compact performance - festo · 2020. 3. 11. · 3.2.3 overview of the diagnostic bytes 3-12........

153
Elektronics manual CPV valve terminal with field bus direct connection Types: – CPV...-DI02 PROFIBUS-DP – CPV...-CS02 ABB CS31 Compact performance Manual 548732 en 1201a [762106]

Upload: others

Post on 30-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Elektronics manual

    CPV valve terminalwith field bus directconnection

    Types:– CPV...-DI02

    PROFIBUS-DP

    – CPV...-CS02ABB CS31

    Compact performance

    Manual548732en 1201a[762106]

  • Contents and general instructions

    I

    Original de. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Edition en 1201a. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Designation P.BE-CPV-DI02-EN. . . . . . . . . . . . . . . . . . . . . . .

    Order no. 548732. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    © (Festo SE & Co. KG, D-73726 Esslingen, Federal Republic of Germany, 2012)Internet: http://www.festo.comE-Mail: [email protected]

    The reproduction, distribution and utilisation of this document as well as the communication of its contents to others without express authorisation is prohibited. Offenders will be held li-able for payment of damages. All rights reserved in particular the right to register patents, utility models and designs.

    Festo P.BE-CPV-DI02-EN en 1201a

  • Contents and general instructions

    II Festo P.BE-CPV-DI02-EN en 1201a

    PROFIBUS, PROFIBUS-DP ®, SIMATIC ®, SPEEDCON®, TORX ® are registered trade-marks of their respective trademark holders in certain countries.

  • Contents and general instructions

    IIIFesto P.BE-CPV-DI02-EN en 1201a

    Contents

    Intended use VII. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Target group VII. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Service VII. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Notes on the use of this manual VIII. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Important user instructions IX. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1. Installation CPV-DI02 and CPV-CS02 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.1 General instructions on installation 1-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2 Electrical connecting and display elements 1-4. . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.1 Overview for setting the CPV Direct 1-5. . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.2 Setting the station number 1-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.3 Setting the diagnostic mode (CPV-DI02) or the load voltag monitoring(CPV-CS02) 1-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.4 Recognizing the CPI extension with the SAVE button 1-10. . . . . . . . . . .

    1.2.5 Help table for setting the station number 1-10. . . . . . . . . . . . . . . . . . . .

    1.3 Connecting the field bus 1-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3.1 Field bus cable 1-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3.2 Field bus baud rate and field bus length for PROFIBUS-DP (CPV-DI02) .1-17

    1.3.3 Field bus interface 1-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3.4 Connection possibilities 1-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.4 Bus termination with termination resistors (CPV-DI02) 1-24. . . . . . . . . . . . . . . . .

    1.5 Connecting the power supply 1-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.5.1 Cable for power supply 1-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.5.2 Selecting the power unit 1-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.5.3 Connecting the power supply 1-29. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.6 Extending the CPV Direct 1-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.6.1 Rules for extending the CPI system 1-35. . . . . . . . . . . . . . . . . . . . . . . . .

    1.7 Preparing the CPI system for commissioning 1-38. . . . . . . . . . . . . . . . . . . . . . . . .

    1.7.1 Checking the CP strings 1-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.7.2 Saving the string assignment 1-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.8 Switching-on reaction of the CPI system 1-41. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • Contents and general instructions

    IV Festo P.BE-CPV-DI02-EN en 1201a

    1.9 Reaction of the CPI system to faults in operation 1-43. . . . . . . . . . . . . . . . . . . . . .

    1.9.1 Eliminating assignment faults 1-43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.9.2 Replacing CPI/CP modules 1-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2. Commissioning CPV-DI02 (PROFIBUS-DP) 2-1. . . . . . . . . . . . . . . . . . . . . . . . . .

    2.1 Preparing the CPV Direct for commissioning 2-3. . . . . . . . . . . . . . . . . . . . . . . . .

    2.1.1 Switching on the power supply 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.1.2 Address assignment of the CPV Direct 2-4. . . . . . . . . . . . . . . . . . . . . . .

    2.1.3 Address assignment of CPI/CP modules 2-6. . . . . . . . . . . . . . . . . . . . .

    2.1.4 Information on commissioning 2-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.2 Device master file (GSD) and icon files 2-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3 Configuration with a Siemens master 2-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3.1 STEP 7 – HW Config (up to V 5.2) – preparations 2-10. . . . . . . . . . . . . .

    2.3.2 Station selection with STEP 7 2-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3.3 Configuration with STEP 7 2-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3.4 Tool change configuration 2-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4 Examples of configuration 2-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.1 Standard configuration 2-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.2 Tool change configuration 2-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3. Diagnosis CPV-DI02 (PROFIBUS-DP) 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1 Diagnosis via LEDs 3-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1.1 Normal operating status 3-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1.2 Fault diagnosis with the LEDs 3-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1.3 LEDs for status display of the valve solenoid coils 3-8. . . . . . . . . . . . .

    3.2 Diagnosis via PROFIBUS-DP 3-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.1 Diagnostic words 3-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.2 Diagnosis steps 3-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.3 Overview of the diagnostic bytes 3-12. . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.4 Details for standard diagnostic information 3-13. . . . . . . . . . . . . . . . . .

    3.2.5 Diagnosis with tool change configuration 3-19. . . . . . . . . . . . . . . . . . . .

    3.3 Fault treatment 3-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.3.1 Siemens SIMATIC S7 3-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4 Online diagnosis with STEP 7 3-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • Contents and general instructions

    VFesto P.BE-CPV-DI02-EN en 1201a

    3.4.1 Read out diagnostic buffer with STEP 7 (up to V 5.2) 3-23. . . . . . . . . . .

    3.4.2 Device-related diagnosis with STEP 7 (up to V 5.2) 3-25. . . . . . . . . . . .

    3.5 Short circuit/overload 3-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.5.1 Output module 3-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.5.2 Sensor supply on one input module 3-28. . . . . . . . . . . . . . . . . . . . . . . .

    4. Commissioning CPV-CS02 (ABB CS31) 4-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.1 Preparing the CPV Direct for commissioning 4-3. . . . . . . . . . . . . . . . . . . . . . . . .

    4.1.1 Switching on the operating voltages 4-3. . . . . . . . . . . . . . . . . . . . . . . .

    4.1.2 Address assignment of the CPV Direct 4-4. . . . . . . . . . . . . . . . . . . . . . .

    4.1.3 General data 4-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.2 Configuration 4-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.2.1 CS31 CPU as bus master 4-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5. Diagnosis CPV-CS02 (ABB CS31) 5-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.1 Diagnosis via LEDs 5-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.1.1 Normal operating status 5-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.1.2 Fault diagnosis with the LEDs 5-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.1.3 LEDs for status display of the valve solenoid coils 5-8. . . . . . . . . . . . .

    5.2 Diagnosis via the field bus 5-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.3 Setting the diagnostic mode 5-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.4 Fault treatment 5-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.4.1 Reaction of the CPV Direct to faults 5-12. . . . . . . . . . . . . . . . . . . . . . . . .

    5.4.2 Short circuit/overload at an output module 5-13. . . . . . . . . . . . . . . . . .

    5.4.3 Short circuit in the sensor supply at an input module 5-14. . . . . . . . . .

    A. Technical appendix A-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    A.1 Technical specifications A-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    A.1.1 Common technical specifications of CPV-DI02 and CPV-CS02 A-3. . . .

    A.1.2 Technical specifications for the CPV-DI02 A-5. . . . . . . . . . . . . . . . . . . .

    A.1.3 Technical specifications for the CPV-CS02 A-5. . . . . . . . . . . . . . . . . . . .

    A.2 PROFIBUS-DP: Commissioning with the general DP master A-6. . . . . . . . . . . . .

    A.2.1 Bus start A-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • Contents and general instructions

    VI Festo P.BE-CPV-DI02-EN en 1201a

    A.2.2 Send parametriziung data A-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    A.2.3 Check the configuration data A-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    A.2.4 Transferring input and output data A-10. . . . . . . . . . . . . . . . . . . . . . . . .

    A.2.5 Read diagnostic information A-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    A.2.6 Implemented functions and service access points (SAP) A-11. . . . . . . .

    A.2.7 Bus parameters/reaction times A-12. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    A.2.8 Transmission times on the PROFIBUS-DP A-12. . . . . . . . . . . . . . . . . . . .

    A.3 Accessories A-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B. Index B-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • Contents and general instructions

    VIIFesto P.BE-CPV-DI02-EN en 1201a

    Intended use

    The CPV valve terminals with field bus direct connection(CPV direct) described in this documentation have beendesigned exclusively for use as slaves on the following field

    buses:

    – CPV-DI02: PROFIBUS-DP

    – CPV-CS02: ABB CS31

    The valve terminal may only be used as follows:

    – as designated in industrial applications

    – without any modifications by the user. Only the conver-sions or modifications described in the documentationsupplied with the product are permitted.

    – in faultless technical condition.

    The maximum values specified for pressures, temperatures,electrical data, torques etc. must be observed.

    If additional commercially-available components such as sen-sors and actuators are connected, the specified limits forpressures, temperatures, electrical data, torques, etc. mustnot be exceeded.

    Please comply with national and local safety laws andregulations.

    If implementing an emergency stop function, note themeasures listed in section 1.5.3.

    Target group

    This manual is intended exclusively for technicians trained incontrol and automation technology, who have experience ininstalling, commissioning, programming and diagnosing

    slaves on the field buses named above.

    Service

    Please consult your local Festo Service if you have anytechnical problems.

  • Contents and general instructions

    VIII Festo P.BE-CPV-DI02-EN en 1201a

    Notes on the use of this manual

    NoteThis manual takes into consideration the functioning of thefollowing software and hardware versions:

    – CPV-DI02: software as from 14.09.06, hardware as from0107 (for sizes CPV10 and CPV14)

    – CPV-CS02: software as from 31.07.06, hardware as from0107 (for sizes CPV10 and CPV14)

    This manual contains specific information on installing, com-missioning, programming and diagnosing CPV valve terminalswith direct connection for the field buses named.

    Information on the pneumatics can be found in the“Pneumatics manual P.BE-CDV-...”

    Further information on the PROFIBUS-DP can be found in:

    – the setting up guidelines for the PROFIBUS-DP

    – the manuals of the master manufacturer.

  • Contents and general instructions

    IXFesto P.BE-CPV-DI02-EN en 1201a

    Important user instructions

    Danger categories

    This manual contains instructions on the possible dangerswhich may occur if the product is not used correctly. Theseinstructions are marked (Warning, Caution, etc.), printed on ashaded background and marked additionally with a picto-gram. A distinction is made between the following dangerwarnings:

    WarningThis means that failure to observe this instruction mayresult in serious personal injury or damage to property.

    CautionThis means that failure to observe this instruction mayresult in personal injury or damage to property.

    NoteThis means that failure to observe this instruction mayresult in damage to property.

    The following pictogram marks passages in the text whichdescribe activities with electrostatically sensitive compo-nents.

    Electrostatically sensitive components may be damaged ifthey are not handled correctly.

  • Contents and general instructions

    X Festo P.BE-CPV-DI02-EN en 1201a

    Marking special information

    The following pictograms mark passages in the textcontaining special information.

    Pictograms

    Information:Recommendations, tips and references to other sources ofinformation.

    Accessories:Information on necessary or sensible accessories for theFesto product.

    Environment:Information on environment-friendly use of Festo products.

    Text markings

    • The bullet indicates activities which may be carried out inany order.

    1. Figures denote activities which must be carried out in thenumerical order specified.

    – Hyphens indicate general activities.

  • Contents and general instructions

    XIFesto P.BE-CPV-DI02-EN en 1201a

    The following product-specific terms and abbreviations areused in this manual:

    Term/abbreviation Meaning

    CP cable Special cable for connecting the various CPI/CP modules in a CP string.Colour: black, type KVI-CP1-... and type KVI-CP2-...

    CP function Supports the CP protocolwithout extended functions

    CP module Common term for moduleswithout extended functions which can beincorporated in a CPI/CP system.

    CP string CPI or CP modules which are connected by CPI/CP cable and which areconnected to the CPX-CP interface. For reasons of simplicity, only the term“CP string” is used, even if it has CPI functionality.

    CP system Complete electrical installation system consisting of a CP master with one ormore CP strings. The system consists of CP modules (without extendedfunctions).

    CP valve terminal CPV valve terminal (type 10) or CPA valve terminal (type 12), each withCP connection (also regarded as CP modules). Basic electric unit, black.

    CPI function Supports the CPI protocolwith extended functions

    CPI connection Socket or plug on the CPI modules which allows the modules to beconnected using the CPI or CP cable.

    CPI cable Special cable for connecting the various CPI/CP modules in a CP string.Colour: white, type KVI-CP3-...

    CPI module Common term for moduleswith extended functions which can beincorporated in a CPI/CP system.

    CPI system Also: “CPI installation system”Complete electrical installation system consisting of a CP master with oneor more CP strings. The system consists of CPI/CP moduleswith andwithout extended functions. The system need not consist exclusively ofCPI modules.

    CPV Direct CPV valve terminal with field bus direct connection

    I Digital input

    Input module Input module

  • Contents and general instructions

    XII Festo P.BE-CPV-DI02-EN en 1201a

    Term/abbreviation Meaning

    I/O modules Collective term for the modules which provide digital inputs and outputs(e.g., CPX I/O modules, CPI input modules and CPI output modules).

    I/Os Digital inputs and outputs

    O Digital output

    Octet Number of address words assigned by the CP system

    Output module Output module

    PLC/IPC Programmable logic controller/industrial PC

    String assignment Type and order of the CPI/CP modules connected to one or more CP strings.

    Tab. 0/1: Product-specific terms and abbreviations

  • Installation CPV-DI02 and CPV-CS02

    1-1Festo P.BE-CPV-DI02-EN en 1201a

    Chapter 1

    Installation CPV-DI02 and CPV-CS02

  • 1. Installation CPV-DI02 and CPV-CS02

    1-2 Festo P.BE-CPV-DI02-EN en 1201a

    Contents

    1. Installation CPV-DI02 and CPV-CS02 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.1 General instructions on installation 1-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2 Electrical connecting and display elements 1-4. . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.1 Overview for setting the CPV Direct 1-5. . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.2 Setting the station number 1-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.3 Setting the diagnostic mode (CPV-DI02) or the load voltag monitoring(CPV-CS02) 1-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2.4 Recognizing the CPI extension with the SAVE button 1-10. . . . . . . . . . .

    1.2.5 Help table for setting the station number 1-10. . . . . . . . . . . . . . . . . . . .

    1.3 Connecting the field bus 1-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3.1 Field bus cable 1-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3.2 Field bus baud rate and field bus length for PROFIBUS-DP (CPV-DI02) .1-17

    1.3.3 Field bus interface 1-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3.4 Connection possibilities 1-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.4 Bus termination with termination resistors (CPV-DI02) 1-24. . . . . . . . . . . . . . . . .

    1.5 Connecting the power supply 1-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.5.1 Cable for power supply 1-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.5.2 Selecting the power unit 1-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.5.3 Connecting the power supply 1-29. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.6 Extending the CPV Direct 1-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.6.1 Rules for extending the CPI system 1-35. . . . . . . . . . . . . . . . . . . . . . . . .

    1.7 Preparing the CPI system for commissioning 1-38. . . . . . . . . . . . . . . . . . . . . . . . .

    1.7.1 Checking the CP strings 1-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.7.2 Saving the string assignment 1-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.8 Switching-on reaction of the CPI system 1-41. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.9 Reaction of the CPI system to faults in operation 1-43. . . . . . . . . . . . . . . . . . . . . .

    1.9.1 Eliminating assignment faults 1-43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.9.2 Replacing CPI/CP modules 1-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 1. Installation CPV-DI02 and CPV-CS02

    1-3Festo P.BE-CPV-DI02-EN en 1201a

    1.1 General instructions on installation

    WarningBefore carrying out installation and maintenance work,switch off the following:

    – the compressed air supply

    – the operating voltage supply for the internal logics

    – the load voltage supply for the valves.

    You can thereby avoid:

    – uncontrolled movements of loose tubing

    – uncontrolled movements of the connected actuators

    – non-defined switching states of the electronic components.

    CautionThe CPV valve terminal with field bus direct connection(CPV Direct) contains electrostatically sensitive compo-nents.

    – Do not therefore touch any contacts.

    – Observe the handling specifications for electrostaticsensitive devices.

    You will then prevent the electronics from being damaged.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-4 Festo P.BE-CPV-DI02-EN en 1201a

    1.2 Electrical connecting and display elements

    The following connecting and display elements can be foundon the CPV Direct:

    1

    2

    3

    4

    5

    6

    1 Field bus connection(9-pin Sub-D socket, see section 1.3.3)

    2 Underneath the removable switchcover: DIL switches and the SAVEbutton (see section 1.2.1)

    3 Operating/load voltage connection(4-pin M12 plug, see section 1.5)

    4 Power LEDs PS, PL and bus statusLEDs BF,P (see section 3.1)

    5 CPI extension connection(see section 1.6)

    6 Switching status displays of theCP valve coils (yellow LEDs,see section 3.1.3)

    Fig. 1/1: Connecting and display elements on the CPV Direct

  • 1. Installation CPV-DI02 and CPV-CS02

    1-5Festo P.BE-CPV-DI02-EN en 1201a

    1.2.1 Overview for setting the CPV Direct

    PSPL

    BF

    Fig. 1/2: Removing/fitting the switch cover

    3 2 1

    1 DIL switch for station number and diagnostic mode

    2 SAVE button

    3 Cover

    Fig. 1/3: DIL switches and SAVE button under the switch cover

  • 1. Installation CPV-DI02 and CPV-CS02

    1-6 Festo P.BE-CPV-DI02-EN en 1201a

    Procedure:

    1. Switch off the operating voltage.

    2. Unscrew the screws in the switch cover and remove thecover.

    3. Set the station number and the diagnostic mode on theDIL switch (see section 1.2.2).

    4. If you have connected CPI/CP modules to the CPI exten-sion connection: read the procedure for configuring theCPI/CP modules in section 1.6.

    5. Replace the switch cover. Check that the seal is seated

    correctly and tighten the fastening screws by hand.

    Note– Make sure that the seal is seated correctly when yourefit the switch cover.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-7Festo P.BE-CPV-DI02-EN en 1201a

    1.2.2 Setting the station number

    The station number is entered coded with the 8-positionDIL switch.

    1 CPV-DI02:PROFIBUSaddress (switchelements 1 … 7)

    2 CPV-CS02:CS31 moduleaddress (switchelements 1 … 6)

    1

    2

    Fig. 1/4: Setting the station number on the CPV-DI01 or CPV-CS02

    NoteStation numbers may only be assigned once per field busline.

    Leave DIL switch element 7 set to OFF on the CPV-CS02.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-8 Festo P.BE-CPV-DI02-EN en 1201a

    Set station number: 5 Set station number: 38

    20 + 22

    = 1 + 4 = 521 + 22 + 25

    = 2 + 4 + 32 = 38

    Tab. 1/1: Examples of set station numbers (binary coded)

    The following station numbers are permitted:

    Valve terminal type Protocol Address designation Permitted station numbers

    CPV-DI02 PROFIBUS-DP PROFIBUS address 1; ...; 125

    CPV-CS02 ABB CS31 CS31 module address 0; ...; 60

    Tab. 1/2: Permitted station numbers for PROFIBUS-DP and ABB CS31

  • 1. Installation CPV-DI02 and CPV-CS02

    1-9Festo P.BE-CPV-DI02-EN en 1201a

    1.2.3 Setting the diagnostic mode (CPV-DI02) or the load voltagmonitoring (CPV-CS02)

    The following diagnosis can be deactivated with switchelement 8 of the DIL switch:

    – CPV-DI02: Device-related diagnosis

    – CPV-CS02: Load voltage monitoring

    1 DIL 8 OFF:diagnosisdeactivated

    2 DIL 8 ON:diagnosisactivated

    2

    1

    Fig. 1/5: Setting the diagnostic mode

    For PROFIBUS-DP:If the device-related diagnosis is deactivated (switch element 8

    to OFF), no device-related diagnostic information about thevalve terminal will be sent to the master system, e.g. shortcircuit at the outputs or undervoltage of the valves

    (see section 3.2.2).

  • 1. Installation CPV-DI02 and CPV-CS02

    1-10 Festo P.BE-CPV-DI02-EN en 1201a

    1.2.4 Recognizing the CPI extension with the SAVE button

    When the SAVE button is pressed, the CPI/CP modules con-nected to the CPI extension connection will be recognized

    automatically.

    1. Prepare the connection of the CPV Direct to the powersupply (see section 1.5).

    2. Read the sections 1.6 “Extending the CPV Direct” and 1.7“Preparing the CPI system for commissioning” for theexact procedure.

    In the tool change configuration, pressing the SAVE button isnot necessary. Please refer here to section 2.3.4.

    1.2.5 Help table for setting the station number

    On the following pages you will find help tables for setting thestation numbers with the DIL switch.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-11Festo P.BE-CPV-DI02-EN en 1201a

    Station

    no.

    1 2 3 4 5 6 7 8 Stationno.

    1 2 3 4 5 6 7 8

    0reserved

    16OFF OFF OFF OFF

    ON

    OFF OFF

    1 ONOFF OFF OFF OFF OFF OFF

    17 ONOFF OFF OFF

    ON

    OFF OFF

    2OFF

    ON

    OFF OFF OFF OFF OFF

    18OFF

    ON

    OFF OFF

    ON

    OFF OFF

    3 ON ONOFF OFF OFF OFF OFF

    19 ON ONOFF OFF

    ON

    OFF OFF

    4OFF OFF

    ON

    OFF OFF OFF OFF

    20OFF OFF

    ON

    OFF

    ON

    OFF OFF

    5 ONOFF

    ON

    OFF OFF OFF OFF

    21 ONOFF

    ON

    OFF

    ON

    OFF OFF

    6OFF

    ON ON

    OFF OFF OFF OFF

    22OFF

    ON ON

    OFF

    ON

    OFF OFF

    7 ON ON ONOFF OFF OFF OFF

    23 ON ON ONOFF

    ON

    OFF OFF

    8OFF OFF OFF

    ON

    OFF OFF OFF

    24OFF OFF OFF

    ON ON

    OFF OFF

    9 ONOFF OFF

    ON

    OFF OFF OFF

    25 ONOFF OFF

    ON ON

    OFF OFF

    10OFF

    ON

    OFF

    ON

    OFF OFF OFF

    26OFF

    ON

    OFF

    ON ON

    OFF OFF

    11 ON ONOFF

    ON

    OFF OFF OFF

    27 ON ONOFF

    ON ON

    OFF OFF

    12OFF OFF

    ON ON

    OFF OFF OFF

    28OFF OFF

    ON ON ON

    OFF OFF

    13 ONOFF

    ON ON

    OFF OFF OFF

    29 ONOFF

    ON ON ON

    OFF OFF

    14OFF

    ON ON ON

    OFF OFF OFF

    30OFF

    ON ON ON ON

    OFF OFF

    15 ON ON ON ONOFF OFF OFF

    31 ON ON ON ON ONOFF OFF

    Tab. 1/3: Setting station numbers 0 … 31: position of the DIL switch elements

  • 1. Installation CPV-DI02 and CPV-CS02

    1-12 Festo P.BE-CPV-DI02-EN en 1201a

    Station

    no.

    1 2 3 4 5 6 7 8 Stationno.

    1 2 3 4 5 6 7 8

    32OFF OFF OFF OFF OFF

    ON

    OFF

    48OFF OFF OFF OFF

    ON ON

    OFF

    33 ONOFF OFF OFF OFF

    ON

    OFF

    49 ONOFF OFF OFF

    ON ON

    OFF

    34OFF

    ON

    OFF OFF OFF

    ON

    OFF

    50OFF

    ON

    OFF OFF

    ON ON

    OFF

    35 ON ONOFF OFF OFF

    ON

    OFF

    51 ON ONOFF OFF

    ON ON

    OFF

    36OFF OFF

    ON

    OFF OFF

    ON

    OFF

    52OFF OFF

    ON

    OFF

    ON ON

    OFF

    37 ONOFF

    ON

    OFF OFF

    ON

    OFF

    53 ONOFF

    ON

    OFF

    ON ON

    OFF

    38OFF

    ON ON

    OFF OFF

    ON

    OFF

    54OFF

    ON ON

    OFF

    ON ON

    OFF

    39 ON ON ONOFF OFF

    ON

    OFF

    55 ON ON ONOFF

    ON ON

    OFF

    40OFF OFF OFF

    ON

    OFF

    ON

    OFF

    56OFF OFF OFF

    ON ON ON

    OFF

    41 ONOFF OFF

    ON

    OFF

    ON

    OFF

    57 ONOFF OFF

    ON ON ON

    OFF

    42OFF

    ON

    OFF

    ON

    OFF

    ON

    OFF

    58OFF

    ON

    OFF

    ON ON ON

    OFF

    43 ON ONOFF

    ON

    OFF

    ON

    OFF

    59 ON ONOFF

    ON ON ON

    OFF

    44OFF OFF

    ON ON

    OFF

    ON

    OFF

    60OFF OFF

    ON ON ON ON

    OFF

    45 ONOFF

    ON ON

    OFF

    ON

    OFF

    61 ONOFF

    ON ON ON ON

    OFF

    46OFF

    ON ON ON

    OFF

    ON

    OFF

    62OFF

    ON ON ON ON ON

    OFF

    47 ON ON ON ONOFF

    ON

    OFF

    63 ON ON ON ON ON ONOFF

    Tab. 1/4: Setting station numbers 32 … 63: position of the DIL switch elements

  • 1. Installation CPV-DI02 and CPV-CS02

    1-13Festo P.BE-CPV-DI02-EN en 1201a

    Station

    no.

    1 2 3 4 5 6 7 8 Stationno.

    1 2 3 4 5 6 7 8

    64OFF OFF OFF OFF OFF OFF

    ON 80OFF OFF OFF OFF

    ON

    OFF

    ON

    65 ONOFF OFF OFF OFF OFF

    ON 81 ONOFF OFF OFF

    ON

    OFF

    ON

    66OFF

    ON

    OFF OFF OFF OFF

    ON 82OFF

    ON

    OFF OFF

    ON

    OFF

    ON

    67 ON ONOFF OFF OFF OFF

    ON 83 ON ONOFF OFF

    ON

    OFF

    ON

    68OFF OFF

    ON

    OFF OFF OFF

    ON 84OFF OFF

    ON

    OFF

    ON

    OFF

    ON

    69 ONOFF

    ON

    OFF OFF OFF

    ON 85 ONOFF

    ON

    OFF

    ON

    OFF

    ON

    70OFF

    ON ON

    OFF OFF OFF

    ON 86OFF

    ON ON

    OFF

    ON

    OFF

    ON

    71 ON ON ONOFF OFF OFF

    ON 87 ON ON ONOFF

    ON

    OFF

    ON

    72OFF OFF OFF

    ON

    OFF OFF

    ON 88OFF OFF OFF

    ON ON

    OFF

    ON

    73 ONOFF OFF

    ON

    OFF OFF

    ON 89 ONOFF OFF

    ON ON

    OFF

    ON

    74OFF

    ON

    OFF

    ON

    OFF OFF

    ON 90OFF

    ON

    OFF

    ON ON

    OFF

    ON

    75 ON ONOFF

    ON

    OFF OFF

    ON 91 ON ONOFF

    ON ON

    OFF

    ON

    76OFF OFF

    ON ON

    OFF OFF

    ON 92OFF OFF

    ON ON ON

    OFF

    ON

    77 ONOFF

    ON ON

    OFF OFF

    ON 93 ONOFF

    ON ON ON

    OFF

    ON

    78OFF

    ON ON ON

    OFF OFF

    ON 94OFF

    ON ON ON ON

    OFF

    ON

    79 ON ON ON ONOFF OFF

    ON 95 ON ON ON ON ONOFF

    ON

    Tab. 1/5: Setting station numbers 64 … 95: position of the DIL switch elements

  • 1. Installation CPV-DI02 and CPV-CS02

    1-14 Festo P.BE-CPV-DI02-EN en 1201a

    Station

    no.

    1 2 3 4 5 6 7 8 Stationno.

    1 2 3 4 5 6 7 8

    96OFF OFF OFF OFF OFF

    ON ON 111 ON ON ON ONOFF

    ON ON

    97 ONOFF OFF OFF OFF

    ON ON 112OFF OFF OFF OFF

    ON ON ON

    98OFF

    ON

    OFF OFF OFF

    ON ON 113 ONOFF OFF OFF

    ON ON ON

    99 ON ONOFF OFF OFF

    ON ON 114OFF

    ON

    OFF OFF

    ON ON ON

    100OFF OFF

    ON

    OFF OFF

    ON ON 115 ON ONOFF OFF

    ON ON ON

    101 ONOFF

    ON

    OFF OFF

    ON ON 116OFF OFF

    ON

    OFF

    ON ON ON

    102OFF

    ON ON

    OFF OFF

    ON ON 117 ONOFF

    ON

    OFF

    ON ON ON

    103 ON ON ONOFF OFF

    ON ON 118OFF

    ON ON

    OFF

    ON ON ON

    104OFF OFF OFF

    ON

    OFF

    ON ON 119 ON ON ONOFF

    ON ON ON

    105 ONOFF OFF

    ON

    OFF

    ON ON 120OFF OFF OFF

    ON ON ON ON

    106OFF

    ON

    OFF

    ON

    OFF

    ON ON 121 ONOFF OFF

    ON ON ON ON

    107 ON ONOFF

    ON

    OFF

    ON ON 122OFF

    ON

    OFF

    ON ON ON ON

    108OFF OFF

    ON ON

    OFF

    ON ON 123 ON ONOFF

    ON ON ON ON

    109 ONOFF

    ON ON

    OFF

    ON ON 124OFF OFF

    ON ON ON ON ON

    110OFF

    ON ON ON

    OFF

    ON ON 125 ONOFF

    ON ON ON ON ON

    Tab. 1/6: Setting station numbers 96 … 125: position of the DIL switch elements

  • 1. Installation CPV-DI02 and CPV-CS02

    1-15Festo P.BE-CPV-DI02-EN en 1201a

    1.3 Connecting the field bus

    1.3.1 Field bus cable

    NoteIf installation has not been carried out correctly and if highbaud rates are used, data transmission errors may occuras a result of signal reflections and attenuations.Causes of the transmission faults can be:

    – missing or incorrect terminating resistor

    – incorrect screening/shield connection

    – branches

    – transmission over long distances

    – unsuitable cables.

    Observe the cable specifications. Refer to your controllermanual for information on the type of cable to be used.

    NoteIf the valve terminal is fitted into a moving part of amachine, the field bus cable on the moving part must beprovided with strain relief. Note the relevant regulations inIEC/DIN EN 60204-1.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-16 Festo P.BE-CPV-DI02-EN en 1201a

    CPV-DI02 (PROFIBUS-DP)

    Use a twisted, screened 2-core cable for connecting the field bus.

    Cable specification as per EN 50170 (cable type A):surge impedance: 135 … 165 Ω (3 … 20 MHz)capacitance per unit length: < 30 nF/km

    loop resistance: < 110 Ω/kmcore diameter: > 0.64 mmcore cross-sectional area: > 0.34 mm2

    Bus length Exact specifications on the bus length can be found in thenext section and in the manuals for your control system.

    CPV-CS02 (ABB CS31)

    Refer to the PLC manual for your controller for the type ofcable to be used. Also take into account here the distancesand the field bus baud rate.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-17Festo P.BE-CPV-DI02-EN en 1201a

    1.3.2 Field bus baud rate and field bus length for PROFIBUS-DP (CPV-DI02)

    NoteThe maximum permitted field bus segment lengths dependon the baud rate used.

    • Note the maximum permitted segment length (cablelength without repeater), if you connect the CPX terminalto a field bus segment.

    • Avoid branch lines.

    The CPV-DI02 sets itself automatically to one of the followingbaud rates:

    Baud rate Maximum segment length

    9.6; 19.2; 93.75 kBaud 1200 m

    187.5 kBaud 1000 m

    500 kBaud 400 m

    1500 kBaud 200 m

    3000 … 12000 kBaud 100 m

    Tab. 1/7: Maximum field bus segment lengthsforPROFIBUS-DP depending on the baud rate

  • 1. Installation CPV-DI02 and CPV-CS02

    1-18 Festo P.BE-CPV-DI02-EN en 1201a

    1.3.3 Field bus interface

    There is a 9-pin Sub-D socket on the CPV Direct for connect-ing it to the field bus.This connection serves for the incoming and continuing field

    bus cable. You can connect the CPV Direct with the field busplug from Festo type FBS-SUB-9-GS-DP-B.

    NoteOnly the Festo field bus plug complies with IP65. Beforeconnecting field bus plugs from other manufacturers:

    • replace the two flat screws by bolts (part no. 340 960).

    CPV-DI02 (PROFIBUS-DP)

    Pin Field bus plug IP65from Festo 1)

    PROFIBUS-DP Designation

    123456789Housing

    B

    A

    Clamp strap

    n.c.n.c.RxD/TxD-PCNTR-P 2)

    DGNDVPn.c.RxD/TxD-Nn.c.Screening

    not connectednot connectedReceive/transmit data PRepeater control signal 2)

    Data reference potential (M5V)Power supply positive (P5V)not connectedReceive/transmit data Nnot connectedConnection to functional earth

    (view of socket of the CPV Direct)

    1) Type FBS-SUB-9-GS-DP-B (part no. 532216)2) The repeater control signal CNTR-P is in the form of a TTL signal.

    Tab. 1/8: Pin assignment of the field bus interface for PROFIBUS-DP (CPV-DI02)

  • 1. Installation CPV-DI02 and CPV-CS02

    1-19Festo P.BE-CPV-DI02-EN en 1201a

    CPV-CS02 (ABB CS31)

    Pin Field bus plug IP65 from Festo 1) ABB CS31

    123456789Housing

    B

    A

    Clamp strap

    Bus 1

    Bus 2

    Screening/shield

    (view of socket of the CPV Direct)

    1) Type FBS-SUB-9-GS-DP-B (part no. 532216)

    Tab. 1/9: Pin assignment of the field bus interfacefor ABB CS13 (CPV-CS02)

  • 1. Installation CPV-DI02 and CPV-CS02

    1-20 Festo P.BE-CPV-DI02-EN en 1201a

    1.3.4 Connection possibilities

    NoteUse a protective cap or blanking plug to seal unused con-nections. You will then comply with protection class IP65.

    Connection with field bus plugs from Festo

    • Observe the fitting instructions for the field bus plug.

    You can connect the CPV Direct to the field bus easily with thefield bus plug from Festo (type FBS-SUB-9-GS-DP-B, part no.532216). You can disconnect the plug from the CPV Directwithout interrupting the bus cable (T-TAP function).

    1 Hinged cover withdisplay window

    2 Blanking plug ifconnection is notused

    3 Clamp strap forscreening/shieldconnection

    4 Field busincoming (IN)

    5 Switch for bustermination andcontinuing fieldbus

    6 Field buscontinuing (OUT)

    7 Only connectedcapacitively

    ONAB AB

    21 3

    4567

    Bus in

    Bus out

    Fig. 1/6: Field bus plug from Festo, type FBS-SUB-9-GS-DP-B

  • 1. Installation CPV-DI02 and CPV-CS02

    1-21Festo P.BE-CPV-DI02-EN en 1201a

    NoteThe clamp strap in the field bus plug from Festo isconnected internally only capacitively with the metallichousing of the Sub-D plug. This is to prevent equalizingcurrents flowing through the screening of the field buscable.

    DIL switches With the switch in the field bus plug you can switch thefollowing:

    – switch setting OFF: the bus termination is switched offand the continuing field bus cableis switched on.

    – switch setting ON: the bus termination is switched onand the continuing field bus cableis switched off (see Fig. 1/7).

    NoteNote the type designation of your field bus plug. The plugtype FBS-SUB-9-GS-DP-B switches the continuing field buscable off when the bus termination is switched on.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-22 Festo P.BE-CPV-DI02-EN en 1201a

    Connection with M12 adapter (reverse key coded)

    With adapter (type: FBA-2-M12-5POL-RK, part no. 533118),you can connect the CPV Direct to the field bus via an M12plug connector. The plug connectors have an inverted mech-anical coding (reverse key or B-coded), to avoid confusionbetween incoming and continuing connections.You can disconnect the M12 adapter from the CPV Directwithout interrupting the bus cable (T-TAP function).

    Connection to the field bus is made with a 5-pin M12 plugwith PG9 screw connector. Use the second connection socketfor the continuation of the field bus.

    M12 adapter (reverse key coded) Pin no.

    5

    2

    3

    4

    15

    1

    4

    3

    2 1. VP: Supply voltage positive (P5V)2. RxD/TxD-N: Receive/Send data N3. DGND: Data reference potential (M5V)4. RxD/TxD-P: Receive/Send data P5. FE: Functional earthHousing/thread: Screening/shield

    Protective cap or plug with bus terminationresistor if connection is not used.

    Bus inBus out

    Tab. 1/10: Pin assignment of the field bus interface with adapter for M12 connection,5-pin

  • 1. Installation CPV-DI02 and CPV-CS02

    1-23Festo P.BE-CPV-DI02-EN en 1201a

    Connection with optical-fibre waveguides(only CPV-DI02, PROFIBUS-DP)

    The PROFIBUS-DP interface of the CPV-DI02 complies withspecification EN 50170-2 and supports the control of networkcomponents for optical-fibre waveguides.

    Use optical-fibre waveguides when transmission is affectedby heavy interference, as well as for extending the trans-mission range when high baud rates are used.

    Example of optical-fibre waveguide network components:

    – Siemens Optical Link Module (OLM) for PROFIBUS plus

    – Siemens Optical Link Plug (OLP) for PROFIBUS (IP20)

    – Harting Han-InduNet® Media converter IP65 in combina-tion with adapter cable for Festo products (optical data

    transmission in DESINA installation concept).

  • 1. Installation CPV-DI02 and CPV-CS02

    1-24 Festo P.BE-CPV-DI02-EN en 1201a

    1.4 Bus termination with termination resistors (CPV-DI02)

    NoteIf the valve terminal is at the beginning or the end of thefield bus system, a bus termination will be required.

    • Fit a bus termination to both ends of a bus segment.

    Recommendation:Use the ready-to-use field bus plugs from Festo for the bustermination. A suitable resistor network is incorporated in thehousing of this plug (see Fig. 1/7).

    Receive/send data P(data cable B)

    Receive/send data N(data cable A)

    390 Ω

    390 Ω

    220 Ω

    Pin 6: Supply voltage

    Pin 5: Data reference potential

    Pin 3

    Pin 8

    120 nH

    120 nH

    Fig. 1/7: Circuit diagram for bus termination network(switch in Festo field bus plug set to ON)(PROFIBUS-DP: for cable type A as per EN 50170)

  • 1. Installation CPV-DI02 and CPV-CS02

    1-25Festo P.BE-CPV-DI02-EN en 1201a

    1.5 Connecting the power supply

    1.5.1 Cable for power supply

    • Use a power supply cable with sufficient cross-sectionalarea.

    • Avoid long distances between the power unit and the CPVvalve terminal. Long cables reduce the voltage supplied

    by the power unit.

    • If necessary calculate the suitable cross-sectional areaand the maximum permitted cable length.

    The power supply connection is in the form of a plug. The pinassignment of the plug can be found on the following pages.

    For connecting the power supply, use plugs from the Festorange which correspond to the outer diameter of the cableused (see appendix A.3).

  • 1. Installation CPV-DI02 and CPV-CS02

    1-26 Festo P.BE-CPV-DI02-EN en 1201a

    1 Cable

    2 Strain relief

    3 Housing

    4 Connecting part

    12

    3

    4

    Fig. 1/8: Individual socket parts and cable routing

    Preparing When you have selected suitable cables, connect them asfollows (Fig. 1/8):

    1. Open the socket: Loosen the centre knurled nut.

    2. Open the strain relief on the rear of the housing. Pass thecable through.

    3. Remove 5 mm of the insulation from the end of the cableand fit core end sleeves.

    4. Connect the conductors.

    5. Replace the connecting part on the housing of the socketand screw it tight. Pull the cable back so that there are noloops inside the housing.

    6. Tighten the strain relief.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-27Festo P.BE-CPV-DI02-EN en 1201a

    1.5.2 Selecting the power unit

    Warning• In order to provide the electric power supply, use onlyPELV circuits as per IEC/DIN EN 60204-1 (ProtectiveExtra-Low Voltage, PELV).Take into account also the general requirements forPELV circuits as per IEC/DIN EN 60204-1.

    • Use only power packswhich guarantee reliable electricalisolation of the operating voltage as per IEC/DINEN 60204-1.

    By the use of PELV power units, protection against electricshock (protection against direct and indirect contact) isguaranteed in accordance with IEC/DIN EN 60204-1(electrical equipment of machines, general requirements).

    The current requirement of a CP system depends on thenumber of CP modules and valve coils.Recommendation:

    • Use closed-loop controlled power units.

    • When selecting the power unit, check that it providessufficient output. If necessary, calculate the total current

    requirement according to the following table.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-28 Festo P.BE-CPV-DI02-EN en 1201a

    Total current consumption The table below shows how to calculate the total currentconsumption for a CP system. The values specified have beenrounded up.

    Current consumption of theCP electronics (pin 1)

    Sums

    CPV Direct max. 100 mA

    CPV valve terminal max. 40 mA

    CPA valve terminal 20 mA

    CP input module max. 40 mA

    Sensors see manufacturerspecifications

    CP output module max. 40 mA

    Carry forward = ______ mA

    Current consumption of thevalve supply (pin 2)

    Current consumption ofall simultaneouslyenergized valve coils 1) __ x ____ mA = ______ mA

    1) Current consumption deepnds on the valve type (see TechnicalSpecifications of the valves in the relevant pneumatics manual).

    Tab. 1/11: Calculating the total current consumption

  • 1. Installation CPV-DI02 and CPV-CS02

    1-29Festo P.BE-CPV-DI02-EN en 1201a

    1.5.3 Connecting the power supply

    WarningIf the valve terminal is supplied with load voltage via anoutput of a “safety I/O module”, switch-on test pulses ofthe “safety I/O module” may lead to unexpected reactionsof the valve terminal.

    • Make sure that switch-on test pulses are reliablysuppressed or switched off.

    Power is supplied via a 4-pin M12 plug (see Fig. 1/1).

    Current consumption depends on the type of valve terminal.Please refer to the “Pneumatics manual, P.BE-CPV-...” and the

    previous section for the values.

    • Observe the tolerance with the connection for the 24 V

    load voltage at pin 2: DC 20.4 … 26.4 V DC. Check the24 V operating voltage of the valves whilst the system isoperating.

    CautionProtect the load voltage of the CPV valve coils with amax. 2 A external fuse.

    In this way you can avoid functional damage to the CPVDirect in the event of a short circuit.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-30 Festo P.BE-CPV-DI02-EN en 1201a

    NoteCheck within the framework of your EMERGENCY STOPcircuit, to ascertain the measures necessary for puttingyour machine/system into a safe state in the event of anEMERGENCY STOP.

    – Switching off the load voltage for the valves and outputmodules in the secondary circuit of the power unit.

    – Switching off the compressed air supply for the valveterminal.

    Due to energy stored in the input circuitry of valve ter-minals, there may be a delayed reaction of the valves whenthe load voltage is switched off.

    Take this into consideration, e.g. as follows:

    – by using an input signal in the controller for checkingwhether the load voltage has been switched off.

    – by blocking the control signal for the valves by lockingthe output signal with the input signal “Load voltage”.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-31Festo P.BE-CPV-DI02-EN en 1201a

    Pin assignment of the power supply connection

    1

    1 Pin assignment1: 24 V DC operating voltage for the electronics

    (and inputs, with modules connected to theextension connection) (max. 2 A)

    2: 24 V DC load voltage for the valves (max. 2 A)3: 0 V4: Earth/ground connection

    Fig. 1/9: Pin assignment of the power supply connection

    Potential equalization

    The CPV valve terminal has 2 earth connections for potentialequalization:

    – on the power supply connection

    – on the end plate.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-32 Festo P.BE-CPV-DI02-EN en 1201a

    Note• Always connect the earth potential to pin 4 of the powersupply connection.

    • Connect the earth connection of the end plate with lowimpedance (short cable with large cross-sectional area)to the earth potential.

    • By means of low-impedance connections, make surethat the housing of the valve terminal and the earth con-nection at pin 4 have the same potential and that thereare no equalizing currents.

    In this way, you will avoid interference caused by electro-magnetic influences.

    1 2 43 2

    24 V

    0 V

    PS

    MNS

    3 1 2 4

    2 A

    2 A

    1 PE

    2 Potential equalization

    3 Load voltage can be switched off separately

    4 Earth connection at pin 4 designed for 3 A

    Fig. 1/10: Example of connection with PELV power supplyunit and potential equalization

  • 1. Installation CPV-DI02 and CPV-CS02

    1-33Festo P.BE-CPV-DI02-EN en 1201a

    1.6 Extending the CPV Direct

    This section is only relevant for you if you wish to connectCPI/CP modules to the CPI extension connection.

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    1

    1 CPI extension connection

    Fig. 1/11: CPI extension connection

    The rules for CPI systems also apply for extending theCPV Direct (see section 1.6.1).

    You can connect the following CPI/CP modules to theCPI extension connection:

    – CP input and output modules

    – CPI input and output modules (with extended functions)

    – CPV-SC with CPI connection

    – CPV/CPA valve terminals with and without extended

    functions.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-34 Festo P.BE-CPV-DI02-EN en 1201a

    CautionThe max. cable length between the CPV Direct and the lastCPI/CP module must not exceed 10 m.

    The CP connecting cables must have special electricalproperties. Therefore always use Festo CP connectingcables.

    Ready-to-use CP connecting cables are available from Festo.These are available in various lengths and designs.} www.festo.com/catalogue

    Seal unused CP connections of yourCP system with the relevant seal pro-vided. In this way you will comply withprotection class IP65.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-35Festo P.BE-CPV-DI02-EN en 1201a

    1.6.1 Rules for extending the CPI system

    The CPI system supports a different number of modules perCP string, depending on the type of CP master and on theCPI/CP modules connected.

    The CPV Direct is a CPI master.

    Modules can be placed in two different groups:

    – CPI modules (with extended functions)

    – CP modules (without extended functions)

    Rules and properties

    CPI system – Max. 4 modules on the CP string– Max. 32 inputs and 32 outputs (per CP string)– The sequence of the modules within the CP string is optional

    CPI master A mixture of CPI/CP modules is possible on CPI masters:– Only one CP input module is possible at the end of a string– Only one CP valve terminal 2) or one CP output module 2) is possible per CP string.– “Unused” locations on the CP string can be “filled” with CPI modules 1)

    CPI modules Incoming and continuing interface on all CPI modules (input modules, outputmodules) and valve terminals with CPI connection

    1) With extended functions2) Without extended functions

    Tab. 1/12: Rules for extending the CPI system

    NoteIrrespective of the type of CPI/CP modules, not more than32 inputs and 32 outputs may be connected (sum of allmodules on a CP string).

    This means that a CP string can be extended by maximum2 CP valve terminals with CPI ability, as CP valve terminalsalways occupy 16 output addresses.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-36 Festo P.BE-CPV-DI02-EN en 1201a

    X X I

    CPI master

    X X

    X X I

    X VI/O

    X: Any CPI module or CP valve terminal with CPI ability(max. 2 valve terminals possible)

    I: CP input module

    VI/O: CP valve terminal or CP output module

    grey = CPI modules/valve terminals with extended functions

    X X

    X

    Fig. 1/12: Examples of extending a CPI system

  • 1. Installation CPV-DI02 and CPV-CS02

    1-37Festo P.BE-CPV-DI02-EN en 1201a

    CP string withoutCPI output modulewith max. oneCP valve terminaltype

    Maximumsensor currentconsumption ofthe CPI moduleson the CP string 1)

    Maximum string length with CPI cable,type KVI-CP-3-...

    Vval = 21.6 ... 24 V16 valves 2)

    Vval = 20.4 V8 valves 3)

    Vval = 20.4 V16 valves 4)

    CPV10-.../CPA10-... 0.5 ... 1.5 A 10 m 10 m 10 m

    CPV14-.../CPA14-... 0.5 ... 1.5 A 10 m 10 m 10 m

    CPV18-...

    0.5 A 10 m 10 m 10 m

    1.0 A 10 m 10 m 10 m 5)

    8 m 6)

    1.5 A 10 m 10 m 10 m 5)

    5 m 6)

    1) Maximum sensor supply current used2) Rated voltage or undervoltage of -10 %, 16 valve solenoid coils switched simultaneously

    (high current phase)3) Rated voltage or undervoltage of -15 %, 8 valve solenoid coils switched simultaneously

    (high current phase)4) Rated voltage or undervoltage of -15 %, 16 valve solenoid coils switched simultaneously

    (high current phase)5) Valve terminal installed in each case at start of string6) Valve terminal installed in each case at end of string

    Tab. 1/13: Permitted string lengths with CPI cables, type KVI-CP-3-... depending on theCP valve terminal used and on the sensor current consumption

    CP string without CP valveterminal, with a maximum ofone CPI output module, type

    Maximum sensor currentconsumption of the CPImodules on the CP string 1)

    Maximum string lengthwith CP cable, typeKVI-CP-3-...

    CP-A04-M12-CL 0.5 A 10 m

    CP-A08...-M12-... 1.5 A 10 m

    1) Maximum sensor supply current used

    Tab. 1/14: Permitted string lengths with CP cables, type KVI-CP-3-... depending on theCPI output module used and on the sensor current consumption

  • 1. Installation CPV-DI02 and CPV-CS02

    1-38 Festo P.BE-CPV-DI02-EN en 1201a

    1.7 Preparing the CPI system for commissioning

    This section is only relevant for you if you have connectedCPI/CP modules to the CPI extension connection.

    NoteDo not yet connect the CPV Direct to a higher-ordercontroller for preparing commissioning.

    You will thus avoid addressing faults which may occur invarious field bus systems when address ranges are modi-fied during operation.

    1.7.1 Checking the CP strings

    Preparations Before commissioning a CPV Direct with CPI extensions, youshould first prepare each individual CPI system for commis-sioning.

    Proceed as follows:

    1. Check the pneumatic tubing of the valve terminals withthe aid of the manual override (see pneumatics manual).

    2. Check the complete electric circuitry of the CPI system.

    3. Save the current string assignment of the CPI system as thenominal assignment, as described in section 1.7.2.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-39Festo P.BE-CPV-DI02-EN en 1201a

    1.7.2 Saving the string assignment

    WarningBe very careful if the string assignment of your CPI systemis modified at a later stage:

    • After saving the string assignment, check the addressassignments of your CPI system before starting userprograms.

    You will then avoid addressing faults in the case ofincorrectly fitted CPI modules.

    String assignment The CPV Direct saves the type and the sequence of the con-nected CPI modules for the CP string (string assignment).

    The saved string assignment enables the CPV Direct to avoidfaults in connecting, and thus addresssing. It checks auto-matically to see if the current string assignment is the sameas the saved assignment. A distinction is made here betweenthe following test phases:

    – testing during the start-up phase (see section 1.8)

    – testing during operation (see section 1.9).

    When the status LEDs on all the CPI modules light up, theCPI system is prepared for commissioning. You can nowcommission the CPI system.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-40 Festo P.BE-CPV-DI02-EN en 1201a

    Saving the stringassignment

    The desired string assignment is generated and saved forcommissioning. In this way the appropriate addresses areassigned to the connected CPI modules.

    Save the string assignments as follows:

    1. Leave the power supply for the CPV Direct switched off forthe time being.

    2. Make sure that the CPI cables are fastened properly withthe union nut.

    3. Switch on the power supply for the CPV Direct and, ifnecessary, for the CPI/CP modules with load voltageconnection.The fault LEDP on the CPV Direct will flash if CPI/CPmodules are connected or if the string assignment ismodified.

    4. Use a small screwdriver or similar tool to press the SAVEbutton for at least 1 s (see section Fig. 1/3).This will save the current string assignment as the nom-inal string assignment in the CPV Direct.The fault LEDPno longer flashes.The status LEDs of all the recognized CPI/CP moduleslight up.

    5. Power OFF/ON

    NoteAfter saving the string assignment, check the addressassignments of your CPI system before starting userprograms.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-41Festo P.BE-CPV-DI02-EN en 1201a

    1.8 Switching-on reaction of the CPI system

    When the power supply is switched on, the CPV Direct ascer-tains automatically the current string assignment. It also as-certains which CPI/CP modules are connected to the string

    extension.

    If the current assignment is the same as the saved assign-ment, the CPV Direct will switch automatically to the ready-to-operate status.

    The PS/PL LEDs of the CPV Direct as well as the status LEDson the connected CPI/CP modules light up.

    If the current assignment is not the same as the saved assign-ment, the fault LEDP on the CPV Direct will flash. In this casethe CPI system is not ready to operate.

    You then have the following possibilities of restoring thereadiness to operate:

    – eliminate assignment faults manually or replace individ-

    ual CPI modules (see section 1.9)

    – save the current assignment as the nominal assignment

    (see section 1.7.2).

    Detailed instructions on diagnosing the CPV Direct using theLEDs can be found in section 3.1.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-42 Festo P.BE-CPV-DI02-EN en 1201a

    “CP configuration fault”Fault LEDP flashes

    Switch on the powersupply

    Yes

    Save buttonpressed?

    No

    String assignmentsave

    Fault LEDP off

    Module types:Set = Actual?

    Yes

    CP string: Registermodule types

    No

    CPI system ready tooperate (permanentI/O update)

    Initial commissioning(commissioning withmodified configuration)

    Normal operation

    Fig. 1/13: Switching-on reaction of the CPI system

  • 1. Installation CPV-DI02 and CPV-CS02

    1-43Festo P.BE-CPV-DI02-EN en 1201a

    1.9 Reaction of the CPI system to faults in operation

    WarningUndesired activation of actuators

    An incorrect status of the valves and outputs can lead todangerous situations.

    • Make sure that valves and outputs are put into a safestate when faults occur.

    If there is a fault on the CP string during operation, e.g. dueto cable fracture, etc., this will be displayed on the CPV Directby the diagnostic LED of the string extension (P). The status

    LED on the relevant module goes out. All modules workingwithout faults remain ready to operate.

    Detailed instructions on diagnosing the CPV Direct using theLEDs can be found in section 3.1.

    1.9.1 Eliminating assignment faults

    In order to eliminate assignment or connection faults of theCPI system:

    1. Switch off the power supply for the CPV Direct.

    2. Restore the saved assignment by connecting theappropriate CPI/CP modules with the CPV Direct.

    3. Switch on the power supply for the CPV Direct again.

  • 1. Installation CPV-DI02 and CPV-CS02

    1-44 Festo P.BE-CPV-DI02-EN en 1201a

    1.9.2 Replacing CPI/CP modules

    NoteReplacing a CPI/CP module with a CPI/CP module of adifferent type or replacing several CPI/CP modules willrequire new commissioning and new saving of the stringassignment (see section 1.7).

    In order to replace a single CP module, proceed as follows:

    1. Switch off the power supply for the CPV Direct.

    2. In the case of CPI/CP output modules and valve terminalson the CP string concerned:switch off the following sources of energy:– the compressed air supply to the valve terminal– the operating voltage supply for the CPI/CP output

    module.

    3. Disconnect all connecting cables and, if necessary, alsothe tubing.

    4. Connect all the cables and, if applicable, the tubing withthe new module of the same type.

    5. Now connect the new module of the same type to thesame string.

    6. In the case of CPI/CP output modules and CP valveterminals:switch on the operating voltage supply or the compressedair supply again.

    7. Switch on the power supply for the CPV Direct again.

    8. Check the addresses of the CPI system.

  • Commissioning CPV-DI02 (PROFIBUS-DP)

    2-1Festo P.BE-CPV-DI02-EN en 1201a

    Chapter 2

    Commissioning CPV-DI02 (PROFIBUS-DP)

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-2 Festo P.BE-CPV-DI02-EN en 1201a

    Contents

    2. Commissioning CPV-DI02 (PROFIBUS-DP) 2-1. . . . . . . . . . . . . . . . . . . . . . . . . .

    2.1 Preparing the CPV Direct for commissioning 2-3. . . . . . . . . . . . . . . . . . . . . . . . .

    2.1.1 Switching on the power supply 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.1.2 Address assignment of the CPV Direct 2-4. . . . . . . . . . . . . . . . . . . . . . .

    2.1.3 Address assignment of CPI/CP modules 2-6. . . . . . . . . . . . . . . . . . . . .

    2.1.4 Information on commissioning 2-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.2 Device master file (GSD) and icon files 2-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3 Configuration with a Siemens master 2-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3.1 STEP 7 – HW Config (up to V 5.2) – preparations 2-10. . . . . . . . . . . . . .

    2.3.2 Station selection with STEP 7 2-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3.3 Configuration with STEP 7 2-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3.4 Tool change configuration 2-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4 Examples of configuration 2-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.1 Standard configuration 2-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4.2 Tool change configuration 2-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-3Festo P.BE-CPV-DI02-EN en 1201a

    2.1 Preparing the CPV Direct for commissioning

    2.1.1 Switching on the power supply

    NotePlease observe also the switching-on instructions in themanual for your PLC.

    When the controller is switched on, it will automatically carry

    out a comparison between the NOMINAL and the ACTUALconfigurations. It is important for this configuration run that:

    – the specifications for the field bus configuration are com-plete and correct.

    – the power supplies for the programmable logic controllerand for the field bus slaves are switched on either simul-

    taneously or in the sequence indicated below.

    Please note the following when switching on the power

    supply:

    Common supply Common power supply for the control system and all field

    bus slaves via a central power unit or a central switch.

    Separate supply If there is a separate supply for the control system and for thefield bus slaves, the power should be switched on in thefollowing sequence:

    1. the operating voltage supply for all field bus slaves

    2. the operating voltage supply for the controller.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-4 Festo P.BE-CPV-DI02-EN en 1201a

    2.1.2 Address assignment of the CPV Direct

    The CPV Direct always occupies 16 output addresses,irrespective of the number of valve solenoid coils fitted on it.This enables the CPV Direct to be extended at a later stage

    without the need to shift the addresses.

    The following diagram shows the addressing sequence of theindividual CPV valve plates.

    0-1

    2-3

    4-5 8-9

    10-11

    12-13

    6-7 14-15

    Fig. 2/1: Address assignment of the CPV Direct

    – A valve location on the CPV Direct always occupies 2 ad-dresses, even if it is fitted with a blanking plate or pressure-separator plate. If a valve location is fitted with a double-

    solenoid valve, the following applies:

    – pilot solenoid coil 14 occupies the less significantaddress

    – pilot solenoid coil 12 occupies the more significantaddress.

    With single-solenoid valves the higher-value addressremains unused.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-5Festo P.BE-CPV-DI02-EN en 1201a

    – Addresses are assigned from left to right on the CPV Directand from the front to the rear on the individual valve loca-

    tions.

    OB: Output byte

    OB x OB x+1

    O20.0

    O20.1

    O20.3

    O20.2

    O20.5

    O20.4

    O20.6

    O20.7

    O21.1

    O21.0

    O21.3

    O21.2

    O21.5

    O21.4

    O21.7

    O21.6

    0

    1

    2

    3

    4

    5

    6

    7

    0

    1

    2

    3

    4

    5

    6

    7

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    Fig. 2/2: Address assignment of the CPV Direct (outputs)

    with examples for OB20 and OB21

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-6 Festo P.BE-CPV-DI02-EN en 1201a

    2.1.3 Address assignment of CPI/CP modules

    Tab. 2/1 provides an overview of the assigned addresses forthe various CPI/CP modules (as at 2011).

    CPI/CP modules Assigned I/O onCPV-DI02-...

    Type CPI-capable 1) CPI masters 1)

    I O

    CPI/CP input modules CP-E08-M8-CLCP-E08-M12-CLCP-E16-KL-CLCP-E08-M12-ELCP-E16-M8-ELCP-E32-M8-ELCP-E16-M8CP-E16N-M8CP-E16-M8-ZCP-E16-M12x2-5POLCP-E16N-M12x2CP-E16-KL-IP20-Z

    YesYesYesYesYesYesNoNoNoNoNoNo

    8 I8 I16 I16 I16 I32 I16 I16 I16 I16 I16 I16 I

    ––––––––––––

    CPI/CP output modules CP-A04-M12-CLCP-A08-M12-EL-ZCP-A08-M12-5POLCP-A08N-M12

    YesYesNoNo

    ––––

    8 O8 O16 O16 O

    CPI/CP valve terminals CPV...-CPICPV-SC-CPICPV...-GE-FB-4CPV...-GE-FB-6CPV...-GE-FB-8CPA10/14-IFB-CP

    YesYesNoNoNoNo

    – 16 O16 O16 O16 O16 O16 O

    1) with extended functions

    Further CPI modules and CPI-capable valve terminals in preparation.

    Tab. 2/1: Assigned I/Os of the CPI/CP modules

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-7Festo P.BE-CPV-DI02-EN en 1201a

    2.1.4 Information on commissioning

    FREEZE and SYNC

    The operating modes FREEZE and SYNC are supported by theCP system in accordance with EN 50170.

    The method of accessing the FREEZE and SYNC commands

    depends on the controller used. Please refer here to thedocumentation for your field bus module.

    CautionThe operating mode FREEZE or SYNC will be reset auto-matically:

    – when the CP system is switched on/off

    – when the field bus module stops.

    Only the operating mode FREEZE will be reset automati-cally:

    – when the bus connection to the CP system is interrupted(response monitoring active).

    FREEZE command

    All the outputs of the CPI system will be “frozen”. The CPV

    Direct now sends a constant image of all the inputs to themaster. With each further FREEZE command, the input imageis updated and sent again to the master.

    Return to normal operation: UNFREEZE command

    SYNC command

    All the outputs of the CPI system will be “frozen”. The CP sys-tem now no longer reacts to modifications to the output

    image in the master. With each further SYNC command, theoutput image will be updated and transferred.

    Return to normal operation: UNSYNC command

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-8 Festo P.BE-CPV-DI02-EN en 1201a

    Module consistency

    The CP system supports the following variants of moduleconsistency:

    – over the selected format (word)

    The following table provides an overview of the possibleDP identifiers for the CPV-DI02:

    CPV and extension DP identifier Comment

    Siemens EN 50170

    CPV-DI02 (without extension) ID: 16DO ID: 21h/33d 16 digital outputs/valvecoils of the CPV

    Extension: 8 digital inputs ID: 8DI ID: 10h/16d e. g. CPI/CP inputmodules

    Extension: 16 digital inputs ID: 16DI ID: 11h/17d

    Extension: 24 digital inputs ID: 24DI ID: 12h/18d

    Extension: 32 digital inputs ID: 32DI ID: 13h/19d

    Extension: 8 digital outputs ID: 8DO ID: 20h/32d e. g. CPI/CP outputmodules, CP valveterminalsExtension: 16 digital outputs ID: 16DO ID: 21h/33d

    Extension: 24 digital outputs ID: 24DO ID: 22h/34d

    Extension: 32 digital outputs ID: 32DO ID: 23h/35d

    Extension: Tool change configuration(32 digital inputs and outputs)

    ID: 32DX ID: 33h/51d see section 2.3.4

    Tab. 2/2: Overview of DP identifiers for various extensions to the CPV-DI02

    NoteEnter the identifiers corresponding to the physicalsequence of the modules on the CP extension string,starting with the CPV-DI02.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-9Festo P.BE-CPV-DI02-EN en 1201a

    2.2 Device master file (GSD) and icon files

    In order to configure the CPV Direct with a PC/programmer,you will require the appropriate GSD file. In addition to theslave-typical entries (Ident. number, Revision, etc.), the de-vice master file (GSD) also contains a selection of identifiers.

    Reference sources Current GSD files can be found on the Festo Internet pages

    under:

    – www.festo.com/fieldbus

    GSD files You will require one of the following files for the CPV Direct:

    – CPV_0A35.GSD (german Version) or

    – CPV_0A35.GSE (international version)

    Icon files You will find icon files to represent the valve terminal in yourconfiguration software under the above-mentioned Internetaddress.

    Normal operatingstatus

    Diagnostic case Special operatingstatus

    File: Pbdicpin.dib File: Pbdicpid.dib File: Pbdicpis.dib

    Tab. 2/3: Icon files for configuration software

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-10 Festo P.BE-CPV-DI02-EN en 1201a

    2.3 Configuration with a Siemens master

    NoteVarious configuration programs are available for use inconjunction with a Siemens master. Please observe therelevant procedure for your configuration program.

    The following sections describe as an example the main con-figuration steps with the STEP 7 software. It is assumed thatthe reader is already familiar with the information in the man-ual for the STEP 7 software.Information on operation with general DP masters can befound in appendix A.2.

    2.3.1 STEP 7 – HW Config (up to V 5.2) – preparations

    GSD 1. Copy the GSD of the valve terminal into the directory...\STEP7\S7DATA\GSD on your PC/programmer.File: CPV_0A35.GS*(Reference sources for the GSD see section 2.2)

    The GSDs can either be:

    – copied manually into the above mentioned directory(e. g. with Windows Explorer) or

    – loaded via the menu [Options] [Install new GSD].

    NoteUpdate the hardware catalogue if you copy the GSD duringwork with STEP 7.Menu in HW Config: [Options] [Update catalogue]

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-11Festo P.BE-CPV-DI02-EN en 1201a

    NoteAs from STEP 7 V4.02, GSDs are stored within the STEP 7project (station GSD). This can cause the updating/readingof new GSD files to appear as if incorrect. Please informyourself about handling the station GSD files in the STEP 7help.

    2. Process the dialogue window “Properties PROFIBUS”– Baud rate– Profile

    Icons 3. Copy the icon files (see section 2.2) for the CPV Directinto directory ...\STEP7\S7DATA\NSBMP on your PC orprogrammer.

    The icon files can either be:

    – copied manually into the above named directory or

    – loaded via the menu [Options] [Install new GSD] – filetype “Bitmap files” in HW Config.

    4. Insert a DP master system:– Right-hand mouse click on “DP” under “CPU” in the rack.– Click on [Add master system] in the context menu.The line of the DP master system will be displayed.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-12 Festo P.BE-CPV-DI02-EN en 1201a

    2.3.2 Station selection with STEP 7

    1 2

    3 4

    Fig. 2/3: Station selection with STEP 7 – HW Config(the windows displayed are not all visible at the same time, see text)

    1. If the hardware catalogue is not open: click on thecatalogue icon (see Fig. 2/31 ).The hardware catalogue will be displayed.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-13Festo P.BE-CPV-DI02-EN en 1201a

    2. Open the following folder in the hardware catalogue:“\PROFIBUS-DP\Additional Field Devices\Valves.”The folder “Valves” is displayed when you copy the GSD(see step 1 of the preparations).Pull the station type “Festo CPV-DI02” onto the line of theDP master system2.The dialogue window “Properties – PROFIBUS interface”will be displayed3.

    3. Select the PROFIBUS address identical to the selectedsetting on the DIL switch in the switch module (seesection 1.2.2) and close with OK.The icon of the valve terminal will be displayed on the lineof the DP master system.

    4. If necessary, process the dialogue window “Properties –DP slave”4: Double-click on the icon of the valve terminal.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-14 Festo P.BE-CPV-DI02-EN en 1201a

    2.3.3 Configuration with STEP 7

    1 2 3

    4 5

    Fig. 2/4: Configuration with STEP 7 – HW Config (example for adding one CP inputmodule with 16 inputs, explanations see text)

    1. Click on the icon of the valve terminal to be configured inthe HW Config1. The configuration table will be dis-played under the rack2.

    2. Open the module “Festo CPV-DI02” (folder\PROFIBUS-DP\ Additional Field Devices\Valves\...) in the hardwarecatalogue3.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-15Festo P.BE-CPV-DI02-EN en 1201a

    Basic configuration The CPV-DI02 valve terminal always occupies 16 outputaddresses. Carry out first a configuration of the basic deviceas follows.

    3. Pull the entry “Base: 16DO” onto the 1st. line of theconfiguration table4 .

    4. Pull the modules onto the next free line in the configur-ation table according to the extension of your CPV Direct.Assign the starting address in the window “Properties –DP slave”5 .

    NotePull the modules into the configuration table accordingto the physical sequence of the extensions of your CPIsystem.

    Modifying the address The addresses are assigned automatically.

    • Double click on the relevant line in the configurationtable and modify the starting address of theinputs/outputs in the window “Properties – DP slave”.

    NoteWith S7-400 controllers, up to 4 bytes of addresses arereserved for each DP identifier, depending on the versionstatus.

    This concludes the station selection and configuration.

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-16 Festo P.BE-CPV-DI02-EN en 1201a

    2.3.4 Tool change configuration

    With the tool change configuration you can commission mod-ules without new configuration on the CP extension connection.In the tool change configuration, pressing the SAVE button is notnecessary.

    The tool change configuration is useful if various extensionsare connected in turn to the CP...-SC-DP during operation.

    1 2

    Fig. 2/5: Tool change configuration

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-17Festo P.BE-CPV-DI02-EN en 1201a

    Procedure:

    1. Carry out the basic configuration1.

    2. Pull the entry “Tool change O/I:32/32” out of the hard-ware catalogue onto the 2nd. line of the configurationtable2.

    Addressing and function With the tool change configuration the maximum possible32 inputs and 32 outputs will be assigned, irrespective ofwhether these are used or not. The addresses are assignedwithout gaps, module after module in ascending sequence.Please take this into account when programming the con-troller.

    CautionCommunication via the PROFIBUS-DP will start in any case,even if the addresses are used incorrectly.

    The system does not check in the tool change configur-ation which modules are actually connected. After chang-ing the string assignment, evaluation of input signals canappear to be defective if inputs are read which are nolonger present in the string assignment.

    After changing the string assignment (e.g. with fewermodules): Ensure that only the addresses of the modulesactually connected to the CP string are processed by thecontroller. The same applies to outputs. Note the examplein Tab. 2/8.

    Device Assigned I/Os Addressing

    CPV basic device 16 O Output byte 0 … 1

    CPI extension 32 I Input byte 0 … 3

    32 O Output byte 2 … 5

    Tab. 2/4: I/O assignment for tool change configuration

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-18 Festo P.BE-CPV-DI02-EN en 1201a

    Configuration Advantages Disadvantages

    Standardconfiguration

    – Good diagnostic possibilities– Protection against confusion of the

    modules on the CP string

    – Modifications to the CP extensionstring must be configured again.

    Tool changeconfiguration

    – Modifications to the CP extensionstring are possible without newconfiguration.

    – Can be configured

    – Limited diagnostic possibilities(see section 3.2.5)

    – Address assignment of the changeconfigurations must be carried outvery carefully.

    Tab. 2/5: Advantages and disadvantages of the tool change configuration

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-19Festo P.BE-CPV-DI02-EN en 1201a

    2.4 Examples of configuration

    2.4.1 Standard configuration

    The following table shows three examples of configurationand addressing extensions on the CPI extension connection ofa CPV-DI02.

    No. Standard configuration DP identifiers Addressing

    1

    CPV-DI02 + CP-E08-M12-CL

    16DO 1) O20.0 … O21.7

    8DI I20.0 … I20.7

    2

    CPV-DI02 + CP-A04-M12-CL + CP-E08-M12-CL

    16DO 1) O20.0 … O21.7

    8DO O22.0 … O22.7

    8DI I20.0 … I20.7

    3

    CPV-DI02 + 4x CP-E08-M12-CL

    16DO 1) O20.0 … O21.7

    8DI I20.0 … I20.7

    8DI I21.0 … I21.7

    8DI I22.0 … I22.7

    8DI I23.0 … I23.7

    1) CPV-DI02 Basic configuration

    Tab. 2/6: Examples of standard configuration and addressing a CPV-DI02 with differentCPI extensions

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-20 Festo P.BE-CPV-DI02-EN en 1201a

    2.4.2 Tool change configuration

    The following table shows the same CPI extensions asTab. 2/6, but this time with the tool change configuration.Inthis way you can connect the extensions1,2 or3 with-out a new configuration.

    Tool change configuration DPidentifiers

    Assignedaddresses

    I20.0…I20.7

    O22.0…O22.3 I20.0…I20.7

    I20.0…I20.7 I21.0…I21.7

    I22.0…I22.7 I23.0…I23.7

    O20.0…O21.7

    Addresses used

    1

    2

    3

    16DO 1) O20.0 … O21.7

    32DX I20.0 … I23.7

    O22.0 … O25.7

    1 CPV-DI02 + CP-E08-M12-CL2 CPV-DI02 + CP-A04-M12-CL + CP-E08-M12-CL3 CPV-DI02 + 4x CP-E08-M12-CL1) CPV-DI02 Basic configuration

    Tab. 2/7: Different extensions with tool change configuration(compare with example in Tab. 2/6)

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-21Festo P.BE-CPV-DI02-EN en 1201a

    NoteThe following example makes clear that with the toolchange configuration you must be very careful, especiallyin using the input and output addresses.

    Explanation of theexample

    In configuration1 in Tab. 2/8 a lamp is connected to the2nd. output module as a signal generator. In configuration2 an actuator is connected to the 2nd. output module. Inboth cases address O23.7 is used.Take into account in the controller that the lamp now lies ataddress O25.7 and an actuator at O23.7.

    Tool change configuration DPidentifiers

    Assignedaddresses

    O22.0…O22.7 O23.0…O23.7

    O22.0…O22.7 O23.0…O23.7 O24.0…O24.7 O25.0…O25.7

    O20.0…O21.7

    Addresses used

    1

    O23.7

    O23.7 O25.7

    2

    16DO 1) O20.0 … O21.7

    32DX I20.0 … I23.7

    O22.0 … O25.7

    1 CPV-DI02 + 2x CP-A08-M12-CL2 CPV-DI02 + 4x CP-A08-M12-CL1) CPV-DI02 Basic device

    Tab. 2/8: Example of a tool change configuration which requires special attention withthe addressing (see text above)

  • 2. Commissioning CPV-DI02 (PROFIBUS-DP)

    2-22 Festo P.BE-CPV-DI02-EN en 1201a

  • Diagnosis CPV-DI02 (PROFIBUS-DP)

    3-1Festo P.BE-CPV-DI02-EN en 1201a

    Chapter 3

    Diagnosis CPV-DI02 (PROFIBUS-DP)

  • 3. Diagnosis CPV-DI02 (PROFIBUS-DP)

    3-2 Festo P.BE-CPV-DI02-EN en 1201a

    Contents

    3. Diagnosis CPV-DI02 (PROFIBUS-DP) 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1 Diagnosis via LEDs 3-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1.1 Normal operating status 3-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1.2 Fault diagnosis with the LEDs 3-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.1.3 LEDs for status display of the valve solenoid coils 3-8. . . . . . . . . . . . .

    3.2 Diagnosis via PROFIBUS-DP 3-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.1 Diagnostic words 3-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.2 Diagnosis steps 3-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.3 Overview of the diagnostic bytes 3-12. . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.2.4 Details for standard diagnostic information 3-13. . . . . . . . . . . . . . . . . .

    3.2.5 Diagnosis with tool change configuration 3-19. . . . . . . . . . . . . . . . . . . .

    3.3 Fault treatment 3-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.3.1 Siemens SIMATIC S7 3-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4 Online diagnosis with STEP 7 3-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4.1 Read out diagnostic buffer with STEP 7 (up to V 5.2) 3-23. . . . . . . . . . .

    3.4.2 Device-related diagnosis with STEP 7 (up to V 5.2) 3-25. . . . . . . . . . . .

    3.5 Short circuit/overload 3-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.5.1 Output module 3-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.5.2 Sensor supply on one input module 3-28. . . . . . . . . . . . . . . . . . . . . . . .

  • 3. Diagnosis CPV-DI02 (PROFIBUS-DP)

    3-3Festo P.BE-CPV-DI02-EN en 1201a

    3.1 Diagnosis via LEDs

    The LEDs on the cover indicate the operating status of theCPV Direct.

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    12

    14

    1

    2

    3

    1 LED PS: “Power System”: Operating voltage supply for the electronics andsensors

    LED PL: “Power Load”: Load voltage supply for valves (and valves/outputsin the CP extension string)

    2 LED BF: Bus fault/statusLEDP: Other fault messages

    3 Yellow LEDs for pilot solenoids 12 and 14

    Fig. 3/1: LEDs on the CPV Direct

    3.1.1 Normal operating status

    Only the green Power LED and the yellow LEDs of the pilot

    solenoids light up in the normal operating status.

    lights up; flashes; off

  • 3. Diagnosis CPV-DI02 (PROFIBUS-DP)

    3-4 Festo P.BE-CPV-DI02-EN en 1201a

    LED Colour Operating status Fault treatment

    PS greenlights up

    Power supply for the electronics/sensors OK

    PL greenlights up

    Power supply for the valves/outputs OK

    BF off No bus fault –

    P off No other fault –

    Tab. 3/1: Normal operating status

    3.1.2 Fault diagnosis with the LEDs

    Fault diagnosis with the LED PS

    The green LED PS (“Power System”) indicates faults in theoperating voltage supply.

    LED Colour Operating status Fault treatment

    PS off Operating voltage for electronicsnot applied

    • Check operating voltage supply(pin 1)

    PS greenflashes slowly

    Operating voltage for theelectronics . 18 V

    PS greenlights up

    Operating voltage for theelectronics is applied

    Tab. 3/2: Fault diagnosis with the green LED PS

  • 3. Diagnosis CPV-DI02 (PROFIBUS-DP)

    3-5Festo P.BE-CPV-DI02-EN en 1201a

    Fault diagnosis with the LED PL

    The green LED PL (“Power Load”) indicates faults in the loadvoltage supply.

    LED Colour Operating status Fault treatment

    PL off Load voltage for valves/outputsnot applied

    • Check load voltage supply(pin 2)

    PL greenflashes fast

    Load voltage of CP valves of theCPV Direct . 20.4 V

    PL greenflashes slowly

    Load voltage of the CP valves/outputs in the CPI extension string. 20.4 V

    • Check load voltage supply ofthe CPI extension string (pin 2)

    PL greenlights up

    Load voltage for CP valves/outputs is applied

    Tab. 3/3: Fault diagnosis with the green LED PL

    Load voltage faults are always displayed with the LED PL(irrespective of the diagnostic mode set).

    If the device-related diagnosis is activated, faults will also besent to the master PLC via the field bus.

  • 3. Dia