TITLE V/STATE OPERATINGPERMIT
FIRSTMISSSTEEL INCSTONY CREEKPLANT
PERMIT NO: P1-56-00167
BaseduponPennsylvania’sOperating PermitProgram25 Pa.CodeChapter127
EffectiveNovember25, 1994
COMMONWEALTH OF PENI~1SYLVANIADEPARTMENT OF ENVIRONMEI~1TAL PROTECTION
AIR QUALITY PROGRAM
TITLE V/STATE OPERATING PERMITISSUE DATE: 29-FEB-00 EFFECTIVE DATE: 29-FEB-00EXPIRATION DATE: 28-FEB-05
In accordancewith theprovisionsof theAir Pollution ControlAct, theActofJanuary8, 1960,P.L.2119, asamended,and25 Pa.CodeChapter127, theOwner,[and Operatorif noted] (hereinafterreferredto asperrnittee)identified belowis authorizedby theDepartmentof Environmental Protection(Department)tooperatetheair emissionsource(s)morefully describedin thesite inventorylist. This Facility is subjectto all termsandconditionsspecifiedin thispermit. Nothingin this permitrelievesthepermitteefrom its obligationstocomplywith all applicableFederal,StateandLocal lawsandregulations.
Theregulatoryor statutoryauthorityfor eachpermit conditionis set forthin brackets. All termsandconditionsin thispermit arefederallyenforceableunlessotherwisedesignatedas“State-Only” requirements.
TITLE V PERMIT NO: 56-00167TAX-ID/PLANT CODE 23-2540690/01
OWNER FIRSTMISSSTEEL INCMAILING P0 BOX 509ADDRESS HOLLSOPPLE, PA. 15935
PLANT STONY CREEKPLTLOCATION 56 Somerset County 56935 Quemahoning TwpSIC CODE 3312 Manufacturing - Blast Furnaces And Steel Mills
RESPONSIBLE OFFICIALNAME TERRY HEINRICHTITLE PLANT CONTROLLER
PERMIT CONTACT PERSONNAME PATRICK 3 KLIMEKTITLEPHONE (814)479-2551
[SIGNATURE]JOSEPH P P , S UTHWESTREG AIR PROGRAMMANAGER
Section B. General Title V Requirements#001 Definitions#002PropertyRights#003PermitExpiration#004PermitRenewal#005Transferof Ownershipor Operational Control#006InspectionandEntry#007ComplianceRequirements#008Needto Halt or ReduceActivity Nota Defense#009Duty to ProvideInformation#010Reopeningand RevisingtheTitle V Permitfor Cause#011Reopeninga Title V Permitfor CausebyEPA#012SignificantOperatingPermitModifications#013Minor OperatingPermit Modifications#014AdministrativeOperatingPermitModifications#015SeverabilityClause#016FeePayment#017Authorizationfor De Minimis EmissionIncreases#018ReactivationofSources#019Circumvention#020Submissions#021Sampling,TestingandMonitoring Procedures#022Recordkeeping Requirements#023ReportingRequirements#024ComplianceCertification#025 OperationalFlexibility#026RiskManagement#027ApprovedEconomicIncentivesandEmissionTradingPrograms#028 Permit Shield
Section C. Site Level RequirementsC-I: RestrictionsC-Il: TestingRequirementsC-Ill: MonitoringRequirementsC-IV: RecordkeepingRequirementsC-V: ReportingRequirementsC-VI: Work PracticeStandardsC-VII: AdditionalRequirementsC-VJII: Compliance CertificationC-IX: ComplianceSchedule
Section A. Facility/Source IdentificationTableof ContentsSiteInventoryList
Section D. Source Level Requirements
Note: Thesesamesub-sectionsare repeatedfor eachsource!
SectionE-I:E-II:E-III:E4V:E-V:E-VI:E-VII:
Section F.
Section G.
E. Alternative Operating Scenario(s)RestrictionsTestingRequirementsMonitoringRequirementsRecordkeepingRequirementsReportingRequirementsWorkPracticeStandardsAdditional Requirements
Emission Trading Groups
Emission Restriction Summary
D-I: RestrictionsD-II: TestingRequirementsD-III: MonitoringRequirementsD-IV: RecordkeepingRequirementsD-V: ReportingRequirementsD-VI: WorkPracticeStandardsD-VII: Additional Requirements
Section H. Miscellaneous
ID Source Name
031 BOILER #1101 ELECTRIC FURNACENO 1103 LADLE METALLURGYFURNACE106 INDUCTION FCS./LADLE UNIT107 OXYGENCONVERTERW/UNI LANCE SYSTEM108 VACUUMDEGASSING SYSTEM (VOD) 45/T111 VAC DEGASSING/VOD8,000 LB HEATS112 950 LB INDUCTION FURNACE113 3,000 LB INDUCTION FURNACE114 EAST & WEST TORCHCUTTING (CASTER)115 INGOT TEEMING OPERATION116 CONTINUOUSCASTER OPERATION - 45/T117 INGOT GRINDING118 INGOT TORCH CUTTING119 SHOT BLAST MACHINE FOR PIG CASTING120 N. CAR BOTANNEALING FURNACE (LNB) 11.0 MMCF/HR Natural Gas121 5. CAR BOT.ANNEAL FURNACE(LNB) 11.0 MMCF/HR Natural Gas122 SWING FURNACE (FIXEDBOX) 3.8 MMCF/HR Natural Gas123 #3 ANNEALING FURNACE 3.8 MMCF/HR Natural Gas124 #4 ANNEALING FURNACE 3.8 MMCF/HR Natural Gas125 #5 ANNEALING FURNACE(LNB) 6.2 MMCF/HR Natural Gas126 #6 ANNEALING FURNACE 6.2 MMCF/HR Natural Gas127 #7 ANNEALING FURNACE 6.2 MMCF/HR Natural Gas128 #8 ANNEALING FURNACE 6.2 MMCF/HR Natural Gas129 FMA #2 ANNEALING FURNACE 4.6 MMCF/HR Natural Gas130 FMA #3 ANNEALING FURNACE 4.6 MMCF/HR Natural Gas131 INGOT GRINDING -OUTSIDE BUILDING132 OXYGENCONVERTERDRYER133 FOUR-45 T/LADLE HEATERS (#1,#2,#3,# 40.0 MMCF/HR Natural Gas134 (1) 45 TON LADLE DRYER(#5) 5.0 MMCF/HR Natural Gas135 CASTER TUNDISH HEATER 5.0 MMCF/HR Natural Gas136 CASTER TUNDISHDRYER 5.0 MMCF/HR Natural Gas137 FOUR BLDG. HEATERS (#1,#2,#3,#4) 24.0 MMCF/HR Natural GasCOl W. CARBORUNDUMBAG HOUSEC02 EAST CARBORUNDUMC03 FULLER BAGHOUSEC04 N. WHEELABRATORBAG HOUSECOS S. WHEELABRATORBAG HOUSEC06 LADLE DRYING UNIT BAGHOUSEC07 S.W. CARBORUNDUMBAG HOUSEC08 OXYGEN CONVERTERBAGHOUSEC09 INSIDE WHEELABRATORBH501 W. CARBORUNDUMS02 E. CARBORUNDUMS03 FULLER BAG HOUSE
Capacity Fuel/Material
20.0 MMBTU/HR
Source Name
OXY CONV.STACKS.W. CARBORUNDUMBAG HOUECLEAVER BROOKSBOILERINSIDE WHEELABRATORBHVAC. DEGASSINGSYS.
Comb031
Proc101
EP- - >S09
CD- ->C01
I CD- - >C02
I CD- - >C03
Proc CD103 - ->CO1
I CD- - >C02
CD- - >C03
EP-->S01
EP- - >S02
EP- - >S03
EP- ->S01
EP- - >S02
EP- - >S03
Proc107
CD- - >C08
EP- - >S07
Proc EP108 - - >ZOS
Proc CD EP114 - - >C07 - - >S08
ID Capacity Fuel/Material
S07508S09SlOzos
Wordsandtermsthatarenot otherwisedefinedin this permitshallhavethemeanings setforth in Section3 of theAir Pollution ControlAct(35 P.S.§ 4003)and25 Pa. Code§ 121.1.
#002 [25 Pa. Code §127.512(c)(4)]ProperlyRights
This permitdoesnot conveypropertyrights of anysort, oranyexclusiveprivileges.
#003 [25Pa. Code§127.446(a)and (c)JPermit Expiration
This permit is issuedfor afixed termof 5 yearsfrom theeffectivedateshownon page2 of this permit. The termsandconditionsof theexpiredpermit shallautomatically continuependingissuanceof anewTitle Vpermit, providedthepermitteehassubmittedatimely andcompleteapplicationandpaid applicable feesrequiredunder25 Pa.CodeChapter127,SubchapterI andtheDepartmentis unable,throughno fault of thepermittee,to issueor denyanewpermitbeforetheexpirationof thepreviouspermit. An application iscompleteif it containssufficientinformationto beginprocessingtheapplication,hastheapplicablesectionscompletedandhasbeensignedby aresponsibleofficial.
#004 [25Pa. Code§§127.412,127.413, 127.414,127.446(e)& 127.503]Permit Renewal
(a) An applicationfor the renewal oftheTitle V permit shallbesubmittedto theDepartmentat least6 months,andnotmorethan 18months,beforethe expiration dateof this permit. Thepermitteeshallsubmitatimely andcompleteapplicationto the Department’sRegionalAirProgramManager. The renewalapplicationis timely if acompleteapplicationis submittedto theDepartmentwithin the timeframespecffiedin this permit condition.
(b) Theapplicationfor permit renewalshall includethecurrentpermitnumber,theappropriatepermitrenewalfee, a descriptionof anypermitrevisionsandoff-permit changesthatoccurredduringthepermit term,andanyapplicablerequirementsthatwerepromulgatedandnotincorporatedinto thepermit duringthepermit term.
#001 [25 Pa. Code§121.11Definitions
(c) The renewalapplication shallalsoinclude submissionof proofthatthelocal municipalityandcounty,in which the facility is located,havebeennotified in accordancewith 25 Pa.Code§ 127.413. Theapplicationfor renewal oftheTitle V permit shallalsoincludesubmissionofcompliancereviewforms whichhave beenusedby thepermitteeto updateinformationsubmittedin accordancewith either25 Pa.Code§ 127.412(b)or§ 127.4120).
(d) The permittee,uponbecomingawarethat anyrelevantfactswereomittedor incorrectinformation wassubmittedin thepermitapplication,shall submitsuchsupplementaryfactsor correctedinformationduring thepermitrenewalprocess.Thepermitteeshallalsoprovideadditionalinformation asnecessaryto address any requirementsthatbecomeapplicableto thesourceafterthedateacompleterenewalapplicationwassubmittedbut prior to releaseof adraft permit.
#005 [25 Pa. Code§§127.450(a)(4)& 127.464(a)JTransfer of Ownershipor OperationalControl
(a) In accordancewith 25 Pa. Code§ 127.450(a)(4),a changein ownershipor operationalcontrolof thesourceshall betreated asanadministrativeamendmentif:
(1) TheDepartmentdeterminesthatno otherchangein thepermit isnecessary;
(2) A written agreementhasbeen submittedto theDepartmentidentifying thespecificdateof thetransferofpermitresponsibility,coverageandliability betweenthecurrentandthenewpermittee;and
(3) A compliancereviewform hasbeen submittedto theDepartmentandthepermittransferhasbeenapprovedby the Department.
(b)In accordancewith 25 Pa.Code§ 127.464(a),this permitmaynot betransferredto anotherpersonexceptin casesof transfer-of-ownershipwhich aredocumentedandapprovedto thesatisfactionof theDepartment.
#006 [25 Pa. Code§127.513,35 P.S. §4008and §114ofthe CAAJInspection and Entry
(a) Uponpresentationof credentialsandotherdocumentsasmayberequiredby law for inspectionandentrypurposes,thepermitteeshallallow theDepartmentof Environmental Protectionor authorizedrepresentativesof theDepartmentto performthe following:
(1) Enterat reasonabletimes uponthepermittee’spremiseswhereaTitle V source islocatedoremissionsrelatedactivity is conducted,orwhererecordsarekept under theconditionsof this permit;
(2) Haveaccessto andcopyor remove,at reasonabletimes, recordsthatare keptunder theconditionsofthis pennit;
(3) Inspectat reasonabletimes,facilities, equipmentincludingmonitoringandair pollution controlequipment, practices,or operationsregulatedorrequiredunderthis permit;
(4) Sampleor monitor, at reasonable times,substances orparameters,for the purposeof assuringcompliancewith thepermitorapplicablerequirementsasauthorizedby the CleanAir Act, theAirPollutionControlAct, or theregulationspromulgatedundertheActs.
(b) Pursuantto 35 P.S.§ 4008, no personshallhinder,obstruct,preventor interferewith theDepartmentor its personnelin theperformanceof anyduty authorizedundertheAir Pollution ControlAct orregulationsadoptedthereunder.
(c) Nothing in this permitconditionshall limit the ability of theEPAto inspector enter thepremisesof thepermitteein accordance withSection114 or otherapplicableprovisionsof the CleanAir Act.
#007 [25 Pa. Code § §127.25, 127.444, & 127.512(c)(1)]ComplianceRequirements
(a) Theperinittee shallcomplywith theconditionsof this permit.Noncompliancewith this permitconstitutesaviolation of the CleanAirAct andtheAir Pollution ControlAct andis groundsfor oneor moreofthefollowing:
(1) Enforcementaction
(2) Permit termination,revocationand reissuanceor modification
(3) Denialof apermit renewalapplication
(b) A personmaynot causeor permittheoperationof asource,whichis subjectto 25 Pa.CodeArticle III, unlessthe source(s)andaircleaningdevicesidentified intheapplicationfor theplanapprovalandoperatingpermit andtheplan approvalissuedto thesourceareoperatedand maintainedin accordancewith specificationsin the applicationsandtheconditionsin theplanapprovalandoperatingpermitissuedby the
Department.A personmaynotcauseorpermit theoperationof an aircontaminationsourcesubjectto 25 Pa. CodeChapter127 in amannerinconsistentwith goodoperatingpractices.
(c) For purposesof Sub-condition(b) of this permitcondition,thespecifications inapplicationsfor planapprovalsandoperatingpermitsarethephysical configurationsandengineeringdesigndetailswhich theDepartmentdeterminesareessentialfor thepernhittee’scompliancewiththeapplicablerequirementsin this Title V permit. Nothing inthissub-condition shallbe construedto createanindependentaffinnativeduty uponthepermittecto obtainapredeterminationfrom theDepartmentfor physical configurationor engineeringdesigndetailchangesmadebythepermittee.
#008 [25 Pa. Code§127. 512(c)(2)JNeed to Haltor Reduce Activity Nota Defense
It shallnot be a defensefor apermittee inanenforcementactionthatit would havebeen necessaryto halt or reducethepermittedactivity inorderto maintaincompliancewith theconditionsofthis permit.
#009 [25 Pa. Code§§127.411(d)& 127.512(c)(5)JDuty to Provide Information
(a) Thepermitteeshall furnish to theDepartment,within areasonabletime, informationthat theDepartment mayrequestin writing to determinewhethercauseexistsfor modiI~ring,revokingandreissuing,orterminatingthepermit, or to determinecompliancewith thepermit.
(b) Uponrequest,thepermittee shallalsofurnish to theDepartmentcopiesof recordsthatthepermitteeis requiredto keepby this permit,or for informationclaimed tobe confidential,thepermitteemayfurnishsuchrecordsdirectly to theAdministratorof EPA alongwith aclaim ofconfidentiality.
#010 [25 Pa. Code § §127.463, 127.512(c) (3)& 127.542]ReopeningandRevisingthe Title V Permitfor Cause
(a) This Title V permitmaybemodified, revoked,reopenedandreissuedor terminatedfor cause. Thefiling of arequestby thepermitteefor apermitmodification,revocationandreissuance,or termination,or of anotification ofplanned changesor anticipated noncompliancedoesnotstaya permit condition.
(b) This permit may bereopened,revisedandreissuedprior toexpiration ofthepermitunderoneor moreofthe following circumstances:
(1) Additional applicablerequirementsundertheCleanAir Act ortheAir Pollution ControlAct becomeapplicableto aTitle V facilitywith aremainingpermittermof 3 ormoreyearsprior to the expirationdateofthis permit. Thepermitrevision shallbecompletedwithin 18monthsafterpromulgationof theapplicablerequirement. No suchrevisionis requiredif theeffectivedateof therequirementis laterthanthe expiration dateof this permit, unlesstheoriginal permitorits termsandconditionshasbeenextended.
(2) Additional requirements,including excessemissionsrequirements,becomeapplicableto an affected sourceundertheacidrainprogram.Upon approvalby theAdministratorof EPA, excessemissionsoffset plansfor an affectedsourceshallbe incorporated intothepermit.
(3) TheDepartmentor theEPA determinesthatthis permitcontainsamaterialmistakeor inaccuratestatementsweremadein establishingtheemissionsstandards orothertermsor conditionsof this permit.
(4) TheDepartmentor theAdministratorof EPA determinesthat thepermitmust berevisedor revokedto assurecompliancewith theapplicablerequirements.
(c) Proceedings torevisethis permit shall follow thesameprocedureswhich applyto initial pennitissuanceandshallaffectonly thosepartsof this permitfor which causeto reviseexists. Therevisionshallbemadeasexpeditiouslyaspracticable.
(d) Regardlessofwhethera revision ismadein accordancewith (b)(1)above,thepermitteeshall meettheapplicablestandardsor regulationspromulgatedunder theCleanAir Act within the time frame requiredbystandardsorregulations.
#011 [25 Pa. Code§127.5431Reopening a Title VPermitfor Cause byEPA
As requiredby theCleanAir Act andregulationsadoptedthereunder,thispermitmaybemodified, reopenedandreissued,revokedor terminatedforcauseby EPA in accordancewith proceduresspecifiedin 25 Pa.Code§127.543.
Whenpermitmodfficationsduringtheterm of this permitdo not qualifyasminor permitmodificationsor administrativeamendments,thepermitteeshall submitanapplicationfor significantTitle V permitmodificationsin accordancewith 25 Pa. Code§ 127.541.
#013 [25 Pa. Code§§121.1& 127.462]Minor OperatingPermit Modifications
(a) The permitteemaymakeminor operatingpermitmodifications(asdefinedin 25 Pa. Code§ 121.1)in accordancewith 25 Pa. Code§ 127.462.
(b) Unlessprecludedby theCleanAir Act or theregulationsthereunder,thepermitshielddescribedin 25 Pa. Code§ 127.516(relatingto permitshield) shall extendto anoperationalflexibility changeauthorizedby25 Pa.Code§ 127.462.
#014 [25 Pa. Code§127.450]AdministrativeOperatingPermit Modifications
(a) Thepermitteemayrequestadministrativeoperatingpermit amendments,asdefinedin 25 Pa.Code§ 127.450(a),accordingto proceduresspecifiedin § 127.450. Administrative amendmentsarenot authorizedfor anyamendmentprecludedby theCleanAir Act or the regulationsthereunderfrom being processedasan administrativeamendment.
(b) Upontakingfinal actiongrantinga requestfor anadministrativepermit amendmentin accordancewith § 127.450(c),theDepartmentwillallow coverageunder25 Pa.Code§ 127.516(relatingto permitshield)for administrativepermit amendmentswhichmeettherelevant requirementsof 25 Pa.CodeArticle III, unlessprecludedby the CleanAir Act or theregulationsthereunder.
#015 [25 Pa. Code§127.512(b)]SeverabilityClause
Theprovisionsof this permit areseverable,andif anyprovision ofthispermit is determinedby theEnvironmentalHearingBoardor acourtofcompetentjurisdiction to be invalid or unenforceable,suchadeterminationwill not affect theremaining provisionsof this permit.
#012 [25 Pa. Code§127.541]Significant OperatingPermitModifications
(a) The permitteeshall payfees totheDepartmentin accordancewiththeapplicablefeeschedulesin 25 Pa.CodeChapter127,SubchapterI(relatingto planapprovalandoperatingpermit fees).
(b) EmissionFees. The permitteeshall, on or beforeSeptember1st ofeachyear, payapplicableannualTitle V emissionfeesfor emissionsoccurringin theprevious calendar yearasspecifiedin 25 Pa.Code§127.705. Thepermitteeis not requiredto pay anemissionfee foremissionsof morethan4,000tonsof eachregulatedpollutantemittedfrom thefacility.
(c) As usedin this permitcondition,theterm “regulatedpollutant” isdefinedas aVOC, each pollutantregulatedunderSections111 and 112 oftheCleanAir Act andeachpollutant for whichaNational AmbientAirQuality Standardhasbeenpromulgated,exceptthatcarbonmonoxideisexcluded.
(d) Late Payment. Late paymentof emissionfeeswill subjectthepermitteeto thepenaltiesprescribedin 25 Pa. Code§ 127.707andmayresult in thesuspensionor terminationof theTitle V permit. Thepermitteeshall payapenaltyof fifty percent(50%) of thefeeamount,plusintereston thefeeamountcomputedin accordance with26 U.S.C.A.§6621(a)(2) from thedatethe emissionfeeshouldhavebeenpaid inaccordancewith thetime framespecifiedin 25 Pa. Code§ 127.705(c).
(e) Thepermitteeshall pay anannualoperatingpermit administrationfee according tothe feeschedule establishedin 25 Pa. Code§ 127.704(c)if thefacility, identified in subparagraph(iv) of thedefinition of theterm“Title V facility” in 25 Pa.Code§ 121.1,is subjectto Title VaftertheEPA Administratorcompletesarulemaking requiringregulationofthosesourcesunderTitle V of theClean AirAct.
(f) This permitcondition doesnotapplyto aTitle V facility whichqua]ifies forexemptionfrom emissionfeesunder35 P.S.§ 4006.3(f).
#017 [25 Pa. Code §§127.14(b) & 12 7.449]Authorizationfor DeMinimis Emission In creases
(a) This permit authorizesdeminirnis emissionincreasesfrom aneworexistingsourcein accordancewith 25 Pa. Code§§ 127.14and 127.449without theneedfor aplanapprovalor prior issuanceof apermitmodification.The permitteeshallprovidetheDepartmentwith 7 daysprior written noticebefore commencinganyde miniinis emissionsincrease.
#016 [25 Pa. Code § §127. 704, 127.705 & 127.7071Fee Payment
Thewrittennoticeshall:
(1) Identify anddescribethepollutantsthatwill beemittedas aresultof thedeminimis emissionsincrease.
(2) Provideemissionratesexpressed intons peryearandin termsnecessaryto establishcomplianceconsistent withanyapplicablerequirement.
TheDepartment maydisapproveor conditionde mininiis emissionincreasesat anytime.
(b) Exceptasprovidedbelow in (c) and(d) of tliis permitcondition,thepermitteeis authorizedduringthe termof this permitto makedemininiis emissionincreases(expressedin tonsperyear)up to thefollowing amountswithout theneedfor aplan approvalor prior issuanceof apermitmodification:
(1) Fourtonsof carbonmonoxide froma singlesourceduringthetermof thepermit and20 tonsof carbon monoxideat thefacility duringthe termofthepermit.
(2) Oneton of NOx from asingle sourceduring thetermof thepermitand5 tonsof NOx at thefacility duringthetermof thepermit.
(3) Oneandsix-tenthstonsof theoxidesof sulfur from asinglesource duringthe term of thepermitand8.0 tonsof oxidesof sulfur atthefacility duringthe termof thepermit.
(4) Six-tenthsof aton of PM10 from asinglesourceduringthetermof thepermit and3.0 tonsof PMLO at thefacility duringthetermof thepennit. This shall includeemissionsof apollutant regulatedunderSection112 of theCleanAir Act unlessprecludedby theCleanAirAct or 25 Pa.CodeArticle III.
(5) Oneton ofVOCs from asinglesourceduringtheterm ofthepermit and5.0 tonsofVOCs at thefacility duringthe termof thepermit. This shall includeemissionsof apollutantregulatedunderSection112 of theCleanAir Act unlessprecludedby theCleanAir Act or25 Pa. CodeArticle III.
(c) The permitteeis authorizedto install the following minor sourceswithout theneedfor aplanapproval:
(1) Air conditioningorventilationsystemsnot designedto removepollutantsgeneratedorreleasedfrom othersources.
(2) Combustionunits ratedat 2,500,000or less Btuper hourofheatinput.
(3) Combustionunitswith aratedcapacityoflessthan 10,000,000Btu perhourheat inputfueledby naturalgassuppliedby apublicutility, liquified petroleumgasorby commercialfuel oils which areNo.2 or lighter, viscositylessthanor equalto 5.82c St. andwhich meetthesulfur content requirementsof 25 Pa.Code§ 123.22(relatingtocombustionunits). For purposesof this permit, commercial fueloilshall bevirgin oil which hasno reprocessed,recycledorwaste materialadded.
(4) Spaceheaterswhich heatby directheattransfer.
(5) Laboratoryequipmentusedexclusivelyfor chemicalorphysicalanalysis.
(d) This permitdoesnotauthorizedeminimis emissionincreasesif theemissionsincreasewould causeoneormoreof the following:
(1) Increasetheemissionsof apollutant regulatedunderSection112oftheCleanAir Act exceptasauthorizedin Subparagraphs(b)(4) and(5) ofthis permitcondition.
(2) Subjectthe facility to thepreventionof significantdeteriorationrequirementsin 25 Pa. CodeChapter127,SubchapterDand/orthenewsourcereviewrequirementsin SubchapterE.
(3) Violate anyapplicablerequirementof theAir Pollution ControlAct, theCleanAir Act, or theregulationspromulgatedundereitheroftheacts.
(4) Changeswhich aremodificationsunderanyprovision ofTitle Iof theCleanAir Act andemissionincreaseswhich would exceedtheallowableemissionslevel (expressesas a rate ofemissionsor in termsof total emissions)under theTitle V permit.
(e) Unlessprecludedby theCleanAir Act or theregulationsthereunder,thepermitshielddescribedin 25 Pa.Code§ 127.516 (relatingto permitshield)appliesto de minimis emissionincreasesandthe installationofminor sourcesmadepursuantto this permit condition.
(it) Emissionsauthorizedunderthis permit conditionshallbe includedin themonitoring, recordkeepingandreportingrequirementsof thispermit.
(g) Exceptfor demininctisemissionincreasesallowedunderthis permit,
25 Pa. Code§ 127.449,or sourcesandphysicalchangesmeetingtherequirementsof 25 Pa.Code§ 127.14, thepermitteeis prohibitedfrommakingphysicalchangesor engagingin activitiesthatarenotspecificallyauthorizedunderthis permitwithout firstapplyingfor aplanapproval.In accordancewith § 127.14(b),aplanapprovalis notrequiredfor theconstruction,modification,reactivation,orinstallationof thesourcescreatingthedeminimis emissionsincrease.
(h) The permitteemaynot meetde minimis emissionthresholdlevelsbyoffsettingemissionincreasesordecreasesat thefacility.
#018 [25 Pa. Code§§127.lla& 127.215]ReactivationofSources
Thepermitteemayreactivateasourceat thefacility thathasbeenoutofoperationor productionfor at leastoneyear,but lessthanor equalto 5 years, ifthesourceis reactivatedin accordance withtherequirementsof 25 Pa.Code§§ 127.lla and 127.215. Thereactivatedsourcewill not beconsideredanewsource.
#019 [25 Pa. Code§§121.9& 127.216]Circumvention
(a) The owner ofthisTitle V facility, or anyotherperson,maynotcircumventthenewsourcereviewrequirementsof 25 Pa.CodeChapter127, -
SubchapterE by causingor allowing apatternof ownershipordevelopment,including thephasing,staging,delayingor engaginginincremental construction,overageographicareaof afacility which,exceptfor thepatternof ownershipor development, would otherwiserequireapermitorsubmissionof aplanapprovalapplication.
(b) No personmay permittheuseof adevice,stackheightwhich exceedsgood engineeringpracticestackheight, dispersiontechniqueor othertechniquewhich, without resultingin reductionof thetotal amountofair contaminantsemitted,concealsor dilutesan emissionof aircontaminantswhich would otherwisebein violation of this permit, theAir PollutionControlAct or theregulations promulgatedthereunder,exceptthatwith prior approvalof theDepartment,thedeviceortechniquemay beusedfor control of malodors.
(a) Reports,test data,monitoringdata,notificationsandrequestsforrenewal ofthepermit shall besubmittedto the:
RegionalAir Program ManagerPADepartmentof Environmental Protection(At theaddressgiven onthepermit transmittalletter,or otherwisenotified)
(b) Any reportor notificationfor theEPA AdministratororEPA RegionIII shouldbe addressedto:
EnforcementProgramsSection(3AT13)United StatesEnvironmentalProtectionAgencyRegion31650 ArchStreetPhiladelphia,PA 19103-2029
(c) An application,form, reportor compliancecertificationsubmittedpursuantto this permitcondition shall containa certificationby aresponsibleofficial asto truth, accuracy,andcompletenessasrequiredunder25 Pa. Code§ 127.402(d).
(d) Unlessotherwiserequiredby theCleanAir Act or regulationsadoptedthereunder,aresponsibleofficial of the facility shall certify thatbasedon information andbeliefformedafterreasonableinquiry, thestatementsandinformationin thedocumentsaretrue, accurate,andcomplete.
#021 [25 Pa. Code §127.441(c) & Chapter 139; § §114(a)(3),504(b)ofthe CAAJSampling, Testingand Monitoring Procedures
(a) The permitteeshallperformall applicableemissionsmonitoringandanalysis proceduresor testmethods,including proceduresandmethodsunderSections1 14(a)(3)or 504(b) of theCleanAir Act.
(b) The permitteeshallcomply with themonitoring, recordkeepingorreportingrequirementsof 25 Pa.CodeChapter139 andtheotherapplicablerequirementsof 25 Pa.CodeArticle III andadditionalrequirementsrelatedto monitoring, reportingandrecordkeeping requiredby theCleanAir Act andtheregulationsthereunderincluding themonitoringrequirementsof 40 CFRPart64, if applicable.
(c) Unlessalternativemethodologyis requiredby theCleanAir Act and
#020 [25 Pa.Code§§127.402(d)& 127.513(1)]Submissions
regulationsadoptedthereunder,sampling,testingandmonitoringrequiredby or usedby thepermittee todemonstratecompliance withany applicableregulationor permit conditionshallbe conductedin accordancewith therequirementsof 25 Pa.CodeChapter139.
#022 [25 Pa. Code §§127.511 & Chapter 135]Recordkeeping Requirements
(a) The permitteeshall maintainandmakeavailable,uponrequestby theDepartment,thefollowing recordsof monitoredinformation:
(1) The date,place(as definedin thepermit) andtime ofsamplingor measurements.
(2) Thedatestheanalyseswereperformed.
(3) Thecompanyor entity thatperformedtheanalyses.
(4) Theanalytical techniquesor methodsused.
(5) Theresultsof theanalyses.
(6) The operatingconditionsasexistingatthetime of samplingor measurement.
(b) The permittee shallretainrecordsof therequiredmonitoringdataandsupportinginformationfor at leastfive (5) yearsfrom thedateofthemonitoring, sample,measurement,report orapplication. Supportinginformationincludesthecalibrationdataandmaintenancerecordsandoriginal strip-chartrecordingsfor continuousmonitoringinstrumentation,andcopiesof reports requiredby thepermit.
(c) The permitteeshallmaintainandmakeavailableto theDepartmentupon request,recordsincluding computerizedrecordsthatmaybenecessaryto complywith thereporting,recordkeepingandemissionstatementrequirementsin 25 Pa.CodeChapter135(relatingto reportingof sources).In accordancewith 25 Pa.CodeChapter135, § 135.5,suchrecordsmayinclude recordsof production,fuel usage, maintenanceofproductionor pollution controlequipmentor other informationdeterminedby theDepartmentto be necessaryfor identificationandquantificationof potentialand actualair contaminantemissions. Ifdirectrecordkeepingis not possibleorpractical, sufficient recordsshall bekeptto providetheneededinformationby indirectmeans.
(a) Thepermitteeshall complywith theapplicablereportingrequirementsofthis Title V penmtincluding SectionsC andD, theCleanAir Act and the regulationsthereunder,theAir Pollution ControlAct and25 Pa. CodeArticle III including Chapters127, 135 and 139.
(b) Pursuantto 25 Pa. Code§ 127.511(c),the reportingrequirementsfortheTitle V facility shall includethe following:
(1) Submittalofreportsof requiredmonitoringat leasteverysixmonths. Thereports shallinclude instancesof deviations(asdefinedin25 Pa. Code§121.1)from therequirementsof this Title V permit.
(2) Thepermitteeshall reportdeviations(asdefinedin 25 Pa.Code§ 121.1)from permit requirements withinthe timeframesspecifiedinthis permit. Thereportingof deviationsshall includetheprobablecauseof thedeviationsandcorrectiveactionsor preventivemeasurestaken, exceptthatsourceswith continuous emission monitoringsystemsshall report accordingto theprotocolestablishedandapprovedby theDepartmentfor thesource.
(c) Thepermitteeshall submitreportsto theDepartmentcontaininginformationtheDepartmentmayprescriberelativeto theoperationandmaintenanceof any air contamination source.
(d) Everyreportsubmittedto theDepartmentunderthis permitconditionshall complywith thesubmissionproceduresspecifiedin Condition #020(relating to submissions)of this permit.
(e) Any records,reportsor informationobtainedby theDepartmentorreferredto in apublic hearing shallbemade availableto thepublic bytheDepartmentexceptfor suchrecords,reportsor informationfor whichthepermitteehasshowncausethat thedocumentsshouldbe consideredconfidentialandprotectedfrom disclosureto the public underSection4013.2of theAir PollutionControlAct consistentwith Sections112(d)and114(c) of theClean AirAct, or25Pa. Code§ 127.411(d).Thepermitteemaynot requestaclaimof confidentialityfor anyemissionsdatageneratedfor theTitle V facility.
#024 [25 Pa.Code§127.513]Compliance Certification
(a) Within oneyearfrom thedateof issuanceof theTitle V permitandeach yearthereafter,thepermittee shallsubmitto theDepartmentand
#023 [25 Pa. Code§§ 127.411(d),127.442& 127.511(c)]Reporting Requirements
EPARegionIII a certificationof compliancewith thetermsaridconditionsin this permitincluding theemissionlimitations,standardsor workpractices.This certfficationshall include:
(1) Theidentification ofeach termor conditionof thepermitthatis thebasisof thecertification.
(2) A descriptionof themeansusedto monitor compliancewith theemissionlimitations, standardsandwork practices,consistentwith 25Pa. CodeArticle III.
(3) The compliancestatus.
(4) Themethodsusedfor determiningthe compliancestatusof the
source,currentlyandover thereportingperiod.
(5) Whethercompliance wascontinuousor intermittent.
(6) OtherfactstheDepartmentmayrequireto determinethecompliancestatusof a source.
(b) The compliancecertfficatiionsha]1be submittedto theDepartmentandEPA iii accordancewith thesubmissionrequirementsspecifiedinpermitcondition#020 ofthis section.
#025 [25Pa. Code§127.31Operational Flexibility
(a) The permitteeis authorizedto makechangeswithin theTitle Vfacility in accordancewith the following provisionsin 25 Pa.Code
Chapter127 which implement the operationalflexibility requirementsofSection502(b)(1O)of theCleanAir Act and section6.1(i) of theAirPollutionControl Act:
(1) Section127.14(relating to exemptions)
(2) Section127.447(relatingto alternative operatingscenarios)
(3) Section127.448(relatingto emissionstradingat facilities withFederally enforceableemissionscaps)
(4) Section 127.449(relatingto demininiiis emission increases)
(5) Section 127.450(relatingto administrativeoperatingpermitamendments)
(6) Section127.462 (relatingto minor operatingpermit amendments)
(7) SubchapterH (relating to generalplanapprovalsandoperatingpermits)
(b) Unlessprecludedby the CleanAir Act or theregulationsadoptedthereunder,thepermitshield authorizedunder25 Pa.Code§ 127.516shall extend tooperationalflexibility changesmadeat this Title Vfacility pursuantto this permitcondition andotherapplicableoperationalflexibility termsand conditionsof this permit.
#026 [25Pa. Code§§127.441(d),127.512(i)and40 CER Part 68]RiskManagement
(a) If requiredby Section112(r) of theCleanAir Act, thepermitteeshalldevelopandimplementan accidentalreleaseprogramconsistentwithrequirementsof theCleanAir Act, 40 CFRPart68 (relatingto chemicalaccidentpreventionprovisions)andtheChemicalSafetyInformation,SiteSecurityandFuels RegulatoryReviewAct(P.L. 106-40).
(b) Thepermitteeshall prepare andimplementaRisk ManagementPlan(RMP)which meetstherequirementsof Section112(r) of theCleanAirAct, 40 CFRPart68 andtheChemicalSafetyInformation,SiteSecurityandFuels RegulatoryReviewAct whena regulatedsubstancelisted in 40CFR§ 68.130is presentin aprocessin morethanthe listedthresholdquantityat theTitle V facility. Thepermitteeshall prepare andimplementtheRMP according tothe following scheduleandrequirements:
(1) Thepermitteeshall submit thefirst RMP to acentralpointspecifiedby EPA no later thanthe latestof the following:
(i) June21, 1999;
(ii) Threeyearsafterthedateon whicharegulatedsubstanceis
first listed under§ 68.130; or
(iii) The dateon which aregulatedsubstanceis first present
aboveathresholdquantityin a process.
(2) The permitteeshallsubmit anyadditionalrelevantinformationrequestedby theDepartmentor EPA concerningtheRMP and shallmakesubsequentsubmissionsof RiVIPs in accordancewith 40 CFR§ 68.190.
(3) The permitteeshall certify that theRMP is accurate andcompletein accordancewith therequirementsof 40 CFRPart68, including achecklistaddressingtherequired elementsof acompleteRMP.
I I(c) As usedin this permitcondition, theterm “process”shallbe asdefinedin 40 CFR§ 68.3. Theterm “process”meansanyactivityinvolving aregulatedsubstanceincluding any use,storage,manufacturing, handling,or on-site movementof suchsubstancesoranycombinationof theseactivities. For purposesofthis definition, anygroupofvesselsthatareinterconnected,or separatevesselsthat arelocatedsuchthataregulatedsubstancecouldbeinvolved in apotentialrelease,shallbe considereda singleprocess.
(d) If theTitle V facility is subjectto 40 CFR Part68, as partof thecertificationrequiredunderthis permit, thepermitteeshall:
(1) Submitacomplianceschedulefor satisfyingtherequirements40CFRPart68 by thedatespecffiedin 40 CFR§ 68.10(a);or
(2) Certify that theTitle V facility is in compliancewith allrequirementsof 40 CFRPart68 includingthe registrationandsubmissionof theRMP.
(e) If theTitle V facility is subjectto 40 CFRPart68, thepermitteeshallmaintainrecordssupportingthe implementationof an accidentalrelease programfor five yearsin accordancewith 40 CFR§ 68.200.
(1) WhentheTitle V facility is subjectto theaccidentalreleaseprogramrequirementsof Section112(r) ofthe CleanAir Act and40 CFRPart68, appropriateenforcementactionwill be takenby theDepartmentif:
(1) Thepermittee failsto registerand submit the EMP or a revisedplanpursuantto 40 CFRPart68.
(2), Thepennitteefails to submitacompliancescheduleor includeastatementin thecompliancecertfficationrequiredunderCondition#24ofSectionB of this Title V permit that theTitle V facility is incompliancewith therequirementsof Section112(r) of theCleanAir Act,40 CFRPart 68, and25 Pa.Code§ 127.512(i).
#027 [25Pa. Code§ 127.512(e)]ApprovedEconomic IncentivesandEmission TradingPrograms
No permit revisionshall be requiredunderapprovedeconomic incentives,marketablepermits, emissionstradingand othersimilar programsorprocessesfor changesthatareprovidedfor in this Title V permit.
(a) The permittee’s compliancewith theconditionsofthis permit shallbe deemed incompliancewith applicablerequirements(as definedin 25Pa.Code§121.1) as ofthedateof permitissuanceif either of thefollowing applies:
(1) The applicablerequirementsareincludedandarespecificallyidentified inthis permit.
(2) TheDepartmentspecificallyidentifiesin thepermitotherrequirementsthat arenot applicable tothepermittedfacility.
(b) Nothing in25 Pa.Code§ 127.516 or theTitle V permitshall alteror affectthe following:
(1) TheprovisionsofSection303 of theCleanAir Act, includingtheauthorityof theAdministratorof theEPA providedthereunder.
(2) The liability of thepermitteefor aviolation of anapplicablerequirement priorto the time of permitissuance.
(3) The applicablerequirementsof theacid rain program,consistentwith Section408(a)of theCleanAir Act.
(4) The ability of theEPA to obtaininformation from thepermitteeunderSection114 of theCleanAir Act.
(c) Unlessprecludedby theCleanAir Act or regulationsthereunder,final actionby theDepartmenton minoror significantpermitmodifications,andoperationalflexibility changesshallbe covered bythepermit shield. Upontakingfinal actiongrantingarequestfor anadministrativepermitamendment,theDepartmentwill allow coverageoftheamendmentby thepermit shield in § 127.516for administrativeamendmentswhich meettherelevantrequirementsof 25 Pa. CodeArticleIII.
(d) Thepermit shield authorizedunder§ 127.516is in effect for thepermit termsandconditionsin thisTitle V permit, includingadministrative operatingpermit amendmentsandminor operatingpermitmodifications.
#028 [25Pa. Code§§ 127.516, 127.450(d),127.449(f)& 127.462(g)]Permit Shield
I. RESTRICTIONS.
Emission Limitation(s).#001 [25 Pa. Code§123.1]Prohibition of certainfugitive emissions
(a) No personmaypermittheemissioninto the outdoor atmosphereoffugitive air contaminantfrom asourceotherthanthe following:
(1) Constructionor demolitionof buildingsor structures.
(2) Grading,pavingandmaintenanceof roadsand streets.
(3) Useof roadsandstreets.Emissionsfrom materialin or ontrucks, railroadcarsandothervehicularequipmentarenot consideredasemissionsfrom useof roadsandstreets.
(4) Clearingof land.
(5) Stockpiling of materials.
(6) Openburning operations.
(7) Sourcesand classesof sources otherthan thoseidentified inparagraphs(1)-(6), for which theoperatorhasobtainedadeterminationfrom theDepartmentthat fugitive emissions fromthesource,afterappropriatecontrol, meetthe following requirements:
(i) theemissionsareof minorsignificancewith respecttocausingair pollution; and
(ii) theemissionsarenot preventingor interferingwith theattainmentor maintenanceof anyambientair quality standard.
(b) An applicationform for requestinga determinationundereither“~subsection(a)(9) or 129.15(c)is availablefrom theDepartment.Inreviewingtheseapplications,theDepartment may requirethe applicanttosupplyinformationincluding, but not limited to, adescriptionofproposed controlmeasures,characteristicsof emissions,quantityofemissions,andambientair quality dataandanalysisshowingtheimpactofthesourceon ambientair quality. The applicantshallbe requiredtodemonstratethat the~requirementsof subsections(a)(9) and(c) and 123.2(relating to fugitive particulatematter)or of the requirementsof129.15(c)havebeensatisfied. Uponsuchdemonstration,theDepartmentwill issueadetermination,in writing, eitherasan operatingpermitcondition, for thosesourcessubjectto permitrequirementsunder theact, or asan ordercontainingappropriateconditionsandlimitations.
(c) A personresponsiblefor anysourcespecifiedin subsections(a)(1) -- (6) or (7) shall takeall reasonableactionsto preventparticulatematterfrom becomingairborne.Theseactionsshall include,but not be limitedto, the following:
(1) Use,wherepossible,ofwateror chemicalsfor control of dustin thedemolitionofbuildingsorstructures,constructionoperations,thegradingof roads,or theclearing ofland.
(2) Application ofasphalt,oil, wateror suitablechemicalson dirtroads,materialstockpilesandothersurfaceswhich maygive rise toairbornedusts.
(3) Pavingandmaintenanceof roadways.
(4) Promptremovalofearthor othermaterialfrom pavedstreetsontowhich earthorothermaterialhasbeentransportedby trucking orearthmovingequipment,erosionby water, or othermeans.
#002 [25 Pa. Code §123.13]Processes
Particulatematteremissionsinto theoutdooratmospherefrom thissourceat thisfacility shallnot exceed0.04 grains/dscfasspecifiedin25 Pa. Code 123.13(c)(1)(i).
#003 [25 Pa. Code §123.21]General
No personmaypermit the emissioninto the outdooratmosphereofsulfur oxidesfrom asourcein amannerthat theconcentrationof thesulfuroxides,expressedas802, in the effluent gasexceeds500partspermillion, by volume,dry basis.
#004 [25 Pa. Code§123.22]CombustionunitsIn accordancewith 123.22(c)(1)Generalprovisions. No personmaypermitthe emissioninto theoutdooratmosphereof sulfur oxides,expressedas802, from anycombustionunit, at anytime, in excessof therateof 3poundspermillion Btu of heat inputoverany 1-hourperiod.
#005 [25 Pa. Code§123.31]Limitations
A personmaynotpermit theemissioninto the outdooratmosphereofanymalodorousair contaminantsfrom anysourcem suchamannerthat themalodorsaredetectableoutsidethepropertyofthepersonon whoselandthesource isbeingoperated.
#006 [25 Pa. Code§127.12b]Plan approval termsand conditions.VOC emissionsfrom theoperationof bothcoatinglines (eastandwestbay) shallnot exceed39 tonsin any 12 consecutivemonthperiod.
#007 [25 Pa. Code§127.441]Operatingpermit termsandconditions.
In accordancewith OperatingPermit#56-307-00 iF,Condition#4, Steelproductionfrom the following sources shallnot exceedthenumberslistedbelowin any 12 consecutivemonthperiod.
EAF & LMS - 190,000tonsof steelperyearOxygenConverter- 80,000tonsof steelperyearInductionFurnace- 10,000tonsof steelperyear.
#008 [25 Pa. Code§127.441]Operatingpermit termsand conditions.In accordancewith OperatingPermit#56-307-OGiF,Condition #5,Facffity-wideemissionsshallnot exceedthefollowing amountsin anyconsecutive12 monthperiod.
FACILITY WIDE EMISSIONLIMITATIONS:
Pollutant Yearly Limit
Co 275tpyNOx 80 tpyVOC 40 tpyPM1O 64.4tpySOx 4otpyLead 1 tpy
#009 [25Pa. Code§127.441]Operatingpermit termsand conditions.In accordancewith OperatingPermit 56-307-00iF, Condition #10,“Opacityfrom facility baghousesshallbe limited to 10%.”
#010 [25Pa. Code§129.14]Open burning operations
(a) Air basins.No personmay permittheopenburning ofmaterial inan airbasin.
(c) Exceptions:Therequirementsof subsections(a) and(b) do notapplywheretheopenburningoperationsresultfrom:
(1) A fire set to preventor abateafire hazard,whenapprovedbytheDepartmentandsetby or under thesupervisionof apublic officer.
(2) A fire setfor thepurposeof instructing personnelin firefighting, whenapprovedby theDepartment.
(3) A fire set for thepreventionandcontrolof diseaseor pests,whenapprovedby theDepartment.
(4) A fire setin conjunctionwith theproductionof agriculturalcommoditiesin theirunmanufacturedstateon thepremisesof thefarmoperation.
(5) A fire setfor thepurposeof burningdomesticrefuse,whenthefire is on thepremisesof a structureoccupiedsolelyas adwelling bytwo familiesor lessandwhentherefuseresultsfrom thenormaloccupancyof suchstructure.
(6) A fire setsolely for recreationalor ceremonialpurposes.
(7) A fire setsolely forcookingfood.
(d) Clearingandgrubbingwastes.Thefollowing is applicableto
clearingandgrubbingwastes:
(1) As usedin this subsectionthefollowing termsshall havethe
following meanings:
Air curtain destructor-- A mechanicaldevicewhich forcefully projectsacurtain of air acrossapit in which openburningis beingconductedsothat combustionefficiencyis increasedandsmokeandother particulatematterarecontained.
Clearingandgrubbing wastes-- Trees,shrubs,andothernativevegetationwhich areclearedfrom landduringor prior to theprocessofconstruction.Thetermdoesnot include demolitionwastesanddirt ladenroots.
(2) Subsection(a) notwithstanding,clearingandgrubbing wastesmay beburnedin abasinsubjectto thefollowing requirements:
(i) Air curtain destructorsshallbeusedwhenburningclearingandgrubbingwastes.
(ii) Eachproposeduseof air curtaindestructorsshallbereviewedandapprovedby theDepartmentin writing with respecttoequipmentarrangement,designandexistingenvironmentalconditions priorto commencementof burning.Proposalsapprovedunderthis subparagraphneednotobtainplanapprovalor operatingpermitsunderChapter127(relatingto constructionmodification, reactivationandoperationofsources).
(iii) Approval foruseof an air curtaindestructorat one sitemay begrantedfor a specified periodnot to exceed3 months,but maybeextendedfor additional limited periodsupon further approvalby theDepartment.
(iv) The Department reservestheright to rescindapprovalgrantedif adeterminationby theDepartment indicatesthat an airpollutionproblemexists.
(3) Subsection(b) notwithstandingclearingandgrubbingwastesmaybeburnedoutsideof an airbasin,subjectto thefollowing limitations:
(i) Upon receiptof acomplaintor determinationby theDepartmentthat an air pollutionproblemexists,theDepartmentmayorderthat theopenburningceaseor complywith subsection(b) of this section.
(ii) Authorizationfor openburningunderthis paragraphdoesnot applyto clearingandgrubbingwastestransportedfrom an airbasinfor disposal outsideof an airbasin.
(4) During anair pollution episode,openburningis limited byChapter137 (relatingto air pollutionepisodes)andshallceaseasspecifiedin suchchapter.
II. TESTING REQUIREMENTS.#011 [25 Pa. Code§127.441]Operatingpermit termsandconditions.
The owner/operator shallutilize aportableanalyzerto measureemissionrateson an annualbasis(for NOx, VOC, andCO) for sourceswith ratedgrossheat inputsbetween20-50MMBTU/Hr andwhich operate750hoursormoreper 12 consecutivemonthperiod.
III. MONITORING REQUIREMENTS.#012 [25 Pa. Code§123.43]Measuring techniques
Visible emissions maybe measuredusing eitherof the following:
(1) A deviceapprovedby theDepartmentandmaintainedto provideaccurateopacitymeasurements.
(2) Observers,trainedandqualified to measureplumeopacitywith thenakedeye orwith theaid of anydevicesapprovedby theDepartment.
#013 [25 Pa. Code§127.441]Operatingpermit termsand conditions.
To coincidewith presumptivePACT, sourceswith ratedgrossheatinputsof lessthan20 mmbtu/hrwould qualify for no direct emissionsourcemeasurement.At aminimum, themostcurrentAP-42emission factorsalongwith recordsfo fuel consumptionshallbeusedto calculateandverifyemissionrates. This is theacceptable methodfor naturalgasandoil-fired sources.
IV. RECORDKEEPING REQUIREMENTS.#014 [25 Pa. Code §127.12b]Plan approval terms and conditions.All VOC andHAP emissionsfrom thesprayboothsshallbedeterminedandrecorded. Theserecordsshall be maintainedfor a minimumof two yearsat the facility.
#015 [25 Pa. Code§127.441]Operatingpermit termsand conditions.
The owner/operator shall,at aminimum, verify compliancewith theSulfurOxideslimitation of 500partspermi]lion by compilingandmaintainingrecordsof fuel usage,throughput,operation schedule,andthemostrecentandappropriateAP-42emission factors.
#016 [25 Pa. Code §127.441]Operatingpermit termsand conditions.In accordancewith OperatingPermit56-307-00iF, Condition#6, ‘Theowner/operatorshall keepdaily recordsof steelproductionfrom thefollowing: EAF/LMS, OxygenConverter,and InductionFurnace.Theserecordsshall bekept on site for aperiod of two yearsandbe madeavailableto theDepartmentupon request.”
#017 [25Pa. Code§135.21]Emission statements
(a) The Owner/Operatorshall submitby March 1 of eachyearasourcereportfor thepreceding calendaryear. Thereport shall includeinformationfor all previously reportedsources, newsourceswhich werefirst operatedduringtheproceedingcalendar yearandsourcesmodffiedduringthesameperiod whichwerenotpreviouslyreported.
(b) The sourceowneror operatormayrequestan extensionof time fromtheDepartmentfor the filing of a source report,andtheDepartmentmaygranttheextensionfor reasonablecause.
V. REPORTING REQUIREMENTS.#018 [25 Pa. Code§127.441]Operatingpermit termsandconditions.[a]The permitteeshall reportto theDepartmenteachmalfunctionthatoccursat theTitle V facffity. As definedin 40 CFR60.2andincorporatedby referencein 25 Pa.CodeChapter122,ama]functionmeansanysudden,infrequent,andnot reasonably preventablefailure of airpollution controlequipement,processequipmentor aprocessto operatein anormalor usualmanner. Failuresthatarecausedin partby poormaintenanceor carelessoperationarenotmalfunctions.
[bi Whenthema]functionposesanimminentand substantialdangerto thepublichealthandsafetyor potentialharmto theenvironment,thenotification shallbe submittedto theDepartmentno later thanonehouraftertheincident.
[ci Unlessotherwiserequiredby speefficreportingrequirements,anymalfunctionthat is not subjectto thenoticerequirementsof subsection[bi of this permitconditionshall be reportedto the Departmentwithin24 hours[or thenextbusinessday] of discoveryof themalfunction.
[11The permitteeshallnotify theRegional AirProgram Managerwithin4 hours[or thenextbusinessday] of becomingaware oftheoccurrenceofexcess emissions whichlast for morethan4 hoursandwhich resultfrom amalfunction,abreakdwonof processor control equipmentor anyabnormalcondition.
The noticeshalldescribe the:
(i) nameandlocationof the facility.
(ii) natureandcauseof themalfunctionor breakdown;
(iii) time whenthe malfunctionor brekdownwas firstobserved;
(iv) expecteddurationof excess emissions;and
(v) estimatedrateof emissions.
[21The permitteeshallnotify theDepartmentimmediatelywhen
correctivemeasureshavebeenaccomplished.
[3] Subsequentto themalfunction, thepermitteeshallsubmitafull
report on themalfunctionto theDepartment within15 days, if requested.
[4] Thepermitteeshallsubmitreportson the operationandmaintenanceof thesourceto theRegional AirProgramManagerat suchintervalsandin suchform anddetailasmayberequiredby theDepartment. Informationrequiredin thereportsmayinclude,but is notlimited to, processweightrates,firing rates,hoursof operation,andmaintenance schedules.
#019 [25 Pa. Code§135.3]Reporting
(a) The ownerand/oroperatorshall submitby March 1 of eachyearasourcereportfor theprecedingcalendaryear.The report shall includeinformationfor all previously reportedsources,newsourceswhich werefirst operatedduring theproceedingcalendaryearand sourcesmodffiedduringthesameperiodwhich werenotpreviouslyreported.
(b) A sourceowneror operatormay request anextensionoftime fromtheDepartmentfor thefiling of asource report,andtheDepartmentmaygranttheextensionfor reasonablecause.
VI. WORK PRACTICE STANDARDS.#020 [25 Pa. Code §12 7. 12b]Plan approval terms and conditions.In accordancewith PlanApproval 04-227A,“The owner/operator shall notusea material containingVOCs (solvent)for clean-upacitiviesinvolvingspraygunsand/orspraybooths.”
#021 [25 Pa. Code§127.12b]Plan approvaltermsand conditions.In accordancewith PlanApproval 04-227A,“All coatingsused atthe twosprayboothsshall be appliedwith HVLP paint spraygunsor otherdeviceswith anequivalenttransferefficiency.’’
VII. ADDITIONAL REQUIREMENTS.#022 [25 Pa. Code§127.12b]Plan approval termsand conditions.Theemissionsreductionsofthe targetedcontaminantsbelowthe levelsspecifiedin this approvalwhich areachievedby optimizingtheeffectivenessof equipmentarenot surplusemission reductions,and shallnot beusedto generateemissionreductioncredits. In orderfor theemissionreductionsto be creditable,theemissionreductionsmustsatisfytherequirementsof 25 Pa. CodeSection127SubchapterE.
#023 [25 Pa. Code §127.83]Adoption ofprogram.
ThePreventionof SignificantDeteriorationrequirementspromulgatedin 40 CFR52 bytheAdministratorof theEPAundersection161 of theCleanAir Act (42 U.S.C.A. 7471) areadoptedin theirentirelyby theDepartmentandincorporatedhereinby reference.The adoptionof theserequirements supplementstherequirementsofthis chapteranddoesnotsupersedeor rescindrequirementsof theactor this article.Theterm“Administrator” usedin 40 CFR52.21(b)(17), (fi(1)(v), (3) and(4)(i) (g)(l) -- (6), (1)(2), (p)(l) and (2) and (t) meanstheAdministrator of theEPA. Theterm“Administrator” usedin 40 CFR52.21(b)(3) (iii), (r) (2) and (w) (2) meanstheAdministratorof theEPA or theSecretaryof theDepartment.Theterm“Administrator” means
theDepartmentin all otherportionsof 40 CFR52.21.
#024 [25 Pa. Code §137.4]Standby plans
(a) This section appliesto thefollowing classesof sourceslocatedin thecountiesidentifiedin subsection(b):
(1) Coal or oil-fired electricgeneratingfacilities.
(2) Coal or oil-fired steamgeneratingfacilities ratedat morethan
100million Btu perhourof heatinput.(3) Manufacturingindustriesofthefollowing classificationswhich
employmorethan 20 employeesat any onelocation:
(i) Primaryandsecondarymetalsindustries.
(ii) Petroleumrefining andrelatedindustries.
(iii) Chemicalandallied productsindustries.
(iv) Paperandalliedproductsindustries.
(v) Glass, clayandconcreteproductsindustries.
(4) Municipal andcommercialrefusedisposalandsalvageoperationsotherthan incineratorsratedat lessthan 1,000poundsperhourofrefuse.
(5) Othersourcesdeterminedto be of significanceby theDepartment.Thepersonsresponsiblefor thesourceswill be so advisedbytheDepartment.
(b) TheDepartmentwill annuallyclassifyeachcountyasan arearequiringastandby plan basedon monitoredexceedanceofthe followingcriteria:
S02--0.02 p.p.m.,annualarithmeticmean;0.1. p.p.m.,24-hourmaximum,0.5 p.p.m.,maximum3-houraverage.
PM1O -- 60 [mgr ]g/m3, annualgeometricmean;150 [mgr Ig/m~3, 24-hourmaximum.
CO -- 48 p.p.m., 1-hourmaximum; 12 p.p.m.,8-hourmaximum.
N02 -- 0.06p.p.m.,annualarthmetic mean.
Ozone-- 0.10p.p.m., 1-hourmaximum.
(c) A personresponsiblefor theoperation ofa sourceidentifiedinsubsection(a) andlocatedin acountyclassifiedin subsection(b) asrequiringastandbyplan shall preparestandbyplansfor reducingtheemissionof air contaminantsfrom thatsourceduringalert, warningandemergencylevels.Theplansshallbe designedto reduceor eliminatetheemissions ofair contaminantsin accordancewith the objectivesin137.11-137.14(relating to level actions).Theplansshallbe in writingonforms publishedanddistributedby theDepartmentandshall identifytheapproximateamountof reductionof variousair contaminantsandadescriptionof themaimerin which thereductionswill beachieved.
(d) If theDepartmentdeterminesthatastandbyplandoesnotprovidefor effectivelyachievingtheobjectivesin 137.11-137.14,theDepartmentmaydisapprovetheplan, stateits reasonsfor the disapprovalandeitherorderthepreparationof anamendedplanwithin atime periodspecifiedin theorderor issue,by order,aplan to replacethedisapprovedplan.
(e) The Departmentmay amendorotherwisechangeastandby planif itdeterminesthatgoodcauseexistsfor theaction.An amendmentor changewill bein writing andwill beaccompaniedby anoticeof sufficientcausefor theaction.
(f) Duringaforecast,alert, warningor emergencylevel, thestandbyplan shallbe madeavailableby thepersonresponsiblefor thesourcetoemployeesof theDepartmenton thepremisesof thesource.
VIII. COMPLIANCE CERTIFICATION.No additionalcompliancecertifications existexceptasprovidedin othersectionsofthis permitincluding SectionB (relating to Title V GeneralRequirements).
IX. COMPLIANCE SCHEDULE.No compliancemilestonesexist.
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 031
SourceName:BOILER #1
SOURCECAPACITY: 20.0MMBTU
Comb EP
031 - - >S09
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexistexceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 101
SourceName:ELECTRIC FURNACENO 1
SOURCECAPACITY:
Proc CD EP
101 - ->CO1 - ->SO1
CD EP
- - >C02 - - >S02
CD EP
- - >C03 - - >S03
I. RESTRICTIONS.
Emission Limitation(s).#001 [25 Pa. Code§127.4411Operatingpermit termsand conditions.In accordancewith OperatingPermit#56-307-00iF, Condition#8,“Emissionsof particulatematterfrom theEAF baghouseshall belimitedto .0052gr/dscf.”
#002 [25 Pa. Code §127.4411Operatingpermit termsand conditions.
In accordancewith OperatingPermit 56-307-00iF, Condition#9, Emissionsfrom theEAF shallnot exceedthefollowing:
CarbonMonoxide - 80 lbs/hr.Nitrogen Oxides- 20 lbs/hr.Volatile OrganicCompounds- 12 lbs/hr.Sulfur Dioxides - 12 lbs/hr.PM1O - 8 lbs/hr.
#003 [40 CERPart 60 Standards of Performance for New StationarySources§40CER 60.121Subpart A - General ProvisionsCircumvention.No owner oroperatorsubjectto theprovisionsof this part shallbuild,erect, install,or useanyarticle, machine,equipmentorprocess,theuseofwhich concealsan emissionwhich would otherwiseconstituteaviolation of an applicablestandard.Such concealmentincludes,but isnot limited to, theuseofgaseousdiluentsto achievecompliancewith anopacitystandardorwith a standardwhich is basedon theconcentrationof apollutant in thegasesdischargedto theatmosphere.
#004 [40 CER Part 60 StandardsofPerformancefor NewStationary Sources §40CER 60.2 72a]SubpartAAa- Standardsof Performancefor SteelPlants: Electric Arc Furnacesand Argon-OStandardfor particulatematter.
(a) Onandafter thedateof which theperformancetestrequiredto beconductedby 60.8is completed,no owneror operatorsubjectto theprovisionsof this subpartshall causeto be dischargedinto theatmospherefrom anEAF oranAOD vesselanygaseswhich:
(1) Exit from acontroldeviceandcontainparticulatematterinexcessof 12 mg/dscm(0.0052gr/dscfi;
(2) Exit from acontroldeviceandexhibit 3 percentopacityorgreater;and
(3) Exit from ashopand,duesolely to theoperationsofany affectedEAF(s) orAOD vessel(s),exhibit 6percent opacityor greater.
(b) Onandafter thedateon which theperformancetestrequiredto beconductedby 60.8 is completed,no owneror operator subjectto theprovisionsof this subpartshallcauseto be dischargedinto theatmospherefrom thedust-handlingsystemanygasesthatexhibit 10percentopacityor greater.
II. TESTING REQUIREMENTS.#005 [25 Pa. Code §127.4411Operatingpermit termsand conditions.In accordancewith OperatingPermit56-307-001F, Condition #12, “Stacktestingshall be conductedon theEAF baghouseonceeveryfive years,prior to permitrenewal,for the following pollutants: NOx, CO,S02,VOC, andPM10.”
#006 [25 Pa. Code §127.441]Operatingpermit termsand conditions.In accordancewith OperatingPermit56-307-00iF, Condition#14, “Twocopiesof apre-testprotocolshallbe submittedto theDepartmentforreviewatleastsixty daysprior to theperformanceof thestacktest.”
#007 [25 Pa. Code §127.441]Operatingpermit terms and conditions.In accordancewith OperatingPermit56-307-00iF, Condition#15, “TheDepartmentshallbe notified at leasttwo weeksprior to thestacktestof thedateandtime of the testsothat anobservermay bepresent.”
#008 [40 CFR Part 60Standardsof Performancefor NewStationary Sources§40 CFR 60.275a1SubpartAAa - StandardsofPerformancefor Steel Plants: Electric Arc FurnacesandArgon-OTestmethodsandprocedures.
(a) During performancetestsrequiredin 60.8, theowneror operatorshallnotaddgaseous diluentsto theeffluent gas stream afterthefabric in anypressurizedfabric filter collector,unlesstheamountofdilution is separatelydeterminedandconsideredin thedeterminationofemissions.
(b) Whenemissionsfrom anyEAF(s) orAOD vessel(s)arecombinedwithemissionsfrom facffities not subjectto theprovisionsof this subpartbut controlledby acommoncapturesystemandcontroldevice,theowneror operatorshall use eitherorboth of thefollowing proceduresduringaperformancetest (seealso60.276a(e)):
(1) Determinecomplianceusingthecombined emissions.
(2) Useamethodthat is acceptableto theAdministratorandthatcompensatesfor theemissionsfrom thefacilities not subjectto theprovisionsof this subpart.
(c) When emissionfrom anyEAF(s) orAOD vessel(s)arecombinedwithemissionsfrom facilities not subjectto theprovisionsofthis subpart,theowneror operatorshall demonstratecompliancewith 60.272(a)(3)basedon emissionsfrom only theaffectedfaciility(ies).
(d) In conductingtheperformancetestsrequiredin 60.8, theowneroroperatorshall useasreferencemethodsandproceduresthe testmethodsin appendixA of this part or othermethodsandproceduresasspecifiedin this section,exceptasprovidedin 60.8(b).
(e) The owneror operatorshall determine compliancewith theparticulatematterstandardsin 60.272aasfollows:
(1) Method 5 shall beusedfor negative-pressurefabric filters andothertypesof controldevicesandMethodSD shallbeusedforpositive-pressurefabric filters todeterminetheparticulatematterconcentrationandvolumetricflow rateof theeffluent gas. Thesamplingtime andsamplevolume for eachrun shall be at least4 hoursand4.50dscm(160dscf)and,whena singleEAF orAOD vessel issampled,the
samplingtime shall includean integralnumber ofheats.
(2) When morethanonecontroldeviceservestheEAF(s) beingtested,theconcentrationofparticulatemattershallbe determinedusingthefollowing equation:
n ncst = [ (csiQsdi)I/ Qsdi
i=1 i=1
where:cst=averageconcentrationof particulatematter,mg/dscm(gr/dscf).csi=concentrationof particulatematterfrom controldevice“i”,
mg/dscm(gr/dscio.n=totalnumberof controldevicestested.Qsdi=volumetricflow rateof stackgasfrom controldevice“i”,
dscm/hr(dscf/hr).
(3) Method9 andtheproceduresof 60.11 shallbe usedto determineopacity.
(4) To demonstratecompliancewith 60.272a(a)(1),(2), and(3), thetestrunsshallbe conducted concurrently,unlessinclementweatherinterferes.
(1) To complywith 60.274a(c),(f), (g), and(h), the owneroroperatorshall obtainthe informationrequiredin theseparagraphs duringtheparticulatematterruns.
(g) Any control devicesubjectto theprovisionsof the subpartshallbe designedand constructedto allow measurementof emissions usingapplicabletest methods andprocedures.
(li) Whereemissionsfrom anyEAF(s) or AOD vessel(s)arecombinedwithemissionsfrom facilities not subjectto theprovisionsof this subpart
but controlledby acommoncapturesystemandcontroldevice, theowneror operatormayuseanyof the following proceduresduringaperformancetest:
(1) Basecomplianceon control of thecombined emissions;
(2) Utilize amethodacceptableto theAdministratorthatcompensatesfor theemissionsfrom thefacilities not subjectto theprovisionsofthis subpart,or;
(3) Any combinationof thecriteriaofparagraphs(h)(1) and(h)(2) ofthis section.
(i) Whereemissionsfrom anyEAF(s) or AOD vessel(s)arecombinedwithemissionsfrom facilities not subjectto theprovisionsofthis subpart,determinationsofcompliance with60.272a(a)(3)will only bebaseduponemissionsoriginatingfrom theaffectedfacility(ies).
(j) Unlessthepresenceof inclementweather makesconcurrenttestinginfeasible,theowneror operatorshallconduct concurrentlytheperformancetestsrequiredunder60.8 to demonstratecompliancewith60.272a(a)(1),(2), and(3) of this subpart.
III. MONITORING REQUIREMENTS.#009 [25 Pa. Code §127.441]Operating permit terms and conditions.
The owner/operatorshall utilize aportable analyzerto measureemissionratesfrom this EAF (for NOx,VOC,andCO) onceper 12 consecutivemonthperiod.
#010 [25Pa. Code §127.441]Operatingpermit termsand conditions.FirstMiss shallcontinuouslymonitorandrecordthe temperatureat thebaghouseinlet. The readoutfrom this monitorshall be availablein thespectrometerlabwhich will bemannedduringthe furnaceoperation. Ifthe labis notmannedthenit shall bereadat thefurnacecontrolroom.
#011 [25 Pa. Code §127.441]Operatingpermit terms and conditions.
Theowner/operator shalltakedaily opacityreadingsby following EPAMethod9. A minimum of twenty-fourobservationsshallbe taken. Theseobservationsshallalsotakeplaceconcurrentlyduringstacktestsunlessinclementweatherinterferes.
#012 [40 CER Part 60 StandardsofPerformancefor NewStationary Sources§40 CFR 60.273a]Subpart AAa- Standardsof Performancefor SteelPlants: ElectricArc FurnacesandArgon-OEmissionmonitoring.
(a) Exceptasprovidedunderparagraphs(b) and(c) of this section,acontinuousmonitoringsystemfor themeasurementof theopacityofemissions dischargedinto theatmospherefrom thecontroldevice(s)shallbe installed, calibrated,maintained,andoperatedby theowneroroperatorsubjectto theprovisionsof this subpart.
(b) No continuousmonitoringsystemshall berequiredon any controldeviceservingthedust-handlingsystem.
(c) A continuousmonitoringsystemfor themeasurementofopacity isnot requiredon modular, multiple-stack,negative-pressureorpositive-pressurefabric filters if observationsof theopacityof thevisibleemissionsfrom thecontroldeviceareperformedby acertifiedvisible emissionobserverasfollows: Visible emissionobservationsareconductedat leastonceperday whenthefurnaceis operatingin themeltingandrefining period.Theseobservationsshall betakeninaccordancewith Method 9, and, for at leastthree6-minuteperiods,theopacityshallbe recordedfor anypoint(s)wherevisible emissionsareobserved.Whereit is possibleto determinethatanumberofvisibleemissionsites relateto only oneincidentofthevisible emissions,onlyonesetof three6-minuteobservationswill be required.In this case,Method9 observationsmustbemadefor thesite ofhighestopacitythatdirectly relatesto thecause(or location)of visibleemissions observedduring asingle incident. Recordsshall be maintainedof any 6-minuteaveragethat is in excessof theemissionlimit specifiedin 60.272a(a)of this subpart.
#013 [40 CFRPart 60 Standards of Performance for NewStationary Sources§40 CFR 60.274aJSubpart AAa - Standardsof Performancefor Steel Plants: Electric ArcFurnaces andArgon-OMonitoring of operations.
(a) The owneror operatorsubjectto theprovisionsofthis subpartshall maintainrecordsofthe following information:
(1) All dataobtainedunderparagraph(b) of this section;and
(2) All monthlyoperationalstatusinspectionsperformedunderparagraph(c) of this section.
(b) Exceptasprovidedunderparagraph(d) of this section,theowneror operatorsubjectto the provisionsof this subpartshall check andrecordon aonce-per-shiftbasisthefurnace static pressure(if DECsystemis in use)andeither (1) checkandrecordthecontrol systemfan
motoramperesanddamperpositionon aonce-per-shiftbasis;or (2)install, calibrate,andmaintainamonitoringdevicethatcontinuouslyrecordsthevolumetric flow ratethrougheach separatelyductedhood.Themonitoringdevice(s)may beinstalledin anyappropriate locationin theexhaustductsuchthat reproducibleflow ratemonitoringwill result.Theflow ratemonitoringdevice(s)shall haveanaccuracyof 10 percentoverits normaloperatingrangeandshall becalibratedaccordingto themanufacturer’sinstructions.TheAdministratormayrequiretheowneroroperatorto demonstratetheaccuracyof themonitoringdevice(s)relativeto Methods1 and2 of appendixA of thispart.
(c) When theowneror operatorof anaffectedfacility is requiredtodemonstratecompliancewith thestandardsunder60.272a(a)(3)and atanyothertime theAdministrator may requirethat (undersection114 of theAct, asamended)eitherthecontrol systemfan motor amperesandalldamperpositionsor thevolumetric flow ratethrough eachseparatelyductedhood shallbe determinedduring all periodsin which ahoodisoperatedfor thepurposeof capturing emissionsfrom theaffectedfacility subjectto paragraph(b)(1) or (b)(2) of this section.Theowneror operatormay petitiontheAdministratorfor reestablishmentof theseparameterswhenevertheowneror operatorcandemonstrateto theAdministrator’ssatisfactionthattheaffectedfacility operatingconditionsuponwhich theparameterswerepreviouslyestablishedarenolonger applicable.Thevaluesoftheseparametersasdeterminedduringthemost recentdemonstrationof complianceshallbe maintainedat theappropriatelevel for eachapplicableperiod. Operationat otherthanbaselinevaluesmaybe subjectto therequirementsof paragraph276a(c).
(d) The owneror operatorshall performmonthly operationalstatusinspectionsof theequipmentthatis importantto theperfonnanceof thetotal capturesystem(i.e., pressuresensors, dampers,anddamperswitches).This inspectionshall includeobservationsof thephysicalappearanceofthe equipment(e.g.,presenceofholesin ductworkorhoods,flow constrictions causedby dentsor accumulateddustinductwork, andfan erosion).Any deficienciesshallbe notedandpropermaintenanceperformed.
(e) The owneror operatormay petitiontheAdministratorto approveanyalternativeto monthly operationalstatusinspectionsthatwillprovideacontinuousrecordof theoperationof each emissioncapturesystem.
(g) Whentheowneror operatorof an EAF controlledby aDEC isrequiredto demonstratecompliancewith thestandardunder60.272a(a)(3)of this subpart,and atanyothertime theAdministrator mayrequire(undersection114 of the CleanAir Act, asamended),the pressurein thefreespaceinside the furnaceshall be determinedduringthemelting and
refining period(s)usingthemonitoringdevicerequiredunderparagraph(I) ofthis section. The owneror operatormay petitiontheAdministratorfor reestablishmentof the 15-minuteintegratedaverageofthepressurewhenevertheowneror operatorcandemonstrateto theAdministrator’ssatisfactionthat theEAF operatingconditionsuponwhich the pressureswerepreviouslyestablishedareno longerapplicable.The pressuredeterminedduringthemost recent demonstrationof complianceshall bemaintainedat all times whentheEM’ is operatingin ameltdownandrefining period. Operationat higherpressuresmaybeconsideredby theAdministratorto beunacceptableoperationandmaintenanceof theaffectedfacffity.
(h) During anyperformancetestrequiredunder60.8, andfor anyreportthereofrequiredby 60.275a(d)ofthis subpart,or to determinecompliancewith 60.272a(a)(3)ofthis subpart,theowneror operatorshall monitorthe following informationfor all heatscovered bythetest:
(1) Chargeweightsandmaterials,andtapweightsandmaterials;
(2) Heattimes, includingstartandstoptimes, andalog of processoperation,including periodsof no operationduringtestingandthepressureinside anEM’ whendirect-shellevacuation controlsystemsareused;
(3) Control deviceoperationlog; and
(4) Continuousmonitor orReferenceMethod9 data.
IV. RECORDKEEPING REQUIREMENTS.#014 [25 Pa. Code §127.441]Operating permit terms and conditions.
The owner/operator shallkeepall weeklyinspectionsanddocumentthemaintenanceperformedon thebaghouseon site for no lessthantwo years.Theserecordsshall alsobemadeavailableto the Department uponrequest.
#015 [25 Pa. Code §127.4411Operating permit terms and conditions.
The owner/operatorshallmaintainrecordsof all stacktests and testsutilizing portableanalyzersfor aminimumof two years. Theserecordsshall bekepton file andsubmittedto theDepartmentif requested.
#016 [25Pa. Code§127.441]Operatingpermit termsand conditions.
The ownwer/operatorshallmaintainalog bookcontainingthe dailyreadingsof theMethod9 readings.This logbookshall include thenameof thecompanyrepresentative,date,time of monitoring, andthewinddirection.
#017 [40 CFRPart 60 Standards of Performance for NewStationaiy Sources §40 CFR60.7]Subpart A - General ProvisionsNotification and record keeping.
(a) Any owneror operator subjectto theprovisionsofthispart shallfurnishtheAdministrator writtennotificationasfollows:
(1) A notificationofthedate construction(or reconstructionasdefinedunder60.15)of anaffectedfacility is commencedpostmarkednolater than30 daysaftersuchdate.This requirementshall notapplyinthecaseof mass-producedfacilities which arepurchasedin completedform.
(2) A notification of theanticipateddateof initial startup ofanaffectedfacility postmarkednotmorethan60 days norlessthan30 daysprior to suchdate.
(3) A notification of theactualdateof initial startupof anaffectedfacility postmarkedwithin 15 daysaftersuchdate.
(4) A notification ofanyphysicalor operational changeto anexistingfacility which may increasetheemissionrateof anyairpollutant to whichastandardapplies,unlessthat changeis specificallyexemptedunderan applicablesubpartor in 60.14(e). Thisnoticeshall bepostmarked60 daysor assoonaspracticablebeforethechangeiscommencedandshall include informationdescribingtheprecisenatureofthechange,presentandproposed emissioncontrol systems,productivecapacityof thefacility beforeandafterthechange,andtheexpectedcompletiondateof the change. TheAdministrator mayrequestadditionalrelevantinformation subsequentto this notice.
(5) A notification ofthe dateuponwhich demonstrationof thecontinuous monitoring systemperformancecommencesin accordancewith60.13(c).Notification shallbepostmarkednot lessthan30 daysprior tosuchdate.
(6) A notificationof the anticipateddatefor conductingtheopacityobservationsrequiredby 60.11(e)(1) of this part.The notificationshallalsoinclude,if appropriate,arequestfor theAdministratorto provideavisible emissionsreaderduring aperformancetest.The notification
shall be postmarkednot lessthan30 daysprior to suchdate.
(7) A notificationthat continuousopacitymonitoring systemdataresultswill beusedto determinecompliancewith theapplicable opacitystandardduringaperformancetestrequiredby 60.8 in lieu of Method9observationdataasallowedby 60.11(e)(5) of this part. Thisnotificationshall bepostmarkednot lessthan30 daysprior to the dateof theperformancetest.
(b) Any owneror operatorsubjectto theprovisionsofthis partshallmaintainrecordsof theoccurrenceanddurationof anystartup,shutdown,or malfunctionin theoperationof anaffectedfacility; anymalfunctionof theair pollution controlequipment; oranyperiodsduringwhich acontinuous monitoringsystemor monitoringdevice isinoperative.
(c) Eachowneror operatorrequiredto install acontinuousmonitoringsystem(CMS) or monitoringdeviceshallsubmit anexcessemissionsandmonitoringsystemsperformance report(excessemissionsaredefinedinapplicablesubparts)and/orasummaryreportform (seeparagraph(d) ofthis section)to theAdministrator semiannually,except when:morefrequentreportingis specificallyrequiredby an applicablesubpart;ortheCMS dataareto beuseddirectly for compliancedetermination,inwhich casequarterlyreportsshallbesubmitted;or theAdministrator, onacase-by-casebasis,determinesthatmorefrequentreportingisnecessaryto accuratelyassessthecompliancestatusof the source.Allreportsshallbe postmarkedby the30thdayfollowing theendof eachcalendarhalf (or quarter,asappropriate).Written reportsof excessemissions shallinclude thefollowing information:
(1) The magnitudeof excess emissionscomputedin accordance with60.13(h),anyconversionfactor(s)used,andthedateandtime ofcommencementandcompletion ofeachtime periodof excess emissions.Theprocessoperatingtime duringthereportingperiod.
(2) Specificidentificationof eachperiodof excessemissionsthatoccurs duringstartups,shutdowns,and malfunctionsof theaffectedfacility. The nature andcauseof anymalfunction(if known), thecorrectiveactiontakenorpreventativemeasuresadopted.
(3) The dateandtime identifying eachperiodduringwhich thecontinuous monitoringsystemwas inoperative exceptfor zeroand spanchecksandthenatureof thesystem repairsor adjustments.
(4) Whenno excessemissions haveoccurredor thecontinuousmonitoringsystem(s)havenotbeeninoperative,repaired,or adjusted,suchinformationshallbe statedin thereport.
(d) Thesummaryreportform shall containtheinformationandbe inthe formatshownin figure 1 unlessotherwisespecifiedby theAdministrator.Onesummaryreportform shallbe submittedfor eachpollutantmonitoredat eachaffectedfacility.
(1) If the total durationof excessemissions forthereportingperiodis lessthan 1 percentof thetotal operatingtime for thereportingperiodandCMS downtimefor thereportingperiod islessthan5 percentof thetotal operatingtime for thereportingperiod,only the summaryreportform shallbesubmitted andtheexcessemissionreportdescribedin 60.7(c)neednotbe submitted unlessrequestedby theAdministrator.
(2) If thetotal durationof excess emissionsfor thereportingperiodis 1 percentor greaterof thetotal operatingtime for thereportingperiodor the total CMS downtimefor thereportingperiodis 5 percentorgreaterof the total operatingtime for thereportingperiod,thesummaryreportform andtheexcessemissionreport describedin 60.7(c)shallboth besubmitted.
Figure 1--SummaryReport--GaseousandOpacityExcessEmissionandMonitoringSystem Performance
Pollutant(Circle One--502/NOX/ TRS/H25/CO/Opacity)Reportingperioddates:From___to___
Company:EmissionLimitationAddress:Monitor ManufacturerandModelNo.Dateof LatestCMS CertificationorAuditProcessUnit(s) Description:Total sourceoperatingtime in reporting period1
Emissiondatasummary<FN1> CMS performancesummary<FN1>1. Durationof excess emissionsin 1. CMS downtime inreporting periodreportingperioddueto: dueto:
a. Startup/shutdown a. Monitor equipmentmalfunctions
b. Control equipmentproblems.... b. Non-Monitor equipmentmalfunctions
c. Process problems c. Quality assurancecalibration....d. Otherknowncauses d. Other knowncausese.Unknowncauses e. Unknowncauses
2. Total durationof excess 2. TotalCMS Downtime
emission3. Total durationof excessemissionsX (100) [Total sourceoperatingtime] %<FN2>
3. [Total CMS Downtime]X (100)[Total sourceoperatingtime]
%<FN2>
<FN1>Foropacity, recordall timesin minutes.For gases, recordalltimes in hours.<FN2>Forthereportingperiod:If the total durationofexcessemissionsis 1 percentor greaterof thetotal operatingtime orthetotal CMSdowntimeis 5 percentor greaterof the total operatingtime, both thesummaryreportform andtheexcessemissionreport describedin 60.7(c)shallbe submitted.
Ona separatepage,describeanychangessincelast quarterin CMS,processor controls.I certify that theinformationcontainedin thisreport istrue, accurate,andcomplete.
Name
Signature
Title
Date
(e)(1) Notwithstandingthefrequencyof reportingrequirementsspecifiedin paragraph(c) ofthis section,an owneror operatorwho isrequiredby an applicablesubpartto submitexcessemissionsandmonitoring systemsperformance reports(and summaryreports)on aquarterly(or more frequent)basismayreducethe frequencyof reportingfor thatstandardto semiannualif thefollowing conditionsaremet:
(i) For 1 full year (e.g., 4 quarterlyor 12 monthlyreportingperiods)theaffectedfacility’s excessemissionsandmonitoringsystemsreports submittedto complywith astandardunderthis partcontinuallydemonstratethat the facility is in compliancewith theapplicablestandard;
(ii) The owneror operator continuesto complywith all recordkeepingandmonitoringrequirementsspecifiedin this subpartandtheapplicablestandard;and
(iii) TheAdministrator doesnot objectto areducedfrequencyofreportingfor theaffectedfacility, asprovidedin paragraph(e)(2) ofthis section.
(2) The frequencyof reportingof excessemissionsandmonitoringsystems performance(and summary)reports maybereducedonly aftertheowneror operatornotifies theAdministratorin writing ofhis or herintentionto makesuchachangeandtheAdministratordoesnot object totheintendedchange.In decidingwhetherto approveareducedfrequencyof reporting,theAdministratormayreviewinformation concerningthesource’sentirepreviousperformancehistory during therequiredrecordkeepingperiodprior to the intendedchange, including performancetest results,monitoringdata, andevaluationsof an owneroroperator’sconformancewith operationand maintenancerequirements.Suchinformationmaybeusedby theAdministratorto makeajudgmentaboutthe source’spotentialfor noncompliancein the future. IftheAdministratordisapprovestheowneror operator’srequestto reducethe frequencyofreporting,theAdministratorwill notify theowneror operatorin writingwithin 45 daysafterreceivingnotice oftheowneror operator’sintention.The notificationfrom theAdministratorto theowneroroperatorwill specifythegroundsonwhich the disapprovalis based.Intheabsenceof a noticeof disapprovalwithin 45 days,approvalisautomaticallygranted.
(3) As soonasmonitoringdataindicatethat theaffectedfacility isnot in compliancewith anyemissionlimitation oroperatingparameterspecifiedin theapplicablestandard,the frequencyof reportingshallrevert tothefrequencyspecifiedin theapplicablestandard,andtheowneror operatorshall submitanexcessemissionsandmonitoringsystemsperformance report(andsummaryreport, if required)at thenextappropriatereportingperiod following thenoncomplyingevent.Afterdemonstratingcompliancewith theapplicablestandardfor anotherfullyear, theowneror operatormay againrequestapprovalfrom theAdministratorto reducethe frequencyof reportingfor thatstandard asprovidedfor in paragraphs(e)(1) and(e)(2) of this section.[Thenew60.7(e)addedat 59 FR 12427,March 16, 1994]
(f) Any owneror operatorsubjectto theprovisionsof this partshallmaintainafile of all measurements,including continuousmonitoringsystem,monitoringdevice,andperformancetestingmeasurements;allcontinuousmonitoringsystemperformanceevaluations;all continuousmonitoringsystemor monitoringdevicecalibrationchecks;adjustments
andmaintenanceperformedon thesesystemsor devices;andall otherinformationrequiredby this part recordedin apermanentform suitablefor inspection.Thefile shallbe retainedfor at leasttwo yearsfollowing thedateof suchmeasurements,maintenance,reports,andrecords.
(g) If notificationsubstantiallysimilar to that in paragraph(a) ofthis sectionis requiredby anyotherStateor local agency,sendingtheAdministratoracopy of thatnotificationwill satisfytherequirementsofparagraph(a) of this section.
(h) Individual subpartsof this partmayinclude specificprovisionswhich clarify or makeinapplicabletheprovisionssetforth in thissection.[Former 60.7(e)--(g)redesignatedasnew(fi--(h) at 59 FR 12427,March16, 1994]
V. REPORTING REQUIREMENTS.#018 [40 CERPart 60 Standards of Performance for New Stationary Sources §40CER 60.41Subpart A - GeneralProvisionsAddress.All requests,reports, applications,submittals,andothercommunicationsto theAdministratorpursuantto this part shallbe submittedinduplicateto theappropriateRegionalOffice of theU.S. EnvironmentalProtectionAgencyto theattentionof theDirectoroftheDivisionindicatedin tehfollowing list ofEPA RegionalOffices.
DirectorAir Toxics andRadiationU.S. EPA, RegionIII1650Arch StreetPhiladelphia,PA 19103-2029
#019 [40 CFR Part 60 StandardsofPerformancefor NewStationary Sources §40CFR 60.276a1Subpart AAa - Standards of Performance for Steel Plants: Electric Arc FurnacesandArgon-ORecordkeepingand reporting requirements.
(a) Records ofthemeasurementsrequiredin 60.274amustberetainedfor at least2 yearsfollowing thedateofthemeasurement.
(b) Eachowneror operatorshall submitawritten reportofexceedancesof thecontrol deviceopacityto theAdministratorsemi-annually.For thepurposesof thesereports.exceedancesaredefinedasall 6-minuteperiodsduringwhich theaverageopacity is 3 percentor
greater.
(c) Operationatafurnacestaticpressurethat exceedsthevalueestablishedunder60.274a(g)andeither operationof control systemfanmotoramperesat valuesexceeding15 percentof thevalueestablishedunder60.274a(c)oroperationat flow rateslower thanthoseestablishedunder60.274a(c)maybe consideredby theAdministratorto beunacceptableoperationandmaintenanceof the affectedfacffity.Operationat suchvalues shallbereportedto theAdministratorsemiannually.
(d) Therequirementsof this section remainin forceuntil andunlessEPA, in delegatingenforcementauthorityto aStateundersection111(c)of theAct, approvesreporting requirementsor analternativemeansofcompliancesurveillanceadoptedby suchState.In thatevent, affectedsourceswithin theStatewill be relievedof theobligationto complywith this section,providedthat theycomplywith therequirementsestablishedby theState.
(e) Whentheowneror operatorof anEAF orAOD is requiredtodemonstratecompliancewith thestandardunder60.275(b)(2) or acombinationof (b)(1) and(b)(2) theowner oroperator shall obtainapprovalfrom theAdministratoroftheprocedure(s)thatwill beusedtodeterminecompliance. Notificationof theprocedure(s)to beusedmustbepostmarked30 daysprior to theperformancetest.
(I) For thepurposeof this subpart,theowneror operatorshallconductthedemonstrationof compliancewith 60.272a(a)of this subpartandfurnishtheAdministratorawritten reportof the results ofthetest.This report shall includethefollowing information:
(1) Facility nameandaddress;
(2) Plantrepresentative;
(3) Makeandmodelof process,controldevice,andcontinuousmonitoringequipment;
(4) Flow diagramof process andemissioncaptureequipmentincludingotherequipmentor process(es)ductedto thesamecontroldevice;
(5) Rated(design)capacityof processequipment;
(6) Thosedatarequiredunder60.274a(h)of this subpart;
(i) List of chargeandtapweightsandmaterials;
(ii) Heattimesandprocesslog;
(iii) Control deviceoperationlog; and
(iv) Continuousmonitoror ReferenceMethod9 data.
(7) Testdatesandtesttimes;
(8) Testcompany;
(9) Testcompanyrepresentative;
(10) Test observersfrom outsideagency;
(11) Descriptionof testmethodologyused,including anydeviationfrom standardreference methods;
(12) Schematicof samplinglocation;
(13) Numberofsamplingpoints;
(14) Descriptionof sampling equipment;
(15) Listing of sampling equipmentcalibrations andprocedures;
(16) Fieldandlaboratorydatasheets; -
(17) Descriptionof samplerecoveryprocedures;
(18) Samplingequipmentleak checkresults;
(19) Descriptionof quality assuranceprocedures;
(20) Descriptionof analyticalprocedures;
(21) Notationofsampleblankcorrections;and
(22) Sampleemissioncalculations.
VI. WORK PRACTICE STANDARDS.
#020 [25 Pa. Code§127.4411Operatingpermit termsand conditions.FirstMissshall performaweekly inspectionof thecleansideof thebaghouseandmaintenanceperformedon the baghouse.
VII. ADDITIONAL REQUIREMENTS.#021 [40 CERPart 60 Standards of Performance for NewStationary Sources §40CER 60.51SubpartA - General ProvisionsDeterminationof constructionor modification.
(a) Whenrequestedto do soby anowneror operator,theAdministratorwill makeadeterminationofwhetheractiontakenorintendedto betakenby suchowneror operatorconstitutesconstruction(includingreconstruction)ormodification or thecommencementthereofwithin themeaningof this part.
(b) TheAdministratorwill respondto anyrequestfor adeterminationunder paragraph(a) of this sectionwithin 30 daysofreceiptof suchrequest.
#022 [40 CFRPart 60 Standards of Performance for NewStationary Sources §40 CFR60.61Subpart A - General ProvisionsReview of plans.
(a) Whenrequestedto do soby anowneror operator,theAdministratorwill reviewplansfor constructionor modification for thepurposeofprovidingtechnicaladviceto the owneror operator.
(b) (1) A separaterequestshall be submittedfor eachconstructionormodificationproject.
(2) Each request shallidentify the locationof suchproject, andbeaccompaniedby technicalinformationdescribingtheproposednature,size, design,andmethodof operationof eachaffectedfacility involvedin suchproject, including informationon any equipmentto beusedformeasurementor controlof emissions.
(c) Neitherarequestfor plansreviewnor advicefurnishedby theAdministratorin responseto suchrequestshall (1) relieveanowneroroperatorof legalresponsibilityfor compliancewith anyprovision ofthispart orof anyapplicable Stateor local requirement,or (2) preventtheAdministratorfrom implementingor enforcinganyprovision ofthispart ortaking anyotheractionauthorizedby theAct.
#023 [40 CFR Part 60 StandardsofPerformancefor NewStationary Sources §40CFR 60.9]Subpart A - General ProvisionsAvailability of information.Theavailability to thepublic of informationprovidedto, orotherwiseobtainedby, theAdministratorunderthis part shall begovernedby part2 of this chapter.(Information submittedvoluntarily to theAdministratorfor thepurposesof 60.5and60.6is governedby 2.201through2.213of this chapterandnot by 2.301 ofthis chapter.)
#024 [40 CERPart 60 Standards of Performance for NewStationary Sources §40 CER60.101Subpart A - General ProvisionsState authority.
The provisionsofthispart shallnot be construedin anymannertopreclude anyStateor political subdivisionthereoffrom:
(a) Adoptingandenforcinganyemissionstandard orlimitationapplicableto anaffectedfacility, providedthat suchemissionstandardor limitation is notlessstringentthanthe standardapplicableto suchfacility.
(b) Requiringtheowneror operatorofan affectedfacility to obtainpermits,licenses,or approvalsprior to initiating construction,modification,or operationof suchfacility.
#025 [40 CFR Part 60 StandardsofPerformancefor NewStationarySources §40CFR 60.270a1SubpartAAa - StandardsofPerformancefor Steel Plants: Electric ArcFurnacesandArgon-OApplicability anddesignationofaffectedfacility
(a) The provisionsof this subpart areapplicableto the followingaffectedfacilities in steelplantsthatproducecarbon,alloy, orspecialtysteels:electricarcfurnaces,argon-oxygendecarburizationvessels,anddust-handlingsystems.
(b) Theprovisionsof this subpartapplyto eachaffectedfacilityidentified inparagraph(a) ofthis sectionthatcommencesconstruction,modification, or reconstructionafter August17, 1983.
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 103
SourceName:LADLE METALLURGY FURNACE
SOURCECAPACITY:
Proc CD EP
103 - - >CO1 - ->SO1I CD EP- - >C02 - - >S02
I CD EP- - >C03 - >S03
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.#001 [25 Pa. Code§127.441]Operatingpermit termsandconditions.
Theowner/operatorshall takedaily opacityreadingsby following EPAMethod9. A minimumof twenty-fourobservationsshall be taken.Theseobservationsshall alsotakeplaceconcurrentlyduringstacktestsunlessinclementweatherinterferes.
IV. RECORDKEEPING REQUIREMENTS.#002 [25 Pa. Code §127.441]Operatingpermit terms and conditions.
Theownwer/operatorshallmaintaina log bookcontainingthedailyreadingsof theMethod9 readings. This logbookshall includethenameof thecompanyrepresentative,date,time of monitoring, andthewinddirection.
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpractice requirementsexistexceptasprovidedin othersectionsofthis permit includingSectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 106
SourceName:INDUCTION FCS./LADLE UNIT
SOURCECAPACITY:
Proc
106
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.#001 [25 Pa. Code§127.441]Operatingpermit terms and conditions.
In accordancewith OperatingPermit#56-307-023A,Condition#4, ‘TheOwner/Operatorshall performaweekly inspectionof thecleansideof thebaghouse.”
IV. RECORDKEEPING REQUIREMENTS.#002 [25 Pa. Code§127.441]Operating permit terms and conditions.In accordancewith OperatingPermit#56-307-023A, Condition#4, “Weeklyinspectionsand maintenancerecordsshall be kepton file including thedate,time, companyrepresentative,maintenanceperformed. Thisinformationshall bemadeavailableto theDepartmentuponrequest.”
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 107
SourceName:OXYGEN CONVERTERW/UNI LANCE SYSTEM
SOURCECAPACITY:
Proc CD EP
107 - - >C08 - - >S07
I. RESTRICTIONS.
Emission Limitation(s).#001 [25 Pa. Code§127.441]Operatingpermit termsand conditions.In accordancewith OperatingPermit56-307--OOiF, Condition#7, “Emissionsofparticulatematter from theConverterbaghouse shall belimited to.0043gr./dscf.”
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.#002 [25 Pa. Code§127.441]Operatingpermit terms and conditions.
The owner/operatorshall takedaily opacityreadingsby following EPAMethod9. A minimumof twenty-fourobservationsshallbe taken. Theseobservations shallalsotakeplaceconcurrentlyduringstacktestsunlessinclementweatherinterferes.
IV. RECORDKEEPING REQUIREMENTS.#003 [25 Pa. Code §127.4411Operatingpennit tenns and conditions.
The owner/operator shallmaintaina log book containingthedailyreadingsof theMethod9 readings.This logbookshall include thenameof thecompanyrepresentative,date,time of monitoring, andthewinddirection.
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 108
SourceName:VACUUM DEGASSINGSYSTEM (VOD) 45/TLADLE
SOURCECAPACITY:
Proc EP108 . - >7(j5
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsofthis permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
* ** PERMIT SHIELD IN EFFECT. ***
SourceID: 111
SourceName:VAC DEGASSING/VOD8,000LB HEATS
SOURCECAPACITY:
Proc
111
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additionalwork practicerequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this peru-Atincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 112
SourceName:950LB INDUCTION FURNACE
SOURCECAPACITY:
Proc
112
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additional testingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additional reportingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additionalwork practice requirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
* ** PERMIT SHIELD IN EFFECT. ** *
SourceID: 113
SourceName:3,000LB INDUCTION FURNACE
SOURCECAPACITY:
Proc
113
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 114
SourceName:EAST& WESTTORCH CUThNG (CASTER)
SOURCECAPACITY:
Proc CD EP
114 - - >C07 - - >S08
I. RESTRICTIONS.No additionalrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof thispermit includingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexist exceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexist exceptasprovidedin othersectionsofthis permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof thispermit including SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
PERMIT SHIELD IN EFFECT. ***
SourceID: 115
SourceName:INGOT TEEMING OPERATION
SOURCECAPACITY:
Proc
115
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit includingSectionB (relating to Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relating to Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexist exceptasprovidedin othersectionsofthis permitincludingSectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS. F
No additionalreportingrequirementsexistexceptasprovidedin othersectionsof this permitincludingSectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
* ** PERMIT SHIELD IN EFFECT. ***
SourceID: 116
SourceName:CONTINUOUSCASTEROPERATION - 45/T HEATS
SOURCECAPACITY:
Proc
116
I. RESTRICTIONS.No additionalrequirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsofthis permit including SectionB (relating to Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relating to Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 117
SourceName:INGOT GRINDING
SOURCECAPACITY:
Proc CD EP
117 - - >C09 - - >S1O
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 118
SourceName:INGOT TORCH CUThNG
SOURCECAPACITY:
Proc CD EP
118 - - >C09 - - >S1O
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 119
SourceName: SHOTBLAST MACHINE FORPIG CASTING
SOURCECAPACITY:
Proc
119
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoring requirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ** *
SourceID: 120
SourceName:N. CARBOT ANNEALING FURNACE (LNB)
SOURCECAPACITY: 11.0 MMCF/HR Natural Gas
Proc
120
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexist exceptasprovidedin othersectionsofthis permit includingSectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additional reporting requirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 121
SourceName:S. CARBOT.ANNEAL FURNACE (LNB)
SOURCE CAPACITY: iLO MMCF/HR Natural Gas
Proc
121
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS. F
No additional reporting requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additionalwork practice requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 122
SourceName:SWING FURNACE (FIXED BOX)
SOURCECAPACITY: 3.8 MMCF/HR Natural Gas
Proc
122
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltesting requirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 123
SourceName:#3 ANNEALING FURNACE
SOURCECAPACITY: 3.8 MMCF/HR Natural Gas
Proc
123
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirements existexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
* ** PERMIT SHIELD IN EFFECT. ***
SourceID: 124
Source Name: #4 ANNEALINGFURNACE
SOURCECAPACITY: 3.8 MMCF/HR Natural Gas
Proc
124
I. RESTRICTIONS.No additional requirements exist except as provided in othersections of this permit including Section B (relating to Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoring requirementsexistexceptasprovidedin othersections of this permit including Section B (relating to Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpractice requirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirements exist except as provided in othersections of this permit including Section B (relating to Title V GeneralRequirements).
I
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 125
Source Name: #5 ANNEALINGFURNACE(LNB)
SOURCECAPACITY: 6.2 MMCF/HR Natura] Gas
Proc
125
I. RESTRICTIONS.No additionalrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersections of this permit including Section B (relating to Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexist exceptasprovidedin othersectionsof this permit includingSectionB (relating to Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additional reporting requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additionalwork practice requirements exist except asprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 126
SourceName:#6ANNEALING FURNACE
SOURCECAPACITY: 6.2 MMCF/HR Natural Gas
Proc
126
I. RESTRICTIONS.No additionalrequirements exist except as provided in othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additional monitoring requirements exist except as provided in othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permitincludingSectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirements exist except as provided in othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
* * * PERMIT SHIELD IN EFFECT. ***
SourceID: 127
SourceName:#7ANNEALING FURNACE
SOURCE CAPACITY: 6.2 MMCF/HR Natural Gas
Proc
127
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this pennitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirements~existexceptasprovidedin other - -
sectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additional reportingrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 128
SourceName:#8ANNEALING FURNACE
SOURCECAPACITY: 6.2 MMCF/HR Natural Gas
Proc
128
I. RESTRICTIONS.No additionalrequirementsexistexceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additional monitoring requirementsexist exceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeeping requirements exist except as provided in othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirements exist except as provided in othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpractice requirements exist except asprovidedin othersectionsofthis permit includingSectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 129
SourceName:FMA #2 ANNEALING FURNACE
SOURCE CAPACITY: 4.6 MMCF/HR Natural Gas
Proc
129
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirementsexistexceptasprovidedin othersectionsofthis permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 130
SourceName:FMA #3 ANNEALING FURNACE
SOURCE CAPACITY: 4.6 MMCF/HR Natural Gas
Proc
130
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additional testing requirements exist except as provided in othersections of this permit includingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeeping requirements exist except as provided in othersectionsofthis permitincludingSectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirements exist except as provided in othersectionsofthis permit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 131
SourceName:INGOT GRINDING -OUTSIDEBUILDING
SOURCECAPACITY:
Proc
131
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexist exceptasprovidedin othersectionsofthis permit includingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permit includingSectionB (relating to Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirementsexist exceptasprovidedin othersectionsof thispermit includingSectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirements exist except asprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
Source ID: 132
SourceName:OXYGEN CONVERTERDRYER
SOURCECAPACITY:
Proc
132
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additional testing requirements exist except as provided in othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 133
SourceName:FOUR-45T/LADLE HEATERS(#1,#2,#3,#6)
SOURCECAPACITY: 40.0 MMCF/HR Natural Gas
Proc
133
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsofthis permit includingSectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsofthis permit includingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additional monitoringrequirementsexist-exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additional requirements exist except as provided in othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
* ** PERMIT SHIELD IN EFFECT. ***
SourceID: 134
SourceName: (1) 45 TON LADLE DRYER (#5)
SOURCECAPACITY: 5.0 MMCF/HR Natural Gas
Proc
134
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permitincludingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirements existexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpracticerequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
* * * PERMIT SHIELD IN EFFECT. ***
SourceID: 135
SourceName:CASTERTUNDISH HEATER
SOURCECAPACITY: 5.0 MMCF/HR Natural Gas
Proc
135
I. RESTRICTIONS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirements exist except as provided in othersectionsofthis permitincluding SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreportingrequirements exist except asprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional work practice requirements exist except as provided in othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 136
SourceName:CASTERTUNDISH DRYER
SOURCECAPACITY: 5.0 MMCF/HR Natural Gas
Proc
136
I. RESTRICTIONS.No additionalrequirementsexist except as provided in othersectionsof this permitincluding SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltesting requirementsexistexceptasprovidedin othersectionsof thispermit including SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoringrequirementsexistexceptasprovidedin othersectionsof this permitincluding SectionB (relating to Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additionalrecordkeepingrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relating to Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpractice requirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexist exceptasprovidedin othersectionsof this permit includingSectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
SourceID: 137
SourceName:FOUR BLDG. HEATERS(#1,#2,#3,#4)
SOURCECAPACITY: 24.0 MMCF/I-IR Natural Gas
Proc
137
I. RESTRICTIONS.No additionalrequirementsexist except as provided in othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
II. TESTING REQUIREMENTS.No additionaltestingrequirementsexistexceptasprovidedin othersectionsofthis permit including SectionB (relatingto Title V GeneralRequirements).
III. MONITORING REQUIREMENTS.No additionalmonitoring requirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
IV. RECORDKEEPING REQUIREMENTS.No additional recordkeepingrequirementsexist exceptasprovidedin othersectionsofthis permit including SectionB (relatingto Title V GeneralRequirements).
V. REPORTING REQUIREMENTS.No additionalreporting requirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VI. WORK PRACTICE STANDARDS.No additional workpractice requirementsexist exceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
VII. ADDITIONAL REQUIREMENTS.No additionalrequirementsexistexceptasprovidedin othersectionsof this permit including SectionB (relatingto Title V GeneralRequirements).
*** PERMIT SHIELD IN EFFECT. ***
No AlternativeOperations existfor this Title V Facility1
Ili
No Alternative Operations exist for this Title V Facility
No Emission TradingGroupsexist for thisTitle V Facility.No Emission Trading Groups exist for this Title V Facility.
101 ELECTRIC FURNAC 80.000 Lbs/Hr CO20.000 Lbs/Hr NOX
8.000 Lbs/Hr PM1O12.000 Lbs/Hr SOX12.000 Lbs/Hr VOC
SITE 215.000 Tons/Yr CO1.000 Tons/Yr LEAD
80.000 Tons/Yr NOX64.400 Tons/Yr PM1O40.000 Tons/Yr SOX40.000 Tons/Yr VOC
DEP ID Source Description Emission Limit Pollutant
.4
Thesesourcesqualifyasinsignificant activitiesandhaveno applicablestandards,limitations, orrecordkeepingrequirements:
1. VD/VOD CoolingTower2. CasterCoolingTower3. PlantCoolingWaterSystem4. Alloy andFlux StorgeAreas(InsidePlant)5. scrapunloading& StorageArea - (InsidePlant)6. MiscellaneousOxy. & AcetyleneUnits7. MaintenanceWelding8. Pneumaticlime silo system9. DieselFuelingFilling Area10. Mobile EquipmentInside11. FurnaceInjection& MaintenanceGuns12. Slag Yard Quench Area13. SlagStorageArea14. SlagLoadingarea15. Scrap unloading& storagearea- Outside16. EM’ Baghousetruck loadingstation17. Mobile Equipment- Outside18. dieselstoragetank - 6000gallon capicity19. inside gasolinestoragetank (250 gallon)20. Outsidegasolinestoragetanks(2) - (250gallons)21. Threepropanestoragetanks- 3000 gallonsapiece.22. Drum storage23. mobilewelders24. diesellocomotive25. argon,oxygen,nitrogen storagetank area26. Hydrochloric (20%) acidtank - 500gallon capacity.
Usedin the etchingprocessof steelfrom thecaster.27. VariousSmallCombustionUnits (<2.5mmbtu/hrapiece)
Total of <10 MMBTU/hr total.