Page 1: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

COMMUNICATION INFOTECH

Page 2: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

BTS COMMISSIONING

Page 3: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start

• Disconnect the bts connection from DDF• Switch on the bts cabinets breakers &

connects the laptop with BTS• User name & password• Communication port setting

Page 4: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• OR• After connecting this window will be appear• Go to configuration>bts.sw download>to

download bts software• After BTS software download this window will

be appear• Go to offline files & select 1st file of master file• Go to offline files & select 1st file of DDL file

Page 5: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Bts software starts to download• All these files are downloaded• Go to configuration bts commissioning• Click start commissioning• Edit sector maping• Check all twin TRE’s• Click end commissioning click << arrow to

move selected to available modules

Page 6: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• All modules shifted to update module• Click no to end• Reconnect the a bts connector at DDF by

verifying the tx/rx cable properly• Give hard reset to bts cabinet as the OML has

established input the site on downloading

Page 7: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

BTS INSTALLATION TOOLS• BTS INSTALLATION TOOLS• ESD Wrist Strap & Cable – Module / Sub Module Installation• TORN SEREW DRIVER SET – Installing modules T25,T10,T20,T45 . Installing

casing kits T25• Module grounding T.25

• FCIA/FCQA/FCFA/FCSA/FMFA machines T25• Installing sub module T20• Fan plate assembling (T20)

• Standoff casing T25• FCIA Site grounding T25• Isolating cable clamps T10• EMIA door alarm kit T10

Page 8: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

Socket or opened spanner 8mm,13mm,17mm,19mm

• DC power terminal nute 17mm• Site grounding 13mm

• FCOA Site grounding 13mm & 8mm• Cabinets 19mm

Folding Knife• Unpacking

• Routing cables through cable entries• Preparing power & grounding cables

Page 9: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Adjustable wrench- general installation tools• Side cutters- cutting be wraps general installation tools• Torque wrench for antenna cables size depend on

antenna jumper & seeder cable lugs• Connecting antenna cables to ERNA or ECXY

• Routing cables • General installation tools

• Cable ties• Tape measure• Flash measure• Flash light, pocket lamp or torch

Page 10: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Off line commising completed successfully• BTS on line commising procedure using BTS go

to configuration >> HARDWARE Setting>> begin H/w modification.

• Go to configuration >BTS commissioning go to start commisining > Edit Q, Adress, Edit Sector maping & twin TRA setting as in off line

• Go to configuration > Hard ware setting> End modification to end online commissing.

Page 11: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• On line commissioning steps Connect the A BTS connector at DDF by verifying Tx/Rx cable properly OML will be established after primary . A BTS put site on downloading from OMC & O&M

• Connect laptop to BTS MMF part • Go to configuration > Hardware setting >

Begin hard ware modification• Online commisioning steps go to configuration

> BTS commissioning > start commissioning – Edit Q Mux Adress

Page 12: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Edit sector mapping * check all twin . TRA setting * click end commissioning and shift all module from selected module to available module * go configuration > Hardware setting> End H/W modification - click yes when automatically H/W modifiaction window appear.

Page 13: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

TECHNICAL DATA

• Installation options- Modular base station for indoor & outdoor installation, floor, Wall, Pole, Most mountable, Supports distributed & feeder less site set ups.

• Frequency bands- Flexi multi radio BTS is geared to support multiple paired & unpaired bands , 700,800,850,900,1800,1900,1700/2100,2100,2300 & 2600 MHZ.

Page 14: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Maximum capacity- up to 6+6+6 GSM or 4+4+4 WCDMA or 1+1+1 LTE at 20 MHZ or flexible combination of the above technologies in concurrent mode. For higher capacity several modules can deployed on a single site.

Page 15: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Multi radio configuration :- 1 Flexi 3- Sector, RF module for GSM/EDGE+ 1 systemmodule for WCDMA/HSDPA & LTE. Remote Radio Head (RRH) solution also supported

• Rf power amplifier technology- muli carrier power amplifier

• Height * width* depth 133*447*560mm per module , indoors & outdoors

Page 16: COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection

• Weight 25 kg per module• Operating temp range – 35`c to 55`c• Power supply 40.5 to 57 VDC 184 to 276 VAC

with power module.• Typical power consumption – 7 go W for

combined GSM & WCDMA site.• Output power- 240 W per RF module or

40w+40w per Remote Radio Head (RRH)