH ENDS
TEST/PIPE PLUG (FOR SPARE CONDUITS)
TEST/PIPE PLUG(FOR SPARE CONDUITS) AND GROUNDING DETAIL
FINISHED GRADE
ITEMS 4811, 20391NS835, OR 20392NS835.
THE FABRIC. THE FABRIC SHALL BE INCIDENTAL TO BID
ALLOW PASSAGE OF EACH INDIVIDUAL CONDUIT THROUGH
SHALL BE "X CUT" ONLY AS MUCH AS NECESSARY TO
LOCATIONS WHERE CONDUITS ENTER THE BOX, THE FABRIC
TO THE EXTERIOR OF THE BOX WITH ADHESIVE. ANY
JUNCTION BOX AND SHALL BE CONTINUOUSLY ADHERED
FABRIC SHALL EXTEND TO JUST BELOW THE LIP OF THE
GEOTEXTILE FILTER FABRIC TYPE IV IN THE HOLE. THE
AND JUNCTION BOX, THE CONTRACTOR SHALL INSTALL
BEFORE THE INSTALLATION OF THE #57 AGGREGATE
NO. 57 AGGREGATE
GRADATION SIZE
C
JUNCTION BOX
12"
BUSHINGS
EARTH
4" FROM BOTTOM OF BOX
CONDUIT SHALL BE EXPOSED
CONDUCTOR INSTALLATIONS-
F
FINISHED GRADE
FIBER FABRIC TYPE IV
ABOVE GROUND BOX
THE BOX.
FOR CABLES ENTERING AND EXITING
CABLE CLAMPS SHALL BE PROVIDED
THE PLATE COVER TO THE BOX.
OF FOUR SCREWS FOR ATTACHING
RESISTANT GASKET AND A MINIMUM
PLATE COVER WITH A WEATHER
AND SHALL BE PROVIDED WITH A
BOXES SHALL HAVE NO KNOCKOUTS
GALVANIZED AFTER FABRICATION.
FROM MINIMUM 12 GAUGE STEEL AND
ABOVE GROUND BOX SHALL BE FABRICATED
NO. 57 AGGREGATE
GRADATION SIZE
C
JUNCTION BOX
12"
BUSHINGS
EARTH
F
FINISHED GRADE
FIBER FABRIC TYPE IV
roadway
under
24"
roadway
not under
18"
JUNCTION BOX LID.
FROM THE BOTTOM OF THE
SHALL BE AT LEAST 8 INCHES
FROM BOTTOM OF BOX AND
CONDUIT SHALL BE EXPOSED
CONDUCTOR INSTALLATIONS
CONVENTIONAL LIGHTING
JUNCTION BOX INSTALLATION FOR
NO. 57 AGGREGATE
GRADATION SIZE
C
JUNCTION BOX
12"
BUSHINGSEARTH
F
FIBER FABRIC TYPE IV
roadway
under
24"
DUCTED CABLE
BOTTOM
9" OR 12" FROM
BOTTOM
3" OR 6" FROM
BOTTOM
3" OR 6" FROM
FINISHED GRADE
HIGHMAST LIGHTING
JUNCTION BOX INSTALLATION FOR
18"
TRAFFIC SIGNALS
JUNCTION BOX INSTALLATION FOR
BOX.
OF THE JUNCTION
4 " FROM THE SIDE
EXTENDED AT LEAST
CONDUITS SHALL BE
UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
A MINIMUM OF 24" PAST THE EDGE OF SUB-BASE
DISTURBING PAVEMENT. CONDUIT SHALL EXTEND
CONDUIT MUST BE INSTALLED WITHOUT
ROADWAY’ IS INCLUDED AS A BID ITEM,
REQUIRED BY CODE. UNLESS ’OPEN CUT
2" RIGID STEEL CONDUIT MINIMUM OR AS
3/13/2017
TRAFFIC SIGNAL AND
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00700J
B.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
T00700J
BMicro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T7
ROADWAY LIGHTING
JUNCTION BOX AND CONDUIT DETAILS
18"
LB CONDULET
PROPOSED
(SIZE AS SPECIFIED)
PROPOSED R.S. CONDUIT
EX. GROUND LINE
AND CONDUITS
EX. POLE, POLE BASE
EX. CONCRETE BASE
EX. GROUND LINE
45° - 60° BEND
EX. CABINET
AND RE-CONNECTED AFTER INSTALLING CONDUIT
LABELED WITH PERMANENT NON-FADING LABELS
THIS OPERATION, SAID WIRES SHALL BE NEATLY
IF ANY CABINET WIRING MUST BE DISCONNECTED FOR
EX. GROUND WIRE)
(CONNECT TO
BONDING BUSHING
18"
CONDUIT INSTALLATION IN EX. CABINET BASE
CONDUIT INSTALLATION IN EX. POLE BASE
2" MIN
BARE COPPER TO EX. GROUND LUG IN POLE
GROUNDING LUG AND CONNECT 4 AWG SOLID
INSTALL ELBOW OR BEND CONDUIT. INSTALL
WITH GROUT AFTER CONDUIT IS INSTALLED
THE SPACE BETWEEN THE CONDUIT AND BASE
FOR THE CONDUIT. THE CONTRACTOR SHALL FILL
AND CHIPPING OUT THE BASE OR DRILLING A HOLE
CONDUIT MAY BE INSTALLED BY SAWING A SLOT
FLUSH WITH EX. POLE BASE
INSTALL CONDUIT RISER
3/10/2017
COMPACTED IF NEEDED
1�" ASPHALT SURFACE
1�"
9"
3"SAW CUT
UNDISTURBED EARTH6" MIN
3" MIN
OPEN CUT PAVEMENT DETAIL
24" MIN
SCHEDULE 80 PVC CONDUIT
FLOWABLE FILL
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00800
SP.
DG
NFIL
E
NA
ME:
E-S
HE
ET
NA
ME:
T00800
SP
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T8
CONDUIT INSTALLATIONS IN
EXISTING LOCATIONS
304
+00
302
+00
303
+00
51+00
50+00
KY 155 (TAYLORSVILLE ROAD)
(HU
RS
TB
OU
RN
E P
AR
KW
AY)
KY 17
47
0’ 40’ 80’20’
L1A
L1B
L3A
L3B
L4A
L4B
L5A
L5B
L7A
L7B
L8A
L8B
1
1
3
3
4
4
5
5
7
7
8
8
6X30
6X30
6X30
6X30
6X30
6X30
6X30
6X30
6X30
6X30
6X30
6X30
2
2
2
2
2
2
2
2
2
2
2
2
I1
I1
I5
I5
I6
I6
J1
J1
J5
J5
J6
J6
1
2
1
2
1
2
1
2
1
2
1
2
LOOP PHASE SLOT CHANNEL SIZE
0’
0’
0’
0’
0’
0’
0’
0’
0’
0’
0’
0’
STOP BAR
DIST. FROM# OF
TURNS
LOOP SCHEDULE
LEGEND
STEEL STRAIN POLE
SIGNAL HEAD
PEDESTRIAN HEAD
PEDESTRIAN DETECTOR
LOOP DETECTOR
BASE MOUNTED CONTROLLER
A
D
B9
(UNLESS OTHERWISE NOTED)
1�" RIGID STEEL CONDUIT
STEEL STRAIN POLES
POLE SPAN SAGHEIGHT CALC. SERV. MOMENTATT. HT.
222.15
226.55
197.18
208.17
5%
5%
5%
5%
A
B
C
D 32
32
32
A-B
A-D
B-A
B-C
C-B
C-D
D-A
D-C
33
29.5
30
27.5
29.5
30
34
28.5
29
VS
ON
O
T
EL
CT
RC
A
BR
AN
DF
RA
FF
EL
ASSEMBLIES TO THE DIVISION OF TRAFFIC OPERATIONS FOR APPROVAL.
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF THE REPLACEMENT
SPECIFICATIONS STATED ON THE POLE BASE/SIGNAL HEAD DETAILS. THE
CONTRACTOR SUPPLIED CLAMP ASSEMBLIES SHALL CONFORM TO THE
INCIDENTAL TO THE INSTALLATION OF THE STEEL STRAIN POLE.
INSTALLATION. CONTRACTOR SUPPLIED CLAMP ASSEMBLIES SHALL BE
REPLACEMENT CLAMP ASSEMBLIES THAT WILL FACILITATE THE
FROM THE TOP OF THE POLE, THE CONTRACTOR SHALL PROVIDE
THE CLAMP ASSEMBLIES’ ATTACHMENT LOCATIONS ARE MORE THAN 2 FEET
ATTACHMENTS BASED ON THE PRELIMINARY DESIGN OF THE POLES. IF
THE CABINET SHALL SUPPLY CLAMP ASSEMBLIES FOR MESSENGER CABLE
R
Y
G
R
Y
G
R
Y Y
G G
SIGNAL HEADS
ALL INDICATIONS L.E.D.
PEDESTRIAN SIGNALS
ALL COUNTDOWN
HEAD # OL
7A, 7B5A, 5B,3A, 3B,1A, 1B,HEAD #
8A, 8B6A, 6B,4A, 4B,2A, 2B,HEAD #
ALL 6 X 30 FOOT LOOPS SHALL BE QUADRA-POLE
ALL SIGNAL HEADS SHALL HAVE REFLECTIVE BACKPLATES
JUNCTION BOX TYPE B
ALL MESSENGER IS 15,400 LB
1-#14/5C CONTROLLER S.H. 1A & 1B
1-#14/5C
1-#14/5C
1-#14/5C
1-#14/5C
1-#14/5C
1-#14/5C
1-#14/5C
1-#14/5C
1-#14/5C
2-#14/5C
1-#14/5C
1-#14/5C
2-#14/5C
2-#14/1-PAIR
4-#14/1-PAIR
2-#14/1-PAIR
4-#14/1-PAIR
1-#14/7C
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
CONTROLLER
S.H. 1A
S.H. 3A
S.H. 4B
S.H. 5B
S.H. 6A
S.H. 7B
S.H. 8A
POLE A
POST A
PEDESTAL B
POLE C
POST C
PEDESTAL D
JB B1
JB B2
JB B3
JB B4
OL
S.H. 2A & 2B
S.H. 3A & 3B
S.H. 4A & 4B
S.H. 5A & 5B
S.H. 6A, & 6B
S.H. 7A & 7B
S.H. 8A & 8B
P.H. 8A & 6B
2 PED BUTTONS
P.H. 2A & 8B & 2 PED BUTTONS
P.H. 4A & 2B
2 PED BUTTONS
P.H. 6A & 4B & 2 PED BUTTONS
L1A & L1B
L3A, L3B, L8A, & L8B
L5A & L5B
L7A, L7B, L4A, & L4B
OL
S.H. 2B
CABLE ORIGIN ENDING CONNECTING
WIRING SCHEDULE
LOOP LEAD-INS INSIDE JB "B1"
SPLICE LOOP WIRES TO TWO 1-PAIR
FROM EDGE OF PAVEMENT TO JB "B1"
INSTALL 1 - 1" RIGID STEEL CONDUIT
INSTALL JUNCTION BOX "B1"
INSTALL 2 PED DETECTORS ON POST "A"
INSTALL 2 PED HEADS ON POLE "A"
FROM POLE "A" TO JB "B1"
INSTALL 1- 1 1/4" PVC CONDUIT
FROM POLE "A" TO POST "A"
INSTALL 1- 1 1/4" PVC CONDUIT
FROM CONTROLLER TO POLE "A"
INSTALL 4- 2" PVC CONDUIT
SHOWN ON THE SPECIFICATION SHEETS
SUPPLY, AND CABLING ON CABINET AS
INSTALL ROUTER, ANTENNA, POWER
MODEL 332 BASE MOUNT CABINET
INSTALL TYPE 170 CONTROLLER IN
INSTALL PEDESTRIAN POST "A"
STA. 302+55.6, 59.2’ LT.
INSTALL STEEL STRAIN POLE "A" AT
SPAN MOUNTED SIGN
PEDESTAL POLE / POST
Coordinates for horizontal control were obtained from GPS methods
and adjusted to the National NAD83/FBN System.
Coordinates are based on State Plane Coordinate System Single Zone and
in U.S. Survey Feet.
COORDINATE SYSTEM
DISTRICT TRAFFIC ENGINEER TO ARRANGE TO PICK UP SIGNS.
DISTRICT WILL SUPPLY SPAN MOUNTED SIGNS. CONTACT
WORK BEING PERFORMED.
OPERATIONS TO VERIFY POLE CALCULATIONS PRIOR TO ANY
PROVIDED TO CENTRAL OFFICE DIVISION OF TRAFFIC
ANY WORK BEING PERFORMED. FINAL LOCATIONS SHALL BE
WITH ENGINEER AND LOCAL UTILITY COMPANIES PRIOR TO
CONTRACTOR SHALL VERIFY FINAL POLE LOCATION
SEWER, ETC.)
CONDUIT CROSSES UTILITIES (TELEPHONE, GAS, WATER,
CONSTRUCTION. HAND DIG AREAS WHERE POLES OR
AND ALL UTILITY COMPANIES PRIOR TO BEGINNING
THE CONTRACTOR SHALL C0NTACT DISTRICT UTILITY AGENT
NOTE:
R3-4
D3-1
D3-1
R10-7
TURN" SIGN
"DELAYED LEFT
LOOP LEAD-INS INSIDE JB "B3"
SPLICE LOOP WIRES TO TWO 1-PAIR
FROM EDGE OF PAVEMENT TO JB "B3"
INSTALL 1 - 1" RIGID STEEL CONDUIT
INSTALL JUNCTION BOX "B3"
INSTALL 2 PED DETECTORS ON POST "C"
INSTALL 2 PED HEADS ON POLE "C"
FROM POLE "C" TO JB "B3"
INSTALL 1- 2" PVC CONDUIT
FROM POLE "C" TO POST "C"
INSTALL 1- 2" PVC CONDUIT
INSTALL PEDESTRIAN POST "C"
STA. 303+90.5, 61.6’ RT.
INSTALL STEEL STRAIN POLE "C" AT
LOOP LEAD-INS INSIDE JB "B2"
SPLICE LOOP WIRES TO FOUR 1-PAIR
FROM EDGE OF PAVEMENT TO JB "B2"
INSTALL 2 - 1" RIGID STEEL CONDUIT
INSTALL JUNCTION BOX "B2"
ON PEDESTAL "B"
INSTALL 2 PED HEADS & 2 PED DETECTORS
FROM POLE "B" TO JB "B2"
INSTALL 1- 2" PVC CONDUIT
FROM POLE "B" TO PEDESTAL "B"
INSTALL 1- 2" PVC CONDUIT
INSTALL PEDESTRIAN PEDESTAL "B"
STA. 304+10.9, 54.6’ LT.
INSTALL STEEL STRAIN POLE "B" AT
LOOP LEAD-INS INSIDE JB "B4"
SPLICE LOOP WIRES TO FOUR 1-PAIR
FROM EDGE OF PAVEMENT TO JB "B4"
INSTALL 2 - 1" RIGID STEEL CONDUIT
INSTALL JUNCTION BOX "B4"
ON PEDESTAL "D"
INSTALL 2 PED HEADS & 2 PED DETECTORS
FROM POLE "D" TO JB "B4"
INSTALL 1- 2" PVC CONDUIT
FROM POLE "D" TO PEDESTAL "D"
INSTALL 1- 2" PVC CONDUIT
INSTALL PEDESTRIAN PEDESTAL "D"
STA. 302+54.0, 59.5’ RT.
INSTALL STEEL STRAIN POLE "D" AT
KY 155 (TAYLORSVILLE RD) AT
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
T00900
SG
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T9
KY 1747 (HURSTBOURNE PKWY)
SIGNAL PLAN SHEET 40’SCALE: 1"=
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T00900
SG.
DG
NFIL
E
NA
ME:
C
6B
2B
2A
4A
6A
8A
8B
8A
3B
3A
1A1B6A6B
5A 5B 2A 2B
4A
7B
4B
7A
4B
8B
8B
8A
3B
3A
5A 5B
1B 1A
4A
7B
7A
4B
B2
B3
B4 B1
OL
AB
CD
A
DC
B
SIGNING SPECIFICATION SHEET
SCOPE OF WORK
SIGN MATERIALS
STEEL POSTS:
SHEET.
PLACEMENT OF POST CLIP SHALL BE AS SHOWN ON THE SIGNING MISCELLANEOUS DETAIL
SIGNS TO THEIR SUPPORTS SHALL BE AS RECOMMENDED BY THE PANEL MANUFACTURER.
ALL HARDWARE FOR THE ASSEMBLY OF PANEL SIGNS AND THE ATTACHMENT OF THESE
IN ACCORDANCE WITH ASTM B-776 AND ASTM A-307.
ALL HARDWARE FOR THE ERECTION OF SHEETING SIGNS SHALL BE CADMIUM PLATED STEEL
HARDWARE:
WITH MANUFACTURER’S SPECIFICATIONS AND/OR RECOMMENDATIONS.
ALL RETROREFLECTIVE MATERIALS SHALL BE FABRICATED AND ASSEMBLED IN ACCORDANCE
LETTERS, SYMBOLS, AND BORDERS:
SIGNING SPECIFICATION NOTES
TO THE WORK DESCRIBED HEREIN:
THE FOLLOWING PUBLICATIONS ARE APPLICABLE
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
ALL STEEL POSTS SHALL MEET THE REQUIREMENTS OF SECTION 832 OF THE STANDARD
E-S
HE
ET
NA
ME:
T010
00
SN
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
SIGN SUBSTRATES
SHEETING SIGN DETAIL SHEET.
INSTALLATION PROCEDURES AND BRACING REQUIREMENTS ARE DETAILED ON THE
TYPE II POST SHALL BE STANDARD INSTALLATION IN SOIL WITH A SOIL STABILIZER.
MISCELLANEOUS
VISIBILITY OF SIGNS, SHALL BE INCIDENTAL TO THE CONTRACT.
CLEARING AND GRUBBING, AND TREE TRIMMING, WHEN REQUIRED FOR CONSTRUCTION OR
DEPARTMENT.
SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
SHEET METAL COVERS. ANY SIGNS THAT ARE DAMAGED AS A RESULT OF COVERING
USED SUCCESSFULLY FOR LIMITED PERIODS. DO NOT USE TAPE, PAPER, PLASTIC, OR
ARE FOLDED OVER THE SIGN EDGES AND SECURED AT THE BACK OF THE SIGN HAVE BEEN
TO MOISTURE, SUNLIGHT, ETC. POROUS CLOTH OR GEOTEXTILE FABRIC COVERS WHICH
COVERINGS MAY CAUSE PERMANENT DAMAGE TO THE SIGN FACE FOLLOWING EXPOSURE
COVER THE SIGN FACE TEMPORARILY FOLLOWING ERECTION, USE CAUTION SINCE SOME
SIGN COVERING IS NOT RECOMMENDED. HOWEVER, IF IT IS ABSOLUTELY NECESSARY TO
AS DIRECTED BY THE ENGINEER, AT NO ADDITIONAL COST TO THE DEPARTMENT.
ANY AREA DISTURBED SHALL BE SIDE GRADED TO THE EXISTING SLOPES AND RESEEDED
APPLY COPY IN A WORKMANLIKE MANNER.
DIAMETER OF 3/16 INCH, AND THE LENGTH SHALL BE AS NECESSARY TO PROPERLY
PANEL OVERLAY SECTIONS SHALL BE AFFIXED WITH A "POP" RIVET WITH A MINIMUM
GROUND-MOUNTED SIGN SUPPORTS
GENERAL:
NOTED ON THE PLANS.
PLANS. NEW SIGNS ARE TO BE INSTALLED AT EXISTING LOCATIONS UNLESS OTHERWISE
COMPLETED SIGNS AS INDICATED AT LOCATIONS DESCRIBED ELSEWHERE IN THESE
TO FURNISH, FABRICATE AND ERECT IN PLACE ALL MATERIALS NECESSARY TO FORM
BEHIND GUARDRAIL.
SHALL BE REMOVED AND REPLACED WITH TYPE I OR TYPE II POSTS, UNLESS THEY ARE LOCATED
REQUIRED BASE EMBEDMENT. EXISTING I-BEAMS ON WHICH SHEETING SIGNS ARE ATTACHED
AND POSTS SHALL BE OF SUFFICIENT LENGTHS TO EXTEND FROM THE TOP OF THE SIGN TO THE
ALL SIGNS SHALL BE POSITIONED AS SHOWN ON THE POSITIONING DETAIL SHEET. ALL BEAMS
CONCRETE BASES
SHOWN ELSEWHERE IN THESE PLANS.
ALL CONCRETE BASES SHALL BE OF CLASS "A" CONCRETE FOR SIGNS AND SHALL BE AS
COST OF CLASS "A" CONCRETE FOR SIGNS.
EXCAVATION NECESSARY TO CONSTRUCT BASES AND FOOTINGS IS INCIDENTAL TO THE
SAMPLES, TESTING, ETC.
DIVISION OF CONSTRUCTION AND APPROVED PRIOR TO ERECTION.
DIFFERENT GAUGE OF ALUMINUM OR STEEL SHEETING USED MUST BE SUBMITTED TO THE
OF ALL MATERIALS TO BE USED. MILL TEST REPORTS FOR BEAMS, STEEL PANELS, AND EACH
ENGINEER DRAWINGS, DESCRIPTIONS, MANUFACTURER’S CUTS ETC. FOR WRITTEN APPROVAL
BEFORE BEGINNING INSTALLATION, THE CONTRACTOR SHALL FURNISH TO THE PROJECT
DUPLICATE SIGNS SHALL NOT BE DISPLAYED DURING THE CONSTRUCTION OF THIS PROJECT.
SHEETING SIGNS (D1-1, D1-2, D1-3) EQUAL TO OR LESS THAN 72" X 42" REQUIRE TWO TYPE I OR
TYPE II POSTS.
THE HORIZONTAL CLEARANCE "X" ON ALL THE SHEETING SIGNS SHOULD BE A MINIMUM OF
6’ FROM THE EDGE OF THE SHOULDER TO THE EDGE OF THE SIGN OR A MINIMUM OF 12’ FROM
THE EDGE OF THE SIGN TO THE EDGE OF THE TRAVELLED WAY AS SHOWN IN THE SIGNING
POSITIONING DETAIL SHEET.
IF ANY SIGN IS LOCATED NEAR A LUMINAIRE OR ANOTHER POLE, IT SHALL BE INSTALLED IN
ADVANCE OF THE POLE SO THAT THE MOTORISTS VIEW OF THE SIGN WILL NOT BE OBSTRUCTED.
SIGNS THAT DO NOT COMPLY WITH THE MUTCD SHALL BE REMOVED BY THE CONTRACTOR AS
APPROVED AND DIRECTED BY THE ENGINEER.
SPACING BETWEEN SIGNS.
EACH OTHER, THE POSTS SHALL BE SPACED TO PROVIDE APPROXIMATELY SIX INCHES (6") OF
ON SHEETING SIGNS WHERE THERE ARE MORE THAN ONE SIGN ASSEMBLY MOUNTED BESIDE
THE PROJECT.
THE COST FOR REMOVING EXISTING PANEL SIGNS SHALL BE INCIDENTAL TO THE COST OF
ADMINISTRATION
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CURRENT EDITION) -- FEDERAL HIGHWAY
STANDARD HIGHWAY SIGNS AND MARKINGS (CURRENT EDITION) -- FEDERAL HIGHWAY ADMINISTRATION
CONSTRUCTION (CURRENT EDITION)
KENTUCKY DEPARTMENT OF HIGHWAYS STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (CURRENT EDITION) AND THESE PLANS.
SIGN SUBSTRATES SHALL CONFORM TO SECTION 833 OF KENTUCKY’S STANDARD
PANEL SIGNS SHALL BE LABELED AS P-#. SHEETING SIGNS SHALL BE LABELED AS S-#.
SIGN SHEETING:
ON THE DEPARTMENT’S LIST OF APPROVED MATERIALS SHALL BE USED.
FOR ROAD AND BRIDGE CONSTRUCTION (CURRENT EDITION) AND THESE PLANS. ONLY SHEETING
SIGN SHEETING SHALL CONFORM TO SECTION 830 OF KENTUCKY’S STANDARD SPECIFICATIONS
MATERIALS SHALL BE USED. BRACING, IF REQUIRED, SHALL BE INCIDENTAL TO TYPE I POST.
ONLY BREAKAWAY TYPE "D" POST SYSTEMS ON THE DEPARTMENT’S LIST OF APPROVED
STABILIZER, OR TYPE "D" (BREAKAWAY SIGN POST SUPPORT SYSTEM INSTALLATION).
TYPE I STEEL POSTS SHALL BE EITHER STANDARD INSTALLATION IN SOIL, WITH SOIL
BEAMS:
RESOLUTION.
BEAM LENGTHS, WITH ANY DISCREPANCIES BROUGHT TO THE ATTENTION OF THE ENGINEER FOR
MEASUREMENTS AT EACH SIGN LOCATION AND CROSS SECTIONS SHALL BE DEVELOPED TO VERIFY
THESE PLANS ARE FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR SHALL TAKE FIELD
BE INDICATED FOR EACH PANEL SIGN ON THE SIGN DETAIL SHEETS. BEAM LENGTHS INCLUDED IN
LIST OF APPROVED MATERIALS SHALL BE USED. THE TYPE AND SIZE OF BEAM TO BE USED SHALL
FOR "C" BEAM SHEET. ONLY BREAKAWY (TYPE "C") BEAM SUPPORT SYSTEMS ON THE DEPARTMENT’S
DETAIL SHEET, AND THE TYPE "C" BEAMS ARE SHOWN ON THE BREAKAWAY SIGN SUPPORT SYSTEM
SIGN POST SUPPORT SYSTEM INSTALLATION). TYPE "A" BEAMS ARE SHOWN ON THE PANEL SIGN
ALL BEAMS SHALL BE EITHER TYPE "A" (STANDARD BEAM INSTALLATION) OR TYPE "C" (BREAKAWAY
USING TYPE III OR TYPE IV SHEETING.
ALL OTHER PERMANENT SIGNS (INCLUDING THE BACKGROUNDS OF PANEL SIGNS) SHALL BE FABRICATED
SIGNS LISTED ABOVE
- SUPPLEMENTAL PLAQUES TO ANY OF THE PREVIOUSLY LISTED FLUORESCENT YELLOW-GREEN
SIGNS
- IN-STREET PEDESTRIAN CROSSING (R1-6) SIGNS AND OVERHEAD PEDESTRIAN CROSSING (R1-9)
PLAQUES THAT SUPPLEMENT PEDESTRIAN WARNING SIGNS
- PEDESTRIAN WARNING (W11-2) SIGNS AND DIAGONAL DOWNWARD POINTING ARROW (W16-7P)
(W16-1P) PLAQUES AND DIAGONAL DOWNWARD POINTING ARROW (W16-7P) PLAQUES
- BICYCLE WARNING (W11-1) SIGNS AND ANY SUPPLEMENTAL PLAQUES, SUCH AS "SHARE THE ROAD"
WARNING SIGNS THAT ARE NOT INCLUDED IN THE MUTCD
SIGNS SHOWN IN FIGURES 7B-1 AND 7B-6 OF THE MUTCD AND OTHER SCHOOL-RELATED
- SCHOOL AND SCHOOL BUS WARNING SIGNS, INCLUDING THE FLUORESCENT YELLOW-GREEN
THE FOLLOWING SIGNS SHALL BE FABRICATED USING TYPE IX FLUORESCENT YELLOW-GREEN SHEETING:
- ALL ADVISORY SPEED (W13-1P) PLAQUES
FIGURE 2C-1 OF THE MUTCD
- HORIZONTAL ALIGNMENT SIGNS AND PLAQUES, INCLUDING THE SIGNS SHOWN IN
THE FOLLOWING SIGNS SHALL BE FABRICATED USING TYPE IX FLUORESCENT SHEETING:
- WRONG WAY (R5-1A) SIGNS
- DO NOT ENTER (R5-1) SIGNS
- YIELD (R1-2) SIGNS
- ALL WAY (R-13P) SIGNS
- STOP (R1-1) SIGNS
- WHITE SIGN LEGENDS (INCLUDING ROUTE MARKERS) ON PANEL SIGNS
THE FOLLOWING SIGNS AND SIGN COMPONENTS SHALL BE FABRICATED USING TYPE IX SHEETING:
FONTS:
WILL NOT BE REQUIRED.
CONCRETE. THE COST SHALL BE INCIDENTAL TO STEEL POST, AND SOIL STABILIZERS
SHALL DRILL HOLES OF THE REQUIRED DEPTH INTO THE ROCK AND BACKFILL WITH
LINE AS SHOWN. HOWEVER, IF SOLID ROCK IS ENCOUNTERED, THE CONTRACTOR
TYPE I AND II STEEL POSTS IN SOIL SHALL BE DRIVEN 32" TO 34" BELOW THE GROUND
STANDARD ALPHABETS SHALL BE USED FOR ALL LEGENDS ON PANEL GUIDE SIGNS.
05-9008.00 JEFFERSON
MILEPOST MARKERS
THE CURRENT PROJECT SIGNING PLAN DETAIL SHEETS.
SHOWN ON THE SIGNING PLANS MUST BE INSTALLED. FOR SIGN SIZES AND SPECIFICATIONS, SEE
BE INCIDENTAL TO THE PROJECT. IN ADDITION TO REPLACING ALL EXISTING SIGNS, ALL SIGNS
CONFORM TO THE SIGNING PLANS AND SPECIFICATIONS, AND ALL HARDWARE REQUIRED, SHALL
REMOVING EXISTING SHEETING SIGNS AND POSTS,RELOCATING EXISTING SIGNS AND POSTS TO
SIGNS AND POSTS SHALL CONFORM TO CURRENT STANDARDS/SPECIFICATIONS. THE COST FOR
GIVEN ON THE SIGNING POSITIONING DETAIL SHEET.
ON UNIFORM TRAFFIC CONTROL DEVICES (CURRENT EDITION). ADDTIONAL REQUIREMENTS ARE
MILEPOST MARKERS SHALL CONFORM TO THE GENERAL REQUIREMENTS SET FORTH IN THE MANUAL
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T010
00
SN.
DG
NFIL
E
NA
ME:
T10
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
NUMBERS:
PROJECT
COUNTY OF
Commonwealth of KentuckyDEPARTMENT OF HIGHWAYS
DESIGNED BY:
DATE SUBMITTED:
STANTEC
JEFFERSON
FD52 1550 C056 E143
9037001 D
WITH SOIL STABILIZER
SQUARE TUBING POST
TYPE I
WITH SOIL STABILIZER
CHANNEL POST
TYPE II
SOIL STABILIZER
SOIL STABILIZER DETAIL
SOIL STABILIZER
FOR TYPE I POST
SOIL STABILIZER DETAIL
GROUND LINE
4" MAXIMUM
2" RECOMMEND
NOT TO SCALE NOT TO SCALE
TYPE II CHANNEL POST
TYPE I -SQUARE TUBING OR
PLAN VIEWPLAN VIEW
3’
W
O
L
F
C
F
F
A
R
T
I
6" - 8" MAXIMUM
GROUND LINE
PLAN VIEW
NOT TO SCALE
2"x2" TYPE I POST
CORNER BOLT
MEDIUM
5/16" (2.5" L)
& NUT
FLANGED SHOULDER BOLT
GRADE 8
STRAIGHT 3/8"-16 x 3"
TYPE 1 ANCHOR
2.25" x 2.25" x 3’
TRAFFIC FLOW
ON BACKSIDE OF POST FROM
INSTALL SOIL STABILIZING PLATE
NOT EMBEDDED IN CONCRETE,
FOR SIGN INSTALLATIONS
HOLES ARE 1" ON CENTER
32" - 34"
32" - 34"
W
O
L
F
C
F
F
A
R
T
I
ADDED HOLE IN SOIL PLATE
B/2
B
B/2
A
A B C D E
30" 24" 11" 11" 12D6"
45" 36" 18D9" 16.5"16.5"
1�"R
C
DE
M1-5 (3 OR 4 DIGIT)
12B
18B
FONT
3 DIGIT 4 DIGIT
CONVENTIONAL
FREEWAYEXPRESSWAY/
OR FULL CONTROL OF ACCESS
AS A DIVIDED HIGHWAY WITH PARTIAL
NOTE: EXPRESSWAY/FREEWAY DEFINED
TYPE MAY BE MADE TO ENSURE VISUAL ACUITY
ADJUSTMENTS TO THE DIGIT LAYOUT AND/OR FONT
NOTE: FOR ROUTE MARKERS, IF NECESSARY,
SHEETING SIGN DETAIL
August 16, 2017
DA
TE P
LO
TT
ED:
kos
wald
US
ER:
E-S
HE
ET
NA
ME:
T01100
SN
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 5-9008.00 T11
NOT TO SCALE
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T01100
SN.
DG
NFIL
E
NA
ME:
SHEETING SIGNS DETAIL SHEETE-S
HE
ET
NA
ME:
T012
00
SN
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
MESSAGES SPECIFICATION SIDE OF
ROAD TRAVELING
1
SIGN LOCATION
FACING TRAFFIC
SIZES
IN INCHES
HORIZ. VERT.AT STATION (APPROXIMATE)ON ROAD
NUMBER
ASSEMBLY
SIGN/SIGN
SPECIAL NOTES:
SHEETING SIGN DETAIL SHEET SCALE: NTS
MESSAGES SPECIFICATION SIDE OF
ROAD TRAVELING
1
SIGN LOCATION
FACING TRAFFIC
SIZES
IN INCHES
HORIZ. VERT.AT STATION (APPROXIMATE)ON ROAD
S-1
NUMBER
ASSEMBLY
SIGN/SIGN
155
155
R3-4
R3-4
R3-4
R2-1
R1-1
R1-1
R3-2
R4-7
R1-2
R1-2
R1-2
R1-2
M3-1
M1-5
M1-5
M6-4
3636
30 36
36 36
36 36
24 24
24 30
36 36
36 36
36 36
36 36
24 12
30 24
30 24
21 15
30 36
30 36
30 36
36 36
LT
LT
LT
LT
LT
LT
RT
LT
LT
LT
RT
RT
RT
RT
LT
LT
LT
295+40TAYLORSVILLEEBMED
295+40TAYLORSVILLEWBMED
297+96TAYLORSVILLEWB
298+47WB TAYLORSVILLE
298+78
298+70WB TAYLORSVILLE
TAYLORSVILLEWB
300+58
300+58
TAYLORSVILLE
TAYLORSVILLEWB
WB
302+36
302+61
304+23
304+48
TAYLORSVILLE
TAYLORSVILLE
TAYLORSVILLE
TAYLORSVILLE
EB
EB
EB
EB
50+52
50+52HURSTBOURNE
HURSTBOURNE
SB
SB
307+29TAYLORSVILLEWB
307+29TAYLORSVILLEWB
57+14HURSTBOURNESB
57+55
57+55
HURSTBOURNE
HURSTBOURNE
NB
SB
MED
MED
58+05HURSTBOURNENB
HURSTBOURNESB 60+03
S-3
S-7
S-14
S-19S-8S-4
S-13S-12S-11S-10
S-17S-16S-2
05-9008.00JEFFERSON
36 36
36 36
R3-5(R)
R3-5(R)
R3-5(R)
R3-7(R)
30 24 M1-5
21 15 M6-4
155
174730 24 M1-5
21 15 M6-3
LT 305+61TAYLORSVILLEWB
S-20
S-21
LT 305+61TAYLORSVILLEWB
T12
V:\1785\
AC
TI
VE\178566025\
TR
AN
SP
OR
TA
TI
ON\
DE
SI
GN\
DR
AWI
NG\
PL
AN_
SH
EE
TS\
T01200
SN.
DG
NFI
LE
NA
ME:
4.
3.
2.
1.
POSTS SHALL BE 2" X 2", 12 GAUGE
SHEETING SIGNS SHALL BE MOUNTED ON TYPE I POST USING STANDARD INSTALLATION IN SOIL, WITH SOIL STABLIZER. SEE THE SHEETING SIGN DETAIL SHEETS.
SHEETING SIGNS SHALL BE FABRICATED FROM 0.125 GAUGE MATERIAL IF ANY DIMENSION IS GREATER THAN 36" (THIRTY-SIX INCHES), OTHERWISE 0.080 GAUGE MATERIAL SHALL BE USED.
THE COLORS SHALL BE AS SHOWN IN THE "MANUAL ON UNIFORM TRAFFFIC CONTROL DEVICES" AND "STANDARD HIGHWAY SIGNS".
R3-224 24
S-18S-15S-5
S-9S-6
SHEETING SIGNS DETAIL SHEETE-S
HE
ET
NA
ME:
T013
00
SN
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
MESSAGES SPECIFICATION SIDE OF
ROAD TRAVELING
1
SIGN LOCATION
FACING TRAFFIC
SIZES
IN INCHES
HORIZ. VERT.AT STATION (APPROXIMATE)ON ROAD
NUMBER
ASSEMBLY
SIGN/SIGN
SPECIAL NOTES:
SHEETING SIGN DETAIL SHEET SCALE: NTS
MESSAGES SPECIFICATION SIDE OF
ROAD TRAVELING
1
SIGN LOCATION
FACING TRAFFIC
SIZES
IN INCHES
HORIZ. VERT.AT STATION (APPROXIMATE)ON ROAD
S-22
NUMBER
ASSEMBLY
SIGN/SIGN
W4-336 36 51+12HURSTBOURNENB
05-9008.00JEFFERSON
T13
S-23
RT
V:\1785\
AC
TI
VE\178566025\
TR
AN
SP
OR
TA
TI
ON\
DE
SI
GN\
DR
AWI
NG\
PL
AN_
SH
EE
TS\
T01300
SN.
DG
NFI
LE
NA
ME:
W4-6 51+41HURSTBOURNENBRT36 36
POSTS SHALL BE 2" X 2" TYPE 1, 12 GAUGE.
SHEETING SIGNS SHALL BE MOUNTED ON TYPE I POST USING STANDARD INSTALLATION IN SOIL, WITH SOIL STABLIZER. SEE THE SHEETING SIGN DETAIL SHEETS.
SHEETING SIGNS SHALL BE FABRICATED FROM 0.125 GAUGE MATERIAL IF ANY DIMENSION IS GREATER THAN 36" (THIRTY-SIX INCHES), OTHERWISE 0.080 GAUGE MATERIAL SHALL BE USED.
THE COLORS SHALL BE AS SHOWN IN THE "MANUAL ON UNIFORM TRAFFFIC CONTROL DEVICES" AND "STANDARD HIGHWAY SIGNS".
4.
3.
2.
1.
45
155
S-20
S-21
295
+00
300
+00
305+00
310
+00
315
+00
50+00
55+00
60+00
0’ 200’ 400’100’
155
1747
SIGN ON DECORATIVE POST.WATCH SIGN. INSTALL NEW STOP
SIGNS, AND NEIGHBORHOOD DECORATIVE STREET POLE,
REMOVE, STORE AND REINSTALL EXISTING
S-22
S-23ON NEW POST
CREEK SIGNBEARGRASS
REINSTALL EXISTINGREMOVE, STORE AND
SIGNING PLAN
August 16, 2017
DA
TE P
LO
TT
ED:
asle
wis
US
ER:
E-S
HE
ET
NA
ME:
T014
00
SN
Micro
Statio
n v8.11.7.443
COUNTY OF ITEM NO. SHEET NO.
JEFFERSON 05-9008.00 T14
SCALE: 1"=200’
V:\17
85\
AC
TIV
E\17
8566025\
TR
AN
SP
OR
TA
TIO
N\
DESIG
N\
DR
AWIN
G\
PL
AN_S
HE
ET
S\
T014
00
SN.
DG
NFIL
E
NA
ME:
C
C
C
C
C
C
155
S-2
S-1
S-3
S-4
S-5
S-6
S-7
S-14
S-10
S-11
S-12
S-13
S-9
S-16
S-17
S-18
S-15
S-19
S-8