EN TRIPS Community Workshop
October 5, 2011
![Page 2: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/2.jpg)
Purpose of Meeting
1. Present preliminary design alternatives for three sets of streets:
• Folsom and Howard Streets• 7th and 8th Streets• 16th Street
2. Discuss and give input on design alternatives
![Page 3: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/3.jpg)
Agenda
• 6:00-6:20 Overview and Introduction
• 6:25-6:50 Corridor Discussion #1
• 6:55-7:20 Corridor Discussion #2
• 7:25-7:50 Corridor Discussion #3
• 7:50-8:30 Regroup, Review, and Next Steps
![Page 4: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/4.jpg)
Purpose of EN TRIPS
• Develop transportation improvements for the neighborhoods included in the EN Area Plans.
• Address future transportation impacts of expected growth
![Page 5: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/5.jpg)
EN TRIPS Corridor Projects
Folsom/Howard (5th-11th)
16th (Potrero – 7th)
7th/8th (Market – Harrison)
![Page 6: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/6.jpg)
Corridor Project Development Steps
Develop design and project alternatives
Model circulation impacts
Refine design concept
Create funding and implementation strategy
Prepare EN TRIPS Report
Public Workshop
![Page 7: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/7.jpg)
Policy GoalsCommunity • Improve multimodal
circulation• Improve safety• Maintain accessibility• Respond to community
aspirations
Environment• Improve quality of public realm• Improve air quality / reduce
GHG emissions• Reduce impact on water system
Economy• Integrate transportation and land
use• Catalyze appropriate development • Facilitate goods movement
Deliverability• Select projects that can be
implemented in an appropriate timeframe
• Select projects that are cost-effective
![Page 8: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/8.jpg)
# Description1 1-Way: 2 Lanes + Buffered Bike Lane2 1-Way: 2 Lanes + Buffered Bike Lane + Busway3 1-Way: 3 Lanes + Buffered Bike Lane4 1-Way: 3 Lanes + Bike Lane
51-Way/2-Way: 2 Lanes one way + Buffered Contraflow Lane (Folsom), 2 Lanes one way + Cycletrack (Howard)
6 1-Way/2-Way: 2 Lanes one way + 1 Lane other (Folsom), 2 Lanes one way + Cycletrack (Howard)
7 2-Way: 1 Lane each way + Center Turn Lane (“Valencia”)
8 2-Way: 1 Lane each way + Buffered Bike Lanes (Folsom), 2 Lanes each way (Howard)
9 2-Way: 2 Lanes one way, 1 Lane other + Buffered Bike Lane
10 2-Way: 1 Lane + 1 Peak Towaway Lane each way + Cycletrack
Folsom and Howard: 10 Alternatives
![Page 9: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/9.jpg)
Folsom/Howard Alternative 1: 1-Way
![Page 10: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/10.jpg)
Folsom/Howard Alternative 2: 2-Way
![Page 11: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/11.jpg)
Folsom/Howard Alternative 3: 2-Way Folsom/1-Way Howard
Folsom
![Page 12: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/12.jpg)
Folsom/Howard Alternative 3: 2-Way Folsom/1-Way Howard
Howard
![Page 13: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/13.jpg)
# Description1 1-Way: 2 Lanes + Buffered Bike Lane2 1-Way: 2 Lanes + Buffered Bike Lane + Busway3 1-Way: 3 Lanes + Buffered Bike Lane4 1-Way: 3 Lanes + Bike Lane
51-Way/2-Way: 2 Lanes one way + Buffered Contraflow Lane (Folsom), 2 Lanes one way + Cycletrack (Howard)
6 1-Way/2-Way: 2 Lanes one way + 1 Lane other (Folsom), 2 Lanes one way + Cycletrack (Howard)
7 2-Way: 1 Lane each way + Center Turn Lane
8 2-Way: 1 Lane each way + Buffered Bike Lanes (Folsom), 2 Lanes each way (Howard)
9 2-Way: 2 Lanes one way, 1 Lane other + Buffered Bike Lane
10 2-Way: 1 Lane + 1 Peak Towaway Lane each way + Cycletrack
7th and 8th: 10 Alternatives
![Page 14: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/14.jpg)
7th/8th Alternative 1: 3 Lanes + Cycletrack
![Page 15: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/15.jpg)
7th/8th Alternative 2: 3 Lanes + Wide Sidewalks w/Bike Lane
![Page 16: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/16.jpg)
16th Street: 9 Alternatives
# Description
1 Median Transitway
2 Median Transitway + Bike Lanes
3 Median Transitway + Bike Lanes + Curb Stops
4 Median Queue Jump + Parking
5 Median Queue Jump + Bike Lanes
6 Median Bikeway + Transit Lanes
7 Median Green
8 Reversible Lane
9 Side-Running Transit Lane + Bike Lanes
![Page 17: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/17.jpg)
16th Alternative 1: Median Transitway
![Page 18: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/18.jpg)
16th Alternative 2: Median Transitway + Bike Lanes
![Page 19: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/19.jpg)
16th Alternative 3: Side-Running Transitway
![Page 20: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/20.jpg)
Format for This Workshop
• Go to one of three tables (Folsom/Howard, 7th/8th, or Sixteenth)
– Facilitator will review details of each alternative
– Give feedback on the designs. Three options:
• Discuss, ask questions, tell us your feedback (we will take notes) ...• Write your thoughts on sticky notes or on paper• Vote – place stickers next your priorities for the street on the “priorities”
board
• After 25 minutes, switch tables to discuss the next corridor, or stay to continue the conversation.
• After each group discusses each corridor, we will regroup for up to 30 minutes.
![Page 21: Community Meeting #2 Slideshow Presentation](https://reader036.vdocument.in/reader036/viewer/2022081519/555c0255d8b42a56448b5307/html5/thumbnails/21.jpg)
Next Steps
Refine design concept
Create funding and implementation strategy
Prepare EN TRIPS Report